Hi,
I have 120 plus interfaces as IDoc receivers/sender running in production.
The existing ECC system [SAPabc] will be down for patch updates and we need to point different ECC system [SAPxyz].
Please let me know which way is better to handle this situation.
a) Change each and every receiver channel details with SAPxyz and receiver agreement in the ID component and once revert back to SAPabc once it is up and running.
b) Change the logic system name in the SLD and point the existing SAPabc system details to SAPxyz and rever back once the SAPabc system is back and running.
Much appreciated if I get the steps to change the system details in SLD. [not much worked in SLD ]
Thanks
Ray..

Hi Ray,
   There may be other places also to be changed in your case.
Check the below wiki.
http://wiki.sdn.sap.com/wiki/display/XI/ConnectionSettingsbetweenECCandPIsystem
However, i have few questions.
1) How long is this stop gap arrangement?
2) What happens when the main system is live again? how does the system get updated with the postings that happened in its absense?
Best Regards,
Ravikanth Talagana

Similar Messages

  • Which method is good for upgrade small size database

    wants to upgrade 10g database to 11g.
    production database 10g running on server1 wants to upgrade 11g at different server server2
    which way is good.
    ------>>>>1 upgrade then migrate 2 different server.
    ---->>>>>2 migrate then upgrade database.
    ----->>>>other question
    if am installing 11g on server2 and migrating 10g directly then there will be any issues coming future on production.

    Pl identify exact versions (to 4 digits) of "10g" and "11g", along with the exact OS versions on the source and target. How big is your database and how much downtime can you afford ?
    One straightforward option is export/import - Moving Data Using Oracle Data Pump
    HTH
    Srini

  • Is there a way to find all config changes between clients and sap system

    We have our Dev system with clients
    310 - Developer make changes and create transport
    400 - Test client
    410 - a copy of our Production system (over 1 year ago0
    TST - this is our quality system with one client
    101
    Production system one client
    101
    I know if i do a database copy from Production to our TST system, both systems would be exact.
    Abaper Director wants to know all the configuration changes that are different between Devopment client 310 - Test and production.
    I told him that in development client 310 the abaper or functional users make most of the changes if they do  not get transported they would be missing.
    I cannot copy to client 310 otherwise we would loose all of our version management.
    Is there another way that I can see the config changes between all these clients.
    Thanks
    Joe

    You should be able to use tcode SCU0 
    Regards,
    Brian

  • Change Receiving System Name in BD64

    Hi folks,
                   We have our production instance and QA instance; we have copied all data from Production to QA ENV (Client Copy). After that when I login in to QA system I saw in BD64 all the system pointing to receiving production system. I  ran  BDLS ( transaction ) which convert production logical system name to QA logical system name in tables and as well as in SCC4 transaction.
    I again went to BD64 and I noticed after running BDLS my production system name replace to QA system name. But Receiving systems names are still pointing to production systems. I know that BDLS just change the sending system logical name not receiving.
    My question is that how I can change or modify the receiving system production names to testing name. Is there any way or program?
    I try to change the receiving system name but it’s not letting me change. You guys have any idea how to change the receiving system production name to test name.
    I don’t want to create all distribution model names with test systems as I have 30 distribution models and client copy is keep on going after every 1 or 2 months.
    Please help me in this regards.
    Thanks

    The OSS notes just tell about the BDLS. I already done with BDLS… Scenarios is like that say we have one distribution model name in Production
    Model name = ZXYZ
    (Sender system) Production system name = PRD_123
    (Receiving production System in UK)      = PRD_UK
    These above are the setting for Production client.
    We copy data from Production to Quality, so its copy all the data and Distribution name in QA ENV…
    So now my QA looks like
    Model name = ZXYZ
    Sender system) Production system name = PRD_123
    Receiving production System in UK)      = PRD_UK
    After that I ran T-code BDLS and give logical system name = QA_123, then when I go back to BD64 the model is looks like following
    Model name = ZXYZ
    Sender system) Production system name = QA_123
    Receiving production System in UK)      = <b>PRD_UK </b>
    But PRD_UK isn’t change because it’s the production system for receiving one , so Now I need to modify <b>PRD_UK to QA_UK in BD64</b> , How I’ll do it ?
    I am trying to change receiving system but it doesn’t allowing me.
    I hope, now I made my self more clear.
    Thanks in Advanced.
    Bye
    Message was edited by: Suleman Javed

  • How to change the ECC Source system in SAP BI

    Dear Experts,
    In my BI development system instead of showing ECC development system as a source system it is showing ECC production system.
    Now in my BI system I want to change the source system from ECC Production to ECC development.
    Kindly explain me step by step to change the source system from ECC Production to ECC development.
    Regards,
    Suresh.

