In order to refresh our SAP ERP system with EHP4 we would like to execute a system copy of the existing SAP EHP4 system.
This system should be installed on the existing server.
Question:
Which parts of the software (SAP, Oracle) do I need to delete before or can I rewrite the existing system with the exported EHP4 system?
Any helpful information will be very appreciated!

Hi!
Many thanks for your reply.
> 1. install MCOD
> 2. Drop database and recreate
The second option means the existing system/database will be rewritten by the new database.
I have a double stack system (ABAP + Java Stack, including Portal)
Question
Does this option (Drop database and recreate) suit in my case (SAP system with double stack) or should delete old SAP system before installing the new one with SAPINST via system import?

Similar Messages

  • How to find time in the existing sap system

    Hello all,
            How to fine time in the existing sap system;where do find the define time in img;plz help me.
    what is the difference between logical system and client?
    plz sugest me
    thanks in advance

    Dear Sameer
    Go to STZAC where you set Time in IMG.
    Thanks
    G. Lakshmipathi

  • How can we change the SID of an existing SAP  system.

    Hi to all basis experts.
    Is it possible to change the SID of an existing SAP system.
    i am performing R3copy method and i want to change the SID of the tar

    check these link
    http://help.sap.com/saphelp_nwmobile71/helpdata/en/aa/1dc94af0fa11d3a6510000e835363f/content.htm
    http://sap.ittoolbox.com/documents/changing-the-ltsidgtadm-password-17764

  • Copy data from one SAP system to another based on conversion rules

    Hi All,
    Please provide your input on how can we copy data from one SAP system to another based on conversion rules.
    Conversion rule :
    vkrog in 110  vkorrg in 120
    1234            4567   
    <<text removed>>
    Thanks
    Edited by: Matt on Feb 16, 2009 4:35 PM

    Please read the Rules of Engagement here: Please read "The Forum Rules of Engagement" before posting!  HOT NEWS!!
    Please note that offering points is against the rules.
    matt

  • BI system copy without the Java :consequences ?

    Hello,
    We have a SAP BI.7 environnement that we are going to sopy from PRD to QAS.
    Actually, our SAP BI.7 includes two different systems the BI-ABAP and the BI-JAVA hosted by two different hosts.
    We have been asked to copy only the BI-ABAP system, not the BI-JAVA.
    What are the consequences of this procedure.
    Since BI-JAVA is by definition hosting the Bex Web, is there any risk of data loss : loosing some bex queries for eexample ?
    Thank you in advance for your help and your attention.

    Because of the user rights we got the issue.
    Thanks,
    Praveen.

  • ** Is it possible to change the IP of the existing Technical System in SLD?

    Hi Friends,
    I want to do RFC to RFC scenario. When I try to import the RFC from the Business System, RFC is not imported. When I looked the corresponding technical system in the SLD, it is having the old IP address. That's why I am not able to import. So, is it possible to change the IP of the existing technical system in the SLD ?
    Kindly reply.
    Kind Regards,
    Jegatheeswaran P

    Reason being : We can associate n business syatems with one tech system with and we configure the scenarios via business systems which itself uses Tech system , if we will make changes in tech system later on it will affect the other scenarios also which are  using the same tech system

  • Port of the TNS Listener for the second SAP system

    Hello!
    I had problems during the installation of the second SAP system with second Oracle DB on the same host (OP is SOLARIS).
    The error occurs was faced with TNS Listener.
    (> error: TNS Listener is started)
    Which settings are applied for the TNS Listener per default in SAPINST?
    (e.g. on the same port)
    Which settings should I apply in SAPINST for TNS Listener, e.g. configure an another port?
    Thank you very much!
    regards
    Thom

    Hello!
    Thank you very much!
    Even that is the question.
    1) If I have selected "ok" during the installation and no further values selected, will SAPINST check whether the Port 1527 is allocated by the first SAP System and create the second Port 1528?
    2) Do I have one TNS Listener with two file entries or two TNS Listener?
    Thank you very much!
    regards
    Thom

  • Assign current system date to the existing variant of date field

    Hi Experts,
       I am working with BDC for data uploading. Here I have a different requirement that how to assign the current system date to the existing variant of the  date field .
    The date field is defined as:   select-options s_date type sy-datum.
    Anybody have an idea, pls let me know.
    please help me .
    appreciate your valuable suggestions.
    Thanks.
    Prasad.

