Hi Experts,
We are doing a Source system upgrade from 4.6c to ECC6.0 just a Technical upgrade. Can you please let me know if we need to delete all the delta queues and re-initialize delta.
Following are the 4.6c Pre- Export Activities  in relation BW.
1. Lock the users
2. Clear the entire delta queues in RSA7 (till we achieve - 0 records in BW) and  make sure no outbound queues are empty in SMQ1
3. Delete Set -up table data.
4. Reshedule V3 Jobs
5. ReSchedule - BW process chains
After upgrading to ECC6.0
1. SM59 connections with new system.
2. Restore Source System connections in RSA1
3. Replicate DS and Activate Transfer Structure. (In relation to BW: we have done the technical upgrade from 3.x to BI7.0 (but the datasoucre and data flow are still 3.x).
After all Post processing of ECC6.0 Upgrade activities, the source system is only available to users for posting the transaction.
Please let me know if we need to delete all the delta queues and re - initialize delta.
1.We are not installing any new business content extractors from ECC6.0 - Just using same 4.6c extractors and structures.
2.And consider that no users post any transaction after clearing the delta queues in RSA7.
Appreciate your feedback,

Hello Subbu,
There is no need to reinitialize the extractors, the steps you mentioned in your original post are enough, the reason
for these steps is to make sure that there is no data left in sm13, lbwq, ras7, setup tables etc, you need to run the related infopackages twice on the BW side to clear the BW repeat part of the queue in RSA7, if you have a doubt that this was
not done you can goto rsa7, select the queue and on the next screen you can check if there is any data available in the
delta repeat part of the queue.  
The reason for the step is that that the upgrade could potentially change an extract structure for a datasource and then if you
have data in the old format it may not be possible to upload it in the old format.
I repeat though there is NO need to delete the current entries in RSA7 and reinitialize.
Best Regards,
Des

Similar Messages

  • ECC6 Upgrade and EHP 4 because of a CRM7 in the landscape?

    Hi,
    I am in the way to upgrade my SAP 4.6c system to ECC6.
    In my overall landscape, I have a CRM 7 installed.
    Do you believe I need to perform a simple ECC6 upgrade or a ECC6 upgrade including EHP4 SR1?
    In other words, is it mandatory to go through the Upgrade + EhP4 because I have a CRM 7 around?
    Thank you,
    Chris

    Hi,
    according to my view upgrade from SAP 4.6c to ERP 6.0 EHP4 is easy because you can save your time in all preparation task that you to carry before starting upgrade as EHP upgrade itself takes time for preaprtion task....
    also, you can reduce the downtime of your production environment if you will directly go to ERP EHP4..
    As EHP4 takes significant downtime to upgrade the system ( also depends on hardware and database size)...
    Also, you can reduce probablity of error free upgrade by carrying out one upgrade instead of carrrying out 2 upgrade (from SAP 4.6c to ERP6.0 then ERP6.0 to EHP4)...
    Hope it clears to you...
    Thanks
    Sunny

  • Combined Upgrade and Unicode conversion of Sap 4.6C to ECC6.0

    Hello all,
    my project team intends to carry out a combined upgrade and unicode conversion of an SAP ERP 4.6C system with MDMP to ECC6.0 (no enhancement package). The system is running on Oracle 10.2.
    In preparation for this upgrade, I have gone through the SAP notes 928729, 54801.
    We need to get a rough estimate of the entire downtime so as to alert our end users. From the CU&UC documentation in 928729, I read up note 857081. However the program in this note cannot be used to estimate the downtime as my system is < SAP netweaver 6.20.
    Is there any other SAP note or tool or program that I can use to estimate the downtime for the entire CU&UC? Thanks a lot!

