Enabling drill through using FR

Hi Team ,
We have configured Drill through in FDMEE and we are able to drill from web-forms and smart view to FDMEE . Please advise if we can drill to FDMEE from Hyperion reports also .
Basically if i can drill through from web-forms for an intersection how can i enable drill from the same intersection from HFR .
Regards,
Roshin Rasheed

It is possible .. Check below link for detailed explanation of how to enable that : http://www.oracle.com/technetwork/middleware/financial-management/tutorials/obe-fr-erpidrillthru-100179.html
Cheers !

Similar Messages

  • To enable drill through in EISeveryleaf membe of dimensionis at samelevel

    Hi All,
    I a facing a drill through problem in EIS,to enable drill through feature in EIS,every leaf member of a dimension must be at same generation,is it correct?
    Plz guide me in this as it is very urgent.
    Thanks,
    Ravi

    This link will explain the difference between a Balanced, Unbalanced, and ragged hiearchy. It should help you to understand better.
    http://publib.boulder.ibm.com/infocenter/db2luw/v8/index.jsp?topic=/com.ibm.db2.udb.db2_olap.doc/cmdhierarchy.htm
    Hybrid Analysis requires hierarchy is balanced, relational drill thru does not.
    Are you planning to use Hybrid Analysis? If not, don't worry about balanced hierarchy.

  • Enabling Drill Through causing Essbase Integration Server hang.

    During the automation process using olapicmd command and *.cbs we are enabling Drill Through which is causing Essbase Integration Server hang.
    We don't get any error message in log file. Plus sometime its run successful , also when we run this manually going to EIS console, it run fine.
    Thanks in advance
    -Piyush

    Hi Kishore,
    Thanks for your prompt reply......
    I have checked in before itself the Drill down option ......
    I am not able to understand whats the issue we are able to drill through in EIS till last level but after improting in OBIEE we are not able to drill through to last level, in the last level it showing no results....
    I am not able to find the solution any other suggestions ?
    Regards,
    Tarang Jain

  • Enabling drill through from Essbase cube to drill through report

    The requirement is that I keep summary level information in the Essbase cube and detailed granular information (order level) in a relational table.I would like to enable drill through between the cube and the report.
    Please advise what would be the best approach considering the current system architecture that is outlined below.( Hyperion suite 11.1.2.1).
    Would also like to know drill thru vs hybrid analysis options.
    1) ASO/BSO cube is populated through Oracle Data Integrator
    2) The relational transactional table is also poulated through ODI.
    3) The cube would hold summary level info while thr drill through report should provide the order level details in the same context as chosen in the cube.
    Would appreciate guidance on the best way forward.
    Thanks & Regards,
    Anirban

    Incidentally we had been trying to use Essbase studio as an option.But there are 2 oints that we are trying to investigate.
    1) Can we bypass deployment of data and metadata everytime through Essbase studio after the initial outline is delpoyed? In the system architecture the relational tables are populated using ODI. We would like to load the data and metadata through ODI into the cube. Eeven then can we implement drill thru bypassing deployment through Essbase Studio?
    2) If Essbase studio is imperative for drill through then what are the batch automation options for deployment through Essbase studio? Ideally the option should be after the relational tables are populated through ODI then the Essbase deployment should be invoked and batch script should load the data and metadata through Essbase Studio.
    Please advise.
    Thanks,
    Anirban

  • How to filter records in EIS drill through using template SQL

    Hi,
    I'm looking for an option to filter records in EIS drill through using Template SQL.
    For eg: If we user runs drill through on 2011, it should restrict display of Jan & Feb and should display records for other months.
    I tried using NOT IN clause, but got an error.
    Can any one help me in understanding how this needs to be defined in template SQL
    Thanks in advance

    Hi Glenn,
    I'm able to filter the records for specific periods.
    However, I'm facing another problem now.
    When I try to run drill through I get 'OLAP_error (1192025): Unknown Error: Not a valid Entry' error.
    This is happening when I include condition as ((($$ab.ACCOUNT_CODE-COLUMN $$) IN ($$Account-VALUE$$)))
    Here, ACCOUNT_CODE is field from Account dimension table and 'Account' is the name of the dimension.
    If I remove this statement and run drill through, it runs but shows data for all accounts (irrespective of the Account selected)resulting in incorrect data.
    Our RDBMS is Oracle. Can you please help me with this
    Thanks

