Hi Gurus,
Our Client is planning to upgrade from 4.6C to ECC6.0 and currently No plan for BW (we are on 3.10) upgrade.
I have gone through previous postings & refered few sap notes on the same topic. Can anyone collectively provide information on upgrade tasks on the preparations / prerequisite for BW side before and after upgrade. We have COPA, LO cockpit, SEM - BPS, SEM-BCS installed on BW side.
Please send me any a sample step step instructions / project plan to understand the procedures better way. Please help. Thanks.
Email ID: [email protected]
Hi,
Please concentrate about following BI 7.0 LINKS.
data modelling..
http://searchsap.techtarget.com/searchSAP/downloads/April2006.pdf
http://searchsap.techtarget.com/searchSAP/downloads/chapter-october.pdf
Enterprise Dataware Housing.
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/67efb9bb-0601-0010-f7a2-b582e94bcf8a
Enterprise Reporting.
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0901c9bb-0601-0010-49ab-c1770c527673
http://help.sap.com/saphelp_nw04s/helpdata/en/a4/1be541f321c717e10000000a155106/content.htm
http://help.sap.com/saphelp_nw04s/helpdata/en/e3/e60138fede083de10000009b38f8cf/frameset.htm
https://www.sdn.sap.com/irj/sdn/bi
http://searchsap.techtarget.com/searchSAP/downloads/April2006.pdf
http://searchsap.techtarget.com/searchSAP/downloads/chapter-october.pdf
LO Extraction
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b0af763b-066e-2910-a784-dc6731660f46
lo extraction step by step
LO Step by step documentation
LO Cockpit (SD) Step by step
LIS Extraction
lis extraction
Steps for LIS Extraction
COPA Extraction
/people/prakash.darji/blog/2006/09/18/bpx-methodology-and-example--part-2
How to handle COPA realignment / restatement
/people/hari.peruri/blog/2006/11/01/execute-conversion-of-logical-system-names-bdls-in-short-time-and-in-parallel--intermediate
BI platform:
http://help.sap.com/saphelp_nw2004s/helpdata/en/42/594e3c6bf4233fe10000000a114084/frameset.htm
performance optimization
http://help.sap.com/saphelp_nw2004s/helpdata/en/80/1a62dee07211d2acb80000e829fbfe/frameset.htm
analysis & repair environment
http://help.sap.com/saphelp_nw2004s/helpdata/en/92/1d733b73a8f706e10000000a11402f/frameset.htm
scheduler
http://help.sap.com/saphelp_nw2004s/helpdata/en/e1/b7463c32a3fe13e10000000a114084/frameset.htm
FI extraction
http://help.sap.com/saphelp_bw32/helpdata/en/af/16533bbb15b762e10000000a114084/frameset.htm
whats new in BI 7.0
http://help.sap.com/saphelp_nw04s/helpdata/en/57/a21f407b402402e10000000a1550b0/frameset.htm
System administration tasks
http://help.sap.com/saphelp_bw30b/helpdata/en/d1/e81c3b85e6e939e10000000a11402f/frameset.htm
process chains
http://help.sap.com/saphelp_nw70/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
WAD screen cam
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6dd54713-0c01-0010-8691-a3576b9a95d9
BI content installation
http://help.sap.com/saphelp_nw2004s/helpdata/en/c1/ea683cc5e8ca68e10000000a114084/frameset.htm
BI suite :Business Explorer
http://help.sap.com/saphelp_nw2004s/helpdata/en/5b/30d43b0527a17be10000000a114084/frameset.htm
BI 7.0 & EP 7.0 integration
/message/3945089#3945089 [original link is broken]
DTP's
http://help.sap.com/saphelp_nw2004s/helpdata/en/42/fb8ed8481e1a61e10000000a422035/frameset.htm
Extractions in BI
https://www.sdn.sap.com/irj/sdn/wiki
transport
http://help.sap.com/saphelp_nw2004s/helpdata/en/b5/1d733b73a8f706e10000000a11402f/frameset.htm
Thanks,
Sankar M
Similar Messages
-
Screens not working in ECC 6 after upgradation from 4.6c.
