ECC 6.0 IDES configuration of source system in BI 7.0

Recently I have installed the ECC 6.0 IDES version on my desktop it has both mySAP and BI on the same system. I tried to create new source system under SAP folder using RSA1 got the following message.
"No entry for BW_USER in table RSADMIN available"
ANY SUGGESTIONS/IDEAS ARE WELCOME
Thanks
Kannan

Hi Kannan,
To connect both systems you need a background user (like ALEREMOTE) in both systems.
In the source system creation, if you haven't created the RFC connection between BW and ECC you shouldn't select one (chek if DM0 is your ECC system), you should use the three fields below (app server, system ID and system number). Then enter both users and passwords (source system and local system).
In some moment you'll be prompted to log on to ECC, there you should use a DIALOG user, for example, your user. This user should have administrator rights (if you have SAP_ALL it's ok). ECC system should be open for modifications to be able to create the system.
If you still have problems with the users, just include SAP_ALL to both background users and should work.
Hope this clarifies.
Regards,
Diego

Similar Messages

  • Configuration of source system

    Hi all,
    I had a problem with the configuration of source system with bi 7.0 . i wanna know it is same as earlier. can any body help me plz. it urgent
    Thanks n regards
    KK

    Hi Kannan,
    To connect both systems you need a background user (like ALEREMOTE) in both systems.
    In the source system creation, if you haven't created the RFC connection between BW and ECC you shouldn't select one (chek if DM0 is your ECC system), you should use the three fields below (app server, system ID and system number). Then enter both users and passwords (source system and local system).
    In some moment you'll be prompted to log on to ECC, there you should use a DIALOG user, for example, your user. This user should have administrator rights (if you have SAP_ALL it's ok). ECC system should be open for modifications to be able to create the system.
    If you still have problems with the users, just include SAP_ALL to both background users and should work.
    Hope this clarifies.
    Regards,
    Diego

  • Error in ODI while configuring ERPi  Source system

    Hi All,
    Hyperion Version : Hyperion 11.1.2.1
    OS: windows 2008
    I'm getting the following Error in ODI while configuring ERPi Source system in workspace.
    "942 : 42000 : java.sql.SQLException: ORA-00942: table or view does not exist
    java.sql.SQLException: ORA-00942: table or view does not exist "
    can anyone guide how can achieve this. thanks in advance.
    Regards,
    Ravi

    Hi All,
    Please find the below error log from ERPi configurator [Workspace] and let me know further steps to solve this issue....
    ERPI Process Start, Process ID: 71
    ERPI Logging Level: DEBUG (5)
    ERPI Log File: C:\Windows\TEMP\2\/aif_71.log
    Jython Version: 2.1
    Java Platform: java1.4.2_08
    COMM Create Process Detail - Create Process Detail - START
    COMM Create Process Detail - Create Process Detail - END
    Error in Start PS HCM Setup Source System
    java.lang.Exception: The scenario did not end properly.
    at com.sunopsis.dwg.dbobj.SnpScen.a(SnpScen.java)
    at com.sunopsis.dwg.dbobj.SnpScen.localExecuteSync(SnpScen.java)
    at com.sunopsis.dwg.tools.StartScen.actionExecute(StartScen.java)
    at com.sunopsis.dwg.function.SnpsFunctionBaseRepositoryConnected.execute(SnpsFunctionBaseRepositoryConnected.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execIntegratedFunction(SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTaskTrt(SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSqlS.treatTaskTrt(SnpSessTaskSqlS.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTask(SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessStep.treatSessStep(SnpSessStep.java)
    at com.sunopsis.dwg.dbobj.SnpSession.treatSession(SnpSession.java)
    at com.sunopsis.dwg.cmd.DwgCommandScenario.treatCommand(DwgCommandScenario.java)
    at com.sunopsis.dwg.cmd.DwgCommandBase.execute(DwgCommandBase.java)
    at com.sunopsis.dwg.cmd.e.i(e.java)
    at com.sunopsis.dwg.cmd.h.y(h.java)
    at com.sunopsis.dwg.cmd.e.run(e.java)
    at java.lang.Thread.run(Unknown Source)
    ERPI Process End, Process ID: 71
    Thanks
    Ravi

  • How to configure BAPI Source system in BW3.0B

    Hi all,
    I am using BW 3.0B, i am extracting CSV file from website and want to load its data into infocube for analysis, the problem is for this i need to configure BAPI source system and then i can use DBConnect functionality to get data from CSV,
    please inform me how this is possible.
    Thanks in advance.

