Hi Marina,
You need to configure (t.code is SWU3) SAP Workflow to sent mails' from SAP to to systems such as Outlook or Lotus Notes. Below links'a maybe very useful for you;
http://help.sap.com/saphelp_dimp50/helpdata/EN/92/bc26a6ec2b11d2b4b5006094b9ea0d/content.htm
http://www.sap-basis-abap.com/wf/sap-workflow-faq-techniques.htm
Cheers

Similar Messages

  • How to activate email notification for SC approval

    Hi Gurus;
    We are using SRM7.
    How to activate email notification for SC approval i.e. the system should send email to the approver's external email (e.g.Outlook) informing that there is SC to be approved.?
    Thanks

    Hi,
    You can schedule the /SAPSRM/OFFLINEAPPROVALSEND program.
    http://help.sap.com/saphelp_srm701/helpdata/en/31/47c6cb8e9249f2bc29444212e4704a/frameset.htm
    Regards,
    Masa

  • Is there a way to send the email notification as a PDF attachment and the email receipt as an email

    Has anyone found a way to send the email notification as a PDF attachment rather than email? I would still like to send the receipt as an email though? Any thoughts or experiences out there?

    Thanks for prompt response. Does this mean that there are future plans to do this?
    The forms received are used as part of a registration process into aonther system and aren't that User friendly in an email form. They have to be processed as received, so not efficiet to go in through the back end.

  • Adding a hyperlink to the email notification for leave approval

    Hi All,
    Is it be possible to have a hyperlink in the email notification that goes to the approver ( for a leave ) so that the approver can click on the link and be taken straight to the ESS/ MSS portal to approve/reject the leave request?
    Regards
    AK

    Basically you can modify the standard task too. Of course it is not recommended, but maybe it is not that bad, if you only need to modify the work item text (and the variables are already available in the container, so you don't need to do any additional bidnings and container elements (or do you?)).
    Other options is that you take a copy of TS12300097 and a copy of the leave request worfklow template, and then do the changes to these copies. Then you just need to remember to also check the SPRO settings, that your copy of workflow is started instead of the standard workflow.
    Regards,
    Karri

  • Email notification for PO approval

    Hi all,
    Can PO approval alert as well as email to authorizer?
    Approval procedure only alert authorizer. l thinking set an alert, however alert will not trigger on draft document...
    Thanks,
    Phoebe

    Hi Phoebe,
    You may try a user alert to check WDD related tables for alert info.
    Thanks,
    Gordon

  • I am trying to change my primary email address for it has been compromised. the email address I am trying to change it to is my rescue email address? how do I change my primary email address?

    I am trying to change my primary address for it has been compromised. The email address I am trying to change it to is my "rescue" email address. How do I change my primary email address to my rescue email address? can I delete my rescue email address so I can use it as my primary?

    You will have to delete your rescue email address first, then go back and change your primary.
    Source: http://support.apple.com/kb/ht5312
    You can edit or delete your rescue email address at My Apple ID. To edit your rescue email address:
    Navigate to My Apple ID using your web browser.
    Click "Manage your account"
    When prompted, sign in using your Apple ID and password.
    Click Password & Security
    You'll be asked to answer 2 of your 3 security questions before you can make any modifications. If you are unable to remember your answers, you can choose to send an email to your rescue email to reset your security questions.
    Note: The option to send an email to reset your security questions and answers will not be available if a rescue email address is not provided. You will need to contact iTunes Store support in order to do so. 

  • Email Notifications for Collaboration Tasks are Not going to Lotus Notes

    Hello Everyone,
    Email Notifications for the Tasks in Collaboration are not going to Lotus Notes. We are working on EP 7.0 SP14 with external ITS and backend r/3 4.7.
    I performed all the configuration activities that are suggested in the below wiki:
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageId=61244035
    It was worked fine once for me when i perfomed the activities mentioned in the below thread:https://www.sdn.sap.com/irj/scn/thread?threadID=147316
    But after restarting our Portal Server the Email Notifications for Collaboration Tasks are not coming.
    Could any one please suggest that we need to do any other configurations.Thank you.
    Regards,
    Sridhar.
    Edited by: Sridhar on Mar 18, 2009 12:14 PM