Hi,
The custom developed screens which where developed in 4.6c version is not working properly in ECC 6 after upgradation.Do i have to make any more changes for this .? If anyone have an idea please help me in this issue.The custom developed things are an extended functionality we have done to r/3.
Regards,
jinesh kumar c.Hi,
Check the Transportatation Logs in STMS for the programs/screens and check whether they are successfully tranported or not?
Because some times we get Dynpro errors for transportation of the screens.
Reward if useful.
regards,
Anji -
SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion
Basis Gurus
I am working on upgrade from R/3 4.6C to ECC 6.0.
ECC 6.0 upgrade completed( still in non Unicode). Now I am in the process of Unicode conversion.
I have used following methods for the upgrade.
1. Combined Upgrade & Unicode conversion(CU & UC)
2. Resource minimized( as I am doing it in Sandbox).
As I understand I need to perform the DB export and Import now for the unicode conversion.
According to the Upgrade document, First I need to run Export using R3load in ECC6.0(Non unicode)
and then install Unicode system and import the same data file.
My understanding was, when I choose, Resource minimized, I need to run Export and import
in the same system.
Can you please help me , whether I need another Unicode system for import ??
GrahamHi,
Dont get confused with upg strategy and unicode conversion.
In general Upgrade strategy (either downtime-minimized/resource minimized)
In unicode conversion you have export/import(exp/imp) of data concept
In CU&UC approach you have to do in a streach to complete migrate from old release to new realease ECC 6.00.
Using database independent (sapinst only) or Using database dependent (migration monitor or Distribution monitor)
It can be done in 2 ways.
If you dont have addtional server for unicode conversion
1)you can either do exp on same hardware and take bakup and do import using the exp dump.
2)Do exp on one server and prepare your target empty database on another server and complete imp of data.
Hope this is clear.
Regards,
Vamshi. -
ECC-600 EHP4 upgrade with VIRSAHR 520 700 - PREP_EXTENSION/ADDON_QCALC
Hi
We are getting following error at phase PREP_EXTENSION/ADDON_QCALC in the ECC 6.0 upgrade:
3 ETN256 You want to install the following add-on components:
3 ETN248 Component: "VIRSAHR" rel. "520_700", Support Package
level: "0" (component type "A")
3 ETN248 Component: "VIRSANH" rel. "520_700", Support Package
level: "0" (component type "A")
2 ETN085X"2. Adding Add-on Installation Queue" " " " " " "
3 ETN262 Calculating queue part for add-on "VIRSAHR" rel. "520_700"
3 ETN490 Use the Add-On installation package "SAPK-523EXINVIRSAHR"
(type &4"AOX") for Add-On &2"VIRSAHR" rel.&3"520_700"
3 ETN245 The following import prerequisites of OCS Package "SAPK-
523EXINVIRSAHR" have not been met:
3 ETN264 In the (alternatively) Requirement set "01":
3WETN491 Required software component "SAP_HR" rel."600" is not installed2WETN543 OCS package "SAPK-523EXINVIRSAHR" does not match the current
software component vector
1 ETN214X."**************************************************"
We have alreacy checked note 1002147, which clearly states that we have to include SAPK-523EXINVIRSAHR in the upgrade. SAP_HR is part of the upgrade.
We have included SAP_HR and other Support Package as per the queue generated by Solution Manager, but we did not include VIRSAHR & VIRSANH Packages until we got to this phase. We then included these support packages in eps\in directory, but we are now getting this error now.
Any ideas?
Regards
ChanduHi
This is what the solution provided by SAP Support:
Quote:
we have finally found the problem, it's a bug in the package upload
functionality used by the upgrade. The consequence of this bug is that
Support Packages whose EPS files (.PAT files) have a certain string in
the name, namely the string 0000000 after the _ and before .PAT
extension, are not properly uploaded to the ABAP system and hence are
not visible or known to the upgrade.
