ECC-DIMP 604 upgrade

Hi exports,
I had alredy upgraded my ECC 6.0 Ready to EHP4, know i am trying to upgrade the component ECC-DIMP using SAINT.
My OS platform is HP-UX IA and DB is Oracle.
In the SAINT queue i had put both ECC-DIMP 603 and 604, along with stack.xml
While import during DDIC_ACTIVATION phase it failed and the log file shows "tp ended with return code 12 ".
I had checked the file system and data base tables, it seems ok.
Recently i had upgrated my kernel to 117, which is the latest one.
Also i had alredy gone through all the below mention notes, and taken action as necessary
Note 822380 - Problems w/ add-on inst/upgrade to SAP NW 7.0 AS ABAP
Note 874473 - Release strategy for ECC-DIMP as of ECC 6.0
Note 874471 - Additions for installing or activating ECC-DIMP on ECC 6.0
Note 1083533 - Installation of Enhancement Package 3 on SAP ERP 6.0
Note 822379 - Known problems with Support Packages in SAP NW 7.0x AS ABAP
Note 822379 - Known problems with Support Packages in SAP NW 7.0x AS ABAP
Note 1118803 - ECC 600 Support Packages and ERP enhancement packages
Note 1119856 - Description, tips and tricks for Attribute Change Packages
Note 1258938 - DDIC_ACTIVATION error during EhP4 installation
Please provide your valuable suggestion
Thanks & Regards
Dusmanta

Hi,
The problem is solved after applying SAP Note 1476315 - Error in activation protocol for switch framework.
You need to implement the coding corrections of the note to your system and restart import . If the note cannot be
implemented via SNOTE, as most likely the note assistant may be locked . Please ask one of your developers to perform the changes manually via SE80/SE24
Regards
Dusmanta.

Similar Messages

  • Installation of ECC-DIMP 604 on ERP 6.0 already in EHP4

    Hello,
    I have a problem regarding the installation of ADD-ON ECC_DIMP 604. My sistem is ALREADY a ECC 6.0 with EHP4 installed. I used the techinical usage FINANCIALS during the queue calculation on SOLMAN.
    Now I want to implement this add-on with transaction SAINT . The transactrion asks for an XML file that I'm unable to generate thru SOLMAN MOPZ.
    It give me an error like
    OCS PACKAGE SAPK-603DHINSAPAPPL DOES NOT MATCH CURRENT SOFTWARE VECTOR
    ABAP QUEUE CHECK FAILED
    I'm really stuck. Please advise
    Kir

    Hi,
    To implement any add-on in EHP4 system, you need stack xml file. As per your logs it looks like that stack xml file is wrong. Please check stack xml file again.
    Also, while downloading stack xml file from MOPZ, please select technical usage related to ECC-DIMP only.
    Thanks
    Sunny

  • ECC 6.0 upgrade and use of IS-Automotive (possible???)

    Hi folks,
    Weu2019re currently using SAP 4.6c and IS-MP, plan to upgrade to ECC 6.0 and we want to start using functionality covered by IS-Automotive on ECC 6.0.
    Is it possible to use both industry solutions (IS-MP and IS-Automotive) in parallel / on one SAP instance? (Same application server)
    Any known implications, questions which should be answered upfront?
    Weu2019re in good hope that this is possible, because both (former separate) IS-solutions are included w/ SAP ECC in one SAP ECC-DIMP business function set (industry extension).
    Thanks upfront for your replies and comments!
    Regards
    Andreas

    Dear Andreas,
    Kindly note that the ECC-DIMP Solution includes 5 Industry Solutions:
    IS Automotive,
    IS Aerospace and Defence,
    IS High Tech,
    IS Enginering & Construction, and
    IS Mill Products.
    If you activate the DIMP Solution some structures, tables, dynpros, etc. will be enhanced.
    Also new table entries will be inserted with Switched BC Set´s during the upgrade.
    Furthermore there exist some new transactions and programs.
    Please be aware about the restrictions of note 874471.
    Before you activate ECC-DIMP, note that it is not possible to deactivate the Industry Extension ECC-DIMP.
    You would have to re-install the system to get back to a state without DIMP.
    Release Strategy Note 874473 provides more information about the consequences activating ECC-DIMP has for
    your ERP system.
    874473 - Release strategy for ECC-DIMP as of ECC 6.0
    874471 - Additions for installing/activating ECC-DIMP on ECC 6.0
    I hope this helps you out.
    Regards,
    Abhishek