    Hi,
    please read:
    http://help.sap.com/saphelp_nw04/helpdata/en/50/63d6b37bda7f4a92e2dec21b14ceee/content.htm
    regards
    michael

  • How to transport FM retraction configuration if source-system changes?

    Hi experts,
    I have configured FM retraction in ERP through SPRO connecting it to my Dev source system in my Dev ERP. What do I need to do to transport this configuration to my production ERP and make sure the BI source-system changes from Dev to Prod as well? Is there some kind of souce-system mapping as there is in the BI side for the extraction?
    For example, I have everything set-up for source-system BWD and I want it to change to BWP when I transport the configuration from ERP dev to ERP prod.
    Thanks
    Edited by: Pedro Fontes Pais on Dec 2, 2008 6:36 PM

    Hi Christian,
    Thanks for your reply, but I didn't get anywhere in OKE7 & OKE8 to include the credit records I made in KSAZ in a Transport.
    Can you elaborate it more.
    Thanks
    Amit Goyal

  • Unable to create IDES R/3 source system in BI

    Dear Experts,
    I am stuck in some stage while creating source system in R/3, Pls guide me.
    Following things are carried out already...
    IMG Settings for Connecting to Other SAP Systems          
    IMG Settings for Connecting to a BI System          
    Now I am in source systems on BI side.....I am following these steps,
    click on source system on LHS, right click on SAP folder on RHS and select create.
    Now from here I am unable to move further...I am getting connection of BW to source system option, what is available destination here...what shud i select ? is it the ligical destination or the actual R/3 server ?
    In target computer(Server) what shud i select ? if it is application server how do i find it ? Any t-code ?
    Please guide me.
    Thanks in advance. Points will be taken care
    Regards
    Mohan

    Hi Shana,
    Thanks for ur quick reply....In target computer(Server) what shud i select ? if it is application server how do i find it ? Any t-code ?
    Pls guide me
    Regards
    Mohan

  • Source system R33CLNT100 is marked as inactive in BI.

    Dear Experts
    When I do a source system check via RSA1 > Source systems > SAP folder > right-click the R/3 system ID and select Check function,
    the system throws as error as shown :
    "Source system R33CLNT100 is marked as inactive in BI."
    "Procedure
        If you have upgraded to BW 2.0, activate the source system.
        With other errors connected to this source system, choose Restore   the
        source system from the source system tree in the Data Warehousing
        Workbench. This regenerates the source system, merges the relevant
        communication parameters, and replicates the DataSources in BI.
    and
    "BI IDoc type ZZZZ011 is not the same as source system IDoc type ZSSS021     RSAR     371     
    There was a system Refresh from Production R/3 46C to QA system R/3 46C.
    We did the BDLS but the IDOC seems to have got overwritten by R/3 Production's, obviously , due to refresh.
    Any idea how to resolve this?
    It seems like I need to re-create manually the idoc but I am not expert in this area.
    I do know there are standard IDOC aspects for BI 7.
    But how to re-create the relevant IDOC settings or configurations ? Need to do this in both  BI and R/3 ?
    Best regards
    Pascal