This bug will be fixed in the next upgrade tool fix, but in the meantimeyou can use the following workaround:
Check your EPS/in directory after the CAR/SAR Archives of the SPs are
extracted and rename all .PAT and .ATT files, which have a name like
*_0000000.PAT (or *_0000000.ATT), by changing the string 0000000 to
9000000. For example, for the VIRSANH SP SAPK-52302INVIRSANH rename the
file VS30020106486_0000000.PAT to VS30020106486_9000000.PAT
Afterwards, the upgrade will upload the informations about the SP
properly and the SP can be included into the upgrade.
Files:
31/01/2007 07:32 329 VS30020106486_0000000.ATT
31/01/2007 07:32 554,073 VS30020106486_0000000.PAT
If these two files are renamed to e.g.
VS30020106486_9000000.ATT
VS30020106486_9000000.PAT
the affected VIRSANH SP2 is uploaded correctly by the upgrade
functionality and the SP inclusion of the VIRSANH SPs works.
Sorry, as of now I cannot promise you a date when the tool fix will be
available. I have found this bug only today in the evening (german time)and will discuss this with the responsible colleagues tomorrow.
Afterwards, I will know more...
Unquote:
Hope this helps. We have decided against upgrading to 530_700 as it will involve upgrading GRC system and also new version has lot of new functionalities, which we like explore it after the ECC upgrade.
Also, I would not suggest deleting VIRSAHR as all the config and customising done for VIRSAHR will be lost.
Regards
Chandu
Edited by: Chandu Cheeti on Jan 17, 2010 11:19 AM -
Error in WBS Element Hierarchy load after ECC 6.0 Upgrade
Hi All,
After ECC 6.0 Upgrade in R/3, we are doing test load in a Test server. While doing, we have encountered an issue with 0WBS_ELEMENT Hierarchy load. The message in the monitor is like below.
"Node ID 00014240 has not been included in the hierarchy
Message no. RH207"
When I run the same hierarchy in another system which is not upgraded , it works fine.
Anybody has faced similar kind of issues and can throw some light on this issue?
Thanks,
MohanTry activating the Heirarchy in R/3 and re-trigger the load, error is very specific to structure of the hierarchy. there is a possibility that this Hierarcy could have got inconsistent after the upgrade.
Thanks,
Amit -
4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format
Dear all,
We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
I shall modity the same to our customer and submit
Thanks & Regards
Senthil
[email protected]Preparation Phase* 6 days
Kick Off Meeting 1 day
Upgrade Project Procedures Preparation 1 day
Prepare Upgrade Project Plan 1 day
Technical Requirements Assessment 3 days
Assess Training needs of Key-users & End-users 1 day
Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
Business Blueprint Phase 6 days
Develop System Landscape Upgrade Plan 1 day
Functional Requirement Checklist 1 day
ABAP Development check list 1 day
Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
Identify Testing Scope & Scenarios 1 day
Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
Develop Documents as per Basis Activity List 1 day
Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
Prepare Upgrade Deliverables Checklist 1 day
Realization Phase 28 days
Installation of Solution Manager 3.2 System 1 day
Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
Upgrade Frontend Software 4 days
Perform SPAU & SPDD Corrections 5 days
Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
Perform Upgrade Testing for each Application Module 7 days
Perform Unit & Integration Testing 6 days
Perform Training to Key Users & End Users (Generic & Specific) 3 days
Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
Testing by end users on Quality System 1 day
Production Realization & Go-Live Phase 6 days
Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
User Acceptance Testing 1 day
Production System Go-Live 1 day
Post Go-Live Support 14 days
Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements. -
Load balancing after ECC 6.0 upgrade
Hi
I we this configuration on ECC 6.0 upgrade:
SAPGUI 7.10
SAP_BASIS 700 Patch level 15
SAPportal ESS
Webdispatcher Installed
Internal ITS
Single sign-on
Can somebody assist as with identifying the problem with load balancing (PUBLIC) E.g. When running ESS remuneration package via the Sapportal. we have configured ITS-Based GUI Services on transaction SICF for customised ZESS_PZ11PDF service.
When we have load balancing group on the load balancing does not work, because I see somebodyu2019s payslip
but when using one app server I see my own payslip. Please help.Hi PR,
Please take a look at the following link:-
http://help.sap.com/SAPHELP_NWPI71/helpdata/EN/28/75153a1a5b4c2de10000000a114084/frameset.htm
"You can only use the SAP message server for HTTP load distribution if
the browser is the direct client of the message server. If another
component lies between the client (browser) and the message server, (for
example, the portal), you cannot use the message server to distribute
the load."
