Hi,
Please suggest if we can send email notification to individual successful tasks in DAC. I appreciate your help.
Thanks

Hi,
In Setup-->Email recipients--->Notification level=10 for the users.
And restart the DAC server to effect the changes.
Notification Level:
The notification levels are as follows:
■Notification Level= 10
Notifies recipient of success or failure of each task.
■ Notification Level= 5
Notifies recipient of success of failure of the entire ETL process.
■Notification Level= 1
Notifies recipient that ETL completed successfully.
Thanks.

Similar Messages

  • Email Notifications for both UWL Tasks and Collaboration Tasks.

    Hello,
    I want to configure Email Notifications for both UWL Tasks and Collaboration Tasks.
    Could any one please give me the configuration steps.
    Thanks in Advance.
    Regards,
    Sridhar.

    Hi sri,
    Refer the following threads
    https://www.sdn.sap.com/irj/scn/thread?threadID=147316
    https://www.sdn.sap.com/irj/scn/thread?messageID=315715#315715
    https://www.sdn.sap.com/irj/scn/thread?messageID=1170132#1170132
    Regards,
    P.Manivannan

  • Users as other task owners are receiving 5 emails notification for the same task

    users as other task owners  are receiving 5 emails notification for the same task in Sharepoint 2010. I have tried to add a 5 minutes delay on the other task owners workflow with no luck.any suggestions? Thanks

    The Book confuses me. I still think assignment delay and leveling resources are the same. Here is the explanation from the book for the three concepts.
    " Project offers two types of delays:
    Leveling delay. This type of delay applies to tasks; it pushes out the start date for the task and all its resource assignments. It’s meant specifically for remov-ing resource overallocations. With the Leveling Delay field, you can remove
    all leveling delays by choosing Resource➝Level➝Clear Leveling.
    Assignment delay. This type of delay applies to a single assignment within a task. Suppose you have a security consultant coming in to help lock down your site. However, your employees have prep work to do before the consultant can get started.
    You can assign everyone to the same “Try hacking into office” task but delay the consultant’s assignment by 5 days. "
    After a couple of pages;
    " Leveling Resources
    In Project 2010, you can level the entire project, tasks you select, or a single resource. By leveling several tasks that are all vying for the resource, or alternatively, leveling only the most in-demand resources, you can focus on the problematic
    portions of your project. Project automatically chooses popular settings in the Resource Level-ing dialog box. In most situations, you might as well run Resource Leveling with these settings. You can undo the leveling if you don’t like the results, but you
    can get some clues from the initial results to help you determine the settings you need. Here’s how to level different parts of your project using the leveling settings cur-rently in place:
    Level a resource. Select the resource you want to level, and then choose Resource➝Level➝Level Resource"

  • * Can We Send Email Notifications Only using User Task in Oracle BPM ?? *

    Hi All,
    Can we send any email notification to initiator, only from Oracle BPM User / Human task without using any notification activity.
    Is it possible to send email notifications using BPM User task alone.
    Any Help appreciated.
    Regards
    Satya

    Hi Satya,
    To send an email to the person who initiated the work item instance in the process when the instance reaches a human task:
    1. Ensure that the id of person who initiated the instance is stored in the process predefined variable called "creator".
    2. In the Interactive activity's input data mapping, map this "creator" process predefined variable to the corresponding "creator" attribute in the human task's execData.
    3. Open the human task -> click the "Notification" tab -> click the "+" icon in the upper right -> on the new row added to the bottom of the list, leave the task status dropdown set to "Assign" and change the recipent (the middle column) to "Initiator".
    Dan

  • No email notification from manual provisioning task - 11gR2

    I have a disconnected application instance and I am using the standard DisconnectedProvisioning flow for provisioning - modified to assign the provisioning task to a group, using a rule which determines the group via the app. instance name.
    The flow itself works as expected and the Manual Task in the flow is assigned to the correct group - the task shows up in the Inbox of the member of the group in the Self Service console
    I would like to send an email to the user when the task is assigned and I have therefore configured SMTP Notification according to this http://allidm.com/blog/2012/11/configuring-smtp-notifications-in-oracle-identity-manager-11gr2/
    I have confirmed that the SMTP server works as expected - I am able to send and receive message using this server.
    On the Notification Tab of my Manual Task I have configured:
    General:
    Status: Assign / Recipient: Assignees
    Status: Complete / Recipient: Initiator
    Status: Error / Recipient: Owner
    Advanced:
    Remind Once: 0 days, 0 hours, 1 minute "After Assignment"
    Encoding: UTF-8
    Make Notifications Secure: False
    Show worklist/workspace URL in notification: True
    Make notification actionable: True
    Send Task attachment: False
    Group Notification Configuration: "Send individual emails" 
    I have redeployed my DisconnectedProvisioning flow to my SOA server a couple of times - remembering not to change the version number and to force overwriting the existing flow.
    My SOA and IDM servers have been restarted as well.
    When requesting the disconnected application instance using the catalog, the manual provisioning task is assigned to the correct user - however - he does not receive any email nor do I send any errors or stack traces from my SOA or IDM servers.
    There must be some check box somewhere that I forgot to tick!
    Does anybody have an idea - did I forget to configure something?
    Kind regards,
    - Tom