    Hi Sridhar,
    I created a Wiki page with usefull links to troubleshoot problems with the Email connectivity from KM:
    https://wiki.sdn.sap.com/wiki/x/g4KmAw
    Please see if it helps,
    Robert

  • Email notification for approval sent to all managers

    Hi everybody,
    an astonishing process occurs in the workflow, a shopping cart was sent for approval, waiting for the manager linked to the requester in organizational structure to receive an email notification for approval,
    unfortunately , in certain case the email is sent to all managers even if we did a control in the badi concerning the workflow according to their role and flag is_manager in the structure.
    Is there anyway to check the flow and try to debug it to understand the way the workflow build this email notification and furthermore how the managers are selected?
    I already passes through the FM RH_GET_ACTORS, I had a look on the report RBBP_OFFLINE_EVAL.
    Thank you in advance for your suggestions.
                             Best regards Mahmoud

    Hi Manoj,
    I check this note today but it 'sounds'  good.
    There are two other notes which are interesting adding to the previews one: 764068 and 636540.
    Thank you very much for your reply.
                          Best regards Mahmoud

  • Configuring Email notifications for approval of requisitions and Pos

    Configuring Email notifications for approval of requisitions and Pos - Using the EBS Server to send the mails as opposed to separate mail-server

    For sending emails, you have to setup the workflow notification mailer.
    Once this setup is done you can send approval worklist in mail and also it can be approved. ( If PO setup is done.)

  • Users as other task owners are receiving 5 emails notification for the same task

    users as other task owners  are receiving 5 emails notification for the same task in Sharepoint 2010. I have tried to add a 5 minutes delay on the other task owners workflow with no luck.any suggestions? Thanks

    The Book confuses me. I still think assignment delay and leveling resources are the same. Here is the explanation from the book for the three concepts.
    " Project offers two types of delays:
    Leveling delay. This type of delay applies to tasks; it pushes out the start date for the task and all its resource assignments. It’s meant specifically for remov-ing resource overallocations. With the Leveling Delay field, you can remove
    all leveling delays by choosing Resource➝Level➝Clear Leveling.
    Assignment delay. This type of delay applies to a single assignment within a task. Suppose you have a security consultant coming in to help lock down your site. However, your employees have prep work to do before the consultant can get started.
    You can assign everyone to the same “Try hacking into office” task but delay the consultant’s assignment by 5 days. "
    After a couple of pages;
    " Leveling Resources
    In Project 2010, you can level the entire project, tasks you select, or a single resource. By leveling several tasks that are all vying for the resource, or alternatively, leveling only the most in-demand resources, you can focus on the problematic
    portions of your project. Project automatically chooses popular settings in the Resource Level-ing dialog box. In most situations, you might as well run Resource Leveling with these settings. You can undo the leveling if you don’t like the results, but you
    can get some clues from the initial results to help you determine the settings you need. Here’s how to level different parts of your project using the leveling settings cur-rently in place:
    Level a resource. Select the resource you want to level, and then choose Resource➝Level➝Level Resource"

  • Email notification for shortdumps in the productive CRM system

    Hello,
    is it with standard possible to get an email notification if a shortdump occurs in the productive system?
    Or has anybody realized such a requirement with own coding?
    Thanks a lot.
    Best regards
    Manfred

    I'm not sure about CRM but I guess this must be the same as in R/3: tcode RZ20 offers lots of various monitors (CCMS monitors).  It is possible to configure the monitors that you need in a way that an e-mail is sent automatically when some specific circumstances occur (when the monitor triggers an alert). This is performed by autoreaction methods.
    I can see a monitor called "Shortdumps" among lots of pthers in RZ20 (under SID\Application server ... \R3Abap) - so maybe that would be what you need.
    regards

  • Email Notification for substitutes.