  • Suggested Support Pack Level for ECC 6.0 Upgrade - Target

    Hi ,
    Can someone give us the suggested support pack level for the ECC 6.0 system after the upgrade.
    Our current patch level is:
    SAP_ABA     700     0012     SAPKA70012
    SAP_BASIS     700     0012     SAPKB70012
    PI_BASIS     2005_1_700     0012     SAPKIPYJ7C
    ST-PI     2005_1_700     0003     SAPKITLQI3
    SAP_BW     700     0014     SAPKW70014
    SAP_AP     700     0009     SAPKNA7009
    SAP_APPL     600     0010     SAPKH60010
    SAP_HR     600     0013     SAPKE60013
    EA-IPPE     400     0008     SAPKGPID08
    EA-APPL     600     0008     SAPKGPAD08
    EA-DFPS     600     0008     SAPKGPDD08
    EA-FINSERV     600     0008     SAPKGPFD08
    EA-GLTRADE     600     0008     SAPKGPGD08
    EA-HR     600     0013     SAPKGPHD13
    EA-PS     600     0008     SAPKGPPD08
    EA-RETAIL     600     0008     SAPKGPRD08
    FINBASIS     600     0008     SAPK-60008INFINBASIS
    ECC-DIMP     600     0008     SAPK-60008INECCDIMP
    ERECRUIT     600     0008     SAPK-60008INERECRUIT
    FI-CA     600     0008     SAPK-60008INFICA
    FI-CAX     600     0008     SAPK-60008INFICAX
    INSURANCE     600     0008     SAPK-60008ININSURANC
    IS-CWM     600     0008     SAPK-60008INISCWM
    IS-H     600     0008     SAPK-60008INISH
    IS-M     600     0008     SAPK-60008INISM
    SEM-BW     600     0008     SAPKGS6008
    IS-OIL     600     0008     SAPK-60008INISOIL
    IS-PS-CA     600     0008     SAPK-60008INISPSCA
    IS-UT     600     0008     SAPK-60008INISUT
    LSOFE     600     0008     SAPK-60008INLSOFE
    IRMIPM     30B     0005     SAPK-30BI7INIRM
    IRMGLB     30B     0005     SAPK-30BG7INIRM
    ST-A/PI     01K_ECC600     0000     -
    GSCDMC     600     0001     SAPK-60001INGSCDMC
    RCMGT     601     0001     SAPK-60101INRCMGT
    Thanks
    Senthil

    Hi Senthil,
    of course it is always recommended to use the newest Support Package Stack,
    but if your system (your business processes) are working fine, I would recommend you to
    import support package only then when you have an error or you want to have a special fiunctionality.
    Some customers play support packages into the system only twice a year, because the business processes
    should be tested after the sp import.
    Kind regards
    Imre Takácsi-Nagy
    Senior Support Consultant II.
    SAP Global Support Center Austria
    Netweaver WEB Application Server ABAP / JAVA

  • ECC 6.0 UPGRADE WITH AFS 6.0

    Hi ,
       We try to upgrade our R/3 Server to ECC 6.0 , The Upgrade was successfully completed . But iam not able to install the IS ADDON AFS 6.0 after the upgrade . The error shows the ECC DIMP has not to be installed .
    Kindly tell me solution for this problem , It is possible to include AFS 6.0 during the upgrade phase , if it is possible , kindly tell me the steps .
    Or tell me the solution for this problem .
    Regards
    PalaniSelvan

    As I replied in your other three or four threads with almost the same question:
    It's not enough to just try to import AFS, you have to import the corresponding CRTs as mentioned in
    Note 1029517 - SAP AFS V600 : CRTs and Support Packages
    Markus

  • Screens not working in ECC 6 after upgradation from 4.6c.

    Hi,
    The custom developed screens which where developed in 4.6c version is not working properly in ECC 6 after upgradation.Do i have to make any more changes for this .? If anyone have an idea please help me in this issue.The custom developed things are an extended functionality we have done to r/3.
    Regards,
    jinesh kumar c.