    Ok - so I did in fact forget to tick a check box!
    After setting up UMS using this: http://docs.oracle.com/cd/E27559_01/admin.1112/e27149/notification.htm#CACCEDGF and enabling notifications via:
    Enterprise Manager, SOA, soa-infra, SOA Infrastructure drop-down, SOA Administration, Workflow Config:
    Notification Mode: Email
    After restarting my SOA and OIM managed servers - I now receive emails as expected.
    Case closed :-)
    Kind regards,
    - Tom

  • OIM 11g - Email Notifications configured in human task is not working

    Hi,
    My requirement is to send email to the assignee whenever a request is assigned to the user. I created a custom bpel workflow and configured email notiifcation in the human task for the status 'assign'. I have configured Email driver with following properties:
    Sender Addresses = <[email protected]>
    Default Sender Address = <[email protected]>
    Outgoing Mail Server = <Exchange server host>
    Outgoing Mail Server Port = 25
    Outgoing Mail Server Security = none
    Outgoing Default From Addr = <[email protected]>
    I have also set the Notification Mode to 'Email' in Workflow Notification Properties.
    However when a request is assigned to the user, email notifications are not sent.
    I do not see any errors in the logs. In Enterprise Manager console I navigated to SOA Infrastructure Home > Human Workflow Engine > Notification Management and I could see outgoing email notifications corresponding to the workflow instance with the status showing 'Sent'.
    Also the Exchange server that is being used has already been tested for provisioning emails from OIM and it works fine for provisioning.
    Any pointers/troubleshooting tip to resolve this issue is greatly appreciated.
    Regards
    Deepa

    Hi,
    My requirement is to send email to the assignee whenever a request is assigned to the user. I created a custom bpel workflow and configured email notiifcation in the human task for the status 'assign'. I have configured Email driver with following properties:
    Sender Addresses = <[email protected]>
    Default Sender Address = <[email protected]>
    Outgoing Mail Server = <Exchange server host>
    Outgoing Mail Server Port = 25
    Outgoing Mail Server Security = none
    Outgoing Default From Addr = <[email protected]>
    I have also set the Notification Mode to 'Email' in Workflow Notification Properties.
    However when a request is assigned to the user, email notifications are not sent.
    I do not see any errors in the logs. In Enterprise Manager console I navigated to SOA Infrastructure Home > Human Workflow Engine > Notification Management and I could see outgoing email notifications corresponding to the workflow instance with the status showing 'Sent'.
    Also the Exchange server that is being used has already been tested for provisioning emails from OIM and it works fine for provisioning.
    Any pointers/troubleshooting tip to resolve this issue is greatly appreciated.
    Regards
    Deepa

  • Email Notification for Forwarded Workflow task

    Hi all,
    Is there a way to trigger an email notification for a Forwarded Workflow task?
    That is when we forward a task from my SAP inbox to another SAP user's inbox by clicking on the fwd button, there is no email notification generated to the user notifying that a task has been forwarded to him/her? We have to manually send an email to the person notifying that I have fwded a task in his inbox.
    Maybe something in SWNCONFIG...
    But what?? not sure... We currently use RSWUWFML2 ...
    Thanks
    Abhi

    Hi Mike
    Thanks for the quick Reply.
    Have been lookking at SWNCONFIG and not sure how to accomplish it...
    Do we have to add a new parameter on the general settings tab ? Is there a SAP delivered Parameter (setting) with a value??
    Any input would be highly appreciated to point us in the right direction?
    Thanks
    Abhi

  • Email notification when creating a task in UWL

    Hi all,
    I have email well configured for workflow notification and subscription, but I can't find out why when I create a new task in UWL the email is not send.
    Where do I have to configure email notification for new tasks?
    I realised that these 2 things are necessary, and also the email configuration (I have the one for subscription and workflow notification):
    1.- In System Administration  ® System Configuration ® Universal Worklist & Workflow ® Workflow ® Engine ® Engine:
    Notify Assignees On Task Creation --> TRUE
    2.- When creating the task: Notify On Updates, Completion, and if Overdue is selected.
    What else do I need?
    Thanks,
    Regards.

