Employee id of the resource assigned to a project

Hi All,
I need to send employee id's of the people assigned to a project from sap ps to third party ps system.
I am able to find the projectid, netwrok id and activity id and work center assigned to it but how do i find which resource(employee id) of this work center is assigned to this activity.
Regards
Satish

Hi ,
check the view   M_CRAMV or CMP3(Tcode).
regards
Prabhu

Similar Messages

  • Employee id's of resources assigned to the project

    Hi All,
    I need to send employee id's of the people assigned to a project from sap ps to third party ps system.
    I am able to find the projectid, netwrok id and activity id and work center assigned to it but how do i find which resource(employee id) of this work center is assigned to this activity.
    Regards
    Satish

    got the answer.
    M_CRAMV is the view and cmp3 is the tcode.

  • Change Default resources Assignment Owner in Project Professional, in the checked-out Enterprise Resource Pool?

    Hi,
    i'm not able to change the default Assignment Owner (massive) in the Checked-out Enterprise resource pool in Project Professional 2013.
    I've also unlocked the "Windows account edit" in the Register Editor.
    Do you know if is this possible or i have to change it for each resource one by one???
    Thanks
    Best regards 
    Daniele
    Daniele

    Hello Daniele,
    I think what you are seeing is by design behavior. Per below article you can set the Default Assignment owner in Project Web Access and it appears in various places in Project client.
    http://office.microsoft.com/en-in/project-help/default-assignment-owner-resource-field-HA010167482.aspx
    If you want to set the same default assignment owner for multiple resources then you can try bulk edit option in resource center.
    Hope this helps.
    Thank you,
    Kiran K.

  • Project Server 2010 - Customizing the resource assignment workflow

    Hi,
    When you build project schedule and publish it, each resource will be able to view his assignments under Tasks then he can edit an assignment and does changes on it.
    What I need to know, is there any way to customize the workflow that controls the assignment lifecycle so that for example if the resource changed the assignment end date I need to generate approval task to his manager and when approved it will generate
    another approval task for his director and if the director approved the task then the change it get reflected on the schedule otherwise the change will be disregard and the resource will be notified by email.

    Hi,
    There is no easy way to configure the task approval chain adding approval level and notifications. By default, the status manager of the task will receive the update for approval before it gets pushed in the project plan.
    Doing some code, you might achieve something similar, like sending an email to a specific user if the assignment finish date has been changed,  but the approval will always be send to the status manager once the update is submitted.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • How to change the resource of an old project from 7830r to 7841r for a NI FPGA module?

    Hello,
    Could you please tell me what is the easiest way to change the target resource (the device
    information) for the FPGA in a old project? We are using a 7841R board, but the
    old LabVIEW project always treat the board as 7830R and I therefore can not complete the compiling and run
    the project. 
    Thanks!

    You need to add the new board as a new target to the project. If you're using a recent version of LabVIEW you can then drag all the resources from the old FPGA target to the new one (I don't know if this works for IO items). In older versions of LabVIEW, you may be able to drag the files but you'll need to recreate the IO, FIFOs, memory blocks etc.

  • How can we get the Latest Resource Assigned in the Approval Form

    I was wondering if there is any way to get the Latest Assigned Resources to a User in my Approval Form.
    I tried this <ref>waveset.resourceAssignments</ref> but it returned all the Resources assigned to a User. While creating a User with Resource Assigned it won�t be problem. While Update when a User is assigned a Resource & it comes for Approval to the owner, all the Previously assigned resources shows up. How can I get only the Latest Resource Assigned.
    Can anyone provide some hints on this..

    idm_guy, if you could elaborate more on what you mean with latest resource assigned it would help - but there are a number of options (if i interprent you correctly to solvethis). My guess is that the easiest way would be to determine if:
    waveset.accounts[<iterate through resources>].created = true or false
    and if
    waveset.accounts[<resource>].lastPasswordUpdate = <last updated date>
    The latter is of course only applicable to resource where you set a password. This value will be updated whenever you set the password and could be a possible value to check against.
    If the account is not created yet but assigned it might be another possibility to check, but again - clairfy a bit about what you mean with "Latest Resource Assigned".
    /Anders

  • Resources assigned to a Work Center

    Hi Experts ,
    Is there any Function Module to get the 'Person Responsible' and the Resources assigned to a Work Center ?
    Thanks,
    Radhika.

    Hi Renjith,
    Thanks for the quick reply. The Second FM is exactly what i was looking for, but regarding the Person Responsible field, i need related to the Work center only not the Project Definition.
    Any idea of person responsible for work center ?
    Thanks.

  • The resource name is already in use. You must select a unique name for the resource.