  • Drill through using Ragged Hierrachy from Essbase

    Problem Description
    I have a requirement to provide the drill through functionality after drilling down to the lowest level for unbalanced ragged heirrachy but the issue was that
    the lowest level grain was shared across different level. This we overcame in RDBMS by introducing skipped ( jumping the all leaf level to the last column) or Psedo balanced
    ( repeating the leaf level till the last column) and then using the Action link and providing the leaf level member as the parameter.
    But now the problem is we need to do the drill through in Essbase sourced cube in obiee where the heirarchy is ragged unbalanced and I cannot change it to skipped / psedo balanced.
    Pls. suggest how to achieve the drill through after drilling down to teh leaf level as the leaf level is shared acros sdiffernet levels.
    Regds

    Hi Sasi
    Thanks for the response . Here I mean the heirarchy is ragged . See below the sample heirrachy where the leaf levels are E,X,Q ,S etc...
    Level1
    Level2
    Level3
    Level4
    Level5
    Level6
    Hierarchy_Id
    A
    B
    C
    D
    E
    null
    1
    A
    B
    X
    null
    null
    null
    2
    A
    N
    P
    Q
    null
    null
    3
    Z
    S
    null
    null
    null
    null
    4
    We have handles drill thorugh in obiee11g using RDBMS as data source by making this ragged heirarchy - a psedo balanced heirarchy by repeating the last level till the end. and then using the last level as the column for drill through parameter.
    Level1
    Level2
    Level3
    Level4
    Level5
    Level6
    Hierarchy_Id
    A
    B
    C
    D
    E
    E
    1
    A
    B
    X
    X
    X
    X
    2
    A
    N
    P
    Q
    Q
    Q
    3
    Z
    S
    S
    S
    S
    S
    4
    But the problem is we cannot do this essbase cube . Pls. suggest how tohandle this in cube where we cannot manipulate teh ragged heirarchy.
    Regds

  • Enable drill through feature in a Financial Reporting Report

    Hi,
    my Hyperion system version is 9.3.1. I need to realize some Financial Reporting reports using the Drill Through feature but i don't know how activate this feature.
    Anybody can hel me?
    Thanks in advance.
    Stefano

    One way is related content, which drills to another report based on the intersection clicked on by the user:
    Check out the fr user guide (chapter 7) for more info:
    http://download.oracle.com/docs/cd/E10530_01/doc/nav/portal_4.htm
    For setting up drill-through, you need to define the Hybrid Analysis relational source in Integration Services Console, check out the Hyperion Essbase – System 9 Database Administrator's Guide from the following link:
    http://download.oracle.com/docs/cd/E10530_01/doc/nav/portal_3.htm
    Regards, Iain

  • Enable/Disable Drill-Through Reporting?

    Hi,
    We have a BSO app which has Drill-through reports (defined in EIS).
    Reports are working fine.
    Is there a way to disable/enable drill-through reporting on an App/DB using MAXL?
    Appreciate your thoughts.
    Thanks,
    Ethan.

    Glenn,
    Thank You for the response.
    I am not exactly able to understand how this whole drill-through reporting concept works technically.
    We define meta-outlines in EIS. Define Drill-through reports for Meta-outlines.
    We build the cubes in Essbase using the EIS Meta-outlines.
    Drill-through reports are available for these cubes from excel Add-in.
    I am clear till now, now starts my confusion...........
    I assume there will be a connection to EIS whenever user does a drill-through through Excel Add-in.
    When I rename the Application in Essbase, I see drill-through reports are still available.
    Are there any files/artifacts (like filters or scripts) on the Essbase app that correspond to drill-through reports?
    Is there a way to tell if the app is created using EIS or not, just by looking at the app in EAS?
    I believe I am asking the complete concept :).
    Appreciate your response.
    Thanks,
    Ethan.

