Edit Shipping Point in ME2O

Hello All,
When we use ME2O to create deliveries to subcontractors, only the default shipping point can be used.
We have Plants which have multiple ship points for the materials . I would like to know if there is any way to edit the shipping point field and let the user enter it manually ? OR be able to choose a ship point from the drop down?
Please advise..

Any one has the same experience ? Please advise.
thanks

Similar Messages

  • Shipping point determination - ME2O

    I'm using ME2O for creating a delivery. I select a line and i press the Create delivery button. A popup appears but the filed Shipping point is empty. What configuration should i make to have a value in that field?
    The shipp. points are assigned to the plants and the determination using the shipping conditions- loading grp-plant are already configured.
    Thanks.

    hi,
    this is to inform you that,
    ME2O - DELIVERY WITH REFERENCE TO SUBCONTRACTING.
    Please check in IMG:
    1. MM - Purchasing -> Purchase Order -> Setup Stock Transfer Order -> Define shipping data for plants
    2. Select the plant and double click in Enter the following field the sales area for the same.
    5.MM>Purchasing>set up Subcontractor order>assigning plants to the delivery document LB.
    6.Have you created a Customer master record in the same sales area as Material and then assigned it to the Vendor Control data in CMR.
    hope this clears this issue.
    balajia

  • Shipping point for OBD in ME2O for subcontracting PO

    Hi all,
    While creating delivery for subcontracting PO in ME2O ,getting error message " Essential transfer parameters are missing ".
    And for this shipping point it not there,not able to maintain it manually also since it is gray.
    Please advice what is the conditions for automatically picking the shipping point in ME2O - outbound delivery and even after maintainance what may be the reason for not picking automatically in OBD.
    Note :In my case shipping point assigned to plant and shipping condition maintained for that.
    Thanks
    Regards,
    Dhina.

    Hi
      Have u maintained delivery type LB for plant , IN SPRO-PO-SET UP Subcontract Order
    Thanks
    Saurava

  • Multiple Shipping Point in One Plant

    Hello.
    How to decide if we create another shipping point or not.
    We have two warehouses, located far from each other.
    The design is to have just one plant, and create two storage locations.
    Should I make two shipping points for each warehouse and assign to just one plant?
    Share you ideas...
    Thank you,

    Dear Deriada Gemma 
    Shipping point requirement is based on physical locations from which shipment is done, in case you are using Logistic execution then based on shipping point shippings will be done.
    If you have two wh and want to create seperate deliveries for both wh use two seperate shipping points
    you can automatically determine based on plant, loading group and shipping condtion.
    from help you will find few other reason for which seperate shipping point decision can be made
    list list, printing ...etc
    Define, copy, delete, check shipping point                                                                               
    In this step, you define the shipping points in your company or edit              
        shipping points that already exist. In order to adapt the functional              
        scope of a shipping point to the organization in your company, you                
        should process the following check list:                                                                               
    o   The shipping point is the top level in the organization for                   
            shipping.                                                                               
    o   A shipping point can be allocated to several plants.                                                                               
    o   A shipping point can be divided into several loading points.                                                                               
    o   A delivery is always initiated from exactly one shipping point.               
            Thus, all items of a delivery belong to one shipping point. Groups            
            of deliveries also belong to exactly one shipping point.                                                                               
    o   You can influence delivery scheduling via allocation to departure             
            zones.                                                                               
    o   The shipping point can be proposed automatically during order                 
            processing depending on the plant, loading group and shipping                 
            condition.                                                                               
    o   A shipping point has an address.                                                                               
    o   The shipping point is used as a selection criterion for lists of              
            deliveries and the work list deliveries.                                                                               
    o   The shipping point is used as a selection criterion for processing            
            deliveries like printing, picking or goods issue.                                                                               
    o   You can determine the printer destination for messages differently            
            for every shipping point on account of shipping documents.                                                                               
    Regards
    Jitesh

  • Shipping point at storage location level in ME2O

    hi Guys,
    I am using stock transport orders at storage location level, and it works fine, we have a customizing point to configure shipping point at storage location level.
    My doubt is if we can use also shipping point det. at storage location level for creating Deliveries for Subcontracting process in ME2O.
    It works only If I customize the shipping point det. at plant level, not considering the customizing at storage location level.
    kind regards
    Brian