    Hi,
    Ask your basis team to change source system entries.
    They knows how to assign logical mappings.
    Tx - BDLS.
    Tables - RSLOGSYSMAP.
    Try this way.
    Bw, Tx - RSA1-->source system, Menu Tools - Conversion of logical system name and Assignment of source system to source system ID.
    Thanks

  • SAP BI System Copy with only Config changes, Not Data

    Hi BASIS,
    I have a requirement from a client to build a system landscape stratagy for their SAP BI system.
    We have DEV - QA - PRD systems for SAP BI (7.0 SP 16)
    Both DEV and QA are completely out of sync with PRD. We are doing development tasks directly on PRD. Now we have decided to re-sync the DEV & QA systems with PRD.
    'System copy with Data' will be easier to implement. But our PRD DB size is nearly 3TB. The client is not ready to pay for the extra/temp. disk space for DEV and QA sync. ( We are on DB2).
    Now, we have only one option left. Capture all Config changes from PRD and transport them back to DEV & QA. This is a tedious task and cause many inconsistencies.
    Would anyone have any other ideas to bring the systems in sync with less time involved and less resources.
    I am a SAP BI person. So dont know much about BASIS tasks. Please help me with any links of best practises or SAP notes.
    Cheers

    HI Reddy,
    We came to know from our basis team that we do not have the Java Stack installed in our BI 7.x system yet.
    As it is integrated with EP which has Java, our web reports are working.
    1) But my question is still do we ned to install the Java Stack in our BI system as i do not find any Export to PDF option in EP for the reports (eventhough AS Java supports this).
    2) Or can we use the existing configuration without Java STack integrated to EP for the new tools like Report Designer and Integrated Planning?
    Regards
    Kumar

  • Itunes has changed the way it stores files over the years and now i am having trouble figuring out which files are where so I can back them up

    Hi
    I have backed up itunes by copying my itunes file to an external hard drive. I try to keep my large media files (like TV shows) in a separate folder so that I can keep my hard drive on my macbook from filling up.  Problem is, apple has changed the way Itunes is organized and backs up over the years.  Now I am having a hard time keeping straight what is where.  When I go to support, it has different instructions for the various versions of itunes. I  am using version 10 now but it seems like I can't see all my files within the itunes music or media folder.  I want to get everything in one place so that I can easily back up, regardless of which version of itunes I am running at the time.
    I have selected to let itunes organize my files.  It keeps all the files I have purchased in one place apparently, but items I have imported don't seem to always be there.
    How can I best sort this out?

    I have, but if I don't have that particular external hard drive connected when my time machine backup hard drive is connected, then I don't think it is all backed up together.  It is getting too complicated to get out all this equipment every time I want to buy some music. 

  • Passing Changed  extended fields using ALE-IDOC to receiving system

    Hi all,
    Please tell me how passing changed  extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    For ex. in matmas05 extended for classification and inspection view and then created using 'CREATION'
    related bapi.Do i also need to incorporate the changes by change related bapi or ir can be handled by change pointer concept.
    Thanks.

    Hi Sanu
    1) Please tell me how passing changed extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.
    => Looks like you have extended standard IDOC here. so you need to find User Exit or BADI for the Push program to populate the additional fields. Yes, it is possible thru change pointers as well.
    1) Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    => Yes, as suggested in 1 try finding User Exits/BADIs.
    Regards
    Shital

  • Need config table which stores data for Vendor Master changes

    Hi Gurus,
    I need to have the name of the config tables which store the details of the Vendor Master configuration changes based on account group information.
    For Example,
    For a given Account Group(ZM09), the VAT Registration field in the control data tab of the transaction XK02 is suppressed. and for other Account Groups the VAT Registration field is appearing in the Control data tab of the XK02 transaction.
    So I need to determine at run time for which vendor account group the VAT Reg field is suppressed and for which it is appearing.
    Hence I require the name of the Config table in SAP which stores this information.