    Hi Iker,
    Could you please check the following documentation on the KM side?
    The channels need to be configured on the KMC side too, and the user has to have a valid email address set up in Identity Management.  We also need to be clear when we are speaking about notfications these are KMC notifications and not the backend workflow SAP Office documents.   There is a bit of confusion sometimes regarding this. On the KMC side please consult the following documentation, that my colleague Cathal was nice to provide us with
    http://help.sap.com/saphelp_nw70/helpdata/en/3d/b58436b8a911d5993900508b6b8b11/frameset.htm
    See also the links at the bottom of the page. Also, note 808756 (notification/channel configuration)
    Please let me know if this helps:
    Beth Maben
    EP - Senior Support Consultant
    AGS Primary Support, Business Suite & Technology
    Please see the UWL Wiki @
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/bpx/uwl+faq  ***

  • Send custom email notification with taskID to task owners

    Hi there,
    For a BPM process we're switching the UI partly from WDJ to SAPUI5.
    I've got a question about that:
    Right now, task owners are notified by the standard e-mail:
    Dear Potential Owners,
    You have new task(s) in your work item inbox. To view this task, click any of the following links.
    Direct access to this task:
    <http://sap.example.com:50000/example.com~approverequest/index.html?taskId=655fba65239311e48ef70000254e17a2>,
    Your complete work item list:
    <http://sap.example.com:50000/NavigationTarget=ROLES:portal_content/every_user/...>
    This mail is generated automatically. Do not reply.
    In case of technical issues, contact your IT department directly
    As we want to make the new UI also available from the internet (e.g. mobile phones), we want to use a reverse proxy for that.
    So in fact the address will no more be http://sap.example.com:50000, but http://approval.example.com.
    Can I send out custom notifications including the task ID?
    Thanks in advance!
    Best regards,
    Thorsten.

    Hi Thorsten,
    I'm not 100% sure if this will work for you or not, but you can change the URL's via Java system properties, see the below screenshot. If you set custom calculated values here they will appear in the default messages that are sent out.
    Being Java system properties these apply across the entire system though so if you only want a subset of tasks to have the external facing URL this wont work, this also assumes the external facing url will work internally too.
    Chris

  • Email Notifications for UWL Tasks and Collaboration Tasks

    Hi,
    I want to configure Email Notifications for both UWL Tasks and Collaboration Tasks.
    I done with the all the Configurations suggested in the below link:
    [https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/706d054d-da24-2b10-f18a-fc82faf6468e]
    But Email Notifications are not reaching the users Lotus Mail ID. Could any one please suggest me that i am missing any Configurations.
    Thanks in Advance.
    Regards,
    Sridhar.

    Hi Sridhar,
    I created a Wiki page with usefull links to troubleshoot problems with the Email connectivity from KM:
    https://wiki.sdn.sap.com/wiki/x/g4KmAw
    Please see if it helps,
    Robert

  • Email Notification is approved but BPM Task is not getting completed

    Hi,
       A transaction is submitted, the approver gets a email notification. The Human task is Actionable.
       So in the email, approver can see Approve / Reject links. On clicking the links it generates a email response and it is sent to the server also.
       But the task is not getting approved.
       Do we need to check any settings in the server or task?
       Thanks for your help.
       Chacko

    ..

  • Email notification in human task: How to customize email subject.

    Dear all community members,
    I am using email notification service in human task to receive email notification if task is assigned to me. I have configured email notification in human task & I do receive the email in my inbox as assignee.
    The default email subject is like [Action Required: TASK_TITLE], I want to remove this [Action Required:] from email subject.
    I tried setting <%null%> in Notification Header in .task file but the email subject is still has Action Required.
    Is there any way to customize email subject so that I can get rid of [Action Required:] [FYI] in email subject.
    Thanks & Regards.

    I believe this will help - http://docs.oracle.com/cd/E23943_01/user.1111/e15175/bpmug_cust_res_bndl.htm

  • Anyone having issue with email notification delay in ES4?