    Hi,
    try like this...
    SELECT-OPTIONS: s_date FOR sy-datum DEFAULT sy-datum.
    Arunima

  • System copy for ECC 6.0 system no j2ee process under MMC

    Dear support,
    This has been observed in many of our clients system which are on ECC 6.0 abap+java system, that after we perform system copy from one system to another
    whether it is Oracle platform or mssql server platform ( system copy for oracle using controlfile script ) ( system copy for mssql with restoring .BAK file from source )
    systems are running fine but j2ee process table showing no processes like
    SDM, dispatcher , server0
    even configtool and go.bat are unable to connect.
    Is there any specific settings we do after system copy for java side
    Please let me know at earliest, as it is most strange thing i have seen in almost all my system where system copy is performed.I have already raised a post against this error but at that time i was not aware of this system copy reason behind the same.
    Best regards,
    AjitR

    Your main problem is not, that you don't see anything in MMC (the system can be added manually without much hazzle) - but is, that you database content of schema SAP<SID>DB does not match the data found on the filesystem.
    If you copy the filesystem structure from production to test/qa, you need to make sure, the database and filesystem are in sync. You will have two problems if you "just copy them":
    - They are out of sync because your production was going on running since you copied the backup files
    - all configuration (all java property sheets) is/are set to point to the production system instead of the test/qa system
    I doubt, that it will work if you copy it over. This also explains, why you can't even start configtool, because it points to the wrong system/schema. You MAY be able to fix all that manually, but you may encounter subsequent errors because not all configuration is documented, you would need to step into the whole j2ee tree and look at each and every propertysheet to find out, whether it's correct or not. Additionally, the database may have other information (see above) and all that may become overwritten during bootstrap.
    So - the best way to get your system up and running quickly is to start sapinst on the source system, export your Java instance (not using ABAP but the Java dump) and re-importing that to your test/qa system.
    Markus

  • Not Able to see SAP systems in List of Available SAP Systems for Crystal R

    Hi All,
    We have installed Crystal reports 2008 and SAP integration KIt client software on my machine. I am trying to create Crystal reports based on the BI query and I could see SAP Connections in the 'Create new connections list' but not able to see any SAP systems in the list of 'Available SAP Systems'.
    How to Add SAP systems to this list.
    Thanks,
    Chindam Praveen Kumar.

    1. Define an environment variable (user or system) with the name SAPLOGON_INI_FILE . This variable should contain the path to your saplogon.ini file including the file name eg. if the saplogon.ini resides in the folder c:\windows the variable should contain the following value c:\windows\saplogon.ini
    2. Open your saplogon.ini file using Notepad and go to File->Save as. Choose All Files in the field Save as type and DO NOT change the name of the file. In the field Encoding make sure that UTF-8 is selected.
    ingo

  • PS CS5 Extended on Windows -  When trying to use the clone stamp and/or healing brush as soon as I move the cursor over the image I get an exact copy of the existing layer that moves around the window with the movement of the clone stamp/healing brush.  W

    PS CS5 Extended on Windows
    When trying to use the clone stamp and/or healing brush as soon as I move the cursor from the toolbar over to the image I get an exact copy of the existing layer that moves around the window with the movement of the clone stamp/healing brush.  This just started tonight.  What's causing this weird behaviour?

    What are the settings in Window > Clone Source?

  • CCMS Error - There are system problems on the remote host (system failure)

    Hi,
    I have installed the SAPCCMSR agent in the AccAD(Accelerated Application Delivery) server. However, when I execute OS07 and try to view the CPU usage, I encountered this error:
    There are system problems on the remote host (system failure)
    Message no. S1308
    Any idea what does the error mean?
    Thanks.
    KY

    Hi,
    Thanks for replying. The problem has been resolved after upgrading the sapccmsr.
    Thanks.
    Regards,
    KY

  • Conectivity between existent SAP Systems and migrated system to MSCS Cluste

    Hi
    I have an existing SAP NW PI 7.0 (Abap + Java on Windows 2003 - SQLServer 2005) and plan to migrate to a cluster with new hardware (MSCS).
    I have to prepare for the installation by creating a homogeneous copy of the database but I'm a little bit confused.
    -Can I use backup/restore method or only can use import/export with R3load tools? The target system is windows and sql server same versions.
    -If I can use backup/restore... what is the rigth sequence to the installation? Can I use sapinst with mixed high availability options and System copy options?
    -I need to use in the target system the same hostname and IP address of the actual system, so in the Follow-Up Activities we do not change the configuration between the actual system (SAP NW PI) and other existent systems in the landscape... but I do not know what is the location in the cluster to this hostname and IP:
    *The central instance will be in the local disks in the node 1. Is the node 1 the rigth option to use the hostname and IP of the actual system?
    *The SAP Cluster group has a virtual hostname and IP, it has message and enqueu services. Is the sap cluster group he rigth option to use the hostname and IP of the actual system?
    How is the communication between the other systemas and the new clustered system?
    Thanks for your help