    Hi,
    Combined upgrade depend upon number of factors like database size, resources on the server and optimization. In order to get idea of how much downtime, it will take, I would suggest you to do combined upgrade and unicode conversion on sandbox system which should be the replica of your production system. And try to optimize it. From there you can get approx. downtime required.
    Also, please read combined upgrade and unicode conversion guides on  http://service.sap.com/unicode@sap
    Thanks
    Sunny

  • 4.7EEx1.10 to ECC6.0 upgrade and Unicode conversion

    Hi Experts,
    We are going to initiate the upgrade from next month onwards. Subsequently i have started preparing the plan and strategy for the same.
    As our current setup is 4.7EEx110/Win 2003 R2-64 bit/Oracle 10.2.0.4.0 (Non unicode). And we have recently migrated on to this setup from WIn2k 32 bit. Also the current hardware is Unicode compatible.
    With respect to strategy for achieving this Upgrade and Unicode conversion, i am planning as follows.
    Step 1) Perform Unicode conversion on the current landscape (Both Export/import on the same servers)
    Step 2) Setup Temporary landscape as part of Dual maintenance strategy and migrate data from the current systems to temporary systems using backup/restore method.
    Step 3) Perform the SAP version upgrade on the current landscape and setup transport routes from temporary to current landscape in order to keep it in sync
    Step 4) after successful upgrade, decommission the temporary landscape
    Please provide your suggestions and valuable advices if there is anything wrong with my strategy and execution plan.
    Regards,
    Dheeraj

    Hi,
    Thanks. As i have already referred these notes as i am seeking advise with respect to my upgrade approach.
    However i have planned to perform in the following manner.
    1) Refresh Sandbox with Prod data and perform Upgrade to ECC6.0 EHP5 & subsequently Unicode conversion on the same server (Since both export & Import has to perform on the same hardware as we have recently migrated on this hardware which is Unicode compatible)
    2) Setup temporary landscape for DEv & QAs and establish transport connection to Production system in order to move urgent changes
    3) Keep a track of the changes which have transported during upgrade phase so that the same can be implemented in the upgraded systems i.e. Dev & QAS
    4) After Sandbox Migration and signoff, we will perform Dev & QAS upgrade & unicode conversion on the same hardware (Note: Since these are running on VMware can we export the data from the upgraded system and import on to a new VM?)
    5) Plan for production cutover and Upgrade the Prod system to ECC6.0 Ehp5 and then Unicode conversion. As i am planning to perform upgrade over the weekend and then Unicode conversion activity in the next weekend (Is it a right way?)
    My Production setup: DB on one Physical host and CI on separate Virtual host
    6) After the stabilization phase, we are planning for OS & DB upgrade as follows:
          a) Windows upgrade from 2003 R2 to Windows 2008 R2
          b) Oracle Upgrade from 10.2 to 11.2
    If anyone thinks that there is anything wrong with my above approach and need changes then please revert.
    I have one more doubt as I am going to upgrade 4.7EEx110 (WAS 620, Basis SP64) to ECC6.0 EHp5.As I presume that I can straight away upgrade from the current version to ECC6.0 Ehp5 without installing EHP. Kindly confirm
    Thanks

  • Upgrading ECC5.0 to ECC6.0 and Internet Sales ISA4.0 CRM4.0

    We are performing a technical upgrade of ECC5.0 to ECC6.0 and we are seeking confirmation and instructions for connecting our existing ISA4.0 system to ECC6.0.  I have searched OSS and SDN and queried our SAP account manager for some confirmation and documentation on ISA4 and ECC6.0 compatability
    Any advice, confirmation and documentation on connecting Internet Sales version 4.0 component to ECC 6.0 is greatly appreciated.
    Here are the details of our ISA4 system
    Kind regards
    ISA System
    sap.com      SAP-JEE      6.40 SP9 (1000.6.40.9.0.20041119045409)      
    sap.com      com.sap.mw.jco       (6.4009.00.0000.20041026130530.0000)
    sap.com      com.sap.security.dbschema       (6.4009.00.0000.20041115123517.0000)
    sap.com      crm.b2b       (400.200904212104)
    sap.com      crm.b2b_lanl       (400.200904221705)
    sap.com      crm.b2c       (400.1020060105115443.0000)
    sap.com      crm.mcm       (400.1020060105115443.0000)
    sap.com      crm.shopadmin       (400.1020060105115443.0000)
    sap.com      crm.trexr3       (400.1020060105115443.0000)
    sap.com      IAIKSecurityFS       (1.3.12)
    sap.com      isacoreddic       (400.1020060105115443.0000)
    JDK 1.4.2_11-b06
    TREX6.1
    Windows 2003 (x86) 5.2
    Warm regards
    Lee Lewis

