Early warning

Hi
My client in Petroleum business they using contracts for Lease rental payments and now they require an email notification when the contract reaches at the maturity (Validity end date).
For this purpose I am trying with Early Watch alters by creating own info structure but it does not work on the Validity dates as these are not the Key Figures and the SAP system could not generate any evaluation structure.
Kindly help me out.
Regards,
Muhammad Tahir

Dear,
We got the same requirement two months ago.
I am not sure whether its suits your requirement or not.. but what I did, I created a query and make it a transaction code for that query. This query transaction run in background on specified intervals (considering buffer date ranges).
Buffer days = less than or equal to 60 days [days you can change as per your requirement]. Report to alert an email to specified email for contracts which going to expire within 60 days from today's system date.
End of Validity date will be greyed out - with display today's date + 60 days and Less than or equal to selection.
Other than this - selection fields are company code, vendor account number, purchase organization, purchasing group, purchasing document date.
Make this report automatically run in background every 15 days and send email to user if any contracts going to expire in period.
Try using a query with tables and main focus of end of validity period.
Regards,
Syed Hussain.

Similar Messages

  • Early warning system for inventory management,

    Dear Friends,
    I had an issue related to  early warning system for inventory management, i.e, if the stock goes below the specified level the system should trigger the mail.
    Pls. explain how to configure
    regards
    Suresh

    Solved

  • Early warning system for monitoring authorizations

    Hi,
    I have heard about a "system" that can monitor authorizations on the R/3 system called "Early Warning" (suposedly).  Is there any functionality fir this on Netweaver platform?  The client wants to recieve mail/SMS/notification if users are granted authorizations outside what is expected.  we do not want to create rules for this, as it should be allowed - but carefullt monitored.
    hope someone has a good idea.
    regards,
    bjorn

    Solved

  • Early warning for QM specs close to limits

    Hi Experts,
    I am currently trying to figure a way to get a notification of a quantitative characteristic getting close to specification limits so that the problem can be addressed before failures occur. Here is the scenario:
    pH is measured for each batch with spec 7.1-7.5. Each batch has one inspection lot.
    It has been noticed that when a batch fails this spec, the previous batches increase or decrease closer to the limits until a batch fails. To decrease batch failure, it is desirable to have a warning for when a batch reaches, for example 7.2 or 7.4. This batch would not fail the specs, but will give an early warning so that the process can be adjusted to avoid the failure of future batches.
    I have been looking at control charts, but we do not use a fixed batch size (which I believe is required) and this seems a little complicated for what we need.
    I have also toyed with the idea of an ABAP report that uses the additional pairs of limits in the quantitative view of the inspection plan to pick out which batches are outside these values and report them in a list so they can be investigated. Although I cannot see how I can get a warning out from this to notify users of the occurrence. I am familiar with Workflow, but cannot see where the trigger will come from as the spec will have passed.
    Although I think that the report would be useful for this, the users really want a warning without having to interrogate the system to find it.
    Kind regards
    Andrew

    I think you can acheive this functionality by using Early Warning System (R/3) or the Business Process Monitoring (BPM) - Sol.Manager.
    I dont have experince in implementing both of them, but we are exploring BPM for some of our shop floor threshold tirggers.
    Thanks,
    Ram

  • Exception value in early warning system.

    Dear all,
    We are using R/3 4.7. My user has a condition in which for every 10,000 numbers made as goods reciept from production (101) movement , system should trigger a mail to the respective user i.d. I tried to create this condition using early warning system. I could not define the condition i.e., every 10,000 numbers.
    There is possibility to provided >,<,= etc., but how to define the condition that for every 10,000 numbers system should trigger mail.
    Experts help and guidance expected.
    Regards,
    M.M

    There is no reply for this message hence marked as answered

  • Early warning system using S026 infostructure

    hi all
    I am trying to use Early Warning system in SAP and have created an exception ZFTEST using infostructure S026. My key figures are Quantity withdrawn and Requirement qty. When I am defining requirement I want to use a 'Plan/actual' analysis. When I go to define this it asks for a 'define a valid plan/actual' planning version for S026. Where do i define this version.
    Thanks a lot

    Hi John,
    Please check this online document perhaps it may help.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOLIS/LOLIS_FRÜHWARNSYSTEM.pdf
    Regards,
    Ferry Lianto

  • Early warning system - S226

    Hi all
    I am using the early warning system exception analysis tcode MCY1. I am using infostructure S226. I want to define requirements using plan/actual comparison method. I want to create a exception using 'withdrawl qty' and 'requirement qty'. The requirement definition asks for a planning version. where and how do I define a planning version?
    thanks a lot

    Hi John
    Planning version , from MD61 define version try to give wat ever version you haev given in your PIR
    Thanks
    Bala

