Energywise future

Hi all,
I would ask for Energywise perspectives today.
Mainly, we use to began a work on interfacing to energywise other kind of objetcs than IT devices (Computer, Phones, Routers, ...) like (power sensor/actuators) . This work quite well with our specific PowerLine or Radio smartPlugs, or Din rails than can deliver their consumptions and that can be actuated to different power levels.
Now to go further we are asking ourselves where to discuss of next evolutions of energywise system.
I do not know if i'm at the right place to open this subject, so please do no hesitate to "re-direct" my post.
Current lu our main questions are about:
- Other kind of datatype recording like Temperature, Luminance, Presence, etc .. could be very useful for optimizing energy efficiency algorithms in softwares like Joulex, Orchestrator or other.
- IPv6 support for energywise
- Other kind of transport protocol like (CoAP) for constrained objects.
Thanks for your interest
Pierre-emmanuel

Hello Vinod
We ended opening a TAC service request and got a solution to the issue. It was not though that easy cause we worked almost a month with TAC to got this fixed. We ended up setting the telnet parameters as follows:
Telnet timeout - 700
Read Delay - 1000
Transport Timeout  - 75000
Login Timeout - 2000
Tune Sleep - 800
Delay After Connect - 1000
I got this solution as more a workaround. LMS should be able to ajust the timeouts to the device type - this timeouts work for our 2K swithes but not for the 3K - for those the only solution is trial and error.
Deploying images is just a small part of what LMS is supposed to be able to perform, but being a Cisco product and  the devices being Cisco also would expect things to go more smoother. I know that we are talking about different departments but anyway :)
Thanks for asking though.
Best regards
Isaac

Similar Messages

  • ICal for iPad not showing events more than 2 years in future in Year view

    As the subject describes, I can create an appointment more than 2 years into the future.  On my Mac and iPhone I can see the event using any view.  It is also visible in all views on my iPad, except for the year view.  A feature?

    Go to the Home screen and double click the Home button. That will reveal the row of recently used apps at the bottom of the screen. Tap and hold on the app in question until it wiggles and displays a minus sign. Tap the minus sign to actually quit the app. Then tap anywhere on the screen above that bottom row to return the screen to normal. Then restart the app and see if it works normally.
    Then reboot your iPad. Press and hold the Home and Sleep buttons simultaneously ignoring the red slider until the Apple logo appears. Let go of the buttons and let the iPad restart. See if that fixes your problem.

  • Bug? My events on the iPad iCal app aren't shown in the year view if they are more than two years in the future.

    My events on the iPad iCal app aren't shown in the year view if they are more than two years in the future even though I can see them on the month, week and day view. Any suggestions on how to fix it? I've tried it all. I called the apple support and they checked on their iPads. They all did the same and they couldn't help me. They suggested trying this way. I'd like to be able to plan a few years ahead and the year view would make thing so easy!
    Is this a bug?

    Go to the Home screen and double click the Home button. That will reveal the row of recently used apps at the bottom of the screen. Tap and hold on the app in question until it wiggles and displays a minus sign. Tap the minus sign to actually quit the app. Then tap anywhere on the screen above that bottom row to return the screen to normal. Then restart the app and see if it works normally.
    Then reboot your iPad. Press and hold the Home and Sleep buttons simultaneously ignoring the red slider until the Apple logo appears. Let go of the buttons and let the iPad restart. See if that fixes your problem.

  • ICal Search doesn't find my events in the distant future !!!

    Here's a bit of a disturbing one: I use iCal (Leopard, so iCal 3.0.8 1287) to keep track of many things- not just a meeting next week or a TO DO - but also for long-term planning. I wanted to enter a reminder for about December 2016 concerning social security - but first wanted to check if I hadn't already done this. I typed social in the iCal search box and everything through 2009 came up.
    But, I said, that's a bit strange since I was almost sure I'd put something into iCal already.
    OK so then I went to the date 28 August 2017 (shift-cmd-T) and once there, I did the same search - and voila - my event about "social security" from 17 Nov 2016 showed-up in the serach results section!!! (I later tried going to March 2016 and it worked as well - so seems it has to be within a few months / year from the date-- ?!?)
    Went back to another date closer to today (19 May 2010) - it did not show up.
    For other searches, some events for April 2010 have showed-up; but nothing 3 years in the future.
    For some repeating items I get results showing 2008 - 2011, but never further than that if I start the search on today's date. (I get all events from past dates all the time).
    Another "workaround" is that if I type the word social into Spotlight, it finds the 17 Nov 2016 event.
    Is this a "bug" that iCal cannot find distant future events? Any comments or other people's experience really appreciated. It's not good, this - (like doing a search on an Excel Spreadsheet and only getting recently dated information or something like that. Not good).
    Appreciate any feedback here.
    Best regards,
    Steve Schulte