    When an incorrect password is entered, the expected message:
    "Name or password is incorrect (Please repeat logon) "
    is displayed.  When the correct password is entered, this message is displayed:
    "Error in user administration"
    No error messages are logged during the login attempt, only the following:
    Message , Datasource
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][actionxecution]='end' [actionclass]='com.sapmarkets.isa.isacore.action.b2b.LoginAction' [path]='/b2b/reallogin' [forward]='/b2b/login/login.jsp' [exectime]='94' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofunctionexecution]='end' [funcname]='BAPI_USER_GET_DETAIL' [ashost]='sapsbx' [sysid]='SBX' [exectime]='31' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofuncionexecution]='begin' [funcname]='BAPI_USER_GET_DETAIL' [ashost]='sapsbx' [sysid]='SBX' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofunctionexecution]='end' [funcname]='SUSR_LOGIN_CHECK_RFC' [ashost]='sapsbx' [sysid]='SBX' [exectime]='15' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofuncionexecution]='begin' [funcname]='SUSR_LOGIN_CHECK_RFC' [ashost]='sapsbx' [sysid]='SBX' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofunctionexecution]='end' [funcname]='RFC_SYSTEM_INFO' [ashost]='sapsbx' [sysid]='SBX' [exectime]='0' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][jcofuncionexecution]='begin' [funcname]='RFC_SYSTEM_INFO' [ashost]='sapsbx' [sysid]='SBX' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][actionxecution]='begin' [actionclass]='com.sapmarkets.isa.isacore.action.b2b.LoginAction' [path]='/b2b/reallogin' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][actionxecution]='end' [actionclass]='com.sapmarkets.isa.isacore.action.DetermineBrowserVersionAction' [path]='/b2b/login' [forward]='/b2b/reallogin.do' [exectime]='15' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]
    Feb 9, 2010 12:03:54 PM                     bbtracing.isa.runtime [SAPEngine_Application_Thread[impl:3]_34] Debug: [(J2EE3718900)ID3718950DB871103440658474576End|?][actionxecution]='begin' [actionclass]='com.sapmarkets.isa.isacore.action.DetermineBrowserVersionAction' [path]='/b2b/login' , 52 [Server 0 0_37189:D:\usr\sap\SSD\JC00\j2ee\cluster\server0\apps\sap.com\crm.b2b_lanl\servlet_jsp\b2b_lanl\root\WEB-INF\logs\isaruntime.log]

  • SAP ECC6 memory and paging issues

    Dear Experts
    I have recently upgraded my 4.6C systems to an ECC 6 system (DB2 LUW 9.5 on AIX 5.3 TL9 64 Bit OS)
    I have been running the LPAR with 14 GB of memory and we are around 100-200+ users using the system, I was monitoring using nmon and found that Physical Memory was around 99.8% Used   (14311.8MB and 22.6MB was free) also the paging space was around 37.2% in result causing the system at times to run slow which can have a very negative effect on the users.
    After further investigation I found that after a system restart the Physical Memory would start around 50.9% and increased at a steady pace until it reached 99.8% that is when the system would start using the paging space which would steadily increase, I found that the only solution was a system restart at least once a week to reduce the memory consumption.
    At first glance it looked like a database manger memory leak with the process db2sysc, so I searched the net with the search words u201Cdb2 memory leaku201D and found the following APARs and notes.
    APAR JR30285 - Pervasive memory leak when compiling SQL statements that use SQL/XML functions
    APAR IZ35230 - There is a pervasive unix-specific private memory leak in the security component
    Note 1288341 - Memory leak in APPLHEAPSZ -> SQL0954C 
    Note 1352361 - Memory leak in shared memory area abrfci
    Note 1147821 - DB6: Known Errors and available Fixes in DB2 9.5 LUW
    After reading the notes and APARs I decided to updated DB2 to the latest fix pack (5SAP), but after the fix pack was implemented it did not solve the memory problem
    I started look at different problems with SAP ECC6, db2 and AIX with paging/memory problems and I found the following notes to do with AIX memory and paging but none of them helped as all parameters and settings were set accordingly  
    789477 - Large extended memory on AIX (64-bit) as of Kernel 6.20
    191801 - AIX 64-bit with very large amount of Extended Memory
    973227 - AIX Virtual Memory Management: Tuning Recommendations
    884393 - AIX saposcol consumes large amount of memory.
    856848 u2013 AIX Extended Memory Disclaiming 
    1048686 u2013 Recommended AIX settings for SAP
    1121904 u2013 SAP on AIX: Recommendations for Paging
    1086130 u2013 DB6: DB2 Standard Parameter Settings
    After even more investigation I found the following evidence suggesting AIX Virtual Memory Manager might have a problem