When using the External ITS you could balance the load using the message server and logon groups. In 700 this functionality is not present if there is not a direct connection to the client (Firefox or IE). So you will have to install the webdispatcher to balance the load.
Hope this helps
Michael -
Hardware requariment for ECC 6.0 upgrade from ECC 5.0
Hello
I am on ECC 5.0 with oracle 9.2.0.7.I need to upgrade this to ECC 6.0.
I have already implemented MM,PP,FICO,QM and HCM.My current data base size is 900GB.This has 30GB monthly growth.
With this ECC 6.0 upgrade i am planing to implement PM,EP.
I know converting none Unicode system to unicode system is required some more hardware resources than the none Unicode.
Some document says 40-60% more disk space and 35% more processing speed from current system.
Can any one give me the correct information about the hardware requirement for ECC 5.0 to ECC 6.0 upgrade.
Thanks
RoshanthaCheck with the Links
https://websmp102.sap-ag.de/sizing
https://websmp208.sap-ag.de/quicksizer
http://www.4soi.de/
http://www.easymarketplace.de/
Kanagaraja L -
DB Migration and ECC 6.0 Upgrade
I have a number of questions, we have a SAP R/3 4.7x200 landscape that is currently Windows 2003 and SQL2000 both 32 bit, we want to do the following, move to Windows 2003 and SQL2005 64bit, perform a Unicode and ECC6.0 Upgrade.
here are the steps I am planning on new hardware
1. Migrate to 64bit
-install 64bit OS and SQL2006 64bit on new hardware
-export db from current 32 bit and import into 64 bit system
a. I am confused, I have seen threads where it appears this was done in house, do we need an SAP certified person to complete this task, this is a hetergenous copy? Note 82478
b. can we do this inhouse if we follow the SAP documentation and checklists provided and have their signoff with checks
- Run tests and then confirm process before real migration
2. Perform Unicode Upgrade
- run this on sandbox, test and verify
3. Perform ECC 6.0 upgrade
- run this on sandbox a no. of times confirm
- freezing development and starting with DEV (this is a small landscape, we can do this)
p.s can steps 2 and 3 be combined in one step, I have broken that out, to in my mind make it simpler to fix if anything breaks.Hi,
DB Migration
1. MS SQL Server 2000 is based on BIN collation and MS SQL Server 2005 is BIN2 collation. SO you need to first convert BIN to BIN2 collation.
Note 960769 Windows Migration from 32bit to 64bit x8664
Note 799058 - Setting Up Microsoft SQL Server 2005
2. can steps 2 and 3 be combined in one step?
Yes. check with link http://service.sap.com/erp-upgrade
Regards,
Srini Nookala -
Any Specific Guide for Ecc 5.0 upgrade to ECC 6.0 (linux/oracle)?
Hi Gurus
Is there any specific guide available for the Upgrade of ECC 5.0 to ECC 6.0 from service market place.
for the linux operating system and oracle database. or atleast , I want to know what are the mimimum checks to be done (prerequisities) in the ECC 5.0 system which need to upgrade into ECC6.0.
Thanks in advance
BalajiHi,
There is not an specific guide for ECC 5.0 upgrade, just the guides specific for your OS/DB combination, they can be downloaded in https://websmp204.sap-ag.de/instguides but you should use the Unix/Oracle document, -
ECC 6.0 UPGRADE - BW 3.10
We are planning to upgrade our source system from 4.6C to ECC 6.0. We are on BW 3.10 ( But planning to upgrade to BI 7.0 once after ECC 6.0 upgrade)
Would like to know,
1. Do we need apply any plug-in requirements to accommodate the ECC 6.0 compatibility?
2. Will the existing BW 3.10 work without any issue with ECC 6.0?
( We are not going to do any change with new Business content available with ECC 6.0)
3. What are the other precautions, we need to take in order to work BW 3.10 with ECC 6.0?
Advance Thanks.refer replies here:
Re: ECC 6.0 Upgrade with BW 3.5 -
ECC 6.0 Upgrade from 4.7 - EDI Interfaces
Hi Gurus,
Need your inputs on what are the precautions to be taken during ECC 6.0 Upgrade related to EDI Interfaces. with SAP upgrading from 4.7 to ECC 6.0, do you see any precautions need to be taken considering the middle ware involvement. Also, is there any changes in IDOC Structures in ECC 6.0 which my cause issues related mapping with middleware.
