E-Test Issues

Hi,
Iam using the e-TEST 8.20 version for testing our web based application. Iam facing some issues while palying back the recorded scripts. the errors are like Navigation failed, Times out..etc. The tool is not specifying detalied cause for the error. May be i need to change some settings, i don't know. What i observed was the errors are not the same each and every time you palyback the script. Sometimes one particular button is not clicked and sometimes some textfield failed due to not filling with values. I had used QTP earlier and was able to see the root cause for why the object is failing. May be because of this tool is working on HTTP level recording, i'm not able to see why the script is failing. Please help me if you have any suggestions/ Comments on this. Thanks in advance.

A Navigation failed usually occurs because eTester cannot find a object in the page that it needs to interact with in order to progress. For example, it may be that a link is not there or it cannot be located. Look on the page before the Navigation failed error occurs and you can look at the events in the Address Properties node - you may need to use the objects index as the location mechanism.
Jamie

Similar Messages

  • EM Testing issue - urgent

    I have been using jdev 11.1.1.2.
    My EJB service running on dev server which has couple of methods. All the methods have been successfully tested in ejb.
    I have created a SOA application.
    In the composite.xml added two webservice adaptor and one mediator. In the mplan I have mapped routing rules.
    Wired exposed services to mediator and mediator to external references.
    I can able to test successfully (EM) all the methods except one method.
    I opened the recent instances the flow trace shows, service -> completed & mediator component -> running. It never finished running. Always in running state. Why? I could not able to test the particular method.
    For other methods, it shows mediator component -> completed.
    I have no clue how to fix this issue. Thank you.

    Puthanampatti,
    You'll probably have more luck on the SOA Suite forum.
    John

  • Ajax Testing issue with e-Tester

    I'm new to using Empirix and we are using it to work with a new site that uses Ajax. I have recorded the script fine but there is an issue with the Link that needs to be clicked on that it will either always change or the index will change. I've tried to use a wild card after the number in the link that always stays the same but when I run the tests it always shows "Used secondary attribute 'index' ". Is there a way to get this to stop showing every time or get it to always use this attribute?
    Thanks,

    Hi,
    <br>There are two different issues here:
    <ol style="margin-top:0px;">
    <li> The link that will be clicked will always change or the index will change.
    <li> e-Tester is always using the secondary attribute "index"
    </ol>
    Let me issue #2 first since its easier to explain.
    <h2 style="color:navy"> e-Tester is always using the secondary attribute "index"</h2>
    <h2 style="color:navy">* For scripts that are not created yet:</h2>
    In order to change the order that e-Tester records the use of attributes you can go to:
    <br> <font style='color:navy'>e-Tester &raquo; Options &raquo; Current Script</font>
    <br> Then on the left side of the Current Script Options window go to:
    <br> <font style='color:navy'>Recording &raquo; Object Identification</font>
    <br>The following image presents how the screen looks like:
    <br><img src="http://qazone.empirix.com/servlet/JiveServlet/download/25-518-1621-527/upanddown.jpg">
    <br>
    Notice the bottons with arrows that are on the right side of the window. Use those to determine which attribute should be used first when recording the script.
    <h2 style="color:navy">* For existing scripts:</h2>
    Go to the page where resides the action of clicking the script, expand the page, <font style='color:navy'>right click on the Address Node</font> and select properties(a new window will appear), double click on the action that is making the click to the link (a new window called Event Properties will appear). In this new window click on the Attributes tab. The following image presents how the Event Properties window looks like:
    <br><img src="http://qazone.empirix.com/servlet/JiveServlet/download/25-518-1621-528/upanddownattributestab.jpg">
    <br>Notice the bottons with arrows that are on the right side of the window. Use those to determine which attribute should be used first when playing back the script.
    <br><br>I will create another post in order to answer the other issue. I need to organize my ideas.
    <br><br>Regards,
    <br>Zuriel

  • Testing issue

    Hey, I was installing gnome-network-manager from testing, and I may have stumbled upon a slight glitch, it seems that many of the files (all relating to dhclient files) are already on the system. I belive this has to do with the dhcp/dhclient packages (not sure which one, I will check when I get home) and the dhcdbd package conflicting. I will look into this further when I get home. I tried to file a bugreport, or at least sign up so that I could file a bug report if it became obvious that it was a bug (I am not sure that it is, all that is needed is that dhcp/dhclient may need to be added as a conflicting package.) In any case I just wanted to post to see if anyone else was having this problem, and to find out how to subscribe to file for Bugs.