    Hi pascal ,
    Seems to be connectivity between the source system and the Bi system it will be restore by basis team only. Couple of tings that you can do at your end will make their work at ease
    i) check the RFC connection between the Source system and the Bi system in Sm59.
    ii)Make sure the user ALERMOTE and SAPCPIC are unlock in ecc side
    Now for configuring the source system by urself follow the below points :
    1. In BW, call TA RSA1.
    2. In the left hand column, choose "Source systems".
    3. In the column Source systems, right click on the respective source system and choose "Restore".
    4. A popup "Create R/3 source system" appears. Enter the passwords for user SAPCPIC. Hit enter.
    5. A popup "Please log on as an administrator in the following screen." appears. Hit enter.
    6. A logon screen of the child system appears. Enter your user and password and hit enter.
    7. A popup "New source system connection" appears. Hit "Continue".
    8. A popup "Check RFC destination" appears. Hit "Check".
    9. The child system jumps into TA59, displaying the RFC destination pointing to the BW system. Check it by pressing "Remote logon" (nothing happens, i.e. no error message appears!) and "Test connection" (the connection test table will be displayed). Hit F3 twice. The system jumps back.
    10. The popup "Check RFC destination" appears again. Now hit "Use".
    11. A popup "Connection can not be used" appears. Hit "Delete".
    12. A popup "Please log on as an administrator in the following screen." appears. Hit enter.
    13. A logon screen of the child system appears. Enter your user and password and hit enter.
    14. A popup "New source system connection" appears. Hit "Continue".
    15. A popup "Check RFC destination" appears. Hit "Check".
    16. The child system jumps into TA59, displaying the RFC destination pointing to the BW system. Check it by pressing "Remote logon" (nothing happens, i.e. no error message appears!) and "Test connection" (the connection test table will be displayed). Hit F3 twice. The system jumps back.
    17. The popup "Check RFC destination" appears again. Now hit "Use".
    18. A popup "Replicate Metadata?" appears. Hit "Only Activate".
    19. If popup "Do you want to reactivate all transfer structures and DataSources?" appears. Hit "No". If "Display activation log" popup appears - press "No" (that message may appear several times).
    20. Press "Back" if "Analyze application logs" screen appears
    Source -->http://forums.sdn.sap.com/thread.jspa?threadID=1892011
    Thanks,
    Deepak

  • Configuring of a new source system in BW

    Hi Experts
    We have to set up a BW system,  which will have 2 source systems( ECC)  clients 550 and 590 of the same ECC ( ECC QUALITY). One client is already there and we have to configure another client of source system with the sane BW Client 350. I understand that the dataflow is partly different (e.g transfer rules and datasources are source system dependent). My question are
    1.     How we can configure a Source System on BW.
    2.     What changes if any I have to make in the existing system (BW)
    3.     What will happens to the Existing Data-sources ( Do I have to replicate each and every data-source of the existing ECC clients to New ECC client.)
    4.     Do I have to create New transfer and update rule for the new client
    Any other point Pl. advice.
    Thanks in advance.
    Dinesh Sharma

    You can more than one source system to onw BW client.
    You have to use source system compounding to differentiate between characterstics values if you are loading to the same object. Otherwise you need to use separate characterstics for ex : Yxxxx object for one source system and Zxxxx object for another.
    Also the dataload timing should be setup properly. Otherwise it may leads to object locks.

  • Prevent objects being transported for Sandpit source system

    Hi there,
    We have a 3-tier systems landscape for BI: DEV, QAS, PRD (we do not have a sandpit BI). In our R/3 development system we habe two clients which are both setup as source system for BI DEV. One of the clients in R/3 DEV serves as sandpit in that system and objects can't be transported from it. However, since this client is connected to BW, objects related to this source system can be transported from BI DEV. We want to prevent that, so only the objects in BW DEV for the real R/3 DEV development client are allowed.
    Is there a way in BI to configure a source system in such a way (other than via security roles/profiles), that objects related to this source system can't be transported?
    Cheers.

    Sander, you should post this in BASIS also. By posting in both the forums, you have a better chance.
    In case BASIS folks say that they cannot stop this, try this work-around.
    In BWQ, in RSA1, there is a Source System Mapping in one of the tools menu. There, your DEV is mapped to QAS, etc.
    There, you may have your R/3 DEV mapped to R/3 QAS.
    See if there is an entry for your R/3 Sandpit/Sandbox. If there is one, leave the mapping for it as Blank.
    See, the only Objects that are related to Source System in BW are InfoSource-DataSources. If there is no mapping for SOurce System in BWQ, then the transport will fail.
    This is just a thought.
    Uday-Ram Chamarthy

  • BI Source system (critical issue)

