Early lot creation

Dear Gurus,
When working with early lot creation, with batch management activated, if I received a partial quantity from an order, it is posted normally to quality, then I make the UD for this lot and it is closed, then if I receive another quantity from the order, it goes unrestricted and do not create a new inspection lot !!!!
Is that normal or there is problem? If normal how can I overcome this?
Regards,
MaX

Dear it is standard procedure system is behaving correct only.
if you want every time stock you do GR for order stock should be posted to QI then in MM QM view keep inspection type control as "each order,batch and storage location" means for 1 order if production do multiple confirmation ( N times) system create only one inspection lot and all the confirmation stock updated to the same inspection lot.
Cheers
KK

Similar Messages

  • Quality lot creation

    Hi
    In production order.. 3 operation are there...generally when production order has done GR ... Inspection lot has created..
    but here i want inspection lot created..at the time of  2nd opearation conformed/released...(inspection lot creation automatically at operation level)...is it possible.. any one could  guide me .. about this  issue..
    regards
    sesidhar

    Hi,
    If you are talking about 03 type inspection then it is not generated at the time of GR (3rd operation) but it is generated at the time of Order Release.
    Now if you are talking about 04 (Receipt against production order) then in general this type of inspection lot is generated at the time of GR, but if you want to create this inspection lot earlier before Goods Receipt then you have option of early Lot creation.For this go to QM view of Material Master and in Inspcetion type view select Inspection type 04.
    And select option Y Early Lot creation at Control Inspection Lot.
    This will generates the inspection lot at the time of order release (not at specific Operation) along with 03 inspection lot.
    Regards,
    Dhaval

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

  • Inspection lot creation

    Dear Experts,
    Reqiurement as follow :
    We have four plant like 1000,1001,1002,1003,1004
    System creates inspection lot when we do GRN against in stock transfer PO when STO from
    1000 to 1004, 1001 to 1004, 1002 to 1004, 1003 to 1004, as we have activated inspection type 08,01 in MMR.
    My requirement is system should not create inspection lot when STO from 1003 to 1004 only.
    We can not deactivate inspection type as we need inspection lot when STO from other plant.
    Please help in this scenario.

    In QM, we can deactivate the quality for certain movement type.That means though QM is active in material master, if we are using any movement type for which QM is not active, it will not generate the inspection lot. For STO from plant 1003 to 1004, use the movement other 101 i.e copy of 101.
    Copy 101 movement say as 901.Using following path deactivate QM for this new movement type 901.
    SPRO - QM - Q. Insp - Insp lot creation - Insp for goods movement - Deactivate insp for movement type. Select the indicator "QM not active".
    Now use movement type 901 for STO from plant 1003 to 1004.
    Vishal Jonnalwar

  • Batch status at recurring insp lot creation

    We have setu recurring insp 09 for few materials. We use "insp stock at creation" option. So system work as expected and create lot and put stock in QI, but still batch status remain "unrestricted". Our req is at the time of lot creation it self system should set batch status as "restricted". How to setup it?
    When system setup "restricted" status for recurring batch? Help appreciated.

    check option
    Recurring Inspection: Block Batch at Lot Creation
    Specifies, that a batch is blocked, when the inspection lot is created, if the inspection date lies within the opening period.
    Use
    If you choose this option, batches are blocked, if their next inspection date lies within the opening period:
    If the batch status management is active in the corresponding plant, the batch status is changed to "restricted".
    If the batch status management is not active in the corresponding plant, the batch stocks are transferred to the blocked stock.
    If the batch status has changed or a transfer posting takes place, a new inspection lot is created for each storage location.
    If a relevant inspection lot already exists and the next inspection date has already been reached, the change of the batch status or the transfer posting also takes place

  • Change of Inspection Lot Specifications at the time of lot creation

    Hi,
    We are using In-process inspeciton.
    At the time of Production Order release an Inspection Lot is created automatically.
    We want the Lot Specification values to be changed based up on the Configuration of the Sales Order.
    Is there any User Exit or BADI  that can be used for this purpose?
    Ramakanth

    Hii,
    Lot specifcation values cannot be changed once inspection lot is created. If u know specification only after creation of inspection lot then u include unplanned inspection charcteristics. Here u can define spec after lot creation also.
    with regards,
    K.Lokesh.

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

Maybe you are looking for