    Hi,
    <br>There are two different issues here:
    <ol style="margin-top:0px;">
    <li> The link that will be clicked will always change or the index will change.
    <li> e-Tester is always using the secondary attribute "index"
    </ol>
    Let me issue #2 first since its easier to explain.
    <h2 style="color:navy"> e-Tester is always using the secondary attribute "index"</h2>
    <h2 style="color:navy">* For scripts that are not created yet:</h2>
    In order to change the order that e-Tester records the use of attributes you can go to:
    <br> <font style='color:navy'>e-Tester &raquo; Options &raquo; Current Script</font>
    <br> Then on the left side of the Current Script Options window go to:
    <br> <font style='color:navy'>Recording &raquo; Object Identification</font>
    <br>The following image presents how the screen looks like:
    <br><img src="http://qazone.empirix.com/servlet/JiveServlet/download/25-518-1621-527/upanddown.jpg">
    <br>
    Notice the bottons with arrows that are on the right side of the window. Use those to determine which attribute should be used first when recording the script.
    <h2 style="color:navy">* For existing scripts:</h2>
    Go to the page where resides the action of clicking the script, expand the page, <font style='color:navy'>right click on the Address Node</font> and select properties(a new window will appear), double click on the action that is making the click to the link (a new window called Event Properties will appear). In this new window click on the Attributes tab. The following image presents how the Event Properties window looks like:
    <br><img src="http://qazone.empirix.com/servlet/JiveServlet/download/25-518-1621-528/upanddownattributestab.jpg">
    <br>Notice the bottons with arrows that are on the right side of the window. Use those to determine which attribute should be used first when playing back the script.
    <br><br>I will create another post in order to answer the other issue. I need to organize my ideas.
    <br><br>Regards,
    <br>Zuriel

  • Captivate 5 SCORM 2004 3rd Edition ADL Testing Issues

    I have published a project from Adobe Captivate 5 and am currently trying to get it through the Advanced Distributed Learning (ADL) Sharable Content Object Reference Model (SCORM) 2004 3rd Edition Conformance Test Suite. I was able to pass the first part: the Content Package Conformance Test and solve the initial errors I was experiencing. However, I now have a new set of errors relating to the Sharable Content Object (SCO) Run-Time Environment (RTE) Conformance Utility Test. It appears that they all stem from:
    ERROR: The Terminate() method was never successfully called.
    Here is the detailed SCO test log:
    Attempting to Launch SCO C:\Documents and Settings\Administrator\Desktop\offender_transportation6\offender_transportation.html
    Commit("") has been called
    ERROR: The Communication Session is NOT initialized
    ERROR: The SCO called the API methods out of order
    ERROR: Commit Before Initialization
    Terminate("") has been called
    ERROR: The Communication Session is NOT initialized
    ERROR: An invalid Terminate() call was made
    ERROR: The SCO called the API methods out of order
    ERROR: Termination Before Initialization
    ERROR: The Terminate() method was never successfully called
    ERROR: The SCO is SCO RTE 1.0 Non-conformant
    The project is currently set to issue a completion status to the LMS after 22 slides have been viewed. Then the project should output the Quiz Results and Slide Views to the LMS. For Project End Options I have tried both: Stop Project and End Project. I haven't been able to find any other settings in Adobe Captivate that relate to this Terminate problem.
    Can anyone give me some insight into what could be causing this error?

    As I tested, Captivate really cannot support 3rd Edition.
    I'm not sure what's the differences between 2nd and 3rd
    Edition, but I found that Articulate's '09 series (
    http://www.articulate.com/products/quizmaker-publishing.php)
    outputs these two editions separately.
    I hope Capative could update the module to treat 3rd
    specially.
    William Peterson
    eLearning Master
    http://www.sameshow.com/blog/