    I am using Project Server 2010 PWA.
    I have created resource of type 'Work' in Resource Center. Server Settings -> Resource Center. Click
    New Resource. I already assigned few task to these Resources.
    Now I want these Resources can login into PWA site. I tried to add New User from Server
    Settings -> Manage user. But I am unable to do so as I am getting the
    error message: The
    resource could not be saved due to the following reasons:The resource account is already in use. (unchecked "User
    can be assigned as a resource" checkbox doesn't solve)
    I am using forms-based
    authentication. From Resource Center I tried Edit
    Resource but we does not have any option there to give Windows User Account. 
    I do not want to delete the resource and re-create. Is there any way by which I can give
    Windows User Account to my existing resources?

    Hi,
    You should edit fhe existing resource from the resource center, check the option "the resource can connect to Project Server" and set a valid user account.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • One or more of the specified resources could not be re-assigned. This can happen if the proposed resource to be assigned has already an assignment on the given task or the specified assignment is deleted or rejected.

    I create a brand new plan based on a template.
    A task in that plan has a team resource assigned. the task is fixed work. The PM may change the work and duration but not the team resource.
    The plan is published.
    I delegate my self as a team resource: and try add myself to team task in the timesheet area (using insert row). I can choose some tasks and the add. Most tasks throw this error. This happens if nothing on the plan is changed - it is brand new - minutes
    old
    One or more of the specified resources could not be re-assigned. This can happen if the proposed resource to be assigned has already an assignment on the given task or the specified assignment is deleted or rejected.
    How can I stop the alert:
    One or more of the specified resources could not be re-assigned. This can happen if the proposed resource to be assigned has already an assignment on the given task or the specified assignment is deleted or rejected.
    Trying to stop the swap to Salesforce - but the errors keep a coming

    oooch - I can fix it - I need delete the task and recreate it. Which is amazingly tedious as I cannot see if a task needs recreating or not. There's 10 template plans and an average of 200 tasks - then I have to rename the template - the assign the
    new template to the EPT - this will be a long night; with only complaints at the end.
    Trying to stop the swap to Salesforce - but the errors keep a coming

  • Assign a role automatically based on resources assigned to the user?OIM 11g

    Hi,!
    i have a request and this is:
    in my scenario i have roles associated with access policies that assign resources .
    i have resources assigned by a target reconciliation ... what i need is assign a role based on resources that the user has..
    if the user has 4 resources added by a target reconciliation and these 4 resources make a role then the role has to be assigned automatically...
    any idea?? this is possible?? thnx..

    any idea?? ... this is possible??

  • Remove Entries with no value in the total "Resource Assignment"

    Dear all,
    I am looking for a view where when i do not use any filters in the Resource view with Summery view selected, and when i choose the date range, i want only tasks with actual work done during that selected period to show.
    that is if the total for a specif task is blank, do not show in the list.
    i am currently doing that by exporting the view to excel and filter the total to remove the blank.
    thank you for your help
    Traffic Manager Born Interactive

    Hi AsaadSaleh,
    I'm not sure to well understand but as far as I get it, you'd like to filter on tasks that have started (ie actual work or actual start date) on a specific period.
    I'd advice you the following:
    Copy and rename the existing filter "time interval" (not sure of the translation, my Project is in french...)
    Add a condition "AND" with for example actual start date different from "NC"
    Then you might add this custopm filter in a custom view.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • How to Load the Resource Master for Generic Resources by Department?

    We are using P6 enterprise version in our company having a central database.
    Q1a.) We set the Activities view > Resource Usage Spreadsheet > Select View 1) By Resource OR 2) By Role.
    The result is the spreadsheet presents the Remaining Early Units by Resource OR by Role. Other spreadsheets behave the same way. Is it possible to view the total Remaining Early Units and not have it separated by Resource OR Role?
    Q1b.) We would like to find out the recommended structure to load Generic Resources (ie. professional and trades such as Civil Engineer, Mechanical Engineer, Carpenter, Welder etc.) for each Department (ie. 8221, 9362, 8524 etc.) into the Resource Library. Example: we would like to load Civil Engineer once for departments 8221, 9362, 8524, load Welder once for departments 9362, 8524, etc.
    We contacted Primavera Support and they pointed us to use Roles.
    Thank-you for any suggestions you may have.