    Shared memories inside of pool 40
    Key:       42  Size:    17792992 (  17.0 MB) DB TTAB buffer              
    Key:       43  Size:    53606392 (  51.1 MB) DB FTAB buffer              
    Key:       44  Size:     8550392 (   8.2 MB) DB IREC buffer              
    Key:       45  Size:     7014392 (   6.7 MB) DB short nametab buffer     
    Key:       46  Size:       20480 (   0.0 MB) DB sync table               
    Key:       47  Size:    10241024 (   9.8 MB) DB CUA buffer               
    Key:       48  Size:      300000 (   0.3 MB) Number range buffer         
    Key:       49  Size:     2769392 (   2.6 MB) Spool admin (SpoolWP+DiaWP) 
    Shared memories outside of pools
    Key:        3  Size:   114048000 ( 108.8 MB) Disp. communication areas   
    Key:        4  Size:      523048 (   0.5 MB) statistic area              
    Key:        6  Size:   692224000 ( 660.2 MB) ABAP program buffer         
    Key:        7  Size:       14838 (   0.0 MB) Update task administration  
    Key:        8  Size:   134217828 ( 128.0 MB) Paging buffer               
    Key:        9  Size:   134217828 ( 128.0 MB) Roll buffer                 
    Key:       18  Size:     1835108 (   1.7 MB) Paging adminitration        
    Key:       19  Size:   119850000 ( 114.3 MB) Table-buffer                
    Key:       41  Size:    25010000 (  23.9 MB) DB statistics buffer        
    Key:       63  Size:      409600 (   0.4 MB) ICMAN shared memory         
    Key:       64  Size:     4202496 (   4.0 MB) Online Text Repository Buf. 
    Key:       65  Size:     4202496 (   4.0 MB) Export/Import Shared Memory 
    Key:     1002  Size:      400000 (   0.4 MB) Performance monitoring V01.0
    Key: 58900114  Size:        4096 (   0.0 MB) SCSA area                   
    Nr of operating system shared memory segments: 16
    Shared memory resource requirements estimated
    ================================================================
    Total Nr of shared segments required.....:         16
    System-imposed number of shared memories.:       1000
    Shared memory segment size required min..:  692224000 ( 660.2 MB)
    System-imposed maximum segment size......: 35184372088832 (33554432.0 MB)
    Swap space requirements estimated
    ================================================
    Shared memory....................: 1654.8 MB
    ..in pool 10  328.6 MB,   58% used
    ..in pool 40  143.3 MB,   30% used
    ..not in pool: 1174.1 MB
    Processes........................:  413.4 MB
    Extended Memory .................: 6144.0 MB
    Total, minimum requirement.......: 8212.2 MB
    Process local heaps, worst case..: 3814.7 MB
    Total, worst case requirement....: 21882.9 MB
    Errors detected..................:    0
    Warnings detected................:    3