    Hi Friends,
    I am working as a basis consultant.
    we have a ECC6 Development server and in the same server we hav installed BI-Cont and using as a BI Dev sever too.
    Client - 400 is R/3 Develop server
    Client - 300 is BI Develop server
    we cofigured 400 client as a source system for bi(300) and lot of develpments are made.
    Now we are planning to make this ECC6 DEV as a Production server for BI. (simultaniously R/3 developments also will happen in the same server).
    Now i have Created a new client-500 for BI(Production) in the same server and i want to add our R/3 Production server client-900(different server) as a Source system.
    1 I maintained RS_MANDT_UNIQUE_SET and set to client 500.
    2 I maintained table RSADMINA and set client 500
    and BW_user
    3 Created RFC between client 500 to PRD server client 900
    now when i tried RSA1 Transaction in BI PRD client 500, it says "Logical system name has been changed for this system"  "Message no. R3206"
    when i see the long text it says
    "The logical system name of this system is PRDCLNT500. However, this system was originally created with the logical system name DEVCLNT300. It is not permitted to change the logical system name, as connections to other systems will be damaged beyond repair.
    System Response
    The transaction is canceled.
    Procedure
    Change the name of the logical system (table T000) for client  back to DEVCLNT300. This enables you to continue working with the system.
    If you really want to change the logical name, than you can, if and when you:
    change the system name back to DEVCLNT300,
    delete all existing connections between this system and other systems,
    delete all transfer structures that still exist, and
    do not use ALE or Workflow."
    1 I tried to remove the source system from 300, but it is prompting to delete lot of packages and it is going for a while. so i stopped it.
    2 I removed all the RFC Connections between 300-400
    3 I deleted the logical system "DEVCLNT300".
    Still the same Issue "Logical system name has been changed for this system".
    Please help me Resolving this issue, since this issue became so critical.
    Thanks in advance
    Prakash

    Thank you for Replying
    I know the landscape we are having will confuse.
    In ECC6 DEV Server a new client 500 is created for BI Producion server (not exactly prod but assume like that).
    There is seperate R/3 Production server (client-900) and that shud be configured as a source system for the new BI PRD Client 500.
    I dont want any data from 300, infact i would delete the 300client (BIdevclt) after i configure everything in client 500.
    I did all the BI post installation steps for client 500.( including RS_MANDT_UNIQUE_SET)
    but since the 300 client was configured as BW dev in the same server, i am getting an error if i access RSA1 in client 500 "Logical system name has been changed for this system"  "Message no. R3206"
    I went through the BDLSS  transaction, but it talks about converting logical system and i dont want to do that.
    Client400 is configured as source system for bi dev 300.  I want to delete all the configuration made in 300.
    I want to know deleting the souce client manually from BI dev 300 client is the only way to fix this or anything else we could do it for this ERROR.

  • Change of the source system

    Hi
    all
    Background installation from  SAP r/3 was already done and the system is up and running.
    Now i would like to replace the SAP R/3 with ECC version , where I must replicate the same extractor now with obviously a different version of  ECC.
    I wonder if the source system change will effect the similar infoobjects which were already installed and assigned to a different source system.
    Please explain me the effect and defects, or if any changes on the master data already existing.
    thanks

    When you change the source system - all your transfer rules , data sources etc will be gone and you will have to do them again.
    The master data and transacton data will not be affected only that you will have to init the same again and deltas subsequently...
    You could instead - keep the old system connection alive and then create a new set of transfer rules , data sources etc for the new system - that way you can have the old Transfer rules , data sources active and then have the coding done the for same alive for reference as well..

  • ECC 6.0 Source Systems are added to 2 Different Folders - BI and SAP

    Hi Experts:
                    Our BASIS team added 2 ECC 6.0 Source Systems to BI 7.0. One of the ECC 6.0 System is added under BI Folder ( where DataMart Source stays) and other ECC 6.0 system is added under SAP folder where all other R/3 Source Systems are. I talked to BASIS team and they followed the same configuration in SM59 for both of the  RFC connections.
    Other peice of Information, Both the ECC 6.0 systems are on same server but just different Client.
    This is how it looks:
    RSA1 -> SOURCE SYSTEM
                  -> BI Folder - 1st ECC 6.0 System
                  -> SAPFolder -  2nd ECC 6.0 System
    Thanks,
    Rez

    Following OSS note fixes this:
    Note 1087980 - ECC Source systems appearing in BI folder

