ECP Upgradtion from 46c to ECC 6.0

Hi,
Our client is upgrading PS from 4.6c to ECC 6.0 (Technical upgrade). In PS we are extensively using nested ECP and in this we are using HTML code in a costmodel template and the formula in derivation rule.
Is  this formula and the HTML code will be moved to ECC6.0 from 4.6c while upgradation? or having any other option?
Thanks for your help in advance.
Krishna.
Edited by: krishna.gujju on May 12, 2010 8:34 PM

Hi,
you have to apply the same type of packages as before.
All other are included in ECC, but if you don't use the special services and applications (for example IS Oil or stuff like this), there is no need to apply all these packages.
SAP_ABA 700 0006
SAP_BASIS 700 0006
ST-PI 2005_1_700 0001
PI_BASIS 2005_1_700 0006
SAP_AP 700 0003
SAP_HR 600 0003
SAP_APPL 600 0003
should be enough
Regards
Timm

Similar Messages

  • Upgrade from 46C to ECC 6

    Hello:
    We are planning to begin technical upgrade in SAP, from 46C to ECC 6.0.
    I have the next landscape:
    -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    We want to install SAP ECC 6.0 in NS and get the data from CS.
    Which is the best and easy way to do this? SAP manuals are quite generic. I have two ideas but I would like your comments:
    1st way
    1. Homogeneous copy of CS
    2. I install ECC 6.0 in NS with the option to import data generated in 1. (is this possible??)
    3. Finish installation and aditional configurations. I begin to test.
    2nd way
    1. Homogeneous copy of CS
    2. I install 4.6C in NS with the option to import data generated in step 1. (Not sure if 4.6C will accept Solaris 10 and Oracle 10.2).
    3. I suppose I don't need to reconfigure after installation and import.
    4. I do necessary tests. At this point I would have 46C on the new versions of Solaris and Oracle.
    5. I begin the SAP upgrade to ECC 6.0 in NS
    6. .... The remaining processes indicated by SAP
    Thanks for your attention.

    > -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    > -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    The database software is usually installed during the run of sapinst/R3setup, not before. You may run into problems if you pre-install Oracle (environment, necessary database options not set etc.)
    The easiest way would be do to a system copy.
    I would then
    - install the latest Oracle instantclient
    - install the latest kernel 46D_EX2 kernel
    Markus

  • Error in upgrade from 46c to ecc 6.0

    hi experts,
    we are facing an error at the time of upgrade from 46c to ecc 6.0 in the phase JOB_RSUPGAIMEXE.
    did anyone face this error anytime during upgrade on windows plotform?
    Please let us know your comments..
    regards
    raghu

    Hello,
    Can you please look in the /put/log directory and copy the error from the appropriate log file. You should find a log file with a name similar the to upgrade phase that is causing the error.
    Thanks
    N.P.C

  • Upgrade from 46c to ECC 6.0 new components support package

    dear experts,
    we have upgraded our test system from 46C to ECC 6.0
    before upgrade in 46C we have support packages components
    SAP_BASIS 46C
    SAP_ABAP 46C
    SAP_APPL 46C
    SAP_HR
    PI 2003_1_46C
    SAP_NOTES 46C
    ST-A/PI 01B_R3_46C
    ST-PI 2005_1_46C
    after upgrade to ECC 6.0 we found
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_BW 700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    EA-IPPE 400 0003
    EA-HR 600 0003
    EA-GLTRADE 600 0003
    EA-PS 600 0003
    EA-RETAIL 600 0003
    EA-FINSERV 600 0003
    EA-DFPS 600 0003
    EA-APPL 600 0003
    FINBASIS 600 0003
    ECC-DIMP 600 0003
    ERECRUIT 600 0003
    FI-CA 600 0003
    FI-CAX 600 0003
    INSURANCE 600 0003
    IS-CWM 600 0003
    IS-H 600 0003
    IS-M 600 0003
    IS-OIL 600 0003
    IS-PS-CA 600 0003
    IS-UT 600 0003
    LSOFE 600 0003
    SEM-BW 600 0003
    we are planning to apply SPS 06. Is it mandatory we have to apply
    all the support packages in SPS 06.
    we are confused as we dont use IS-OIL,EA-,ERECUIT,INSURANCE,FI-
    please suggest which support packages we have apply relating to the
    functionality we have in 46C
    regards
    Raghu