  • BT Speed Tester Issue

    I often use the BTW Performance test to see what my BT Profile is.
    My PC is running Windows 8.1 Pro with IE11 and my laptop is running Windows 7 Pro with IE 11. (and FireFox 30).
    Both machines have the latest version of Adobe Flash Player (both the IE and Firefox versions) and Sun Java installed. All the Microsoft updates are also installed.
    I have recently upgraded from Infinity 1 to Infinity 2. (Past the 10 days since upgrade).
    I can run the 1st part of the speed tester with no problems, but when I run the further diagnostics, it starts running then each time it displays the same error message "Your speed test has completed and the results are shown above, however during the test an error occurred while trying to retrieve additional details regarding your service. As a result we are unable to determine if the speed you received during the test is acceptable for your service. Please re-run the test if you require this additional information. "
     If I re-run the test I still get the same error message. - Both IE and FF give the same error message.
    Is this website faulty ?
    I have tried the usual Browser fixes of trusting the website and running it in Compatability Mode, but the same error exists.
    Both my machines are running as a 'standard user', that is locked down with no Admin Rights.
    Any one else having the same issues, or is the site faulty ?

    This is normally a site problem and often happens. Continually trying will usually get the site to work
    If you like a post, or want to say thanks for a helpful answer, please click on the Ratings star on the left-hand side of the post.
    If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Cache Connectivity Test Issue..:-)

    Hi XI Guru's ,
    Currently i am working on a scenario JDBC-RFC-JDBC scenario using a BPM.
    Issues i am facing....
    1. I have made the polling interval from source table to 10 secs, but i can see table is not getting polled in 10 secs.
    2. On running Cache Connectivity Test I found that It is not working perfectly : as i can see yellow and red symbols frequently..
    3. Sometimes when XI is able to pick the  record it is throwing error in Mapping Runtime
    "Runtime Exception during application Java mapping com/sap/xi/tf/_MM_REQ_"..
    I checked n no of times in Test Mapping it is working fine...
    Mapping is between Async Req Object with  RFC's import parameters...on drilling down further i figured out that values are not getting passed to this RFC ...as when i passed the constant values to RFC it is working fine...
    So i am not sure where the the problem ?
    <b>Currently i am working on PI 7.0 and SP 9.0 ...ans also we are not using FQDN now...</b>.

    Hi Santhosh ,
    <i>
                  on drilling down further i figured out that values are not getting passed to this RFC ...as when i passed the constant values to RFC it is working fine...</i>
    <i>On passing the constant values in mapping to RFC the scenario is moving smoothly its only the record being picked by JDBC sender adapter not getting passed to RFC through BPM....</i>
                          Yes. You are having  issue at  Mapping (desing )  side . So,  Even if your JDBC Sender picks up the data it won't send to RFC.  Obsolutly, your  constant value passed to RFC will woks fine .
                       So, Have you tested like what i have suggested  , like copying the Payload and test the mapping ?
                          If you are getting the java.lang.NullPointerException . I am 100% sure your mapping is wrong .  Please chek the MAPPING ONCE AGAING !
                     Are you getting the Target message structure when you are passing the source etructure ?  Executed successfully Message ?
                      Please chek the Mapping once again . Test teh Interface Mapping too.
    Assing points if you found helpful
    Regards.,
    V.Rangarajan

  • HANA XS - How to fix Inactive Testing issue of items not loading (when using the cookie)

    Is anyone else having issues with the inactive testing using the cookie (sapXsDevWorkspace)?  My team has abandoned using it because it is causing us a lot of trouble.  It initially worked well for a few hours, but eventually it stopped loading resources.  We got errors loading the SAP js libs or even the newly commited ( but not activated) code changes.  
    I have seen the feedback on SCN post http://scn.sap.com/thread/3517042 but we cannot seem to fix the issue of the system not loading things.  I am on version SPS7 (1.00.70.00.386119) on AWS and I have seen it work for a short period then it seems to get flaky and stop working.   I don't understand what is causing the error to occur as I cannot make it do the same thing twice. 
    Here are some screenshots:
    Cookie defined in Chrome
    Repository Name with my user:
    This is the result:
    Sometimes it loads more of the files and fails later:
    I verified that I logged in under the same user and the cookie name.  The system has developer_mode set to true.  Is there something we're missing? 
    Jim Giffin.

