EHS - QM Interface. Inspection Plan Creation

Hi all,
Has anyone used EHS-QM interface before?
I am tryng to create inspection plan characteristics from specification database and it is not working properly.
The customizing that I have done is:
1. We have Specify Environment parameters (i.e. EHQMEP_CONTROLKEY)
2. We have verify Product Safety, Quality Management and Material Management pre-requisites
3. We have filled Mapping Table (CGQM) with and standard value assignment type (SAP_EHS_1013_016) and a class characteristic (SAP_EHS_1013_016_EC_TEMP)
Then in CG02 we have:
1. We have completed a specification in CG02 with Usage QM and a Validity Area
2. In CG02 we create a inspection plan and select rating QM or Group all ratings
3. No Inspection Plan to be created is available
Any clue on what the problem migth be?
Best Regards,
Alberto
Message was edited by:
        Alberto Garcí

Dear all
1.) it might be helful to open a new thread regarding your topic in parallel EH&S FORUM
2.) To my knowlegde witH SAP ECC 6.0 EnhancementPackage 5 EH&S QM interface has been enlarged. I am sorry. My inquiry in internet regarding that was not successful. PLease check SAP Markeptplace as I am pretty sure that there was a change/enhancement
3.) we are not using this intertace but have played around a little bit.
The interfaceh EH&S => QM is in my opion "not well" designed. First of all:
a.) you need to trigger it manually (use of transaciton CG02)
b.) to my knowledge no change in EHST is tarbnsferred automatically to QM; e.g. if flash point has changed or density etc. the user is in charge to make sure that the data will be tranferred into QM
c.) the "trick" to map validity areas to plant (excatly it is a plant plant mapping)  is not goiod approach. Reason:
Normally a density is defined with usage "PUBLIC/EG_WORLD). The meaining is:
1.) can be used e.g. in Materiaql Safety data sheet (public document)  and other EH&S document
Now you can use (you must not) priorized ratings (e.g. rating QM does have higher priority as PUBLIC) in EH&S logic to transfer data from EHS& to QM but to my knowlegde you must make the "plant" <=> "PLant" by "hand" using furtehre validity areas.
That means fi you would like to use density 1 g/cm3 for all plants (and the QM inspecions plans) then you must enter any plant of relevance as validity area to map that to the inspection plan (which to my knowlegde once again is plant specific).
I am not sure if the EH&S QM interface supports you really to "start" immedeatly the generation of inspection plans regardgin all plants,. The link to SAP online help above will lead you directly in the right chapter.
Regarding phrases: sorry the analysis of thsi interfaxce has been done long ago; but phrases are "textes" which can have "any length". It might be a problme to map that to QM Plan. If you check that link above you will lead to this statement:
n the Function module column you can use a function module to define yourself how specification data is to be converted to an inspection characteristic.
As an example, use the function module EHQM09_BUILD_CHA_NO_COMP to develop analogous modules.
Therefore if necessary you could exchange this fuinciotn module by a customer specific one.
May be this helps
C.B.
PS: Regarding changes in EH&S QM Interface ECC 6.0/EnhPack 5: : may be refer to http://www.scribd.com/doc/58761766/37/Quality-Management
PPS: may be of interest could be: http://www.consolut.com/en/s/sap-ides-access/d/s/doc/Q-EHQM0904

Similar Messages

  • Inspection plan creation error....

    Hello gurus,
    I am getting error while creating inspection plan....
    'Work center ABC plant ABC does not exist for task list type Q'
    what should be the solution......?

    Double check that the plant for the inspection plan matches the plant for the work center. If you created the work center in plant ABCD but are creating the plan in a different plant, they may not match.
    This usually happens when you create a plan by using an existing plan in another plant as the template.
    FF

  • Inspection plan creation

    hi all,
    i am creating inspection plan using bapi 'BAPI_INSPECTIONPLAN_CREATE' . it is creating but the issue is in table 'INSPCHARACTERISTIC' there is a field 'SEL_SET1' which is getting populated automatically in transaction and i want that value to be replaced by the one i am passing in table
    'INSPCHARACTERISTIC' but it is not happening.
    Is thers any specific way to get it done through this bapi or is there any exit or badi to perform this task?
    Any pointer will be highly appreciated.
    regards
    vijay

    Yes, I have seen that field.
    You can enter a value for this field only if it is Qualitative characteristic.
    So while populating Qualitative or quantitative indicator values for
    IF INSPCHARACTERISTIC-QUANTITATIVE_IND = 'X'
    INSPCHARACTERISTIC-SEL_SET1 = 'Your value'
    ENDIF.
    If it's Quantitative Do not even pass any value for this field. Not even space.
    In debuggin you can check the INSPCHARACTERISTIC-SEL-SET1 value. It will have the value you passed.
    When I worked on it I remember that there are a whole lot of indicators which are specific to Quantitative or Qualitative. You will have to split the code for them to pass the values separately.
    Note: All the above can happen only if the SEL_SET1 is not defaulted to have a value in configuration.
    Thanks.