    Hi,
    Use this transaction S_ALR_87010039 (Program RFKABL00)
    You can select all levels of changes (i.e. General, Company Code, purchasing org)or individual levels only.
    If you want the tables then CDHDR & CDPOS will provide all the details.
    Regards
    Hiren K.Chitalia

  • Changing the system config parameter

    hi friends,
    I am new to SAP basis
    I want to change a system config parameter using RZ10.Do i need to import profiles to SAP system every time i change a config parameter?? I did not understand the need to do that.Can somebody explain me the steps in changing system parameters in instance,default and start profiles
    Thanks

    HI Nivas,
    As soon as you logon for first time on RZ10 you need to import all profile files to application server so that you can see them at SAPGUI.
    Initially the profiles will be located in OS in \usr\sap\SID\SYS\profiles.
    Logon to RZ10 go to Utilities --> Import Profiles --> Of Active Servers.
    All the profiles you will be able to see at GUI level now. Then select the profile and select extended Maintenace Click on change you will be able to see profile parameter and able to change their values too.
    Thanks & Regards
    Vivek

  • Somehow I received a free movie which I didn't want.  It started to download automatically when I opened iTunes. I don't want it to download and can't stop it.  I have other cds that I would like to download but this movie is in the way.  Help

    Somehow I received a free movie which I didn't want.  It started to download automatically when I opened iTunes. I don't want it to download and can't stop it.  I have other cds that I would like to download but this movie is in the way.  Help

    it's best to just let it download, then delete once it is on your computer.

  • Is there a way to change to change which album art is in the music artist preview

    Say you have a handful of different albums by a particualr music artist. Is there a way to change which album artwork is the in the artist preview pane for each artist under the artist section in your iTunes library.  I've looked cannt seem to find a way to do it.
    Thank You

    Hello.
    How are you?
    Thanks for your reply.
    I tryed to change this propriety, but it doesn't work. I think is my instalation.
    Thanks so much for your helpful!!!!!

  • Sender and Receiver IDOC config Settings

    Guys I have just come up with this document as a quick reference guide to enable me to be able to configure IDOC scenarios quickly and efficiently. Couls you please let me know if this looks ok and all is in the correct order.
    <u>Quick Guide to Scenarios</u>
    Note A Ports only purpose is to allow either the SAP R/3 Backend system to establish an RFC connection with XI or allow the XI to establish an RFC Connection with the Receiver SAP R/3 system.
    Note An RFC Destinations purpose is to: A) Communicate with the SAP system
    B) Pull metadata from either the Sender/Receiver SAP R/3 System or another reference system that contains the same IDOC.
    <u>Sender IDOC Scenario</u>
    When configuring an IDOC Sender adapter there are a few things that you need to configure before you even start with the Config Directory itself.
    Because IDOC Adapter resides on the ABAP stack no sender agreement or sender Comm Channel is necessary
    Your main configuration is in R/3. You configure R/3 to send the IDOC to XI so hence you don’t need an IDOC Adapter or Comm Channel.
    1.     You need to define an RFC destination to XI in the R/3 Backend system. (SM59).  This RFC destination is used to retrieve the IDOC metadata from the sender system. The IDOC adapter needs these metadata to create the corresponding IDOC-XML message from the RFC stream.
    2.     Assign the destination to a Port in the R/3 Backend system (WE21)
    3.     Define your Partner Profiles for the IDOC you are trying to send and Reference that Port there as well (WE20)
    Based on the above conditions, you do not need a Sender Comm Channel for IDOC or a Sender Agreement for the business scenario. Your only configuration in the Config Directory is to define R/3 as a Business System (no Comm Channel) and define the Receiver Business System along with the Receiver Determination, Interface Determination and Receiver agreement.
    <b><u>I'm not sure if this step is necessary in the sender IDOC scenario</u></b> -
    In XI box you must also define the ports in IDX1 which allows you to establish an RFC connection to pull the metadata in from the backend system, by specifying the RFC destination from where you want to get the info from. This system is defined by the sender port and the client in the IDOC control record. It is either the sender SAP system or an SAP reference system.
    There are certain cases which you also need to use IDX2 (Cache). XI itself does need the IDOC metadata to execute the interface but it can usually use IDX1 to pull this data either from the SAP R/3 system or an equivalent reference system. However if there is already cached metadata and the IDOC has changed then IDX1 will not execute. In this instance you can pull this metadata manually using IDX2 (XI Box).
    <u>Receiver IDOC</u>
    When you receive an IDOC things are a little more complex. You do need a Sender agreement and Comm Channel defined. Again there is much to be done in XI and the R/3 Receiver system before you get to the configuration of the Config Directory.
    1.     In XI you must configure the RFC destination which enables XI to communicate with the Target System (SM59)
    2.     In XI you must then create the port which allows you to establish an RFC Connection. In this port you define the RFC destination you previously defined. (IDX1)
    3.     You then must also ensure that a Partner Profile has been established in the Target system which allows XI to send IDOC’s to the Target system. (WE20)
    Once the above is completed you can then continue to configure your IDOC scenario in the Config directory. In your Receiver Adapter you reference both the Port and RFC destination that you just established along with the Release which is to be the Target systems release. You must also specify an Interface version which again is the Target systems version.
    There are certain cases which you also need to use IDX2 (Cache). XI itself does need the IDOC metadata to execute the interface but it can usually use IDX1 to pull this data either from the SAP R/3 system or an equivalent reference system. However if there is already cached metadata and the IDOC has changed then IDX1 will not execute. In this instance you can pull this metadata manually using IDX2 (XI Box).
    Apart from the above the rest of the steps in the Config Directory are as normal.<b></b><u></u>
    Message was edited by:
            Alex Ong