  • R/3 ECC6.0 connection as a source system to BI 7.0 For IDES system

    Hi Friends,
    I want to create a R/3 source system conenction in IDES
    say Example
    My IDES server For <b>R/3 ECC 6.0 is  XYZ800</b> and client is 800.
    My IDES server For <b>BI 7.0 also XYZ800</b> and client is 800.
    in ECC 6.0 IDES, both BI and R/3 is same server.
    In this case how to establish connection bn R/3 ECC 6.0 & BW(BI7.0)
    is it possible to create a R/3 source system in IDES for this senario,
    then please help me....
    I tried to create sourcesystem for different client(812) but it is not accepted
    and I searched in SDN postings too, but I can't get my answer.
    I have with these Documents already,but still my problem is not solved.
    B84_BB_ConfigGuide_EN_DE.doc,BL_Quick_Guide_EN_DE,MySAP BW Cookbook Vol 2.
    please help me to solve my problem, sure you can get points.
    Thanks
    shoukath Ali

    Hi prasanna
    In your Case no need to create any Source system.
    I also got same scenarion and i created connection with BI self Connection.
    and i am able to replicate all data Source. in this case R/3 and BW both residing on same client and same server.
    Just create BI self connection.
    then Restore if it is not giving any error then activate that with Datasource.
    Hope it help you.
    thanks
    Kiran Patel

  • Issues on Sources System ECC and BI

    Dear Friends,
    I ‘m trying to get data’s (extractions) from ECC 6.0 QA 110 to BI DEV 100. But I only have the Source System to the ECC 6.0 DEV without any data, this connections is working very well. I asked the Basis Consultant to do another connection of the BI DEV 100 with the ECC 6.0 QA 110 using RFC connections with Bitemote with sapall,  between ECC and BI.  He already did it and I can see at SPRO under SAP NetWeaver > SAP BIW > Links to Other Systems > General Connection Setting > Assign Logical System to Client, on both sides in BI and ECC. The question is, do I need to do Any configuration at the BI side to active (create?) this new Source System ECC 6.0 QA 110? I hope I’m clear. Thanks in advance.
    Antony

    Hi Frank,
    I can't imagine any issues compared to other installations. The only thing you need to take care about is that in BI you can only work in one client and in your ecc system you can have multiple clients to work in. These will be treaten as different source systems for your bw.
    regards
    Siggi

  • Vendor spend analysis report from ECC as source system

    Hi Experts,
    Currently am working on Functional Specification on a BI report "Vendor Spend Analysis".The source system is ECC.This report should give details about how much the company has spend on a vendor during a particular period along with payment terms , payment term days .
      I have started with Datasource 0FI_AP_4.Please let me know which field(credit or debit field) in the Datasource gives amount spend.I have checked the table EKKO and BSAK .What are the other fields and table i have to take into consideration.Suggest...
    Regards,
    Meera

    Hi Experts,
    Can anyone tell me the table which stores the data regarding the amount paid to a vendor.
    Regards,
    Meera

Maybe you are looking for

  • Problem of automatic widening conversion

    Hello, base one link below: http://docstore.mik.ua/orelly/java-ent/jnut/ch02_04.htm Finally, the notation Y* means that the conversion is an automatic widening conversion, but that some of the least significant digits of the value may be lost by the

  • Cocoa and notifications balloons.

    Hi, there Now I'm writing simple app which fetch data from my server. I want to show notification balloons like Gmail Notifier app (dark windows appeared at the top-right corner of screen). How I can do that in Cocoa? PS. I know that I can use growl,

  • CSM Bridging during Backups?

    I have two questions? This might seem like some dumb questions but, we have dual CSM's 4.2.6 in 6509 IOS 12.2(18)SXF in bridge mode. 1st question is, we have backup clients on one network and the host on another. The host is on a vlan behind the CSM

  • BCM call flow architecture with detailed description of all the components

    Hi Experts, Please provide me BCM call flow architecture and detailed description about all the component Eg. When a customer calls on xxxx number call hits to IVR and than as per customer DTMF routed to available agent. In that call what are the com

  • N210-MD1GD3H/LP Issues with video and audio lag / stutter - can't find cause?

    After much searching I'm now posting to a forum for the first time. #newbie I have an 'old' PC (wait - don't ignore me yet...) and I thought that 'helping' it out with a low spec graphics card and a USB audio card would make everything nice for gener