    Hi,
    you have to apply the same type of packages as before.
    All other are included in ECC, but if you don't use the special services and applications (for example IS Oil or stuff like this), there is no need to apply all these packages.
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    should be enough
    Regards
    Timm

  • Upgrading from 46C to ECC 7.0

    Guys,
    My company is going to upgrade R/3 46C to ECC 7.0 later this year.  From the development (ABAP programs, any ABAP objects) standpoint, any suggestions on preparation, or what can be done in our current 46C environment to ensure a smooth transition from 46C to ECC (unicode, obsolete ABAP syntax, etc)?  Also any idea and recommendation on planning the upgrade, as well as things to watch out for are welcome.
    Thanks,
    Yan.

    First ECC 7.0 does not exist, so you will be upgrading to ECC 6.0.  And yes, you can start by doing a start for any calls to WS_UPLOAD and WS_DOWNLOAD.  You will need to change these calls to call the GUI_UPLOAD or GUI_DOWLOAD function modules.
    Other syntax issues will need to be handled after the upgrade, like using the ECODING extension on all OPEN DATASET statements.
    Regards,
    Rich Heilman

  • Short dump in MIGO and VL02N when upgrading from 46C to ECC 6.0

    Hello,
    We are doing an upgrade from R/3 46C to ECC 6.0 and we face a shortdump in trx MIGO (upon saving the document).
    DBIF_RSQL_INVALID_REQUEST
    a BKPF_INSERT in program SAPLF005
    The same shortdump happens when doing a Goods Issue on the SD side.
    Looking at the program, this is not modyfied so I guess it is a standard SAP error.
    OSS however, up to know did not respond to my message and there does not seem to be a SAP Note on this issue!
    Anyone had this problem before. How did they solve it.
    Thanks for any reply,
    Aart

    Posted in another forum

  • Error in Zreport while upgrading from 46C to ECC 6

    Hello Experts,
    I am facing problems in 1 Zreport while i have upgraded that report from 4.6C to ECC 6. Dump is reported while running the program.
    Error is : "Access non-existent storage area."
    error is coming @ line :  ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    FIELD-SYMBOLS: <f1> TYPE ANY,
                   <f2> TYPE ANY,
                   <f3> TYPE ANY.
    DATA: v_totval LIKE lfc1-um01h.
    IF <f1> IS ASSIGNED  AND
         <f2> IS ASSIGNED  AND
         <f3> IS ASSIGNED.
        ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    ENDIF.
    can you ppl please tell me any solution as its urgent !
    thanks in advance.

    this is fine for me.
      DATA: BEGIN OF numbers,
              one   TYPE p VALUE 10,
              two   TYPE p VALUE 20,
              three TYPE p VALUE 30,
              four  TYPE p VALUE 40,
              five  TYPE p VALUE 50,
            END OF numbers,
            sum     TYPE i.
      SELECT-OPTIONS position FOR sum.
      ADD numbers-one THEN numbers-two
                      UNTIL numbers-five
                      ACCORDING TO position
                      GIVING sum.
    A

  • Recommandations for upgrading from 46C to ECC 6.0

    Hello
    Our SAP system landscape is actually in 46c and is only composed of 3 servers with almost 40 users declared (25 actives) on production system. Modules FI/CO HR MM are actually implemented.
    We plan to upgrade the system to ECC 6.0 between March and August of 2009. The evaluation of the upgrade should begin as soon as possible. Do you think it can be possible to realise the upgrade alone, without the help and expertise of a SAP consultant? Do you think the delay for preparing the upgrade is suffisant?
    Thank you.