    Hi,
    As per my knowledge you need to configure port in IDXI in XI to pull the metadata.
    Its a mandatory step to pull the metadata whatever be scenario like whether you  are sending an IDoc or receiving an IDoc.
    So please configure RFC destination, IDX1 and IDX2 in XI side.
    Only after pulling the IDoc metadata you can proceed with any of the IDoc scenario.
    Whenever there a IDoc is changed you need to delete the previous metadata and pull it again. In such situations you can use the already existing port in IDX1.
    Hope this helps you out.
    Thanks and Regards,
    Vineetha

  • TDMS - time based reduction - receiver system deletion

    Experts,
    I'm doing a time based reduction.  I'm on the step "Start Deletion of Data in Receiver System".  It's been running for over 18hours.
    But I don't see any jobs running in SM66 on the Central/Control or Sender or Reciever systems.
    When I click on the "Task" button, I see it has completed 8,444 of 12,246  sub activites.  There are 3,802 not yet started.
    We're on all the latest levels of DMIS and ECC.
    Any ideas?
    Thanks
    NICK

    Ashley and Niraj,
    Hey, I'm all for tips/tricks so don't worry about messing up my thread.
    I completely shut down the central/control system via stopsap and restarted.  Still it was in "running" status but no jobs were running on sender/rec or central/control.
    So I tried the trouble-shooting but it was un-clear to me what to do.
    I ended up highlighting the phase I reference earlier, then doing "execute" again.  The status changes from the "truck" to a green flag and I started to see jobs run again on the receiver system.  Again they have stopped, but I see another job scheduled to run in a few minutes....It's just weird, I didn't run into this on my last time-based copy.
    I'll post a few things I've learned to increase performance:
    RDISP/MAX_WP_RUNTIME = 0
    At LEAST 25 WP and 25 BCK procs
    rec/client = OFF
    RDISP/BTCTIME = 60
    RUN STATS regularly
    TAKE OUT OF ARCHIVELOG MODE
    Read/Impl these notes:
    Read theseu2026Update these parameters
    o TD05X_FILL_VBUK_1 Note 1058864
    o TD05X_FILL_VBUK_2 Note 1054584
    o TD05X_FILL_BKPF Note 1044518
    o TD05X_FILL_EBAN Note 1054583
    o TD05X_FILL_EQUI Note 1037712
    Set these oracle index on rec system:
    Table: QMIH
      fields: MANDT, BEQUI
    Table: PRPR
      fields: MANDT, EQUNR
    Table: VBFA
      fields: MANDT, VBELN, VBELV, POSNV
    set parameter u2018P_CLUu2019 to u2018Yu2019 in the following
    activities before you start the activities for filling internal header tables:
    TD05X_FILL_BKPF
    TD05X_FILL_CE
    TD05X_FILL_EKKO
    TD05X_FILL_VBUK
    TD05X_FILL_VBUK_1
    TD05X_FILL_VBUK_2
    TD05X_FILL_VSRESB
    TD05X_FILL_WBRK_1
    run TCODE CNVMBTACTPAR, specify the project number to do this
    IMPORTANT TCODEs
    CNV_MBT_TDMS_MY  Main TDMS starting point     
    CNVMBTMON  Process Monitor (must know your project number)
    DTLMON  MWB transfer monitor
    CNVMBTACTPAR  activity parameters
    CNVMBTACTDEF  MBT PCL activity maint
    CNVMBTTWB  TDMS workbench to develop scrambling rules
    CNV_TDMS_HCM_SCRAM  run in SENDER system for scrambling functionality
    Reports
    CNV_MBT_PACKAGE_REORG  to reorganize TDMS projects..aka delete
    CNV_MBT_DTL_FUGR_DELETE  deletes function groups associated with old projects
    Tables
    CNVMBTUSEDMTIDS   lists obsolete MTIDs
    IMPORTANT NOTES