    Hi,
    Check the Transportatation Logs in STMS for the programs/screens and check whether they are successfully tranported or not?
    Because some times we get Dynpro errors for transportation of the screens.
    Reward if useful.
    regards,
    Anji

  • SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion

    Basis Gurus
       I am working on upgrade from R/3 4.6C to ECC 6.0.
    ECC 6.0 upgrade completed( still in non Unicode).  Now I am in the process of Unicode conversion.
    I have used following methods for the upgrade.
    1. Combined Upgrade & Unicode conversion(CU & UC)
    2. Resource minimized( as I am doing it in Sandbox).
      As I understand I need to perform the DB export and Import now for the unicode conversion.
      According to the Upgrade document, First I need to run Export using R3load in ECC6.0(Non unicode)
      and then install Unicode system and import the same data file.
      My understanding was, when I choose, Resource minimized, I need to run Export and import
      in the same system.
      Can you please help me , whether I need another Unicode system for import ??
    Graham

    Hi,
    Dont get confused with upg strategy and unicode conversion.
    In general Upgrade strategy (either downtime-minimized/resource minimized)
    In unicode conversion you have export/import(exp/imp) of data concept
    In CU&UC approach you have to do in a streach to complete migrate from old release to new realease ECC 6.00.
    Using database independent (sapinst only) or Using database dependent (migration monitor or Distribution monitor)
    It can be done in 2 ways.
    If you dont have addtional server for unicode conversion
           1)you can either do exp on same hardware and take bakup and do import using the exp dump.
           2)Do exp on one server and prepare your target empty database on another server and complete imp of data.
    Hope this is clear.
    Regards,
    Vamshi.

  • ECC-600 EHP4 upgrade with VIRSAHR 520 700 - PREP_EXTENSION/ADDON_QCALC

    Hi
    We are getting following error at phase PREP_EXTENSION/ADDON_QCALC in the ECC 6.0 upgrade:
    3 ETN256 You want to install the following add-on components:
    3 ETN248 Component: "VIRSAHR" rel. "520_700", Support Package
    level: "0" (component type "A")
    3 ETN248 Component: "VIRSANH" rel. "520_700", Support Package
    level: "0" (component type "A")
    2 ETN085X"2. Adding Add-on Installation Queue" " " " " " "
    3 ETN262 Calculating queue part for add-on "VIRSAHR" rel. "520_700"
    3 ETN490 Use the Add-On installation package "SAPK-523EXINVIRSAHR"
    (type &4"AOX") for Add-On &2"VIRSAHR" rel.&3"520_700"
    3 ETN245 The following import prerequisites of OCS Package "SAPK-
    523EXINVIRSAHR" have not been met:
    3 ETN264 In the (alternatively) Requirement set "01":
    3WETN491 Required software component "SAP_HR" rel."600" is not installed2WETN543 OCS package "SAPK-523EXINVIRSAHR" does not match the current
    software component vector
    1 ETN214X."**************************************************"
    We have alreacy checked note 1002147, which clearly states that we have to include SAPK-523EXINVIRSAHR in the upgrade. SAP_HR is part of the upgrade.
    We have included SAP_HR and other Support Package as per the queue generated by Solution Manager, but we did not include VIRSAHR & VIRSANH Packages until we got to this phase. We then included these support packages in eps\in directory, but we are now getting this error now.
    Any ideas?
    Regards
    Chandu