    Hi Jim, Hi Matthias
    we are facing the exact same problem with our project.
    Jim, we had the same phenomenon that it worked for 1-2 reloads and then stopped at all.
    After looking into it, I figured out, that the browser was using cached files from all resources except from the "inactive" new files, which we could access with the cookie. This made it work, however, when we refreshed again, the browser eventually removed its cache and tried to load inactive versions from files that didn't had any.
    We ended up in empty responses (no content, no headers)
    We are really looking forward to find some answers here, as it constantly causes trouble to work with multiple developers on the same activated code base.
    Any input or suggestions are appreciated.
    Best Regards,
    Axel

  • Catalyst 3560 PoE Port ASIC Port Loopback Test Issue

    Hi,
    We have a switchports issue in this specific switch, wherein some switchports cannot be
    turned on.  Whenever we try to perform a (shut/no shut) on the interface, it shows this
    message:
    Fa0/1 can't be brought up because it failed POST in loopback test
    We also tried to 'reload' this switch, but still those switchports remains down. When we
    transfer a device from a defective switchport to a working switchport, the device is working
    fine.  Thus, the phsyical connection or host set-up is OK.
    Here's the output from "sh post" command:
    Stored system POST messages:
    Switch 1
    POST: CPU MIC register Tests : Begin
    POST: CPU MIC register Tests : End, Status Passed
    POST: PortASIC Memory Tests : Begin
    POST: PortASIC Memory Tests : End, Status Passed
    POST: CPU MIC PortASIC interface Loopback Tests : Begin
    POST: CPU MIC PortASIC interface Loopback Tests : End, Status Passed
    POST: PortASIC RingLoopback Tests : Begin
    POST: PortASIC RingLoopback Tests : End, Status Passed
    POST: Inline Power Controller Tests : Begin
    POST: Inline Power Controller Tests : End, Status Passed
    POST: PortASIC CAM Subsystem Tests : Begin
    POST: PortASIC CAM Subsystem Tests : End, Status Passed
    POST: PortASIC Port Loopback Tests : Begin
    POST: Failed PortMacLoopback Packet Receive asic_index 1 port_hardware_index 2
    POST: Failed PortMacLoopback Packet Receive asic_index 1 port_hardware_index 3
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 2
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 3
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 4
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 5
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 10
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 11
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 12
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 13
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 18
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 19
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 20
    POST: Failed PortPhiLoopback Packet Test asic_index 1 port_hardware_index 21
    POST: PortASIC Port Loopback Tests : End, Status Passed
    Thanks in advance for your replies.
    Brgds,

    /* Style Definitions */
    table.MsoNormalTable
    {mso-style-name:"Table Normal";
    mso-tstyle-rowband-size:0;
    mso-tstyle-colband-size:0;
    mso-style-noshow:yes;
    mso-style-parent:"";
    mso-padding-alt:0in 5.4pt 0in 5.4pt;
    mso-para-margin:0in;
    mso-para-margin-bottom:.0001pt;
    mso-pagination:widow-orphan;
    font-size:10.0pt;
    font-family:"Times New Roman";
    mso-fareast-font-family:"Times New Roman";
    mso-ansi-language:#0400;
    mso-fareast-language:#0400;
    mso-bidi-language:#0400;}
    This is the wrong forum to post to for this issue but I can still give you insight. Basically when the switch is booting it's going through Power On Self Test (POST). The failures you're seeing basically mean this section of switch ports which are connected to an ASIC are not functional and or have failed. This is a physical hardware problem and can not be resolved. At this point you'll need to open up a TAC case for RMA.