    Dear Ram,
    Can you please specify the configuration that you have made? And which storage location determination rule are you using for your Delivery Type?
    Regards,
    Amitabha

  • Receiving Day / Shipping Point

    Hi Experts!
    When delivering e.g. to Spain from a German shipping point there is a calendar assigned on customer site that has no holiday at all combined with a fixed receiving day "Friday". The German calendar is assigned to the shipping point.
    Because of the route (transit days = 2 days) plus 1 day pick/pack we have always on Tuesdays the material availabiltity day when the delivery starts automatically.
    I realize that in week 21 (holiday on Thursday) the system calculates the Monday as material availability date and I wonder why. Obviously the holiday was considered even the material has already left Germany. In consequence the delivery is too early.
    My understanding is that the settings of the shipping point should calculate only the material availability date and the goods issue date but not more. The Spanish customer is not interested in any holiday in Germany.
    I can't change the setting for the shipping point because our German deliveries have to be kept in this way.
    Any idea?
    Kind regards,
    Hartmut Kroeger

    Hi, thanks for your answer, but this is not what I meant.
    The customer has the goods receiving day intentionally, this is to concentrate all deliveries to him on Tuesday (all material availability dates are Tuesdays).
    Therefore on Customer site everything is OK.
    What I don't understand is that the material availability day was calculated here on Monday.
    Even picking and packing on Tuesday would be OK, then it's sent out anyway. And the following holiday on Thursday should not have any impact on the pack-work in Germany (the '"send work" has alredy finnished then in Germany).
    Therefore my understanding was that any calendar on customer site calculates the goods receiving day (here the Spanish customer) and the calender for the shipping point calculates the Material availability date resp. the Goods Issue date but not the complete transit time.
    In other words: My setting in the Spanish customer has no meaning, anyway all dates are calculated based on the calendar in the shipping point, no matter what calendar is on customer site.
    My problem does not depend especially on a calendar setting on customer site.
    Even without a fix goods receiving day, e.g. for a requested date on Fridays we have the same problem.
    In that week where a holiday is, the system calculates one day earlier even the original dates (without holiday) could be used without any danger. In fact we are delivering too early to that customer.
    Regards,
    Hartmut Kroeger
    Edited by: Hartmut Kroeger on Jun 5, 2009 7:45 AM
    Hi all...
    In the meantime I got the solution!
    As already explained, on customer site everything is OK, same with the shipping point. Problems I had just with the transportation times, I wanted to ignore any holidays there. This is possible by assigning in the routes directly a calendar, of course without any holidays.
    So now all levels are OK for me (customer, routes, shipping point).
    Regards,
    Hartmut Kroeger

  • Shipping point error in sales order creation

    Dear Friends,
    I'm new into customizing in SD. I just crested a new plant, distribution channel, shipping point and have assigned the shipping point to the plant. while trying to create sales order i get this warning message "DOCUMENT /00010 HAS NO CHECKING GROUP (MATERIAL MASTER - PLANT DATA) MESSAGE N0 : W083.
    Also, if i edit for incomplete log it is indicating the following as being missing- SHIPPING/RECEIVING POINT, NO LOADING DATE, NO MATERIAL AVAILABLE DATE, TRANSPORT PLANNING DATE, NO GOODS ISSUE DATE.
    What else do i need to maintain in the customizing  to make it work well
    Thanks in advance

    Dear,
            It is showing because u have not maintained PLANT in MATERIAL MASTER DATA but no need to do so u can directly put into S.O. Iin each line item.
            It is just a warning nmessage just press enter and pass it.
            If still u want to do so then use TCODE ( MMO2) and select SALES ORG1 and under GENERAL DATA u will find PLANT FIELD
            where u can maintain PLANT for matarial but once u maintain data here MATERIAL is restricted to that PLANT so will not allow u to sell it from other PLANT thats why itb is always advisable to keep it blank if you are suppose to sell same MATERIAL from two or more PLANT.
    Regards
    AJIT K SINGH
    HAPPY TO HELP U