    Hi
    This is what the solution provided by SAP Support:
    Quote:
    we have finally found the problem, it's a bug in the package upload
    functionality used by the upgrade. The consequence of this bug is that
    Support Packages whose EPS files (.PAT files) have a certain string in
    the name, namely the string 0000000 after the _ and before .PAT
    extension, are not properly uploaded to the ABAP system and hence are
    not visible or known to the upgrade.
    This bug will be fixed in the next upgrade tool fix, but in the meantimeyou can use the following workaround:
    Check your EPS/in directory after the CAR/SAR Archives of the SPs are
    extracted and rename all .PAT and .ATT files, which have a name like
    *_0000000.PAT (or *_0000000.ATT), by changing the string 0000000 to
    9000000. For example, for the VIRSANH SP SAPK-52302INVIRSANH rename the
    file VS30020106486_0000000.PAT to VS30020106486_9000000.PAT
    Afterwards, the upgrade will upload the informations about the SP
    properly and the SP can be included into the upgrade.
    Files:
    31/01/2007 07:32 329 VS30020106486_0000000.ATT
    31/01/2007 07:32 554,073 VS30020106486_0000000.PAT
    If these two files are renamed to e.g.
    VS30020106486_9000000.ATT
    VS30020106486_9000000.PAT
    the affected VIRSANH SP2 is uploaded correctly by the upgrade
    functionality and the SP inclusion of the VIRSANH SPs works.
    Sorry, as of now I cannot promise you a date when the tool fix will be
    available. I have found this bug only today in the evening (german time)and will discuss this with the responsible colleagues tomorrow.
    Afterwards, I will know more...
    Unquote:
    Hope this helps. We have decided against upgrading to 530_700 as it will involve upgrading GRC system and also new version has lot of new functionalities, which we like explore it after the ECC upgrade.
    Also, I would not suggest deleting VIRSAHR as all the config and customising done for VIRSAHR will be lost.
    Regards
    Chandu
    Edited by: Chandu Cheeti on Jan 17, 2010 11:19 AM

  • Error in WBS Element Hierarchy load after ECC 6.0 Upgrade

    Hi All,
    After ECC 6.0 Upgrade in R/3, we are doing test load in a Test server. While doing, we have encountered an issue with 0WBS_ELEMENT Hierarchy load. The message in the monitor is like below.
    "Node ID 00014240 has not been included in the hierarchy
    Message no. RH207"
    When I run the same hierarchy in another system which is not upgraded , it works fine.
    Anybody has faced similar kind of issues and can throw some light on this issue?
    Thanks,
    Mohan

    Try activating the Heirarchy in R/3 and re-trigger the load, error is very specific to structure of the hierarchy. there is a possibility that this Hierarcy could have got inconsistent after the upgrade.
    Thanks,
    Amit

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Load balancing after ECC 6.0 upgrade

    Hi
    I we this configuration on ECC 6.0 upgrade:
    SAPGUI 7.10
    SAP_BASIS  700  Patch level 15
    SAPportal ESS
    Webdispatcher Installed
    Internal ITS
    Single sign-on
    Can somebody assist as with identifying the problem with load balancing (PUBLIC) E.g. When running ESS remuneration package via the Sapportal. we have configured ITS-Based GUI Services on transaction SICF for customised ZESS_PZ11PDF service.
    When we have load balancing group on the load balancing does not work, because  I  see somebodyu2019s payslip
    but when using one app server I see my own payslip. Please help.

    Hi PR,
    Please take a look at the following link:-
    http://help.sap.com/SAPHELP_NWPI71/helpdata/EN/28/75153a1a5b4c2de10000000a114084/frameset.htm
    "You can only use the SAP message server for HTTP load distribution if 
    the browser is the direct client of the message server. If another     
    component lies between the client (browser) and the message server, (for
    example, the portal), you cannot use the message server to distribute  
    the load."                                                             
    When using the External ITS you could balance the load using the message server and logon groups. In 700 this functionality is not present if there is not a direct connection to the client (Firefox or IE). So you will have to install the webdispatcher to balance the load.
    Hope this helps
    Michael

  • Hardware requariment for ECC 6.0 upgrade from ECC 5.0

    Hello
    I am on ECC 5.0 with oracle 9.2.0.7.I need to upgrade this to ECC 6.0.
    I have already implemented MM,PP,FICO,QM and HCM.My current data base size is 900GB.This has 30GB monthly growth.
    With this ECC 6.0 upgrade i am planing to implement PM,EP.
    I know converting none Unicode system to unicode system is required some more hardware resources than the none Unicode.
    Some document says 40-60% more disk space and 35% more processing speed from current system.
    Can any one give me the correct information about the hardware requirement for ECC 5.0 to ECC 6.0 upgrade.
    Thanks
    Roshantha

    Check with the Links
    https://websmp102.sap-ag.de/sizing
    https://websmp208.sap-ag.de/quicksizer
    http://www.4soi.de/
    http://www.easymarketplace.de/
    Kanagaraja L