  • Re: Testing issues

    Hello Neil,
    Well, why don't you use different repositories for testing your
    packages. First, you make a delivery workspace in your development
    repository and export it in a referentiel/versionning directory.
    After, you import your workspace into the test repository.
    For the suppliers, you can do the same if you want to manage
    different releases between packages.
    If you are talking about integration testing, there is no way to
    manage versions in the repository and managing it by workspaces is very
    dangerous, also for your developement repository (space side effects
    for example, or workspaces which can stay far from the base line).
    All this can be managed by scripts and so be a little automated.
    When a correction is made, it should be in the developement repository
    and delivered with a new release of the package (it can be several
    projects).
    I do this way from 2 years in Forte and more than 6 years in other
    languages with no problem and real seperation between integration,
    performance testing and developement. Just remember that during your
    integration testing programmers continue to develop.
    Last thing : all this can be done in the same environment and your
    testing or integration reposiroties can be local.
    Hope this helps.
    Daniel Nguyen
    Freelance Forte Consulting.
    Neil Gendzwill wrote:
    >
    We're in the middle of our first big Forte project and the issue has
    arisen for package testing. By "package" we mean a collection of classes
    which provide some function or service or just logically belong together.
    If package X is under test and needs package Y, X's tester often
    cannot use the real Y. He will need to stub out Y in places to provide
    the inputs his test needs, or perhaps development on Y is incomplete and
    there are compile errors or missing pieces.
    How is this done with Forte? Does anyone have a good testing strategy?
    If this were C++, we could just link with the stubs rather than the real
    deal. But because of the repository, we're forced to copy things back and
    forth from plans to avoid linking with the real classes.
    So far, we've come up with the idea of creating a test plan and then
    taking copies of everything needed. But that's kind of ugly: for one
    thing, you need to keep making your changes in the original plan and
    importing them into the test plan, because if you do it the other way
    around you tend to break inheritance (at least, at the class level - I
    suppose you could copy individual changed methods). Another idea is to
    make copies of all of our plans which hold versions of the classes, then
    have them supply the test plan rather than the normal plans. That way
    people can share stubs. If there's some common, elegant way to do this
    I'd like to hear about it.
    ========================================================================
    Neil Gendzwill, Senior Software Engineer, SED Systems, Saskatoon, Canada
    E-MAIL: [email protected] PHONE: (306) 933-1571 FAX: (306) 933-1486

              "Brian Mitchell" <[email protected]> wrote:
              >
              >Lionel <[email protected]> wrote:
              >>Are we doing something incorrectly?
              >
              >Lionel,
              >
              >Have you attempted to view the JNDI tree of Managed Servers from Admin
              >console?
              Yes, and the War deployment doesn't show up on the managed server JNDI trees.
              However the application shows as having been successfully deployed.
              > Which protocol being used to access the PROVIDER_URL? (t3, t3s, etc.)
              >
              >
              I've tried both t3://orionCluster:7001 and t3://beaServerA:5001,beaServerB:5003
              (same IPAddress, different ports), with no luck.
              >Brian J. Mitchell
              >Systems Administrator, TRX
              >email: [email protected]
              >
              >----------------------------------------------------------------------
              >PGP key: http://pgp.mit.edu:11371/pks/lookup?op=get&search=0x8BEE2240
              >Fingerprint: 3A84 A5D6 EE26 BC10 E525 1905 6FF0 0B6F 8BEE 2240
              >----------------------------------------------------------------------
              >
              

  • WiSM Design and Testing Issues / Questions / Queries etc......

    Hi all. Heres hoping you can help........
    I hope you can grasp the following description of the test network I have. I admit a diagram would have been better but it's hard to send a whiteboard over the web : )
    I am currently in the process of designing and testing out a wireless solution and am having a few issues / queries. I have a 6509 with a Wireless Services Module (WiSM) installed in slot 3, one Cisco 1240 AP on a remote LAN and a DHCP server on a remote LAN (not the same as the AP)
    I am using LAG on controller 1 with port channel 1 and native VLAN 20.
    VLAN 20 is 10.1.1.0 / 24
    The management interface has IP address of 10.1.1.10
    The AP-manager interface has IP address of 10.1.1.11
    VLAN 11 is 128.88.1.0 / 24
    The service port has IP address of 128.88.1.10
    The Cisco 1240 AP on the remote LAN is picking up a IP address via DHCP (from a remote DHCP server) OK and can route to both the aforementioned VLANs 20 and 11.
    Issue/Question 1
    I can ping the management interface locally on the 6509 and also remotely from the AP so all looks OK there however I cannot ping the AP-manager locally or remotely.
    Is this expected behaviour? I would expect that if I can ping one I should be able to ping the other or is the AP-manager interface not routed and only used in some way to create the LWAPP tunnel>
    Issue/Question 2
    As previously stated the AP is picking up and IP address but it is not being passed the Option 43 parameter from the DHCP server (not yet ruled out the DHCP server as the cause of this). Due to this I have amended the DNS entry of the management interface (10.1.1.10) to CISCO-LWAPP-CONTROLLER as a last resort. With a console on the AP I can see that the AP tries to join by the "%LWAPP-5-CHANGED: LWAPP changed state to JOIN" output but then get;
    LWAPP_CLIENT_ERROR_DEBUG: spamHandleJoinTimer: Did not recieve the Join response
    LWAPP_CLIENT_ERROR_DEBUG: No more AP manager IP addresses remain.
    Is this related to the fact that I cannot see the AP-Manager interface on the network?
    Issue/Question 3
    I have chosen to hard code the IP address of the Service port rather than leave it to DHCP. I am more comfortable having static addresses for management. However, there is no option for a default gateway for the service port.... If I try to get round this by applying a static route via the CLI on the WiSM controller to point traffic out via 128.88.1.1 on VLAN 11 this seemingly overrides all routing on the controller and causes my management interface (10.1.1.10) to fall off the network. Is the routing table applied "en masse" to the Controller? If so this surely means that to use the Service Port you have to be on the local LAN segement?!?!
    Thanks for reading my ramble and heres hoping you can shed some light on my "niggles" !