    Can I use backup/restore method or only can use import/export with R3load tools? The target system is windows and sql server same versions.
    You should follow the SAP guidlines in performing a homogeneous system copy.
    I need to use in the target system the same hostname and IP address of the actual system, so in the Follow-Up Activities we do not change the configuration between the actual system (SAP NW PI) and other existent systems in the landscape... but I do not know what is the location in the cluster to this hostname and IP
    This is not possible.  If you follow the SAP instructions for installing NW 7.0 in MSCS you will create two cluster groups: DBGroup and SAPGroup.  You will therefore have two virtual IP addresses, one for SAP cluster group and one for DB cluster group.  If you retain the current IP address/hostname for the virtual SAPGroup, you will need to follow the SAP guidelines for performing a SAP system copy to find where to change the database hostname/IP addresses to point to your new DBGroup.
    The central instance will be in the local disks in the node 1. Is the node 1 the rigth option to use the hostname and IP of the actual system?
    If you are meaning the ASCS then this should be installed on the disks that are part of the SAPGroup in the cluster.
    If you mean the dialog instance (or the Central Instance of a Java stack) then this can be on a local disk for node 1, and not in the cluster.
    The SAP Cluster group has a virtual hostname and IP, it has message and enqueu services. Is the sap cluster group he rigth option to use the hostname and IP of the actual system
    Yes, this will be the message server host for ASCS.

  • System-Copy on the Backend

    Hi,
    we are planing to make a copy from our productive-system P11 to the test-System C11. Our SRM-Server is connected to the existing C11 (Client 100). What must I do on the SRM-Server (SRM Server 5) to stay correctly connected? Just copy P11 to C11 won't work - because the GUID's for objects on the Backend (e.g. in the table COMM_CATEGORY on the SRM Server) will no longer match.
    I looked for some guides on the SAP Service Portal - but the only document I found was dated July 2002 - and describes what to do if you want to make a copy of the EBP System...
    Yours
    Jürgen

    Hy Jürgen,
    First of all, the GUIDs are not used in the Backend, but only localy.
    The problem you'll get are:
    -RFC/ALE configuration
    -Logical system in the Org.plan and some other atributes(the standard program BDLS doesn't change the attributes), for that use program RHOMATTRIBUTES_REPLACE from note #336688
    -You have to re-synchronize the number ranges (for PR,PO and reservations depending on the integration scenario you use)
    -The vendors may differ between your 2 systems
    Hope it'll help.
    Regards.
    Vadim

  • Creation of New Company in existing SAP system

    What are the major issues involved in a Business running SAP taking over a new non-SAP company and trying to merge the new enterprise into its existing system? Are there any case studies of this type of acquisition/merger available and also step by step config? I want to use the same company code for the new Company.

    Hi,
    You need to go for a rollout to meet your requirements.
    The configuration comes after the preparatio of blue prints, you may need to restructure the business process in the Non-SAP company.
    Then you need to structure the data of Non-SAP company in accordance with that of the existing data in SAP. Like Business Area or Profit Center or Cost Center etc.
    Thnaks
    VK

Maybe you are looking for

  • Issue with table in Dashboard

    Hi People, I am facing an issue with a table which is acting up in the Infoview. In my Dashboard I have a table, when i run the dashboard using the Xcelsius the table is ok, but when i export it and run through the infoview, the table gets bigger tha

  • Error: missing } in xml expression. I cant solve this!

    <script type="text/javascript"> var myObject = new ActiveXObject("Scripting.FileSystemObject"); var pasta = "C:\Users\Catatau\Desktop\BROTHER\Medcurso\oukey\"; var folder = myObject.GetFolder(pasta); var jpg = ".jpg" var pdf = ".pdf" var barra = "\";

  • Motion 5 Banding

    I have spent hours testing and reading manuals, posts in forums and whatnot to find and issue to the problem of banding when rendering certain compositions in Motion 5. I am appalled to see that this problem endures through versions while it is fonda

  • Consultas - Exportacion Excel Terminal Server

    Amigos tengo otro problema Mis sucursales que trabajan por medio de Terminal server cuando realzan algun query y lo quieren exportar a Excel, se queda bloqueado, el servidor de Terminal server Tiene 12 GB Ram, el vpn esta por un enlace E1, tengo que

  • DB2 Log file retrieval during normal operation

    Hi, We recently upgraded our databases to DB2 v9.7 FP1 and started noticing entries in the db2diag.log that state a log file is being retrieved (after it was archived). We are not performing a restore, although this only seems to be happening during