Please suggest.
Thanks & Regards,
C.L. Narasimhan "CLN"Hi,
generally, a release upgrade, delivers new idoc/message types or new releases of existing idoc/message types.
So, taking this in mind, you shouldn't have problems for the mapping of the messages, because the versions of the basic idoc, once released, cannot be changed.
You might have some application problems related to the inbound interfaces, but this is part of the game...the testing phase will highlight whether the problem exists.
A known problem is that the upgrade removes all the customer specific entries in the system table EDIFCT.
Further details are provided in the OSS note [https://service.sap.com/sap/support/notes/865142]
Regards,
Andrea -
ECC 6.0 Upgrade - FI Posting (Payroll)
Hi,
We have gone for ECC 6.0 upgrade and face problem with FI Postings(Posting not cleared). We found out that in the new version there is a new node that got added up where we need to add all US taxes(Payroll US -> Posting to Financial Accounting ->Define WT posting attributes).
How can i find which all wage types are US tax related. I know there is one processing class 72, which define Employer / employee tax, but is there any other way i can find out.
Thank you
SreejaHi Ted,
I am talking about GB payroll, so we have to defnitely maintain the tax wagetypes in the new table V_T7US3PRTXSYMKO. Apart from that do we need to do any other settings in FI. Because it is showing the Profit center not filled.
We have also maintained the v_t52swcodist .
-Swetha -
Upgrade Developer 6i on the server side to patch set 18
Once I upgrade Developer 6i on the server side, I need to bring Developer 6i on windows platform (used for development) to same version level. My understanding both have to be in same version.
What the patches I need to apply for Developer 6i Windows?You need to install Patch 18 for Windows.
-
ECC Upgrade from ECC 5.0 to ECC 6.0 EHP4 - impact on XI 3.0
Hi,
We are palnning for upgrade our ECC System from ECC 5.0 to ECC 6.0 EHP4. We do not have any plan of upgrade on XI, which is on XI 3.0.
After ECC upgrade please provide the impact on XI 3.0 ?
Will XI 3.0 able to work with ECC 6.0 without any change or any change is required in the XI configuration level, please specify?
Thanks.>>Will XI 3.0 able to work with ECC 6.0 without any change or any change is required in the XI configuration level, please specify?
As far as I know, no change is required in XI configuration.
Regards,
Praveen Gujjeti.
Maybe you are looking for
-
Mac and Windows showing different hard drive space remaining?
Hello Guys, I am using my 1tb hard drive with mac and windows and while checking the space remaining, my mac says roughly 600gb left and my windows comp. says about 500gb left. I am just wondering which one of the storage remaining statements is corr
-
Alert Management for RFC Communication Channel
Hi All, I want to send notification to user using Alert Management in case of System Error in RFC Adapter. I tried with defining rule in RWB with * . But still I am not able to find notification in Inbox or Mail Inbox. Thanks.
-
se ejecuta los reportes a traves de run-product, desde form 4.5 en una BD 8i, no levanta la ventana de parametros. generando el error: REP-3301: Error occurred in Error Checking(RXGLER)
-
Justification for Using Oracle Text
Hello, Can someone give me good cause (justification) for utilizing Oracle Text over other tools out there that are not tied directly to Oracle? Apparently it is possible to identify metadata within text and do keyfield and keyword searches this way
-
Hi, I am doing mapping for IDoc to file scenario. Idoc is INVOIC02. Source field is KRATE from segment E1EDP05 Target field is Rate. Mapping rule is as follows. zero when Condiditon type (E1EDP05-KSCHL ) = YCSE ( enter total 15 digits withou