    Hi,
    There are five active substitutes maintained for a user in the system.
    The email notification for approval workitem of shopping cart goes to only one of the substitutes.
    I cant figure out why the email notification does not go to the approver himself and also to other substitutes.
    Could you kindly help me by giving your inputs ?
    Thanks a lot
    Bhakti

    Hi,
    resolved : The forward_wi attribute was not set and one user was locked.
    -bhakti

  • Email notification for SC

    Hi Gurus,
    How do  I restrict the email notification for a Shopping cart which requires only to be sent to the users depending upon the Purchase group assigned to the user.
    At present the SC email notification approval is going for all the users.
    Appreciate if any body can tell me how to configure this in SRM 7.0
    Rrds,
    Shiva

    Hi,
    There is single user field filter in /SAPSRM/OFFLINEAPPROVALSEND program. If it is blank, all users are selected.
    You can copy or enhance the program to handle Purchasing Group.
    Add Purchasing Group input field and select users.
    Regards,
    Masa

  • Multiple email notification for scheduled web intelligence jobs

    Hi,
    Webi job failed email notification for daily scheduled jobs, email count goes more than 2000.
    Operating System Details:
    Windows 2008 R2
    SAP Business Objects Details:
    SAP BO 4.0 SP6
    Database Details:
    CMS DB Oracle 11.2.1.0
    Issue description:
    On daily basis 100 jobs are scheduled using event file. All 100 jobs start after BW data load completion.
    Below is the process for webi job schedule start.
    1) BW job complete
    2) Event file update on shared location 
    3) Webi job scheduling starts.
    Till april 1st week all 100 jobs were scheduled succesfully  and we recieved 101 notification, 1 extra mail for event file notification. 
    But from last week we recieved more than 2000 mail and on subsequent retry all jobs were scheduled succesfully.
    We check the CUID in query builder, but only data for 16 jobs was available, and in instance manager we got 300 failed instances of 16 jobs, but those jobs were executed successfully after multiple reattempt.
    Below is the error mentioned in instance manger for all 300 instances:
    "Object could not be scheduled within the specified time interval".
    Note : Due to unavailablity of trace log, we cannot enable the trace log in enviornment.
    Thanks,
    Vizit Yadav

    Hi Vijay,
    Thanks for reply.
    I have read the KB#144881- Multiple instances spawned after daylight savings time change.
    Though this issue arrived after daylight saving, i have few more points to describe:
    1. Issue arrives only on Monday, not on every day.
    2. Day light saving was on 29th March, after that at the very first Monday on 30th March issue was not       there, however after that issue arrives every Monday, i.e. 6th & 13th of April.
    Is there any SAP notes for SAP-BO 4.0 SP 6 on this.
    Regards,
    Vizit

  • Email notification for SHC and GR

    Hi I would like to know is there are way to email a notification to the approver once shc is created? thus sends another notification to the next approver?
    I would like to know if there is another way aside from the standard report  RSWUWFMLEC?
    If ever is this doable by just configuring Define Recipient of Notifications in spro? or any other way.
    Has anybody also used BBP_ALERTING?
    I also have a requirement that X days before recipient, there should be an email notification to the requester and the recipient.
    Thanks!
    Cindy

    Hi
    Which SAP versions are you using ?
    <u>Refer to the following links.</u>
    <b>SRM Notification sent but user has not received the work item
    Offline Approval: RBBP_NOTIFICATION_OFFAPP Vs RSWUWFMLEC
    Email Notifications for Ad hoc Approvers
    Email notifications
    Setting alerts in SRM when SRM can't communicate with XI
    </b>
    Hope this will help.
    Please reward suitable points, incase it suits your requirements.
    Regards
    - Atul

Maybe you are looking for

  • How to read the tail of a large file?

    My application writes to a log file. I want to read the end (say last 100 lines) of the logfile and display it on a web page. I dont want to read the entire log file as everything apart from the last 100 lines is irrelevant. Is there a way to do this

  • Design view in DreamWeaver CS3 disabled for CSS & Java

    I currently use Adobe Dreamweaver CS3, and only some files have the option to view them in code AND in design view. This works for most files (HTML, PHP, etc). However, anytime I create a new CSS or Java file, the design view is disabled: I have alre

  • Pay roll area and control period

    hai experts we have pay roll area ,control period in personal administration and we have the same options in pay roll so can any body help me out in which option we have to choose thanks thjea points will ne rewarded

  • Firefox will not connect to any website

    I use Firefox to connect to the internet, on a WindowsXP and Windows 7 machine. A day or two ago, both had updates added on shut down. Now, Firefox doesn't work on the Windows 7 machine. Error message looks like: "Unable to connect Firefox can't esta

  • How should we identify Master Data for a particualr module.

    HI SDN, In an implementation scenario, suppose I am doing 1 standard cube. How do I identfy, the necessary Master data required for this cube. Is there any specific stategy on which I can safely assume that I have identified and loaded the required m