    After upgrade from ES2 to ES4, we're experiencing an email notification delay when a task is assigned to an individual or group queue. It's not consistent, but happen enough that we can some what replicate it. It's almost like an email notification from task assignment wouldn't send through until we kick off another process or claim another task. This happens with server default email notification as well as custom email notification. Please advise how I can go about trouble shooting this.

    This is what in the log at the time I ran the test process & email notification delay occured. Again, the email notification delay wasn't the issue when we were in ES2, until we upgraded to ES4 recently. The delay happens spontaneously, no specific pattern. Sometimes it'll arrive instantly and sometimes it will delay. However, when the notification delay occur, if I kick off another new process, the notification will come through.
    [1/21/15 10:27:47:442 CST] 00000031 ServletWrappe I com.ibm.ws.webcontainer.servlet.ServletWrapper init SRVE0242I: [LiveCycleES4] [/adminui] [/secured/about.jsp]: Initialization successful.
    [1/21/15 10:28:03:107 CST] 00000040 CSRFFilter    I   Fetched allowed referer list for servlet:/CoreSystemConfigComponent
    [1/21/15 10:28:03:200 CST] 00000040 Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#bed5ed34fb984a88466db43f9ab1cef8"
    [1/21/15 10:28:03:684 CST] 00000040 ServletWrappe I com.ibm.ws.webcontainer.servlet.ServletWrapper init SRVE0242I: [LiveCycleES4] [/CoreSystemConfigComponent] [/secured/welcome.jsp]: Initialization successful.
    [1/21/15 10:28:03:746 CST] 00000040 ServletWrappe I com.ibm.ws.webcontainer.servlet.ServletWrapper init SRVE0242I: [LiveCycleES4] [/CoreSystemConfigComponent] [FilterProxyServlet]: Initialization successful.
    [1/21/15 10:28:06:680 CST] 00000040 ServletWrappe I com.ibm.ws.webcontainer.servlet.ServletWrapper init SRVE0242I: [LiveCycleES4] [/CoreSystemConfigComponent] [/secured/config.jsp]: Initialization successful.
    [1/21/15 10:28:30:972 CST] 00000031 Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#a8bc74a810dee608d866cdf3d19861ab"
    [1/21/15 10:28:30:988 CST] 00000031 Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#e83cca4f938a1d9f21e821a8c3663008"
    [1/21/15 10:29:46:283 CST] 00000043 Authenticatio W   Authentication failed for user [abc] (Scheme - Username/Password) Reason: Username or password is incorrect . Refer to debug level logs for category com.adobe.idp.um.businesslogic.authentication for further details
    [1/21/15 10:29:49:278 CST] 00000031 Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#f145055ebb4cb72241a696e2e37912b6"
    [1/21/15 10:36:17:867 CST] 0000002d J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@3c103c10#tid=2172366 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:37:33:515 CST] 00000055 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@7c5a7c5a#tid=2172587 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:37:35:980 CST] 000000bf Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#b1ff24709e2764c4fdf7c8f5459a3f3c"
    [1/21/15 10:37:38:570 CST] 000000c0 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@1fbd1fbd#tid=2173407 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:37:42:673 CST] 000000c0 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@3da43da4#tid=2174482 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:38:09:428 CST] 0000002d J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@26002600#tid=2176826 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:38:38:258 CST] 00000055 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@50165016#tid=2177247 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:39:09:272 CST] 00000054 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@26222622#tid=2179048 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:39:21:597 CST] 00000030 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@2b402b40#tid=2179505 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:40:07:291 CST] 00000055 Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#ea6a84b4552fffe36b7a86269d7b67d0"
    [1/21/15 10:41:52:938 CST] 00000033 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@3a503a50#tid=2184317 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:42:21:160 CST] 0000002d J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@56fd56fd#tid=2184783 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:42:24:218 CST] 000000c3 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@276a276a#tid=2186778 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:42:28:071 CST] 000000c2 ProcessRecord W   deleting oldest recording(s) due to space limitation.
    [1/21/15 10:42:29:943 CST] 000000c2 J2EEConnectio W   Service: XMLFormService resource: ProcessResource@5c105c1(name=XMLForm.exe,pid=5908) could not schedule an interrupt for transaction: com.ibm.ws.tx.jta.TransactionImpl@3c5e3c5e#tid=2188110 because excessive time was spent waiting in queue. Supplied timeout: 0s, Wait adjustment: 0s, Effective timeout: 0s.
    [1/21/15 10:51:15:603 CST] 0000002f Reference     I org.apache.xml.security.signature.Reference verify Verification successful for URI "#c536f8c15947c0e0d16970ced8d90811"