  • FCV3 : Customer Credit Early Warning List : Config

    Dear Experts,
    I m making config for Customer Credit Early Warning List, which is displayed thru SAP Easy Access T-Code FCV3 to the users
    i referred to SAP Notes : 313200 & 439296 and did the config as follows in Customizing T-Code OBZJ :
    A.  Procedure Parameters for Credit Check :
          1.  checked on : Read A/R Summary
          2.  checked on : Read A/R Summary from an external system
          3.  checked on : Create A/R Summary
    B.  Procedure Parameters for DSO :
          1.  checked on : all children
          2.  checked on : current balance
          3.  number of months : 3
    when i execute T-Code FCV3, i m still not finding any output.
    Please help & guide, if i have missed any more config part.
    Edited by: Hussein  Merchant on Feb 11, 2010 1:31 PM

    You need to execute the program RFCMCRCV from transaction SE38 for creating the A/R summary so that you will be able to view report.
    Hope this will resolve.

  • Earthquake Early Warning (EEW)

    Hey clever people at Apple, here's an idea: Earthquake Early Warning (EEW) scheme.
    The system, operated by the Japan Meteorological Agency (JMA), ties together an extensive network of earthquake monitors on a high-speed network to provide data to a variety of users, including TV stations, manufacturers and cell phone operators. It provides warnings by measuring the primary waves (P-waves) from a quake, which are weak and fast-moving, to automatically predict when the slower and much more destructive secondary waves (S-waves) will arrive at a given location and how strong they will be.
    Japan's three major mobile phone carriers (NTT Docomo, au and SoftBank Mobile) have provided this service since 2007.
    It is mandatory for 3G cellular phones that were put on the market after 2007 to receive this service, though overseas manufacturers (Nokia, Apple, HTC, LG, Samsung, etc.) are not supported.
    The Japanese phones are as ugly as sin but the tech is way ahead.

    Thanks Tamara. I have sent this message to Apple. My cc to this forum was an attempt to make people understand that not all that glitters is gold.
    My phone was left with yet another dent in its ego on Friday.

  • Re: Early Warning Report

    Dear all,
    I have set exception using t-code MC/1 in the system for materials that I want the system to trigger a re-order point and send a early warning report to me the material numbers that require re-order when is low.
    However, I have been all along receiving 1 email for the list of materials for re-order everyday.
    But all of a sudden I have been receiving two separate emails everyday, which in one emails there is a list of materials that display the stock remaining for a list of materials that require re-ordering while the other report show another different list of materials with zero stocks remaining for a list of material numbers, which I have checked its availability in the system manually, and it is wrong (meaning there is stock remaining).
    Why is this happening? Did I entered a wrong characteristic?
    Pls help. Thanks

    Hi sami,
    Yes I would be pleased to share, but it is no SAP problem, but human error.
    The receipt of two copies of the same early warning report is due to the OS/DB migration.
    We changed the server and upgrade the system to ECC6. Our new Test server uses the old Production server as platform for migration of the database. As it contain background job still running, it is copied to the new Test server. Once testing is completed, the data is sync to the new Production server with the new OS and new server.
    Hence, both the new Test and new Production server contain background job that is still running and with the same variants. So, it makes sense that as the job is assigned to the distribution list that is automatically sent via the smtp, both the Test and Production server sent out the same report as scheduled.
    When we ceased all background jobs in the new Test server, the problem is resolved.
    Rgds.

  • Early Warning for 3rd party software issues

    We have Vertex set up but have occasional timing, connection issues, etc.
    Does anyone have configured an early warning configured for 3rd party software?
    Looking for solutions or suggestions.

    Why can't Apple have their own interface for Windows mobile applications instead of having to purchase Mark Space.
    Hang on... Why should Apple provide their own interface for syncing Microsoft Windows Mobile-based phones? Microsoft don't provide support for Apple's phones do they?
    Microsoft have chosen to use their own proprietary and incompatible syncing methods to sync their own operating systems. It stands to reason you'd be able to sync a Windows Mobile-based phone with a Windows desktop OS.
    why have I got to purchase third party Nova software to sync my N95 8GB
    You haven't got to. Nokia provides their own support via a free iSync Plugin for that phone here:
    http://europe.nokia.com/mac/isync/
    If you're having problems with that, then Nokia are the people to contact - not Apple. But from your other post it appears you're having problems with installing it, not using it, and that's most likely because you've moved iSync.