  • Routing Entry error during Inspection Plan creation in BAPI

    Hi,
    A Material has an task list created manually thorgh QP01. Am trying to created another through BAPI  BAPI_INSPECTIONPLAN_CREATE , changed the group counter to 2, but left the Task list blank. The change number field is also BLANK. Other data are populated for structures.
    While executing the BAPI   I get the error  "For further processing, the routing entry is missing", the Operation number is passed correctly. Which routing entry is it referring to ?
    Help with some pointers.
    Rgds,
    stck

    Hi,
    I could execute the BAPI BAPI_INSPECTIONPLAN_CREATE for a Material with already existing Task list.
    But i had to pass the Change Number, Set the Change Rule to 1 (With Change Number) and Change Value = 0.
    But the new created Task group counter does not allow any more changes beacause of the Change rule = 1.
    Can we not create a task for existing Material without the change number?
    Even if we create with change number how can we allow it for changes?
    What has to be the value combination for Change Rule and Change Type for allowing the change to task?
    Appreciate your inputs.
    Regds,
    stck

  • Control Indicators in inspection plan

    Hi QM Experts,
    I created MICs and assigned the selected set and assigned the control indicators. But when i create the inspection plan for the material and assign the MIC, system is not copying the control indicators from MIC.
    This is happening only in the production client. In the quality client, system works fine and copies the control indicators maintained in MIC to inspection plan.
    I checked all the configurations but could not find anything related.
    Can anybody help?
    Thanks & Regards
    Prathib

    Dear Prathib
    It doesnu2019t matter whether it is complete or incomplete MIC as far as copying of control indicators from MIC to inspection plan is concerned.
    If you are dealing with incomplete MIC, then at the time of inspection plan creation you need to specify lower, upper, target values, may be decimal places and selected set in case of qualitative MIC.
    Control indicators mean the various ticks that you choose while creating MIC in QS21, for example, Lower, Upper, Target values tick, fixed scope, or required, optional characteristic etc.
    I think system will never behave contradictorily in quality and production server because itu2019s certainly not a customizing issue.
    What I would suggest is, note down what control indicators you have chosen for MIC in QS24.
    While creating inspection plan, use this MIC. If itu2019s incomplete give necessary information and proceed. Select the entire MIC line and click on control indicator tab. Note down what indicators it shows.
    I am sure would be same.
    Regards,
    Anand Rao

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection plan selection based on production workcenter for Inspection typ

    Dear QM Guru's,
    I have requirement of automatic inspection lot creation based on production work center.
    For example :- I have Inspection Plan A, Plan B and Plan C for Material XYZ. My requirement is that, when inspection lot created for material XYZ ,when we release production order (Early lot creation) , it should create inspection lot based on production work centers in the order. In this case, if production workcenter A is in the prodiction order, system automatically assigned inspection plan A, when workcenter B,it should choose inspection plan B and same for C workcenter.
    Can we have this set up in the system?
    Let me know if u need any other details.
    Thanks in advance.

    The workcenters in QM and PP don't have to be the same.  In the user exit your going to code in the logic you want to use to select the inspection plan.
    I suggested creating the workcenters the same and the code can use that info to match up the correct task list group to assign the inspection lot. But if that doesn't work pick something else.
    Your code can use any logic you want.  You can put a description in the short text if you want. 
    You can just have an understanding that task list group 10 is always used for production work center XYZ and task list group 20 is always used for production work center ABC and task list group  30 is always used for production work center 123.  In the user exit you check which production line and just change the group to 10, 20 or 30 then.
    I don't care what you pick or how you do it, neither does the function module.  I believe the function module will pass in the parameters of the task list it is planning to assign.  You then have the ability to use the code to pick a different one and pass back new parameters for the task list.
    Craig