    Note 894307 - TDMS: Tips, tricks, general problems, error tracing
    Note 1405597 - All relevant notes for TDMS Service Pack 12 and above
    Note 1402704 - TDMS Composite Note : Support Package Independent
    Note 890797 - SAP TDMS - required and recommended system settings
    Note 894904 - TDMS: Problems during deletion of data in receiver system
    Note 916763 - TDMS performance "composite SAP note"
    Note 1003051 - TDMS 3.0 corrections - Composite SAP Note
    Note 1159279 - Objects that are transferred with TDMS
    Note 939823 - TDMS: General questionnaire for problem specification
    Note 897100 - TDMS: Generating profiles for TDMS user roles
    Note 1068059 - To obtain the optimal deletion method for tables (receiver)
    Note 970531 - Installation and delta upgrade of DMIS 2006_1
    Note 970532 - Installation of DMIS Content 2006_1
    Note 1231203 - TDMS release strategy (Add-on: DMIS, DMIS_CNT, DMIS_EXT...)
    Note 1244346 - Support Packages for TDMS (add-on DMIS, DMIS_CNT, ...)
    I'm doing this for an ECC system running ecc 6.0 EHP6 by the way.
    Still any help with my issue on the delete would be helpful. but post tips I don't kwnow about
    NICK

  • IDoc Status 02 ( Could not find code page for receiving system )

    Hi All,
    I am getting Idoc status 02 when I am trying to send IDocs from ECC to PI system ( Production ).
    Error description.
    Could not find code page for receiving system
    Message no. E0266
    Diagnosis
    For the logical destination PIP001, you want to determine the code page in which the data is sent with RFC. However, this is not currently possible, and the IDoc cannot yet be dispatched.
    Procedure for System Administration
    Possible causes are:
    1. The entry no longer exists in the table of logical destinations.
    2. The target system could not be accessed at runtime.
    3. The logon language is not installed in the target system.
    4. In the destination system, no logon language is maintained
    Please help.
    Thanks - Vinay.

    Hi Vinay,
    Status 02 occurs when data is not passed to port suceessfully. Check the RFC desination  is working fine and your able to connect to target system and also check correct port is assigned.
    Regards,
    Vinod.

Maybe you are looking for

  • Error while loading Hierarchy  using Idoc

    Hi Experts, I am loading Hierarchy data from r/3 to Bw, After load , in the monitoring details tab its like this Data Package 1 ( Records ) : Everything OK Transfer rules ( 911  Records ) : No errors Hierarchies for master data received. Processing b

  • System determining CENVABLE TAX along with Service tax

    Hi ASAP, RAW material Bill passing scenarios Excisable Material is supplied by 1000 party, Transportation support given by 2000 party.As per supply of Excisable raw material, IV for Party 1000 ( Goods/Services) & 2000 ( planned Delivery Cost) will ta

  • What kind of banner is this?  If it is a banner-

    This site- http://www.ubi.com/US/default.aspx What is the scrolling image type banner called??

  • Primary key in mv

    Hello to all.. i have a doubt What is Primary key and row id in Materialised view log? Is there any differnce with normal primary key and row id? thnz

  • No Serial Number will not open

    My Encore and PP CS3 will not allow me to access Encore. No Serial No. Attempts to re-install come up with Adobe CS 3 and Encore elements NOT installing. Whats worse the system shut down my Firewire while installing, so the DVD drive I was using was