    i think you could try to model it like this:
    - define a single "mech eng" role in the role tree (not too deep or even a flat list). no dept's mentioned here. keep the role tree strictly "speciality" oriented or anyway according to their technical classification.
    Role ID     Role Name
    Engr     Engineer
    .......Engr.SE     Structural Engineer
    .......Engr.EE     Electrical Engineer
    .......Engr.ME     Mechanical Engineer
    - define any number of resources (either individuals, or teams or even a combination of the two) in the resuorce tree.
    1 eng with a capacity of 8h/d, a fixed formation (team) regardless of the number of individuals would still have a capacity of 8h/d if they can only accomplish tasks together. if assigning a team of 5 means means faster for fixed workload or more for fixed duration then define a fixed team (again if this is the case) as a single resource with a capacity of 40h/d or simply define and assign the required number of individual eng's 8h/d max each. use activity duration type to switch between duration driving and non-driving resource usage.
    e.g.
    Resource ID     Resource Name     Resource Type     Default Units / Time     Max Units/Time     Primary Role     Roles
    .......*ElecEng     Electrical Engineers*     Labor     20.00h/d     20.00h/d     Electrical Engineer     Electrical Engineer
    ..............EE1BARBW     Barb Wire, Senior Electrical Engineer     Labor     10.00h/d     10.00h/d     Electrical Engineer     Electrical Engineer, Project AQ
    ..............EE2BILLS     Bill Sanders, Junior Electrical Engineer     Labor     10.00h/d     10.00h/d     Electrical Engineer     Electrical Engineer, Consultant
    .......*MechEng     Mechanical Engineers*     Labor     10.00h/d     0.00h/d     Mechanical Engineer     Mechanical Engineer
    ..............MechEng T1     mech eng team 1     Labor     8.00h/d     8.00h/d     Mechanical Engineer     Mechanical Engineer
    ..............MechEng T2     mech eng team 1     Labor     16.00h/d     16.00h/d     Mechanical Engineer     Mechanical Engineer
    .....................MechEng T2.1     ME 2.1     Labor     8.00h/d     8.00h/d     Mechanical Engineer     Mechanical Engineer, Consultant
    .....................MechEng T2.2     ME 2.2     Labor     8.00h/d     8.00h/d     Mechanical Engineer     Mechanical Engineer
    - create the necessary res to role associations. one employee or team (i.e. res) can be linked to one primary qualification and several other proffesions or specialities (i.e. roles)     
    - when assigning to activities, if a particular individual/ team is required assign directly the res. select several activities requiring mech eng, select 1 or several mech eng's and assign them (use resource security to limit user's access to certain res nodes).
    - if any res with a particular role can perform the task, assign the role. later on if you decide for a res, you can assign a particular resource through the previously assigned role. decide applicable rates and h/d between role and res.
    - you can track allocation in spreadsheets and histograms by resource or role (or by activity for both). if individual res have clear capacities, for roles you can chose between custon role limits (manual) and system calculated for each role based on res having that as primary qualification (user pref)
    - you can report by activity / WBS / project / portfolio (tracking)
    - solve over-allocation by levelling, by switching between res for the same role, etc
    - optimise duration vs. load and/or # of res/roles (and viceversa)
    Edited by: Tibi on Oct 9, 2009 9:40 PM
    Edited by: Tibi on Oct 9, 2009 9:59 PM

  • How to Manage the Resource Master in Primavera Enterprise Version

    We are using P6 enterprise version in our company having a central database. We had created our own unique resources and standardised across the enterprise and is Admin protected. However we often have to import some schedules sent by our consultant/client. In those schedules they have their own resources.
    So when we import these schedules, it also imports the resources along with it and pollutes our resource master.
    Can anyone let me know, how to manage such a situation.
    Regards

    We have met this issue. You have few ways to deal with it, but each has its own +ve and -ve.
    1- You may create a separate "Working" db into which you can import those files and keep them there only. Your master db shall be used for maters and your own program only.
    2- You may do the same for checking the resourses, vet them before importing into the final db
    3- P3 and MSP importation allows you to select the node to which the resources will be located. We have created a resource node called "Imported Resources" and dumped all those resources into it. Our users don't have access to that node so those resources can only be used on the imported program and can't be assigned to any other program / activity
    4- Enforce your supply chain to use the same resource list. We managed to do that for our main and subcontractors. That formed part of their contracts.