  • Shipping point and plant assignment

    Hi,
    When i am maintaining enterprize structure in sd in assignment of organizational unit if i want to assign shipping point to the plant ,its not detecting plant untill i set up sales line(plant+sales organization/distribution channel) .what is the relation between sales line set up with shipping point to plant assingment? please clarify...
    Regards
    Supriya

    Shipping point can ONLY be assigned to a delivering plant.
    2. Plants can be "made" in to delivering plant by assigning Sales Org. , D channel to Plant.
    Therefore after 2 you have the possibility to assign shipping point to the plant (which has been made a delivering plant)
    PS - org unit plant is used in MM, PP and SD etc. but delivering plant is an important org unit for SD.
    From a business process perspective - PP: Plant is a manufacturing unit, MM: Plant is a storage of material unit. But to deliver goods to customers, a delivering plant has to be created. Shipping point is the starting point (& the org unit that controls) of outbound deliveries. Thus shipping point is assigned to Delivering plant.
    This is also logical from a business process perspective!
    Edited by: Typewriter on Aug 19, 2011 3:08 PM

  • Change Shipping Point in STO in Transaction code ME27 / ME22

    Hi Experts,
                      I want to change Shipping point in Transaction ME27 Is it possible i want to change default shipping point with manual shipping point ?
                      Is it possible ?
                       Please help...
    Thanks & Regards,
    Tom

    Thanks for your reply
    I have configured multiple shipping point in same plant
    shipping condition - Loading group - Plant - Prop Ship  Point - Manual shipping point
      03  -                        006      -                  xx      -                  x      -                           y
    In me22 - Item shipping data i am not able to change prop shipping point with manual
    Please help me to solve this problem
    Thanks & Regards,
    TOM
    Edited by: tomsoulsurfer on May 18, 2009 1:37 PM
    Edited by: tomsoulsurfer on May 18, 2009 1:38 PM

  • Help in Shipping point.

    I have a scenario... we are selling water and soda. It is shown like the materials is received here at our plant and sold from here.. but in most cases it is taken directly from the manufacturer and supplied to customers
    So, my client wanst to know which batch has gone from our stock and from manufacturer
    If I maintain difefrent shipping point, is it fine? will it have any implications on MM?
    when I enter sales order, i dont know from where is is going to be shipped. say half from system determined shipping point
    I created a delivery with that. Now rest shud be from other shipping point. I have maintained it als oin OVL2
    But without editing sales order, when I try creating with other Shipping point system is showing "Delivery not possible"
    If I change the shipping point in sales order, it works. But person sitting in plant cant edit sales order
    Any idea?
    Regards,
    Anbu

    Hello Anbu,
    A similar thread is active right nnow in the forum.
    See, in Sales Order for each line item you can have only one Shipping point (you can change this shipping point based on Manual Shipping Point defined in OVL2). But the bottom line is that in one line item there can be only one Shipping point & this Shipping Point Cannot be change at Delivery Level.
    I understand that your Plant person will not have authorization to change Sales Order, but there is no other option.
    The solution can be:
    Create a Sales Order with two line Item of same material. Maintain different Shipping Points for each of the line items.
    Now the Plant person can create Delivery for each Shipping Point based on Actual Quantity dispatches.
    The balance quanty in Sales Order can be closed by person having Sales Order change Authorization.
    Example:
    Say you have to deliver 100 Tons of Material A to Customer.
    In Sales Order create two line Item with Quantities like this:
    Line Item 1 Material A 70 Tons - Shipping Point 1
    Line Item 2 Material A 70 Tons - Shipping Point 2
    Now the PLant person can deliver like this:
    Line Item 1 - 45 Tons
    Line Item 2 - 55 Tons.
    The balance quantity in Sales Order can be closed once quantity of 100 tons is Delivered to Customer by entering Reason for Rejection.
    Hope this Helps,
    Thanks,
    Jignesh Mehta

  • Shipping point determination URGENT!!

