EAM, Quality Management, Production Planning, Laboratory Management
Is there any forum with "EAM, Quality Management, Production Planning, Laboratory Management" discussions present in Oracle Website?
Check out the SCM Process Manufacturing discussion forum which you can find off of the E-Business Suite forum level. I think that's what you're looking for.
Here's a direct link...
SCM - Process Manufacturing (OPM)
Similar Messages
-
Production planning Business Transaction Events
Hi All,
Plz provide me with a list of Production Planning related Business Transaction Events.
Thanks & Regards,
Sudheer.Hi,
The following is the basic flow for production planning.
Step 1: Material Master
Logistics > Production > Master Data > Material Master > Material > Create General > Immediately
MM01
Step 2: BOM creation
Logistics > Production > Master Data > Bills of Material > Bills of Material > Material BOM > Create
CS01
Step 3: Work Center creation
Logistics > Production > Master Data > Work Center > ( New Screen ) Work Center > Create
CR01
Step 4: Route creation
Logistics > Production > Master Data > Routings > Routings > Routing > Create
CA01
Step 5: PIR Generation
Logistics> Production>production planning>demand management>PIR>CREATE
MD61
Step 6: MRP Run
Logistics>Materials Management>Material planning>MRP>MRP>Total Planning>Online
MD01 or
Logistics > Production > MRP > MRP > Sng-Item, Multi-Level
MD02
Step 7: Evaluation through MRP list and Stock requirement list
Logistics>Materials Management>Materials Planning>MRP>Evaluations>MRP List>Individual Display
MD05
Logistics>Materials Management>Materials Planning>MRP>Evaluations>Stock Requirements List
MD04
Step 8: Conversion of Planned order to Production order
Logistics > Production > Production control > Order > Create > With a planned order
CO40
OR
Logistics >Production > Production control >Order > Create >With material
CO01(For creating production order Without planned order)
Step 9: Order management
Logistics >Production > Production control >Order > Change >With material
CO02
Step10: Goods issue
1. Logistics >Production >Production Control >Environment >Goods Movement >Goods Issue
2. Logistics >Materials Management >Inventory Management >Goods Movement >Goods Issue
MB1A--261Movement type
Step11: Confirmations.
Logistics >Production >Production control >Confirmation >Enter >For order
CO15
or
Logistics >Production >Production control >Confirmation >Enter >For Operation >For time ticket
CO11N
Step12: Goods receipt
Logistics > Production > Production Order > Environment > Material Movement > Post Mat to Stock
OR
Logistics > Materials Management > Inventory Management > Goods Movement > Good Receipt > For Order
MB31
Step13: Techo Or Close Order.
This can be done from Prd. Order Header menue.
Complete transaction codes you will get in http://www.sap-img.com/sap-pp.htm
Apart from the listed these are also used in spro
1. Subject: Re: list of SPRO t-codes
2. Message: Define Resource Categroy OP40
3. Define Status Profiles BS02
4. Define Field Selection OPFA
5. Define Task List Usage OP45
6. Define Parameters OP7B
7. Define Standard Value Key OP19
8. Define Person Responsible SPRO
9. Define Sub Systems SPRO
Define Default Resource OP42
Define Transition Matrix OPG6
Define Control Keys OP00
Define Setup Type SPRO
Define Wage Group SPRO
Define Suitability SPRO
Define Shift Sequence OP4A
Define Period Pattern Key OP11
Regards,
R.brahmankar -
Configure & integrate the quality management with production planning
hi,
i know general flow of production planning ,
i dono how to configure & integrate the quality management with production planning . can anyone explain step by step to configure.
with regards,
ElanchiHi,
You must define an inspection type 03 and activate it for materail. When you create production order you will have the inspection lot created. you define type of inspection plan in inspection lot type. You will insert an operation in routing og the material. This operation must contain inspection characteristics. use the operation key QM04 with a quality work center.
Inspection process time will be assigned to your production order.
I think you can manage t customise the process from this global definition of the QM process in Production.
Best Regards,
Salih Arslan
SCM Functional Consultant
Zeitine Solution Partners -
SAP Product and Portfolio Management Upgrade(PPM)
HI Everyone, A warm reagrds! W e are planning to upgrade our current SAP Product and Portfolio Management 4.0 to 5.0.While doing the Upgrade analysis I have come across below these questions..Has anyone earlier in this forum have come across
1.What are the side effects of this upgrade on existing system?