  • Error encountered while polling the resource for the service endpoint

    Hello everyone
    I'm a newbie on OSB world. Yesterday, I've tried to test OSB with FTP transport and got some problems.
    As you see in the title, I've search this forum to get a solution already, but I couldn't find anything. So that I create a new thread.
    I created a new OSB project, create a new Proxy service to connect to my FTP server:
    - service type: messaging service
    - request message type: Text, response message type: None
    - FTP transport: external user (I used a Service account), Post read action: archive, transfer mode: ascii, some directories needed were created in /tmp directory
    - Message flow: Start node -> pipeline pairs
    in request pipeline of pipeline pairs node: i created a new stage: Assign action -> Log (to get file contents, error severity) -> Assign -> Log (get file name)
    The expected results are: file file content and file name (display in osb console) after I submit a text file to ftp server (using test console or ftp client)
    But, some error occur continuously after I submit a text file (I can get the file content because error raise and log catch it). The error message is show below:
    <Jun 6, 2011 10:04:59 AM EDT> <Error> <ALSB Logging> <BEA-000000> < [PipelinePairNode1, PipelinePairNode1_request, show_text_info, REQUEST] file contents: li
    ag
    a
    glakjgk
    >
    <Jun 6, 2011 10:05:30 AM EDT> <Error> <WliSbTransports> <BEA-381602> <Error encountered while polling the resource for the service endpoint ProxyService$FTPTestProject$ProxyServices$FTPTestPS: *javax.naming.NameNotFoundException:* While trying to lookup *'wlsb.internal.transport.task.queue.ftp'* *didn't find subcontext 'wlsb'. Resolved ''; remaining name 'wlsb/internal/transport/task/queue/ftp'*
    *javax.naming.NameNotFoundException: While trying to lookup 'wlsb.internal.transport.task.queue.ftp' didn't find subcontext 'wlsb'. Resolved ''; remaining name 'wlsb/internal/transport/task/queue/ftp'*
         at weblogic.jndi.internal.BasicNamingNode.newNameNotFoundException(BasicNamingNode.java:1139)
         at weblogic.jndi.internal.BasicNamingNode.lookupHere(BasicNamingNode.java:247)
         at weblogic.jndi.internal.ServerNamingNode.lookupHere(ServerNamingNode.java:182)
         at weblogic.jndi.internal.BasicNamingNode.lookup(BasicNamingNode.java:206)
         at weblogic.jndi.internal.WLEventContextImpl.lookup(WLEventContextImpl.java:254)
         Truncated. see log file for complete stacktrace
    >
    <Jun 6, 2011 10:06:30 AM EDT> <Error> <WliSbTransports> <BEA-381602> <Error encountered while polling the resource for the service endpoint ProxyService$FTPTestProject$ProxyServices$FTPTestPS: javax.naming.NameNotFoundException: While trying to lookup 'wlsb.internal.transport.task.queue.ftp' didn't find subcontext 'wlsb'. Resolved ''; remaining name 'wlsb/internal/transport/task/queue/ftp'
    javax.naming.NameNotFoundException: While trying to lookup 'wlsb.internal.transport.task.queue.ftp' didn't find subcontext 'wlsb'. Resolved ''; remaining name 'wlsb/internal/transport/task/queue/ftp'
         at weblogic.jndi.internal.BasicNamingNode.newNameNotFoundException(BasicNamingNode.java:1139)
         at weblogic.jndi.internal.BasicNamingNode.lookupHere(BasicNamingNode.java:247)
         at weblogic.jndi.internal.ServerNamingNode.lookupHere(ServerNamingNode.java:182)
         at weblogic.jndi.internal.BasicNamingNode.lookup(BasicNamingNode.java:206)
         at weblogic.jndi.internal.WLEventContextImpl.lookup(WLEventContextImpl.java:254)
         Truncated. see log file for complete stacktrace
    >
    ...There are many BEA-381602 errors that occur continuously.
    My question is how to solve this problem.
    Any suggestion is appreciated.
    Thank in advance.
    Regards, CuongPT
    Edited by: Doubt_Man on Jun 6, 2011 11:17 AM

    Thank atheek1, I remember that I didnt do any manual configuration on my domain :). I use that domain for testing so that I will create a new domain for comparison.

  • CProjects-MS Project - import and export of task-role-resource assignment

    Hi,
    We are on PPM5.0
    We are currently working on cProjects-MSP client integration.
    What we have not been able to configure for import/export so far is:
    1. Task-Role-Resource assignment
    Whereas we are are able to import/export the "Person Responsible" and "Role Responsible" fields, we have not been able to align the task-role-resource assignments.
    We see a "Resource Name" column (Standard) in MSP. When we click on the drop down, we see all the roles from the cProjects project. But the alignment does not happen.
    Summary:
    On export and import, we need to automatically see the role-resource-task assignment. How is this possible?
    2. Code field to "VC_BUPA_GUID" gets a number which is not the BP ID.
    Is it possible to import the BP numbers in MSP. Also, how can we assign a number to the role in MSP such that on import into cProjects, the role is already staffed with the corresponding BP.
    3. Is it possible to export all the resources (BPs) into a drop down in MSP - like we see the Project Type, Role Type etc.
    Thanks.

    Hi Anuradha,
    Thanks for your inputs.
    When we export to MSP, we see the cProjects roles under the "Resource Name" drop down in MSP.
    However, they are only seen when we expand on the drop down.
    For e.g. RoleA, and RoleB are two roles in cProjects project, along with many other roles.
    Both of these roles are assigned to a task, say TASK1.
    When exported to MSP, we expect both of these roles to show against TASKI, as "RoleA, RoleB" under the "Resource Name" column. However, these roles are not seen. They only appear as elements of drop down, along with all other roles in the project, when we explicitly click on the drop down.
    Please let me know if I are missing out on something.
    Thanks.

Maybe you are looking for