  • DB Migration and ECC 6.0 Upgrade

    I have a number of questions, we have a SAP R/3 4.7x200 landscape that is currently Windows 2003 and SQL2000 both 32 bit, we want to do the following, move to Windows 2003 and SQL2005 64bit, perform a Unicode and ECC6.0 Upgrade.
    here are the steps I am planning on new hardware
    1. Migrate to 64bit
    -install 64bit OS and SQL2006 64bit on new hardware
    -export db from current 32 bit and import into 64 bit system
         a. I am confused, I have seen threads where it appears this was done in house, do we need an SAP certified      person to complete this task, this is a hetergenous copy? Note 82478
         b. can we do this inhouse if we follow the SAP documentation and checklists provided and have their signoff      with checks
    - Run tests and then confirm process before real migration
    2. Perform Unicode Upgrade
    - run this on sandbox, test and verify
    3. Perform ECC 6.0 upgrade
    - run this on sandbox a no. of times confirm
    - freezing development and starting with DEV (this is a small landscape, we can do this)
    p.s can steps 2 and 3 be combined in one step, I have broken that out, to in my mind make it simpler to fix if anything breaks.

    Hi,
    DB Migration
    1. MS SQL Server 2000 is based on BIN collation and MS SQL Server 2005 is BIN2 collation. SO you need to first convert BIN to BIN2 collation.
    Note 960769  Windows Migration from 32bit to 64bit x8664
    Note 799058 - Setting Up Microsoft SQL Server 2005
    2. can steps 2 and 3 be combined in one step?
    Yes. check with link http://service.sap.com/erp-upgrade
    Regards,
    Srini Nookala

  • Any Specific Guide for Ecc 5.0 upgrade to ECC 6.0 (linux/oracle)?

    Hi Gurus
    Is there any  specific guide available for the Upgrade of ECC 5.0 to ECC 6.0 from service market place.
    for the linux operating system and oracle database. or atleast , I want to know what are the mimimum checks to be done (prerequisities) in the ECC 5.0 system which need to upgrade into ECC6.0.
    Thanks in advance
    Balaji

    Hi,
    There is not an specific guide for ECC 5.0 upgrade, just the guides specific for your OS/DB combination, they can be downloaded in https://websmp204.sap-ag.de/instguides but you should use the Unix/Oracle document,

  • ECC 6.0 UPGRADE - BW 3.10

    We are planning to upgrade our source system from 4.6C to ECC 6.0.  We are on BW 3.10 ( But planning to upgrade to BI 7.0 once after ECC 6.0 upgrade)
    Would like to know,
    1. Do we need apply any plug-in requirements to accommodate the ECC 6.0 compatibility?
    2. Will the existing BW 3.10 work without any issue with ECC 6.0?
    ( We are not going to do any change with new Business content available with ECC 6.0)
    3. What are the other precautions, we need to take in order to work BW 3.10 with ECC 6.0?
    Advance Thanks.

    refer replies here:
    Re: ECC 6.0 Upgrade with BW 3.5

Maybe you are looking for

  • I don't understand why this thread is blocked

    We have several hundred unit tests that we run very frequently on our application, which uses BDBJE. In the last month or so, we've suddenly had unit tests start randomly hanging on the following stack trace. Can anyone help me understand what we're

  • You cannot use this transaction type to post to this asset Message no.AA834

    Hi, I am settling credit values -ve values from WBS to Asset Under Constructions Assets during CJ88 period settlement run. These assets belongs to Investment Measure. For few assets I am getting below error and You cannot use this transaction type to

  • RAW Native Camera Settings for Nikon - do they convert?

    Question on RAW processing in Lightroom. Can Lightroom show ALL of the the in-camera settings (WB, saturation, etc.) selected when the shot was taken? I prefer not to have to re-cook the RAW photos from scratch on every picture. Nikon NX2 provides th

  • Pasting code into word

    Hi, I've tried to paste my block diagram into word, but for some unknown reason parts of the diagram go missing and some parts blackout. Is there some technique to doing this where the resolution is good. My block diagram is fairly big, and asking to

  • Use of dummy profit center

    Hi I am on ECC6.0 and profit center accounting is active. I have one dummy center. Now what is the use of dummy profit center. It i because SAP will not allow me to post FI transaction with out profit center because of document splitting. Then how du