2. We have 21 client environment on top of the 3 standard clients provided by SAP. What can be the best approach for upgrading the systems? Some of these clients are used by project teams for prototype development , how would the upgrade affect their working (they are not working on this package)?
3. Our team is working on this package in one of the client and have created scenarios in the system. What will be the effect of this upgrade ? (this question can be seen as an extension to question 1)
4. How much effort would be required to carry out this upgrade and what will be the down time for the system?
I have check the service market place and help.sap but at present not getting much info..
Thanks for your time to read.. Please help!1Hi,
it is an own separate NW AddOn, see SAP Note 1377104 (FAQs - SAP Portfolio and Project Management 5.0).
Kind regards,
Florian -
Securities in Cash Management (Product Type 16A)
Hello Experts
My client is investing in its subsidiaries and I am mapping this through the securities - product type 16A.
The process that I am following is -
TS01 (order)>>TS03>>TS04>>TPM28
The problem is that I can only see the impact of the transaction in the cash management FF7B only after the TPM28 trasanction and not TS01 or TS03 0r TS04 - this is required though.
I have done the configuration under -
Financial Supply Chain Management>>Treasury and Risk Management>>Transaction Manager>>General Settings>>Link to Cash Management>>Assign Planning Levels/Specify Update Types for Cash Management (SE1000 update type has been made relevant to CM)
Have also checked the config point Define Company Code-Dependent Settings for the Product Type (under securities node)
Please let me know if this is possible.
Regards
SandeepHi
Have been able to solves some bit of the problem (the FD orders are appearing in the cash forecase). However I am not clear about the interest due - will it appear anywhere in the forecast (or can ths system be configured to reflect the same in the liquidity forecast).
Similarly the bonds issued will have the payments due on account of interest (can this be brought under Liquidity)
I am using the BNK key should I use the PSK key for such items.
Aalso I was reading in the SAP training materila that the planning group can be specified in the BP master (verbatim below) but i could not fing out where in the BO master it may be.
The update to Cash Management distinguishes between two cases:
u2022 Option 1 (liquidity forecast):
If no payment details have been maintained in the transactions, that is, the
bank accounts are not known, the cash flow for a bank account or bank
clearing account cannot be displayed. To ensure that the cash flow appears
in Cash Management, the amount for subledger accounts is displayed. The
system then draws on the planning group specified in the master record for
the business partner.
u2022 Option 2 (cash position):
If payment details are specified in the transaction, that is, the bank accounts
are known, the cash flow appears in CM on the level assigned to the relevant
bank bank (clearing) account.
Thanks for your time and valuable input.
Best Compliments
Sandeep -
Configurable Products and Campaign Management
Hi All,
In our project we are going for configurable products. We plan to give campaign based discounts on these products in CRM.
Please let me know how to handle configurable products in Campaign Management.
Many thanks for your response:
KeshavHi Keshav,
I am currently working on setting up discounts related to a campaign. Would you have any information on how to do this? I know I need to select condition types from the discount tab. I guess I will have to create the conditon types in IMG. There are some condition types already exisitng that are being used by the pricing procedure for sales orders. Can i use the same condition types??
Any input would be highly welcome.
Thanks,
Deepak -
No products in Extension Manager
Hi,
i'm a user of the Adobe Photoshop CS 6 (13.1.2) based on the subscription service in Creative Cloud.
As you can see, my photoshop got the latest updates.
I wanted to install the Adobe Exchange panel and ran into a lot problems. It wasn't possible to install it over the extension manager (manifest error, because my photoshop is too "new").
When i wanted to give up i read on Facebook, that you can install the Panel over the Adobe Application Management.
So i did and was happy it's running finally.
Now when i want to install "Adobe Paper Texture Pro" for example, the panel downloads the file and starts to open the Extension Manager.
(The extension manager is up2date too, no updates available over Appl. Mnmgt).
The Manager opens and tries to install the extension. But then i always (with every extensions tried) got a message, that Photoshop 12.0 or 13.0 or higher is needed to install the extension.
Huh? My photoshop version is the latest version
The extension manager is not showing any products there. I reinstalled the extension Manager manually with the latest version of the adobe page, but this didn't help.
I'm using Windows 7.Have you ever moved or renamed the installation folder of PS and other products? Please run "Adobe ExtendScript Toolkit CS6" from Start Menu, input "BridgeTalk.__diagnostics__;" (Two underscores, not including double quotation mark) in the Source window then click "Debug"->"Run" or press F5. Check output in the Javascript Console window. Check whether "Path" of "photoshop-60.032" or "photoshop-60.064" are consistent with actual installation path.