  • Essbase Studio Drill-through for Recursive Hierarchy - Generation 1

    I'm using Essbase Studio 11.1.2.3 to build an ASO cube. All my hierarchies are recursive (parent-child). I would like to define a drill-through report and I understand that I have to use the Advanced Settings option to specify my intersections. Now one of my dimensions is optional for the users - they don't have to specify a member (they can leave it at the highest level - dimension name on the spreadsheet). Under 'Advanced Settings' for DT report in Studio I have to specify a Generation value of 2 or greater than 2. How do I enable drill through in cells where one of the dimension is at Gen1 ? Specifying the level number didn't work. I think if you specify Level in 'Advanced Settings', drill through is allowed only if that specified level of the dimension is chosen, if Gen 2 is specified, then drill through is allowed as long as the dimension-members specified are at or above Gen2. But what about Gen1?

    Yep, this is a limitation. I suggest you create two reports one that takes your "optional" dimension out and a second one that has it in. if they don't need the dimension, select the first report and if they need the filter then the second. I m always a little leery with recursive hierarchies and Gen 2 or 3 sine they create a list of level 0 members under the selection in the query and there are limits to the number of members in an in clause and at high levels in the hierarchy it is easy to surpass it (In Oracle it is 1000  members)

  • HFM 9.3.1 drill through FDM

    Hi All,
    I'm trying to use the drill through functionality in HFM 9.3.1.
    When I click on Audit Intersection in the web data grid FDM starts to open but then I get an error relating to Single Sign On not being setup correctly.
    I've added the FDM app name to the App setting in HFM and I've got the correct URL in the Web Config .
    Can anyone give me any guidance of where to setup SSO in Shared Services for HFM/FDM?
    Is it possible to use drill through using Web Data Forms?
    Thanks
    G

    Choose Administration>Manage Documents then click on links
    click new to add a new link
    In the link field enter one of the following, for the
    version of FDM you are using.
    • http://<server name>/<wwwwwwww>/AuthorizedPages/LogonPage.aspx?AppName=<xxxxxxxx>
    • Replace <server name> with valid web server address
    • Replace <wwwwwwww> with UpstreamWeblinkDataMart for versions FDM 9.0.2 to FDM 9.2.x
    • Replace <wwwwwwww> with HyperionFDM for 9.3 and above
    • Replace <xxxxxxxx> with a valid FDM Application Name.
    Ensure that FDM does not open in the same page
    • Ensure to include the Single Sign On information in page request. Click ‘Save’
    On the ‘Manage Documents – Links’ screen you will now see your link to FDM. Log into the server where FDM is installed.
    • Go to Start > All Programs > Hyperion > Financial Data Quality Management > Load Balance Manager > Load Balance Configuration
    Go to the ‘Authentication Providers’ tab, click ‘Add’ and choose ‘Visual Basic Script SSO Authentication’ Provide a description. Set sso uathentication script ,The script is generically written, and must be customized for each customer.
    • Once the changed have been made click ‘OK’ and notice the Authentication Providers have been updated.
    • Go back to the ‘General’ tab and re-enter the service account password and click ‘OK’
    • Go back to HFM Workspace and test the link you created. FDM will open up in a new window, and sign you in.
    Now enable FDM to pass the SSO token:
    • Administration -> Integration Settings
    • From the ‘Options’ drop-down choose ‘Use SSO’
    • Enable the check-box
    • Click ‘Save’
    • From the HFM Web-Server you need to provide a link to FDM inside of the ‘Server and Web Configuration’
    • Choose the ‘Web Server’ tab
    • Enter the following link to ‘Financial Data Management URL’ field http://<server name>/HyperionFDM/AuthorizedPages/IntersectionSummaryByLocation.aspx
    • Update <server name> with the appropriate FDM Web-Server name
    •Enter a valid DCOM service account and password in the ‘DCOM User Info’ fields.
    Test Drill back functionality

  • Drill through report

    Hi Friends,
    I am new to this blog. I have a quick question using drill through report. I have deployed BSO cube using EAS / rules files. I want to create a drill through report. I know how to create a drill through using essbase studio but not from EAS. Please advice.
    Thanks
    Andy

    It will be available to the participants of the conference. (it is already posted, but I have changes to upload). I'm not sure when ODTUG will make presetations generally availalbe. IT is not typically for a number of months. Also although the presentaion sildes have information, there is a lot of verbage to go along with it. I'm sure it will end up as an interRel webcast later in the year, but I would not know when. I'm sure none of this helps you. but it is a bigger topic than applicable to the forum