    As suggested earlier, refer to Master and technological guides for reference.
    also for information, the upgrade can fall under any below scenarios.
    1. Strategic Business Improvement
    Focus on functionality extension and improvement
    Enablement of new and optimized business processes and scenarios based on new ERP core functionality
    2. Functional/Retrofit Upgrade
    New functionality to be implemented as part of the upgrade, modification clearing
    Focus on reduction of system complexity
    3. Technical Upgrade
    Focus on pure technology upgrade
    Retain functionality used
    Review Usage of custom developments
    As per the requirement.  knowledge and experience the decision can be made.

  • Upgrade from 46c to ECC

    Hi,
    Can you please explain me the complete procedure to be followed and precautions to be taken for upgrading SPAU(program,func groups,data elements,tables,structures, etc) objects, SPDD objects and custom objects(programs,func grps etc..) from 4.6c to ECC version.
    Thanks,
    Laks.

    Hi ,
            The Precautions are .
    1 .SPDD transaction should be executed 14 days before the upgrade .
    2 .SPAU transcation should be executed after the Upgrade.
    3 .Maximum error in SPAU can be resolved using Basis and Function Consultant support .
    4 Maximum errors are in BDC,Sapscript ,Userexits which deal with standrad transaction .
    5 .Also take care about The Unicode errors.
    6 .For Unicode Use Transaction UCCHECK and SCOV.
    Please reward if useful .

  • Upgrade from 46C to ECC 6.0

    Hi All,
    We are upgrading from 4.6C to ECC 6.0.I have downloaded all the SOFTWARE from Service market place except ORACLE 10.2 which I am not able to locate it.
    Do I need to order ORALCE UPGRADE CDS from SAP? or is there any way to find out on the service market place...
    Would appreciate If any of you can throw some light in this regard...
    Thanks in Advance,
    Johnny.

    Of course the DVDs are available for download.
    I do not know your OS, but you can follow this path:
    http://service.sap.com/installations
    Entry by Application Group ( you should also have it available in "My Company's Application Components" )
    From here there are several ways. For example:
    SAP NetWeaver
    SAP NETWEAVER
    SAP NETWEAVER 2004S
    Installation and Upgrade
    Your OS
    ORACLE
    You get a list including oracle 10g

  • ACLDL, Vistex Vendor Keys - Invalid from 46C to ECC 6 (EHP4) upgrade

    HI
    We are upgrading our system from 4.6C to ECC6 (EHP4) directly using
    CUUC approach.
    In the IS_SELECT phase we have got three add-ons
    ACLDL
    IRMGLB
    IRMIPM
    The note 632429 is mentioned to be referred to get the vendor keys.
    But there is no vendor key for the above three addons mentioned.
    I have referred the note 1069063 - Vistex IP Module Upgrade Guidelines.
    It has given three keys
    Target version
    " ECC60                  3406956 1295006
      ECC60 w/ EhP            See below, depends on SAP_BASIS release
    For ECC60 w/ EHP only, if your system is on SAP_BASIS release 700 when starting the update with SAPehpi, then use these keys:
            IRMGLB = 1408873 IRMIPM = 1131158
    For ECC60 w/ EHP only, if your system is already on SAP_BASIS release 701 when starting the update with SAPehpi, then use these keys:
            IRMGLB = 1103857 IRMIPM = 1162672
    I tried all the above three keys, but all are invalid.
    Can anyone help us to provide the valid vendor keys for
    ACLDL (source version - 400)
    IRMGLB (source version - 30B)
    IRMIPM (source version - 30B)
    Thanks & Regards
    Senthil

    Hi ,  we are doing upgrade from R/3 4.6 c to ERP6.0 with EHP4 -SP08.
    during sandbox , I have removed ACCL component and continue the upgrade. I have created OSS messgae and they said check with your ACC vendor team.
    As of now I don't received any issues either development team during UT/IT. ( Integration Testing is going on)
    We are planing to do mock upgrades and let me know if you have any data loss or any issues during testing without ACCDL component.
    Finally , I check with customer and they said we are not using any more ....
    Please advice if any thing is missing ! Appreciate your help.
    Regards,
    Hari

  • Batch Jobs Running during upgrade from 46C to ECC 6!