  • How to progammatically get Inspection Characteristics from Inspection Plan

    How do I programmatically get Inspection Characteristics from an inspection plan? I am currently getting inspection characteristics from inspection lots via a QM-IDI RFC call (QIRF_SEND_REQUIREMENTS_GET_DAT2), but if the Inspection Characteristic is not in an inspection lot, I don't get it via the RFC call. What BAPI/RFC/IDOCS mechanism can I use from an external subsystem (VB.NET app) to get inspection characteristics (Spec Limits, Target, Operation, Activity) associated with a material in an inspection plan?
    Thanks,
    Ed

    The problem is the SAP system that my external subsystem (VB.NET application using QM-IDI) is interfacing with does not have inspection lots (and the customer is not willing to add inspection lots), so the QM-IDI RFC that I'm using (QIRF_SEND_REQUIREMENTS_GET_DAT2) does not return the inspection characteristics (spec limits, etc) that I require. My customer creates a reference (QP11) with inspection characteristics, then attaches the reference to a Material (QP01). When I try to get the inspection characteristics for the material via QIRF_SEND_REQUIREMENTS_GET_DAT2, I don't get the inspection characteristics because there is no inspection lot associated with the material and inspection characteristics.
    The design is for my external subsystem to do the Material Inspection Characteristic valuation, and then send the valuation results back to SAP. Is there a way to get Material Inspection Characteristics and then send the results back given the SAP setup I described above?
    Thanks,
    Ed

  • Inspection plan based on workcentre

    Dear Sir
    We have one plant,in that we are using two interfaces,result recording has to come from this interfaces for that there is only one material code,we are using workcenter in inspection plan and even for that plan there are two operation,so how get the correct plan for the production confirmation
    Aim if there is eg X work center  its should take X plan
    If there is Y workcenter it  should take take Y plan
    We donu2019t want to use dynamic modification rule ,and in search field in we use some to detect  the plan,it will peak but how to segregate that w r t to workcentre

    Dear Kunal,
    I am not so sure what sort of user interface you are dealing with.
    First of all may I request you to clarify with which inspection type you are working (03, 04, 01 or 89)?
    For every operation you can assign only 1 work center and 1 inspection plan may contain several operations.
    Inspection characteristics are defined at operation level only. These MICs may also vary operation to operation depending upon nature of operation. For example, if your inspection plan contains u201CDrillingu201D and u201CInner Threadingu201D as 2 operations, you can have diameter as inspection parameter for drilling and pitch for threading. Kindly note this entire information is associated with only 1 plan.
    When the inspection lot is created and you click on results tab in QA32, system throws pop up of operations. There you need to choose for which operation you want to perform result recording. If you select Drilling, only diameter will be displayed to you to put observed reading.
    To sum up, this mechanism ensures to pick operation specific (work center specific) inspection characteristics. There is no need to create 2 inspection plans if your plan contains 2 operations in a single plan.
    Regards,
    Anand Rao

  • Material specification and Inspection plan - Task list usage

    Dear Friends,
    In inspection type  Task list usage is assigned
    For Example
    inspection type 01  -  usage - 03
    inspection type 05  -  usage - 05
    inspection type 06  -  usage - 07
    inspection type 10  -  usage - 06
    In my scenario i want to use all the above inspection type for a product
    if i use mateial specification there is no any problem with my  Task list usage
    If suppose i use inspection plan do i need to create different inspection plan with different usage
    or is it possible to create one inspection plan with all the above usage
    what about universal usage 03  can i use it
    i try to use but system does not triggering inspection lot
    can any one Suggest some ideas
    Many Thanks & Regards
    Raj

    Hi Raju,
    All of first pls understand the concept of Task list and specification.
    If you need to inspection any material in very systematic manner, where you will have well segregated operations where the appropriate Work Centers will be bind and under that hierarchy MIC will be attached. The inspection will be governed by some inspection points. And according the the same Samples will be calculated. When you wanna go with all these functionality then you must have to use Task list (Inspection plan).
    And if you don't wish to have these functions then simply go with the material specification.
    Now it comes the actual query about task list usage.
    If there is a common inspection plan is supposed to be used for all the inspection types for your material then you can prepare only one inspection plan, put ant of the Usage to it it can be 05 or 03 universal. But what you have to do is,
    Go to SPRO->Quality Management->Quality Inspection->Inspection Lot Creation->Maintain Inspection Types Execute and set the Task list usage as the same it is set in the inspection plan for all those Inspection types for which that common inspection plan is supposed to be used.
    Note:- There is no any link between inspection lot creation and task list usage of inspection plan.
    Regards,
    Shyamal