    Try a new post in the iCal forum. They have more experience with things like this.
    DALE

  • Provisioning a user in future date

    Hello,
    Creating a new user and provisioned to OID work properly.
    Now I would like to create a user with start date in the future. OIM when the value USR_START_DATE is on the future it update the USR_PROVISIONING_DATE too on the same future date but not execute the provisioning to OID and the USR_STATUS is "Disabled Until Start Date"
    If there any way to update the USR_START_DATE with a different USR_PROVISIONING_DATE and do the provioning as normal and keep USR_STATUS as Active.
    thanks
    TG
    Edited by: TG on 1-Nov-2010 9:48 AM

    Hello again,
    i'm using the Thor.API.Operations.tcUserOperationsIntf.createUser((java.util.Map arg0).
    arg0 will contain USR_PROVISIONING_DATE=today date and USR_START_DATE = to the future date.
    I apply what your propose and push the USR_PROVISIONING_DATE=today date and put it on the pre-insert in Users form.
    sorry it did not work, it change the value in USR_PROVISIONING_DATE to put the USR_START_DATE value and didn't provisioned
    thanks
    TG
    Edited by: TG on 1-Nov-2010 10:47 AM

  • My child accidentally rented a movie on Apple TV.  Is there a way to refund the rental if we don't watch it?  How can I prevent this from happening?  Is there a way to password protect future purchases?

    My child accidentally rented a movie on Apple TV.  Is there a way to refund the rental if we don't watch it? 
    How can I prevent this from happening?  Is there a way to password protect future purchases?

    Did you try Parental Controls?
    Apple TV: Understanding Restrictions (parental controls) - Apple Support
    See if that does the trick: I think there's a way for you to request a password for purchases, but still be logged in.

  • When iTunes upgraded, many of my song tags were changed by iTunes.  This happened again when an update was sent this week.  Is there any way to avoid this happening again in the future?

    When I downloaded the new iTunes, it changed the tags on some of my tracks.  As a result, I had to fix them manually.  When I downloaded another upgrade this week, my tags changed again.  How can I prevent this from happening in the future?

    The cricual thing is to have a complete backup of your library that you could restore if needed.
    What changes are you noticing? There appear to be some new as yet not well documented features designed to sync data across multiple libraries/devices which may have unwanted side effects.
    tt2

  • IMac hard drive fail - what steps to prevent in future?

    I am working on an extensive video editing project on FCP7 on a 2011 iMac with 3.4GHz i7 and 8GB RAM running OSX Lion 10.7.5. I am editing very large pro res video files for a feature-length documentary. All media is stored on external hard drives.
    Several times before, my iMac would freeze and not reboot. All times before, resetting the PRAM seemed to solve the problem.
    Today, while exporting a 30min sequence, the spinning beachball got stuck. I noticed that Time Machine was running at the time, and I attempted to stop Time Machine in Preferences (it was not yet in process of transferring data--I tried stopping time machine before in a similar manner, and it seemed to speed up my computer). Now the entire computer froze. I manually turned off, and tried to reboot. This time, after holding down Command (⌘), Option, P, and R, nothing happened. I turned off and tried again, and this time the new computer setup screen appeared, and I am attempting to restore from time machine.
    How do I know why my iMac HD failed this time, and how do I move forward from here?
    Is my iMac HD compromised, or is it some type of software/OS problem?
    How do I prevent future crashes/fails?
    Should not run any other programs while editing in FCP7? Should I not run Time Machine while editing?
    Thank you in advance, and please pray for my time machine full recovery