    Hi
    I am having exactly the same problem.
    Getting the same error message "No more AP manager IP addresses remain."
    I'm deploying 200 AP's that will connect to 2x WiSM (4 controllers) in 2 seperate C6k Chassis
    (Controller 1a & 1b = wism 1, 2a & 2b = wism 2)
    I have had 1 out of the first 5 AP's physically connected, come online and register with Controller 2b (btw: this was not the master controller, it should not have registed with 2b). All others fail with the same error message as above.
    I have all Management and AP-Manager interfaces in the same vlan/subnet as my AP's.
    I place a console cable onto the failed APs and see the AP cycle though the motions of trying to find the controllers, download new software code from a random controller, then it reboots, gets DHCP assigned, then get the "No more AP manager ip addresses remain" and then issues a "Reload requested by LWAPP CLIENT.
    Then the AP does the whole cycle all over again.
    Not sure why the AP's don't register with the controllers when they are all in the same vlan.
    I have a couple of extra questions.
    1. what address do you bind to the dns entry cisco-lwapp-controller.localdomain, is it the management address or AP-Manager address ?
    I have bound it to the Management address for WiSM 1a.
    Also I have 4x controllers (2x WiSMs, 2 controllers per WiSM). Do I just bind controller 1a's address or do I have to put 4x DNS entries into my DNS server for all my controllers?
    2. DHCP option 43, Do I place all 4x management ip addresses in the option or do I put in the AP-Manager Ip address?
    I followed this guide but was still a little unsure http://www.cisco.com/en/US/products/hw/wireless/ps430/prod_technical_reference09186a00804fc3dc.html#wp125304
    2. This final question is more around Dynamic Interfaces for my 4 controllers once I get the AP's resisted,
    Do I have to set up a dynamic interface ip address on every controller?
    e.g.
    Ssid = data, VLAN=10, VLAN10=10.0.0.0/24, I will bind AP's 1-8 to VLan group 10.
    Do I have to setup 1 dynamic interfaces per controller in the 10.0.0.0 subnet, taking up 4 addresses ?
    And if I only have to set up 1 or 2 dynamic interface, how does this work if the controller fails?
    Cheers

  • Network Manager Testing Issue

    Hi folks,
    I have a bit of an issue regarding Network Manager. It refuses to connect despite the appropriate modules being active for all my interfaces (eth0 wlan0). It goes through the motions of connecting and tries for ages then says "network disconnected".
    I am fairly certain that I have not done anything config wize (but I am open to suggestions) and this is only happening on my Gnome system (I am currently writing this on my XFCE Netbook). Has anyone had any issues re: the recent network manager upgrade on Gnome?
    Cheers,
    Scott
    P.S. Once people begin to reply, if this is not an issue with the Testing repo, could the mods move this to the appropriate forum so I am not misleading anyone looking for real testing repo issues.

    what version of networkmanager? -1 or -2?

  • OBRM 7.5 Pipeline on Linux testing issue

    We are getting the following error while trying to test Pipeline installlation through sample.reg
    bin/ifw: An error occurred during creation.
    Originator : ifw.Pipelines.TestPipeline.DataDescription
    Destination :
    Message : ERR_PARSE_DESCRIPTIONS
    Arguments : error `./formatDesc/Formats/Solution42/SOL42_V670_OutMap.dsc': line 391: ERROR: failed to parse the output mapping description file
    State : false
    Severity : CRITICAL
    Thread : 2182373440
    Could you please suggest where can be the issue.