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • PR Creation at Inspection lot creation

    Dear QM Experts
    can we generate Purchase requisition with the creation of Inspection lot, Automatically.
    in my case there are some inspection operation performed by external agency for which he charge some amount for services.
    for this i created a control key of external services and assign this in the inspection plan in a separate operation and enter all the required data like cost element, vendor, Purchasing oganization and material group but when i created the inspection lot , PR is not generated,
    should this requirement be cater by SAP?
    Regards

    Hi,
    Why do not you try here Source inspection.
    During crsation of purchase order lot will get generated .you can inspect material before its coming to your place..
    You have to activate 0101 inspection type active.
    Qinfo record you have activate source inspection.
    Even in procurrement key in custamizing you can have option if material get rejected.
    Once purchase order created to create lot you have run transaction QI07.where you can click on create lot.after saving this transaction you can get lot..Then you record result as per toyr requirement like from external services.
    Regards
    SANIL

  • Specifications and Inspection Plans

    Hi,
    I have few questions regarding Specs and Inspection plans.
    1) What is the primary purpose of specifications(CG02 transaction)?
    2) What is the use of specficications in QM and EHS modules?
    3) How are specifications related to Inspection plans?
    4) What is the business advantage by enabling specification data to be copied directly into Inspection plans?
    Thanks in adavnce
    Vishnu

    The idea is that you can maintain all the specs in the EH&S module in one place.  Specs are used of course to evaluate the material and make sure the material is what it is suppose to be.
    The transferring however of the specs from the EH&S module to QM however leaves a lot to be desired.  I don't recommend it at this time.  If  you attempt to do it, plan on bringing in a consulting partner or consultants.  You'll probably wind up doing a lot of coding to make it work for you as there isn't much flexibility or functionality as it is currently delivered.  All IMHO.
    Craig

  • Procedural steps of automaic Inspection lot creation.

    Dear Gurus,
    I would like to create Inspection lot automatically for various inspection types. Where I will customize the number ranges w.r.t specific inspection type (e.g. 01, 04, 05 etc.). Example: -
    1. For Inspection Type 01 (GR inspection for incoming materials)- Lot Number is 1000000000.
    2. For Inspection type 04 (GR inspection of finished goods)- Inspection lot number 4000000000.
    3. For Inspection type 05 (Inspection for other good receipt)- Inspection lot number 5000000000.
    Pl. needful.
    Thanks in advance for all,
    Prasun

    If you are using SAP std insp type, then you need to build the following
    - Material master with QM view - MM01
    -Assign the ispection type 01, 04. 05 in QM view
    -Create inspction charectristics - QS21
    -Create inspction plan - QP01
    The usage of inspection plan should be 5.
    Check in the SPRO, is the usage for each insp type is 5 or other. If it is not same then you create insp plan as per teh usage assigned.
    SPRO>QM>Quality inspection>Insp lot creation>Maintain insp type.
    Once you do it, insp lot will be created duting Production GR/PO GR and other GR.
    please come back if required.

Maybe you are looking for

  • Can't install Pages update 3.0.2

    I have downloaded the file from Apple and when I attempt to open and run the Pages_302.pkg file, I get the following error message: "An eligible Pages application was not found in the location /Applications." After originally purchasing the iWork 200

  • SAP FS-CD logic for cancellation of policies

    Hi, I am new to SAP FS-CD.  Hence I am finding it difficult to get the logic for many funtionalities.  Here is one requirement we have. We need to know all the policies that are flagged for cancellation and rescission.  Which table and fields I can u

  • Why does perfmon stop automatically?

    Hi experts,   I scheduled a Data Collector Set in perfmon with very long overall duration and my disk space in C drive is not full. Why does perfmon stop automatically from time to time?

  • If I buy iWork, will that include Pages, Numbers and Keynote for all my Devices?

    If I buy iWork, will that include Pages, Numbers and Keynote for all my Devices? It seems like purchasing Pages, Numbers and Keynote Seperately for my Mac Computers and then again for my iOS 5 Devices ads up to about $100, though iWork costs more as

  • CRC-4 calculation for SENT- Interface

    Hello, i have a SENT- Signal and try to create a VI which is calculate the CRC-4. I did not make it. The polynom is x4+x3+x2+1 and the seed value is 0101. I need a VI which is calculate the CRC-4 for the SENT- Signal. Maybe someone can help me? Best