  • Workaround for HFM Drill-Through when using custom dimensions ( 4) in FDM

    Hi all,
    we have the following scenario:
    - Target Custom 3 is defined as a combination of Target Product and Target Cost Center
    - Target Product needs to be obtained by mapping field "PRODUCT" in the source file
    - Target Cost Center needs to be obtained by mapping field "CC" in the source file
    So,
    One approach would be to enable Custom5 and Custom 6 dimensions in FDM, and configure sequence so these two dims are mapped before custom 3 which has a conditional map to get
    values from target c4 and c5 (using varvalues...)
    The issue here is that drill-through does not work as the sql query for the intersection is looking for UD5x and UD6X as NULL, N, or [NONE], and these two columns have a value as they were mapped.
    Trying to solve this issue, we configured C5 and C6 as lookup dimensions so we could create the mapping tables for them although in order to import data from source file fields we used attr2 and attr3. Besides UD5 and UD6, as expected, were not displayed in the Import and Validate/Export grids
    Then the idea was to update the work table with attr2->ud5 and attr3->ud6 in a event script (importaction or befprocmap..) so ud5 and ud6 are mapped.
    The problem is that we noticed that ud5 and ud6 are not updated from attributes. It seems that as they are configured as lookup dims, values may be mapped but not copied from work table to tdataseg.
    If this would work, then after custom3 is mapped we could set ud5x and ud6x to [none] in order the drill-through query to work.
    Having all in custom 3 dim and use mappings on combinations is not desired by the customer as they want to keep product and cc mappings separately.
    I was thinking to use a dummy location for product and cost center mappings and then emulate mappings using SQL but would like to avoid this.
    Any other suggestion?
    Thanks!

    The criteria for mapping C3 is:
    - If Plan = 6 Then Target C3 = SUBACCOUNT
    - If Plan <> 6 AND Account IN range [70000,70999] Then Target C3 = Target CC
    - If Plan <> 6 AND Account NOT IN range [70000,70999] Then Target C3 = Target CC_Target Product
    Fields in the file
    - PLAN
    - ACCOUNT
    - SUBACCOUNT
    - Source CC
    - Source Product
    So current solution actually is to put that logic in the import format so:
    - If Plan = 6 Then Source C3 = SUBACCOUNT
    - If Plan <> 6 AND Account IN range [70000,70999] Then Source C3 = "RULE2"
    - If Plan <> 6 AND Account NOT IN range [70000,70999] Then Source C3 = "RULE3"
    In the mapping of C3, we managed a simple script mapping checking the source C3
    If source c3 = RULE 2 -> Target C3 = Target CC
    If source C3 = RULE 3 -> Target C3 = Target CC_Target Product
    Else Target C3 = source C3 (which is SUBACCOUNT)
    C5 (Cost Center) and C6 (Product) are mapped before C3.
    In order to make Drill-Through working, we save UD5X and UD6X in ATTR2, ATTR3 so the user can see it, and we set then UD5X and UD6X to [None] so the Drill_Through SQL Query returns the values from FDM. If after loading the user goes to validate step, he will see [None] in C5 and C6 but actually this does not really matter as C3 has already been mapped and is the value to be loaded. If the want to review target product or target cc then they drill down to attribute information.
    regards

  • How Enabling ERP Integrator Drill Through from a Grid

    Hi All,
    Can any one tell me how to see the source data by using FR.
    some where i saw we can see this by using Enabling ERP Integrator Drill Through from a Grid.
    but i dont know how to set this...
    can any one help on this...

    Incidentally we had been trying to use Essbase studio as an option.But there are 2 oints that we are trying to investigate.
    1) Can we bypass deployment of data and metadata everytime through Essbase studio after the initial outline is delpoyed? In the system architecture the relational tables are populated using ODI. We would like to load the data and metadata through ODI into the cube. Eeven then can we implement drill thru bypassing deployment through Essbase Studio?
    2) If Essbase studio is imperative for drill through then what are the batch automation options for deployment through Essbase studio? Ideally the option should be after the relational tables are populated through ODI then the Essbase deployment should be invoked and batch script should load the data and metadata through Essbase Studio.
    Please advise.
    Thanks,
    Anirban

  • How to Drill Through from Hyperion Reporting to Oracle - GL by using FDM?