    First, EVERY hard drive will fail.  It's just a question of when.  There's not much you can do to prevent the physical failure of the drive that I know of, besides making sure the computer runs as cool as possible.  IMac's tend to run hot and that's probably gonna have some effect on the life expectancy of the drive.
    As far as the problems that can happen which are not related to the physical failure of the drive.
    Make sure you keep at least 20% free on your startup drive.
    As Mark said, having a bootable clone is a really good idea.  Here's a user tip all about cloning your startup drive. 
    https://discussions.apple.com/docs/DOC-2494
    I highly recommend Disk Warrior. It's saved my life a few times.
    http://alsoft.com/

  • Tag obrigatória no XML para processo de Entrega Futura

    Boa noite!
    Podem me orientar se o processo de entrada no GRC da nota de remessa, para o cenário de entrega futura pode seguir sem a tag NFref (do xml) estar preenchida? A empresa em que trabalho está implementando e não consegui nenhum exemplo de XML na versão 3.10 com essa tag preenchida por não ser obrigatória e, segundo a empresa que está implementando, não consegue passar dessa etapa.

    Bianca,
    primeiramente, o lugar correto para postar este tipo de mensagem é no espaço SPED & NF-e. SPED & NF-e
    Quanto a sua pergunta: sim, o GRC exige que exista referência na nota de entrega futura. Leia + nessa thread: NF-e Inbound - FUTDELGR - Erro na validação do fornecimento futuro
    []'s
    JN

  • Erro 8B260 (Processo de Entrega Futura)

    Bom dia, Pessoal!
    Estou com um problema no processo de devolução de entrega futura.
    Realizei a entrada da nota de fatura normalmente atraves da MIRO e da nota de remessa atraves da MIGO (mov 801).
    O fornecedor nos enviou as notas de Fatura e Remessa como de entrada pois ele ainda não tem a obrigação legal da NFE, porém a empresa aonde estou já está obrigada a utilizar a NFE e ao realizar a devolução o sistema não encontra a referencia da nota de remessa. A mensagem de erro é a 8B 260 (NOTA FISCAL DE REFERÊNCIA XXXXX NÃO FOI ENCONTRADA)
    O pedido está somente com a opção de parceiro FO o processo já foi criado sem a opção de parceiro "FM" (Fornecedor da Mercadoria).
    As Notas Abaixos já estão aplicadas:
    NF:
    1055401 Subcontracting Returns doesn't find reference Nota Fiscal
    NF-e:
    1175538 NF-e Reference between NF and NF-e
    1238765 NF-e: Returns for Subcontracting - Error 8B287
    1257933 NF-e: Reference NF not found by return for subcontracting
    1288925 NF-e: References between NF-e and non NF-e
    1356952 NF-e: Returns for Subcontracting - Error 8B260
    Estive debugando a função J_1B_NF_DOCUMENT_SELECT_2 e o que pode verificar é que como o processo de fatura/remessa é gerado atraves de uma nota de entrada ele armazena as informações J_1BNFDOC-NFNUM porem ao realizar a devolução, como a empresa que estou é obrigada a emitir a NFE a função realiza a busca no campo J_1BNFDOC-NFENUM com o numero da nota de remessa (NFNUM) por este motivo não é encontrado a nota de referencia e o erro é apresentado.
    Eu procurei por alguma nota que pudesse corrigir meu problema porém não encontrei nenhuma aplicavél, alguem tem alguma ideia de como resolver este problema?
    Obrigado
    Gustavo

    Olá xará,
    tudo certo?
       Esse erro provavelmente está ocorrendo porque existem múltiplos parceiros atribuídos ao Pedido de Compras.
       No procesos de entrega futura, contudo, o sistema comporta somente a utilização de um parceiro, do contrário o processo é interpretado como sendo uma operação triangular.
    Abraços