  • Combined upgrade and Unicode conversion for ECC5 MDMP system

    Hello,
    We are planning to do Upgrade and Unicode conversion of ECC5 MDMP system to ECC6 EHP4 Unicode. We are adopting Combined upgrade and Unicode conversion strategy to minimise the downtime.
       In source version ECC5 we are in support pack level 6. Should we need to update the support pack to any target version to start with CU&UC or we can start with ECC5 with SP 6 itself.
    Since we cant afford more downtime for support pack update also, is it ok to start with upgrade and unicode conversion with current version.
    please advice.
    Regards
    Vinay

    Hello Vinay,
    please note that as a prerequisite the Basis SP should be accurate for an MDMP conversion.
    There is no MUST to have the latest Basis SP, but without you could have severe issues in SPUMG.
    On the application side, there are in most cases no hard requirements on the SP level.
    Best regards,
    Nils Buerckel
    SAP AG

  • Combined Upgrade and Unicode Conversion

    Hello, I'm planning to implement an Upgrade from I386/ORA8/46C TO I386/ORA10/ECC6 using CUUC method.
    According to the guide, I better build up a sperate Sandbox Server for ABAP Program Modification and Testing. Since the customed ABAP Reports used to be related with the customed table, I suppose the best way for the Sandbox Server is to upgrade it to higher version.
    I'm running the Prepare and stuck on the Transport Request import. The sandbox server is not ready yet in a few days.
    My question is, can I just ignore the ABAP Program Import at the current phase and import it at the end of 'Prepare' and before the 'Upgrade'.
    If yes, how?  mannually import the TR for Abap Program changes to 46c after the 'Prepare' finished?  Any steps that I should pay attention to spcially?
    Any experience is welcome.
          Thanks in advance and BR,   Sam

    This would depend on whether your quality and production are consistent in terms of modifications along with your development server. If all changes to quality and production has happened through changes in development and then transporting those changes to qas and prd, then i would suggest when you run your development system upgrade (sandbox in this case) ideally you should do the changes and modifications and record them in transport request using the option "select for transport". Later when you upgrade another sandbox (copy of qas or prd) you should select the transport request to be imported during the prepare.
    But as you are now running PREPARE for copy of development, the prompt for importing transport request into this system is irrelevant and you should say " no" and complete the upgrade, and then the process outlined above..
    Hope this helps.
    Cheers,
    Chetan

  • Table download difference in ECC6.0 and 4.7

    Hi All,
    I am downloading the Z table contents from ECC6.0 and 4.7 as a spreadsheet. But there is a difference in the column position in the excel sheet. for eg. in 4,7 EBELN is placed in column E in excel sheet , while if same table downloaded from ECC6.0, EBELN is placed in column D in excel sheet.
    Please guide, why there is a difference.
    Thanks & Regards
    Akshay

    Hi,
    The ECC6 comes with the inbuilt functionality of New GL which helps in Parallel Accounting, Multiple Reporting Requiremnets, Real time CO to FI Integration, Online document splitting, Integration of management dimensions in the GL etc.
    All these functionality there by helps in fast Period end close or Month end close activities as there is no need to run JOBS or Programmes in moth or period end because of Real time integration.
    Also the Reduction in TCO from Companies point of view.
    These functionalities doesnt come in 4.7 either you intall New GL in 4.7 or upgrade to ECC6.0
    For more details go to help.sap.com.
    Regards
    Shireesh