    HI
    I am new to FDM.
    I already Installed and Configured FDM.
    I need to provide Drill through functionality on Hyperion Planning Workspace (Hyperion Reports built using Hyperion Financial Reporting Studio and Data Forms) to Oracle Financials(GL) by using FDM.
    I think 1st i need to develop Application in FDM Workbench to Push data from Oracle Financials to Hyperion Essbase.
    than i need to enable "Drill" on Hyperion Finaical Reports.
    Can you please share link , guide or any thing.
    Its urgent please.
    thanks
    Sher
    Edited by: Sher Ullah Baig on Sep 13, 2012 3:22 PM

    Thanks
    But when i try to log in i m getting error bellow"
    Failure of server APACHE bridge: No backend server available for connection: timed out after 10 seconds or idempotent set to OFF."
    So do u have any other reference plz
    thanks

  • In Drill through report pass hyperlink value as parameter to another report using ssrs 2008 R2

    Hi All,
    I have one drill through SSRS report in which if I click one hyperlink in the summmary report it should be passed as parameter for detail report, like this....
    Summary:
    AccountType
    A1
    A2
    If I click A1 then that should be passed as parameter to detail report and display A1 data in detail report
    If I click A2 then that should be passed as parameter to detail report and display A2 data in detail report.
    Please give me some ideas or expression code to achieve this in using SSRS 2008R2. Its very urgent.
    Thanks,
    RH
    sql

    Thanks the folowing is my source data for the parameter I am including to the drill through
    SELECT DISTINCT
    case
    when EA_STATUS in ('E4', 'U4', 'P5', '02', '03', '04','B2','B3','B4','12')
    then CAST('Project' AS VARCHAR(15))
    else CAST('Non-Project' AS VARCHAR(15))
    end as EA_PROJECT_GROUP_DESC
    FROM TEAMS.FMPROD_V_EA
    As you can see it has only 2 values.So how do you suggest I wirte the expression to include in the report.
    The name of the parameter I will be using is EAProjectGroup.but below is the error I am getting trying to run the report
    rsMissingFieldInDataSet] The dataset Trends contains a definition for the Field EA_PROJECT_GROUP_DESC. This field is missing from the returned result set from the data source.
    [rsErrorReadingDataSetField] The dataset Trends contains a definition for the Field EA_PROJECT_GROUP_DESC. The data extension returned an error during reading the field. There is no data for the field at position 45.
    Preview complete -- 0 errors, 72 warnings
    what does the position 45 mean?

Maybe you are looking for

  • Goods receipt against process order with inbound idoc

    Hi Experts, We need to post good receipt against process order with movement type 101 and for By-product 531. Can we use inbound idoc-WMMBID02,with message type WMMBXY to achieve this functionality? Or please advise if we can achieve this  from any o

  • How to create an AQ table

    Hi, I run this sql but I got an error: BEGIN DBMS_AQADM.CREATE_QUEUE( Queue_name => 'BING.IP_IN_QUEUE', Queue_table => 'BING.IP_QTAB', Queue_type => 0, Max_retries => 5, Retry_delay => 0, dependency_tracking => FALSE); END; Note: The schema is BING a

  • Adding SWF for pdf interactive

    Hi, I have a multi page indesign doc which is set to export for interactive pdf. I need to add two swf file in different pages and once I add them, they do not show once interactive PDF is exported. I have tried many different options with no success

  • Optional target message - no errors raised

    HI all, I have been trying to find some information on how to deal with optional target messages in a message mapping/interface mapping. I have a situation where one file can potentially create between 0 to 4 files and I don't want errors in producti

  • Dead Pixel on my Sony Xperia Z1

    Hi Concern, Complain here against Sony Mobile Malaysia. I live in Kuala Lumpur Malaysia,and my biggest mistake is i bought Sony mobile for the first time ever. I got the dead pixel on my mobile for 2nd time,even after replace one to one for 2nd time.