    Hi Al,
    Is it possible to assign more then 12 shipping point to shipping conditionloading groupdelivering plant combination in ovl2 t-code?
    Thanks,
    Edited by: Nursa on May 19, 2008 9:01 PM

    Hi nursa
    As 12 is the max in OVL2 if i am  not wrong , as right now i am not in front of SAP system. I think you need to go for the enhancements
    But can i know what is the scenario and what made you to go for more than 12 shipping points?
    Regards
    Srinath

  • Shipping Point Assignment to Plant

    Hi,
    Can anyone tell me the T Code to assign Shipping point to plant.
    Though. I have defined plant in Enterprise Structure, when i go the assignments and try to do this assignment there is only the standard plant appering in the structure and hence am not able to assign the Shipping point for my plant.Am working on ECC 5.0
    Regards,
    Tommy

    Hello Tommy,
    Shipping point to plant assignment T Code : OVXC
    Shipping point determination path:
    spro>logistic execution>shipping>basic shipping function>shipping point & goods receiving point determination-->assign shipping point
    Reward if helpful.
    Regards,
    Priyanka
    Message was edited by:
            Priyanka Dixit

  • Multiple shipping points.

    Hi experts,
    i got a problem in shipping point determination.
    here shipping condition / loading group / plant  are same but have 2 different shipping point..
    not able to give both shipping point here .if i give one shipping point in this determination ..only the same will come in sales order.
    i want an option in sales order from which i can choose one shipping point from multiple option can v do that?
    waiting for the reply
    -Jay

    Hi,
    The shipping point i s determined with the combination of plant, loading group and Shipping condition. Since in your scenario all are same there can be only one shipping point assigned automatically (manual entries can be maintained)
    Any how you can also try the option of asiggning shipping point with the combination od plant/loading group/storage condition and Storage location.
    SPRO --> logistics execution --> shipping --> basic shipping funct --> shipping point and goods receiving point det --> set up storage location dependent shippping point determination
    Steps
    1. Assign the Shipping point determination rule as Storage location specific for the required delivery types.
    2. Assign the shipping point to the combination of plant / loading group / storage condition / Storage location
    Hope this helps you.
    Thanks,
    arun.S
    Edited by: arun subramani on Jul 27, 2011 7:27 AM

  • Every Shipping point has corresponding number range for the HU box number?

    Hi,
    Every Shipping point has corresponding number range for the HU box number assignment?
    For example, we are doing packing, then a Handling Unit number has been generated.  So where to define this number range of the HU number??
    Is it from the SPRO or controled by programs.
    Thanks.