-
I am looking for a way to go from the development (DEV) environment to the production (PRD) environment in a controlled manner.
As I do not want to manually click around with a walk-through screen-shots document = error prone.
As I read these articles
http://technet.microsoft.com/en-us/library/hh519659.aspx
http://blogs.technet.com/b/antoni/archive/2013/10/09/system-center-service-manager-operations-manager-management-pack-and-naming-convention-best-practices.aspx
http://blogs.technet.com/b/wincat/archive/2013/03/28/copying-user-roles-between-management-servers-in-service-manager-2012.aspx
http://www.netiviaconsulting.com/2012/05/10/staying-organized-with-scsm-beware-of-the-management-pack-jungle/
I still have some questions:
1. Can all MPs (un-sealed) be exported from DEV and imported to PRD without breaking things?
2. Are there any known pitfalls?
3. Do you have some tips on this matter? In other words, how do you manage this?
Regards,
ErikAlex is spot-on. Most MPs are environment/management group independent.
But some MPs contain what I call "Environment Specific Variables". In my experience, ESVs are in:
1) Templates (such as the runbook guids)
2) Criteria blocks (like view criteria, and rule criteria)
3) Parameters (such as write action parameters, and console task parameters)
Alex already gave an example of a template ESV.
An example of a Criteria ESV might be some view that you developed that returns objects that have a specific set of values in your dev environment, but may be different for your prod environment. ie: You have a view whose criteria looks afor a specific business
service ServiceId property. Let's say "Business Service X". But "Business Service X" has a different ServiceId in your dev environment than in your prod environment. So, every time you import your view MP from dev to prod, you have to remember to change your
criteria.
A quick Parameter ESV example; you have a notification subscription (a rule+writeaction). In Dev, you've hardcoded the notification recipient to be yourself. In Prod, the recipient has to be your boss. So, every time you import your MP from Dev to Prod,
you have to remember to change the recipient parameter in the subscription's writeaction.
Like Alex said, handling ESVs by hand is error-prone and time consuming.
Alex, when you write that utility, you should make it more robust. Within an MP, allow a user to pick and configure
any ESV. Store that configuration. Then, just run the MP through the utility and have it automatically set all the configured ESVs to the appropriate environment specific value :) (It's been something I've wanted to write into TFS for
a while, but I never take the time to do it ;) ) If an ESV is missing (because it was removed or changed in such a way that it no longer resembles the configured ESV), throw a warning during conversion. -
Product life cycle management in sap
Hi,
is there any prescribed material for product life cycle management (PLM) IN SAP? can anyone refer any institute name and where it is for learning SAP-PLM?Dear heeru
Go through the links
[Life cycle profile|http://help.sap.com/saphelp_46c/helpdata/en/08/2b2c8c50c711d3b478006094b9d648/frameset.htm]
[Configuration Definition|http://help.sap.com/saphelp_46c/helpdata/en/74/7b601ac80811d3b4bc006094b9d648/frameset.htm]
Thanks
G. Lakshmipathi -
Obsolete section in Talent Management Development Plan standard portal view
Hi all,
In Talent Management Development Plan standard portal view theres a section called "Obsolete" . In what conditions do development goals fall into that section?
Thanks for the help.Dear Luke,
Thank you for your reply.
All those Services were activated already. I just checked once. All fine.
We dont have any issues with other templates. All are working fine.
But at the time of saving Development Template in Config Define Process Periods and Groupings,we got an error message as below
Process DEVP cannot be grouped
Message no. HRTMC_TM_ASSESSMENT051"
Despite the error message the Development template still got saved. Is this an issue ?
Below is the Config screen shot.
Appreciate your support.
Kind regards
Sathya -
RFC Connection Problem between Production Server & Solution Manager
Hi,
I want to make a RFC Connection between Production Server & Solution Manager.
But when go through Tcode- SM59 and click on Remote Logon from Production to connect Solution Manager it showing me a Client/Userid/Password window and when i connect go through Solution Manger to Production Server it connects normally. I already done the same process in both the clients, as i already mentioned Logon details in the Logon/Security tab but why it is showing me Client/Userid/Password pad when i am login through Production to SolMan?