  • Failure Email Notification

    Original post by William Culley
    8:29am, May 17 
    Hello,
    I am trying to setup an email notification when a task that uses an agent fails, but choosing the Failure Email option for the task does not appear to work.  I've tested the email template on other task events like start and it works.  So I know the email template is correct. 
    I read through the documentation and it states the Failure Email notifies when an external task fails.  Does this mean a task that invokes an agent does not have the option to send a failure notification?
    Thanks,
     Bill
    Ed Contini
    9:34am, May 17 
    Hi Bill,
    The email should fire in the even of failure of an outbound message. Is your failure for an outbound or an inbound message?- Ed
    William Culley 
    10:16am, May 17 
    Hey Ed,
    I believe we've figured this one out.  We had the failure email being set at the task level and not the agent level.  So the agent failure did not equate to a task failure and we were not receiving the failure email.Thanks for you assistance,Bill 
    Anthony Erickson 
    2:51pm, May 18 
    Hi Bill,
    We have a related issue to this which might provide some useful information.  By turning it on at the Agent level, it will also fire when an inbound update fails.  Where you are integrating tickets to external systems, we've found it's possible for updates to be made to an already-closed ticket in the remote system which tries to send an update after the Requisition has already closed.This triggers a failure notification for us, and the 3 failures we experienced were outnumbered by about the 300 false errors we received daily.  We tried configuring it at the task level, but that is not apparently what the function is for and we have an open case for it.Thanks,

    Ed Contini
    9:34am, May 17 
    Hi Bill,
    The email should fire in the even of failure of an outbound message. Is your failure for an outbound or an inbound message?
    - Ed
    William Culley 
    10:16am, May 17  
    Hey Ed,
    I believe we've figured this one out.  We had the failure email being set at the task level and not the agent level.  So the agent failure did not equate to a task failure and we were not receiving the failure email.
    Thanks for you assistance,
    Bill
    Anthony Erickson 
    2:51pm, May 18 
    We have a related issue to this which might provide some useful information.  By turning it on at the Agent level, it will also fire when an inbound update fails.  Where you are integrating tickets to external systems, we've found it's possible for updates to be made to an already-closed ticket in the remote system which tries to send an update after the Requisition has already closed.
    This triggers a failure notification for us, and the 3 failures we experienced were outnumbered by about the 300 false errors we received daily.  We tried configuring it at the task level, but that is not apparently what the function is for and we have an open case for it.
    Thanks,
    Ant
    We have a related issue to this which might provide some useful information.  By turning it on at the Agent level, it will also fire when an inbound update fails.  Where you are integrating tickets to external systems, we've found it's possible for updates to be made to an already-closed ticket in the remote system which tries to send an update after the Requisition has already closed.This triggers a failure notification for us, and the 3 failures we experienced were outnumbered by about the 300 false errors we received daily.  We tried configuring it at the task level, but that is not apparently what the function is for and we have an open case for it.
    Thanks,
    Ant

  • Customize email notification iPhone five

    I would like to know how to set a customized email notification to individual contacts in my iPhone five

    Hey vey9,
    Thanks for the question. I understand you are experiencing issues watching a purchased movie. If the movie is currently stored on your computer, you can attempt to delete it and re-download from iTunes in the Cloud (if available in your country):
    iTunes 11 for Mac: Download previous purchases from the iTunes Store
    http://support.apple.com/kb/PH12283
    Thanks,
    Matt M.

Maybe you are looking for

  • What are the differences between 4.6B and ECC

    What are the differences between 4.6B and ECC ?. Thanks

  • Lock object vith forgien key

    HI All, I have 4 table that are related via forgin key ,i want to create lock object and my question is if i need to create lock object for each table or just one lock object. Best Regards Joy

  • CS5.1 - OpenGL stops working after making a lasso selection

    I'm starting to tear my hear out at the moment. Everything was working fine with CS5.1 on a 32bit version of Windows 7, then out of the blue I got multiple warnings from windows saying that my hard drive was about to fail. Thankfully I managed to get

  • How to make movable tab ?

    Hi, I have some question with Tab. I want to make any tab that it can be moved . like Eclipse editor tab, Net beans editor tab.. I try to make tab selection on mouse drag, but It works only change to selected tab index. I think that movable tab imple

  • Magic Mouse won't scroll on my ppc

    Just got the Magic Mouse for my G5 PowerMac, I got it connected via a USB device, only problem is the scroll is not working at all. I'm running 10.5.8 and updated the mouse software but still no luck.