  • 46C- ECC6 upgrade with EHP4 SAP_BASIS package not found

    We are executing an upgrade from 46C to ECC6 SR3 and binding in EHP4.
    We have successfully downloaded EHP4 using Solution Manager MOPZ and
    provided the generated "XML" file during the PREPARE.
    During the phase EHP_INCLUSION, PREPARE is stopping with a message "No
    matching SAINT package for 'SAP_BASIS' found".
    The KB70102.SAR and KB70103.SAR packages from EHP4 have definitely been unpacked
    and are available in /usr/sap/trans/EPS/in and we have prompted PREPARE to search EPS/in but it just returns to the previous error after searching.
    It appears from the logs that the upgrade is expecting a "SAINT"
    install package for SAP_BASIS and does not consider the KB70102/3
    patches as acceptable?
    Any clues as to why PREPARE is not accepting the SAP_BASIS packages and looking for a SAINT install?
    Below is an excerpt from the EHP_INCLUSION.LOG
    2 ETQ732 Package descriptions uploaded successfully
    4 ETQ399 Looking for SAINT package for 'SAP_BASIS' ...
    4 ETQ399 ... Read uploaded packages calling function module:
    4 ETQ399      current: name = 'SAP_BASIS', release = '700'
    4 ETQ399      patch type = 'U', ncvers-component = 'SAP_BASIS'
    4 ETQ399 R3upReadNewPackages:
    4 ETQ399   patchType='U', langVect='DEFS'
    4 ETQ359 RFC Login to: System="CB1", Nr="00", GwHost="dbusrcb1", GwService="sapgw00"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "spda_read_new_packages" by RFC
    4 ETQ399   ismovesVersion='0'
    4 ETQ399 R3upReadNewPackages: exit: rc=0
    4 ETQ399 ... No matching package found.
    Regards,
    Mike Tarr

    Ok, I was able to download the K-701DHINSAPBASIS package from Service Marketplace and this resolved the SAP_BASIS problem.  Thank you Markus for this solution.
    I also downloaded the SAP_ABA, SAP_BW, and the PI_BASIS components and unpacked those as well in /usr/sap/trans/EPS/in.    My upgrade is now stuck asking for a SAINT package for SAP_ABA!  I'm sure the SAP_ABA install, K-701DHINSAPABA, is unpacked and available in /usr/sap/trans/EPS/in.
    The SAP_ABA files are definitely readable and there are entries in table PAT03_SDA for them.
    I have a ticket open with SAP support but they have not had a solution yet for the SAP_ABA
    Solution Manager failed to identify any of these packages as required in MOPZ.
    I'm starting to wonder if anybody has ever done a 4.6C to ECC6 upgrade with EHP4 bound before?
    Any ideas on the SAP_ABA would be appreciated.  Here's a section of the EHP_INCLUSION.LOG file from PREPARE.  
    4 ETQ399 R3upReadNewPackages: exit: rc=0
    4 ETQ399      Found: name = 'SAP_BASIS', release = '701', package = 'SAPK-701DHINSAPBASIS'
    4 ETQ399 ... Matching package found: 'SAP_BASIS','701','SAPK-701DHINSAPBASIS'
    4 ETQ399 (trc) R3upPatchDisassembleQueue: 1 package queue entries
    4 ETQ399 (trc) R3upPatchDisassembleQueue: force=NO
    4 ETQ399 (trc) R3upPatchDisassembleQueue: 0 packages will be disassembled
    4 ETQ399 ... ... INST/UPG SAINT decision ok
    4 ETQ399 ... EhP component SAP_ABA, 701
    4 ETQ399 Looking for SAINT package for 'SAP_ABA' ...
    4 ETQ399 ... Read uploaded packages calling function module:
    4 ETQ399      current: name = 'SAP_ABA', release = '700'
    4 ETQ399      patch type = 'U', ncvers-component = 'SAP_ABA'
    4 ETQ399 R3upReadNewPackages:
    4 ETQ399   patchType='U', langVect='DEFS'
    4 ETQ359 RFC Login to: System="CB1", Nr="00", GwHost="dbusrcb1", GwService="sapgw00"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "spda_read_new_packages" by RFC
    4 ETQ399   ismovesVersion='0'
    4 ETQ399 R3upReadNewPackages: exit: rc=0
    4 ETQ399 ... No matching package found.
    4 ETQ010 Date & Time: 20090511150018

  • RGGD1300_FISL dump in ECC6 upgrade

    Hi all,
    In ecc6 upgraded system(from 4.6c) while running the program RGGD1300_FISL the error
    Message type " " is unknown  has been displayed. It is due the following code.
    IF sy-subrc <> 0.
       MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
             WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    endif.
    In the abv code the sy-msgid and sy-msgty were empty. So after executing the statement it throws an error.
    How to solve this issue?
    Regards,
    Kumar.