+Tell me where the actual problem is! In my Solution Manager end or in my Production Server end +
I want to access Solution Manager from Production Server on just clicking once on Remote Logon from Tcode- SM59.
Thank you.
Edited by: varun@pcl on Jul 31, 2010 4:40 PMHi
Mention which Client u login and valid username and password from both PROD Server and Solman .
https://websmp201.sap-ag.de/support under Solman manager .
https://websmp201.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000633637&
Regards -
Difference between Oracle GRC product and Identity management
Hi
I want to know the difference between Oracle GRC product and Oracle Identity and Access Management product. Also what I see that the features Acces manager is providing is also provided by the grc access control governor and transaction control governor. So why two different technology for same task.
RegardsAny answer.
regards -
Oracle Property Manager Product Family and UPK
Hi All,
We are looking for UPK's related to Oracle Property Manager.
Which "Product Family" does Oracle Property Manager belong to ?
Under which product family will i be able to find the UPK's realted to it ?
Regards,
Ajith MoniWe are looking for UPK's related to Oracle Property Manager.
Which "Product Family" does Oracle Property Manager belong to ?Assets and Real Estate which comes under "Financial Management".
EBS Property Manager Information Center [ID 1326216.1]
http://docs.oracle.com/cd/B53825_08/current/html/docset.html
Under which product family will i be able to find the UPK's realted to it ?UPK: Frequently Asked Questions on UPK Content [ID 1188328.1]
Oracle User Productivity Kit Documentation
http://www.oracle.com/technetwork/middleware/upk/documentation/index.html
Thanks,
Hussein -
Cash flow, treasury management, liquidity planning
Hello everyone,
I am currently looking for solutions related to cash flow, treasury management, liquidity planning etc.
Can anyone tell me where i can find information about Business Content for BI related to these topics?
I am especially looking for solutions that work with BI 7 and Integrated Planning!
Thanks, pwba...Hi,
Here is a good pdf using the TR functions
http://www.sap-hefte.de/download/dateien/1239/070_leseprobe.pdf
for the Treasury & Risk Management Bussiness, SAP BI offers few standard reports only for Cash Management
All the Standard reports are based on the DataSource 0TR_CM_1
these are the available Standard Reports based on the DataSource
http://help.sap.com/saphelp_nw70/helpdata/EN/0b/1861371712d829e10000009b38f842/frameset.htm
SAP have been trying to get us of the old R3 based TR module for a few years and use CFM.
http://help.sap.com/saphelp_nw70/helpdata/EN/51/13853c01c89d7ce10000000a11405a/frameset.htm
-Vikram -
I renewed my account Photography Creative Cloud plan (annual) Manage plan Plus my photoshop does not open.
Some general information for a Cloud subscription
Log out of your Cloud account... Restart your computer... Log in to your paid Cloud account
-Sign in help http://helpx.adobe.com/x-productkb/policy-pricing/account-password-sign-faq.html
-http://helpx.adobe.com/x-productkb/policy-pricing/activation-network-issues.html
-http://helpx.adobe.com/creative-suite/kb/trial--1-launch.html
Maybe you are looking for
-
Text Tools Greyed out Acrobat 9 Pro
I really need to do a quick fix on a PDF document. My text tools are greyed out. There are no security issues on the document. I put "never" in the PDF/A view Mode as per another person suggested when I googled. I can't get anything to work.
-
CSCsm71553 - BGP advertises prefix after network command is removed
Hello, I got a stack of core switches with the following components : Switch Ports Model SW Version SW Image 1 52 WS-C3750G-48PS 12.2(52)SE C3750-IPSERVICES-M * 2 52 WS-C3750V2-48PS 12.2(52)SE
-
Dropping frames, generally not playing. Please help, URGENT.
Hi, Sorry to anyone who's seen this question under a different category, but I have to do a presentation tomorrow and I'm freaking out that this doesn't work, I wasn't quite sure what program's fault it was. I have a .mov file that was encoded from F
-
Pls solve mystery about DVD quality
I've read lots of articles about the best settings and workflow for going from FCP-QT Pro-Compressor-DVDSP, and followed the advice. I've also learned why my HDV footage looks pretty bad when seen with my 50" plasma. Text is especially problematic, w
-
I get callfailed when i try to ring from my phone
i cannot ring from my phone or send sms i can bb message recieve and send i can bluetooth but i get call failed when i ring out also if i ring in it goes voicemail i have orange contract sim in phone and the network is fine i seem to have FND set upb