  • Remessa de Entrega Futura

    Senhores tenho o seguinte problema:
    Estamos em processo de implantanção do sap na empresa, e ainda tudo é novo, mas tenho uma duvida sobre o faturamento antecipado.
    No processo cria-se uma ordem para faturamento antecipando (entrega futura) e um documento de faturamento relacionado a esta ordem, até este ponto tudo bem.
    O problema esta na criação das notas de remessa relacionadas ao faturamento antecipado, cria-se uma ordem relacionando o faturamento antecipado mas o Sap nao controla o saldo do faturamento antecipado, trazendo para a ordem sempre a quantidade total faturada antecipadamente.
    O exemplo seria assim:
    Entrega Futura: 100
    Remessa Entrega Futura 1: Saldo 100 Quantidade Utilizada 10 Saldo Restante 90
    Remessa Entrega Futrua 2: Saldo 90   Quantidade Utilizada 20 Saldo Restante 70
    E assim por diante, até zerar o saldo de faturamento futuro.
    Gostaria de saber se tem como controlar este saldo

    Olá Petrúcio,
    O cenário de venda/entrega futura é muito comum nas empresas, porém a SAP não criou essa consistência/inteligência de controlar o saldo das quantidades na remessa.
    Ao mesmo tempo, também não faz para uma simples devolução. As quantidades não são controladas, daquilo que vendeu, daquilo que foi devolvido.
    Quando ocorre a  referencia o sistema simplesmente copia o campo da quantidade e não realiza a verificação se o campo é ou não maior.                                                                               
    A única alternativa para que o sistema atenda as necessidades do negócio,nesse caso, é modificando essa funcionalidade padrão. Veja as sugestões abaixo:                                                                               
    1. Verificar por meio das userexist se o campo está com a quantidade maior que a fatura. Podes usar, por exemplo, a userexit:    
    USEREXIT_CHECK_VBAP -> MV45AFZB ou                                     
    USEREXIT_MOVE_FIELD_TO_VBAP -> MV45AFZZ                                                                               
    2. Bloquear a modificação da quantidade do campo, a userexist USEREXIT_FIELD_MODIFICATION -> MV45AFZZ é uma sugestão para que o campo seja copiado e não modificado o seu valor.                             
    Espero poder ter ajudado.
    Ruy Castro

  • Entrega futura - Não contabiliza PIS e COFINS na MIGO

    Bom dia a todos,
    Estou tendo dificuldades de lançar os impostos PIS e COFINS na MIGO para o cenário de entrega futura com o tipo de movimento 801/802.
    Eu já fiz todas as configurações disponibilizadas no forum e inclusive abri um chamado na SAP que orientou a aplicação das mesmas notas, conforme descrito abaixo :
    Eu estou achando que o problema está na configuração da OMJJ para o movimento 801/802, pois não vejo registros/configurações na pasta "modificação de conta", e acredito que para o sistema identificar a string WE01 talvez precise destas configs ...
    Alguém saberia me dizer se para os tipos de movimentos brasileiros 800-899 é normal que não exista registros na pasta "modificação de conta" ?
    Apenas como informativo :
    - Na MIRO contabiliza corretamente e gera os impostos no livro corretamente;
    - Na MIGO não gera contabilização dos impostos porém na Nota Fiscal os impostos são calculados e destacados corretamente (ICMS, IPI, PIS e  
      COFINS);
    - Não utilizo PIS e COFINS no preço (TAXBRA);
    - O principal documento que segui foi o "PIS-COFINS_not_incl_on_net_price" mencionado na nota 1697517;
    - Também já analisei as notas  844630 e 679372;
    Se alguém já passou por este problema e puder me ajudar eu agradeceria bastante.
    /Flavio Marcilio
    Resposta SAP:
    Hi Flavio,
    Thank you for contacting SAP Active Global Support.
    Unfortunately PIS and COFINS calculation is still not covered for
    future delivery in MIGO. However there is a workaround, but only for
    TAXBRA. This you can read on note 1697517. Please check the text below
    that was taken from that specific note:
    Solution
    To enable PIS/COFINS posting at MIGO you should do the customizing
    described on article of this link:   (
    http://scn.sap.com/docs/DOC-5727 )
    That said, for you to be able to to use this kind of functionality, it
    is necessary to follow the steps on the link above. Just applying note
    1697517 won't solve the issue. Please, review all your steps in order
    to check if all requisites on the link are applied.
    The requested in the message refers to a consulting issue instead of a
    bug or error.