  • Early warning system, PM Module

    Dear Experts,
    Plz thrgh some light on Early warning system? Do send some config details if possible.
    Thanks in advance
    DM

    Deepak,
       EWS is basicaly a part of the logistics Information system, that would help you to send a email whenever your predefined parameters are reached. so that you dont have to keep monitoring them on a regular basis.
      Bascially the standrad functionality contains characteritic and values, that you could use to define your parameters. Then you would need to schedule this particular job to run on a  regular interval,say daily, weekly, monthly etc.
    Hope this intro helps.
    Thanks
    Narasimhan

  • Early warning flags or activities or milestones

    If I remember right, P3 was able to use flags which would give early warning. Does P6.2 have the same capability? I have several activities that require training 14 days in advance. How do I show an acitivity or milestone or flag (if it exist) that is tied to the activity and moves with the activity that will give me early warning of required training--without having any float days on the training Activity or milestone or flag?
    Your help is greatly appreciated
    Edited by: user12191762 on Nov 4, 2010 8:02 AM

    MKV,
    You are correct. Getting some type of automated symbol in your gantt chart is difficult without some leg work. About the only thing I could suggest is that you create a new layout or report just for that particular purpose.
    First of all, make sure that you have "training" acts in your schedule which are linked as pred's to your other act's.
    Filter only on those "training" acts then tag them with a unique code called "Training".
    Or....create a new P6 report (filtered on your "training" filter) that can be run "on demand" or employ the job service to run it automatically.
    Or.... mayabe employ the use of "Issues" on the main menu. Assign the threshold parameters than setup an automated email for notification?
    let me know how it turns out,

  • Anyone dealt with Early Warning Services? Can't get a bank account. Help!

    Hi Everyone, Apparently I was able to not only mess up my credit score but I also destroyed my ability to qualify for a bank account as well. I believe I overdrafted with Wells Fargo a couple years ago when I lost my job. Never thought or did anything about it and that account just seemed to disappear. Well now today I don't qualify for a bank account at Chase or any bank because something is reporting negatively on Early Warning Services. I haven't gotten the report yet -- it is a huge hassle to get and takes a couple weeks but it is on the way. So we all know how to get items removed from our credit report but how does one get negatives removed off their bank worthiness score? I don't want this to affect my ability to get credit cards in the future with BofA, Wells Fargo, or Chase when my scores are eventually high enough.

    Well I do have a secured card through a local credit union. but not a banking account. I have a bank account now but am about to move and there are no branches there. I did call Wells Fargo and pay off the amount owed from so many overdraft charges. They said they'd update Early Warning Systems. I just don't know if it's like a credit report where it stays on my record and hinders me for the next 7 years or if it's an immediate kind of thing?

  • Early Warning systems(URGENT)

    Dear Friends,
    I am configuring early warninf system for inventory management, i.e, if the stock goes below the specified level the system should trigger the mail.
    The problem is that I am not able to trigger maild to my users. Can anyone explain the process to trigger mails.
    Best regards,
    Arahanth

    Fico2014Guy wrote:
    Broke_Triathlete wrote:
    I have ordered both of these reports and I know (credit curiosity can verify) that BOA reports to EWS. They literally had a running log of my checking and savings accounts BY TRANSACTION. I could literally tell when my account got hacked. It's sickening. I didn't authorize that. I will never use BOA again because of that. You can't freeze EWS either...Wow! That is scary. I am glad I closed my accounts with BOA a long time ago. I am still on the fence about giving EWS my personal information in order to get my consumer report with them. I just don't feel comfortable giving them all of that stuff, especially hearing all of the bad stories about them on the web. In addition, they even said they require a consumer to mail or fax in a copy of their driver's license to them in order to get the report.It's sickening isn't it?? I'm glad I'm not with BOA anymore either.

Maybe you are looking for

  • Drum Loops Missing But Plays Fine? EXS24 Instrument "2-step remix.exs"

    Half of my drum loops play just great in the loop browser but when I drag them to the playhead I get the error message "EXS24 Instrument "2-step remix.exs" not found." and the same loop that just sounded great in the loop browser instantly morphs int

  • LSO - Follow-Up Course Participation

    Dear All, When following up a course in SAP LSO, I marked the course participation as 'absent' for ppl who did not turn up for the course. What happens in the system is that a cancellation will be triggered, thus this person will not be reflected in

  • Post installation Issue

    Hi: I have installed Application Express 3.2.1 on Oracle 10g running Oracle Application Server. Installation completes normally. I am using mod_plsql and have configured the dads.conf file correctly and have copied the images direcory. When I try to

  • Pre Amp Problems

    Hello, I recently purchased an M-Audio pre-amp and it is working perfectly with GarageBand but I'm having some problems with Logic when I open logic I go to the window: audio >hardware and drivers then I choose my pre-amp as the driver and then I ena

  • Slide Show Corruption

    I'm building my first iPhoto 09 slideshow, using the Sliding Panels theme. I've worked with previous versions of iPhoto, and am impressed with this theme, except ... In one particular spot in the the slideshow, I can't adjust the picture -- it always