    Hi All
    We are currently due to run our upgrade in the next two weeks and I have one final concern. The only testing we have not done relates to batch jobs.
    Our upgrade stratergy is downtime minimised.
    Does anyone know any best practices or issues that could effect our upgrade?
    Cheers
    Phil

    Hi Phil,
    If I remember correctly all background jobs in SAP R/3 are de-scheduled by the upgrade process. You have to manually reschedule them after the upgrade so make sure you have good scheduling documentation (or consider the central job scheduling provided by SAP NetWeaver for the future).
    One tip is that you need to make sure that jobs started from other systems are postponed until after the upgrade too (e.g. data extractions to BI). The upgrade process cannot determine job schedules and dependencies in other systems/scheduling tools.
    Cheers,
    Mike.

  • Replication of Business partner from CRM to ECC.

    Hi experts,
    We are working on CRM 5.0 with backend ECC 6.0.
    We are facing a problem while replicating BPs from CRM to ECC. Eventhough we are maintaining language code in CRM, the same thing is not replicating to ECC.
    Can anybody help us how to solve this problem.
    Thanks in advance.
    Regards,
    Madhu.

    we have this issue on CRM006 consumers created as an org.
    SAP gave us function module
    'BUPA_OUTBOUND_BPS_FILL_CENTRAL' to fill the langauge in CRM 5.0 or BUPA_GENERAL_UPDATE .
    We have not implemented either yet.  in r/3 46C we have a small core mode in LVV02F3H to force EN as language.

  • Moving/Transporting programs from 46c to ECC6

    Guys,
    For our upgrade we will start with a ECC6 system from scratch.  The questions are - is there a tool to transport ABAP programs/functions from 46C to ECC6?  Or in your experience it is better to manually do a download from 46C then manually upload to ECC6?
    Thanks for your input.
    Yan Guan.

    Hi Yan,
    If you are upgrading an existing 46C system to ECC 6.0 then the Z and Y programs  in the system will be there even after your upgrade.
    We will start with a brand new ECC system from scratch
    means you are creating a system for the first time as ECC 6.0 ?. Then if there is transport path between your 46C sytem and ECC 6.0 sytem, you can transport the objects. Otherwise go for download/upload option. But I think creating a transport path is the better option.
    Regards,
    Soumya.

  • Mass sales orders from CRM to ECC

    Hi,
    We have a requirement to mass upload sales orders from CRM system ECC system. I could not able to find any option to push sales orders in bulk from CRM to ECC.
    Could you please let me know if you know any kind of solution for this kind of scenario.
    Thanks in advance!
    Regards,
    Kumar B.

    Hi Maggie,
    Thanks a lot for your response. But I could not able find CRMD_MASS_UPDATE in CRM system as well as in ECC.
    Could you please let me know how to try this other please let me know the program or tcode.
    Regards,
    Kumar B

Maybe you are looking for

  • IPod touch 2nd gen hooked up to computer but iTunes doesn't recognize it

    My iPod touch 2g 8GB has always worked fine and synched with the computer, but now the computer doesn't recognze. It is hooked up to the cable and in the USB port. The iPod itself shows that it is charging, so it knows it's in the computer. iTunes sh

  • How do I count occurances in an array

    I have a 2D array of strings and I want to count the number of times a particular word occurs in the array. I have been able to isolate the column that contains the string I want to count but I can't seem to get the code to actually count how many ti

  • Fail to setup GRUB2 framebuffer resolution with fglrx

    I've got ATI Mobility Radeon HD 3650 on my laptop, i use fglrx and i got ugly resolution in grub until i will fix this. I did it before on arch and ubuntu - with Uvesafb but as for now i can't setup it. So my steps are: pacman -S v86d add v86d to the

  • I Mac Freeze up

    Ok.   Apple totally censored my last attempt at a post. My Imac has just been upgraded to "Mavericks", new HD, New Super Drive, Max memory. I did all that because it would contiually Freeze up. It still continually freezes up.   (It took 3 restarts t

  • User can't update time in Task grid; it's read-only

    Project Server 2010.<o:p></o:p> This started a couple of weeks ago for two different users. They suddenly were unable to update hours in the My Work/Tasks grid. They can still see the Planned hours per day, but can't enter a value in the Actual field