    Hi,
    Please find good stuff on Handling Units Below:
    HANDLING UNITS CONFIGURATION:
    A Step by Step Guide to the SAP Handling Unit Management Configurations
    The SAP Handling Unit Management system allows you to manage the entire movement of the handling units and the materials they contain rather than tracking each material individually. 
    This paper is for the HUM Delivery although some of the contents is related to Inventory under the Logistics General modules.
    Table of Contents
    Objective 
    IMG Menu – The Starting Point 
    Handling Unit Management Overview 
    Start of HUM Outbound Deliveries Manual Packing Configuration 
    Define Number Ranges for Handling Units 
    Define Packaging Material Types 
    Define Material Group for Packaging Materials 
    Define Allowed Packaging Materials 
    Use Handling Unit Supplements 
    Maintain Goods Movements for Handling Unit Stock-Posting 
    Define User Status Profile 
    Set QM Check and Delivery Type for Each Movement Type 
    HU Requirement for Storage Locations and Default Values for Deliveries 
    Packing Control By Item Category 
    Define Requirements for Packing in the Delivery 
    Delivery Type Determination 
    Set Unique Number Assignment for HU Identification 
    Number Range Maintenance for HU Identification 
    Define Number Assignment for Each Packaging Material Type 
    Delivery Output type for Packing List 
    Maintain the Delivery Output Determination Procedure 
    What else to maintain after the Manual Handling Units Configurations? 
    Start of the Automatic Packaging Configuration 
    Define Number Ranges for Packing Instructions 
    Define Determination Type for Packing Instructions 
    Define Number Ranges for Packing Instruction Determination Records 
    What else to maintain after the necessary Automatic Packaging Configurations? 
    Appendix A: How to do Manual Packing for Non-Assigned Handlings Units? 
    Appendix B: Scenario 1 – How to do Manual Packing by Delivery Item? 
    Appendix C: Scenario 2 – How to Manual Pack the Materials into Pallets? 
    Appendix D: How to do Automatic Packing? 
    Appendix E: How to do Goods Movement for Handling Unit Material? 
    Appendix F: How to Unpack the Handling Unit Material? 
    A handling unit is a physical unit that consists of the packaging materials (load carrier / packaging material) and the goods contained therein. A handling unit is always a combination of materials and packaging materials. All the information contained in the material items, such as batches and serial numbers, is always available by way of the handling units.
    Handling units can be nested, meaning that you can also create new handling units from several handling units as often as you like.
    Handling units have unique, scannable identification numbers that can be formed according to standards such as EAN 128 or SSCC.
    Figure 1: Handling unit example
    Structure
    The handling unit object contains the following attributes:
    •     Identification number
    •     Dimensions
    •     Weight
    •     Volume
    •     Status
    •     Materials and quantities
    •     Packaging materials
    •     Packing instructions
    A handling unit consists of a handling unit header and handling unit items. For identification purposes, it is given a unique number.
    Handling unit header
    The header data of a handling unit is divided in the following way:
    •     Weight/Volume/Dimensions
    •     General data
    •     Means-of-transport data
    •     Additional data
    •     Output determination procedure
    For more information about each of these detailed points, see Editing detailed data for handling units.
    Status
    The handling unit is linked to general status management. In this way, the various physical states (planned or implemented) and other attributes (weighed, loaded, blocked or posted goods issue) of handling units can be documented.
    You can use the HU_ST_INIT user parameter when you create handling units without object reference to set which initial status the handling unit is to have when it is created.
    If you want to implement a status of your own, you can define a user-specific procedure for the packaging material type (see also Define Packaging Material Types).
    Handling unit item
    The items of a handling unit can consist of material items, packaging materials or other handling units that appear in an overview. For more information about this overview, see the Contents section of Editing detailed data for handling units.
    To access the item data of an individual handling unit, select the handling unit concerned and choose Goto  Detailed HU data  Contents.
    Integration
    Handling units can be used in all processes within the supply chain.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • While creatinf Depo dec order VA01 i get error  shipping point receivable

    while creatinf Depo dec order VA01 i get error  shipping point receivable   whent i try to enter the point message i get is shipping cond 02 loading group plant not defined

    Dear,
    This is config issue.
    Please follow following Path to do the setting,
    SPRO-- LOGISTIC EXECUTION-- SHIPPING-- BASIC SHIPPING FUNCTION--ASSIGN SHIPPING POINT( DOUBLE CLICK)
    and maintain following data,
    02 (SC)  Loading grp mainatined in Mat. Master(LGrp)   xxxx (Plant )  ur shipping point (PrShp)ur shipping point(MShpPt)
    Note: Please make habbit of updating your thread.If isuue has been resolved pls close ur thread,
                        if not then upadate where are you getting stuck
    Regards
    AJIT K SINGH
    Edited by: AJIT K SINGH on Sep 29, 2010 4:13 PM

Maybe you are looking for

  • Intermittent error 7 occurred at open file+.vi: Open File

    Hello, I tried searching for this but the other threads I found were not quite the same as the problem I am having. I have a test fixture that is running a teststand sequence and this error is occurring intermittently. Sometimes the error pops up whe

  • Error in allocating Excise inv no Interval not found No object J_1IEXCLOC

    Hi, When I try to execute J1IV, I am getting the below error: Error in allocating Excise invoice number Interval not found Number object J_1IEXCLOC Message no. 8I336 All number ranges are maintained for the above object. Please let me know, whether a

  • Edit in Photoshop will not use sRGB

    When I edit images from Lightroom in Photoshop (Ctrl+E), I can set up a colour space to use for the export. Setting it to Adobe RGB or ProPhoto leads to the expected result that Photoshop asks me whether to use the embedded profile or convert to my w

  • Mass Maintenance of PM orders?

    Hi, Can anybody will tell siutable t-code for mass processing of PM orders other than IW38 as it does not have the option of locking, deletion flag features. Thanks & regards,

  • Cannot install applications and/or drag and move files

    I am having issues in Mountain Lion where it is not allowing me to install applications by dragging them to applications or dragging files to move them.. Anytime I do this, it gives me a green circle below the icon with a white plus sign and does not