    This is the database installation forum. Pl identify what exact Oracle software you are installing, along with a version number and OS details, so that this post can be moved to an appropriate forum
    HTH
    Srini

  • Webi XI 3.1 SP2 LOAD TESTING ISSUE WITH LOAD RUNNER

    Hello,
    We are launching a test campaign in order to test the Webi XI 3.1 SP2 (FP2.2) platform to validate it is capable to host 150 concurents users.
    The test is pretty simple:
    Logon to Infoview
    Navigate to the Document list page
    Make a search to find the adequate report
    Open this document
    Fill the prompts (doc is auto refresh)
    Wait for the results
    Logoff InfoView
    The problem is related to the tool with which we are scripting that is not able to run this script (Tool is Load Runner (ex Mercury)). In fact, we are able to capture the script correctly but when it is replayed, it crashes when displaying the document list page as it can't find the frame with the list of documents and the tree view...
    Do you know whether there are some specific settings to make it working correctely?
    For information, the Protocol used for our testing are:
    Web Click-&-Script
    HTTP-HTML
    AJAX

    I've used LoadRunner for this purpose before.  There is a tutorial that comes with the product.  My suggestion is to go through that and from there you should be able to get it working with enterprise.  I feel that's the best way to get up and running quickly.

  • OSB XSLT testing issue

    I am using the ALSB XQuery/XPath/XSLT Expression Testing functionality of the service bus console. However when I click execute I just get
    "Error executing the transformation: java.lang.NullPointerException" and no details. I looked at the log files at
    <domain_home>/servers/AdminServer/logs/ but I don't see any details.
    Any hints about what may be going wrong here ?

    Hi there, before going to the workmanager, can anyone explain about the socket listner? It seems like my socket listner is fully occupied when load comming in.
    Basically it seems like not releasing the socket. Can i know by defult how the socket works in WLS? I am lost, because from my understanding, each socket is base on one connection means when it reach the JMS it will ends the process and close the listner. Then when JMS proxy picking the message in the queue will perform one by one means consume the socket one by one.
    For e.g:
    1. JMS proxy pick up message>"one socket consumed">send to business service > wait for respone > respone return >"socket close"
    2. JMS proxy pick up message>"one socket consumed">send to business service > wait for respone > respone return >"socket close"
    so each time will used only one socket per transaction am i rite?
    and i received below message from the domain log
    ####<Jul 20, 2010 3:50:25 PM SGT> <Warning> <Socket> <selbgixb50ut002> <CGISOSB_MS1> <[ACTIVE] ExecuteThread: '21' for queue: 'weblogic.kernel.Default (self-tuning)'> <<WLS Kernel>> <> <> <1279612225183> <BEA-000449> <Closing socket as no data read from it during the configured idle timeout of 5 secs>
    ####<Jul 20, 2010 3:50:25 PM SGT> <Warning> <Socket> <selbgixb50ut002> <CGISOSB_MS1> <[ACTIVE] ExecuteThread: '21' for queue: 'weblogic.kernel.Default (self-tuning)'> <<WLS Kernel>> <> <> <1279612225183> <BEA-000449> <Closing socket as no data read from it during the configured idle timeout of 5 secs>
    I am really lost. Recommanded setting for basic Ascync process needed, and i am using the default connection factory, will this cause the problem?

Maybe you are looking for

  • How can I activate home sharing in itunes?

    I really need help on yhis one. I do have an wondows computer. Plz help!

  • BBC SNAFU

    I used to listen to a BBC widget on my PowerBook. Now I have a new iMac and the only sounds this widget makes are when turning the radio on and switching channels. The channels themselves do not play. Nor can I hear when I go directly to any radio st

  • Apple computer users

    Hi I am a flight attendant for United Airlines and can not access my company's software that is supported by Java from my apple computer as of today 2/1/2013. Apple has blocked Java on Macs due to vulnerabilities. Is there a fix for this? Help!!! Tha

  • IDVD 2008: disc ejects before done burning

    I have a 1.5 GB iDVD project that I want to burn on a 4.7 GB empty disc. I click burn, insert disc, but after it says about 11 minutes remaining, it ejects automatically. I inserted it in again, and when it got to "about one minute remaining," it wou

  • Can't repair or reset keychain

    Key chain is giving me lots of problems for many different programs. I have tried using Keychain First Aid. Verification fails, repairs fail. amd when I atempt to reset my default keychain I get thie error message CSSM_ERRCODE_INTERNAL_ERROR System i