    not answered

  • IPPE in Equipment  - Consistency Checks -- ECC6 Upgrade Problem

    HI All,
    We're upgrading from 46C to ECC6. Currently 46C, we don't use iPPE and use IE4N to do install and removal for equipments (issue out reservations).
    When we upgrade and try to use IE4N, we get the following message:
    No structure gap exists at Equipment <XYZ> (warning message)
    No coresponding iPPE structure node foun for function identifier (hard error).
    We don't have iPPE setup on equipments, from the documentations on SAP, it mention you can set up on Configuration Tab on IE02. But we don't have that tab.
    So how can I bypass iPPE setup in IE4N? Is it part of the switch framework that I can switch off?
    I want IE4N to behave like before the upgrade. Any suggestions? has anyone come across the same thing?

    I have created an OSS incident with SAP. But they basically came back and said pay their consulting service and have them come out to help us.
    As a work around, I found transaction: OMPL1. It allows you customize the error level, whether its error, warning, etc. I turned IPPE error message from an error to warning.

  • Difference between ecc6.0 and 4.7

    hello gurus
    what are the major difference between ecc6.0 and 4.7

    Hi,
    The ECC6 comes with the inbuilt functionality of New GL which helps in Parallel Accounting, Multiple Reporting Requiremnets, Real time CO to FI Integration, Online document splitting, Integration of management dimensions in the GL etc.
    All these functionality there by helps in fast Period end close or Month end close activities as there is no need to run JOBS or Programmes in moth or period end because of Real time integration.
    Also the Reduction in TCO from Companies point of view.
    These functionalities doesnt come in 4.7 either you intall New GL in 4.7 or upgrade to ECC6.0
    For more details go to help.sap.com.
    Regards
    Shireesh

  • Recently did an upgrade and lost all my contacts

    recently did an upgrade and lost all my contacts

    Try to check if iTunes made a backup before upgrading the phone. You can check via iTunes or use iPhone Backup Extractor. If there is, you can restore from backup to get your contacts back or simply extract them using the iPhone Backup Extractor. It's worth a try, good luck!

  • IPod touch is not recognized by Windows (with a connect to iTune screen) after OS 5.1.1 upgrade and received an 1602 error

    My iPod touch is not recognized by Windows 7 and will not appear on My Computer as a storage device after OS 5.1.1 upgrade and received an 1602 error.  My iPod is now having a connect to iTune screen.

    Error 1600, 1601, 1602: Try the following steps to resolve this error:
    Ensure proper USB isolation troubleshooting has been performed, and test with a known-good cable.
    Follow the steps listed for Error 1604.
    This error may be resolved by disabling, deactivating, or uninstalling third-party security, antivirus, and firewall software. See steps in this article for details on troubleshooting security software.
    http://support.apple.com/kb/TS3694#error1602

Maybe you are looking for

  • Rollback transactions in CAF

    Hi,      If we execute a method from a webservice developed  in CAF. The transaction get commited and the data gets stored in the Business objects.      Is there any way to rollback the transactions, Suppose if the UI faces some error then can we rev

  • Space Designer resets Wet + Dry mix amounts when sample dragged

    Hi, There is a fairly annoying bug with space designer. Try this: 1. Insert space designer on a track. 2. Turn down the DRY mix to zero, and the WET mix to full. 3. Open the Logic browser, and find a wav file to drag into space designer. 4. Drag the

  • "Starting TomCat"

    Hello, What is the significance of setting up JAVA_HOME for Tomcat? Thanks

  • Cannot get on the Safari 2.04 Forum -keep receiving error message

    I can log in but cannot get to the Safari for Mac Forum anymore ! Keep receiving error message - contact administrator - I click on the Forum link and keep getting the error - The search forums link works but the main forum link does not. Have they d

  • Filter Projects in JDev

    Dear All, I am used to working with eclipse and I just started out learning Jdeveloper. In eclipse, you could create separate workspaces for your projects and have the ability to switch between workspaces. Does Jdev have this feature also? My problem