    Olá Cláudio.
    Não existe solução standard para configuração envolvendo PIS e COFINS para processos de consignação.
    Pode-se tentar atender o cenário customizando PIS e COFINS na mesma linha do ICMS para consignação, mas isto necessita de uma avaliação específica por parte dos seus consultores para determinar esta possibilidade.
    A solução oficial da SAP está descrita na nota #852302.
    Atenciosamente,
    Felipe Silveira

  • Determinação de contas do razão nas compras de entrega futura

    Boa dia amigos,
    Estou com uma dúvida conceitual sobre a entrega futura e seus IVAs.
    Gostaria da ajuda de vocês para entender qual tipo de conta do razão devemos entrar na chave ICC.
    No cenário de entrega futura simples, o IVA K1 é usado no pedido, temos as condições abaixo ativas (ICC e VS1)
    K1     IC1C     ICC     ICMS Ind. Clear. Off
         IP11     VS1     IPI Recuperável
    O VS1 já sabemos que é crédito de IPI, e o ICC nos parece ser uma transitória de ICMS.
    Ai que vem nossa dúvida, devemos ter transitória de ICMS e IPI para os casos de entrega futura ou podemos ter parametrizado na ICC e na IPC a mesma conta do razão que entrariamos na VS1 - IPI crédito e VS2 - ICMS crédito ?
    Grato a todos,
    Alessandro

    Olá Lucídio Gandra,
    Estou com dificuldades também no processo de Nota Fiscal de Entrega Futura. Você conseguiu alterar o código de imposto no formulário de Entrega?
    No caso do meu cliente a nota fiscal de entrega futura não é contabilizado nenhum imposto, só é contabilizado no formulário de remessa do material mesmo, porém quando copio a Nota fiscal de Entrega Futura no formulário de Entrega não é possível alterar o código de imposto.
    Alguém pode me ajudar?
    Luciana Amorim.
    Edited by: Paulo Calado on Oct 22, 2009 8:04 PM
    Edited by: Paulo Calado on Feb 12, 2010 1:47 PM
    Edited by: Paulo Calado on Mar 8, 2010 4:46 PM

  • How to Send an Email at a Specific Time in the Future Using Mozilla Thunderbird.

    Hi guys,
    I downloaded Thunderbird for my Mac for one single purpose, simpy to be able to send an email by executing the time and date i wish my email to be send, automatically. The extension saves the message to draft and monitors the messages in the draft folder, when the chosen time arrives it moves the message to unsent and sends unsent messages. So i can send messages in the future.
    I dont know how to manage this, and i would appreciate help and tutorials from you guys!

    Why not read Thunderbirds tutorials and post in their forum area?

  • Future price is not getting updated as current price when period changed

    Hi all,
    We follow the following procedure to update standard price in material master. Our organization is a manufacturer of pharma products. ( System is not live yet)
    We have BoM's for all FG's and all FG's & SFG's are having Price control indicator as "S". Rest other materials are valuated for Moving Average price.
    > Run T-code CK11n for the FG.
    > Check whether costs of utilities and final product is as per the cost sheets prepared manually (10-20% difference acceptable)
    > Do not save it and goto CK40n tcode. Mark and release price of FG's & SFG's for the current date (eg: 16.01.2008). Now as 10th period of year 2008 was not open at that time and only 9 th period of year 2007 was open, the prices were updated as "FUTURE PRICE" in costing-2 view of material master.
    > Now that when i am opening 10th period (both financial period and inventory period), my future price is not getting updated as my CURRENT PRICE in material master as my standard price.
    Pls. reply to this urgently.

    Hi,
    I am sure about it that when CK40n was done for a future date when some n-1 period was open, the costs released would get updated as future price.
    When the period for which future price was updated is opened as current period, the future price automatically gets updated as current price and is also set as standard price in accounting 1 view.
    But i m unable to identify why is not working.

Maybe you are looking for

  • Local variable in Data Form

    Hi All, I have a dataform in which Entity Dim is in Page. In a Business Rule attached to it there is a variable which should contain the value what ever selected in Entity in Page. Now my issue is what settings i should give while making Entity as lo

  • Killing thread

    hi all i am trying to stop thread by callling stop() method on Thread object but it is deprecated it is saying. can u tell me what is the method in 1.4 for killing a thread class ThreadDemo public static void main (String [] args) MyThread mt = new M

  • MDB Listening to remote queue

              Hi,           Could any of you please let me know what needs to be done to configure my MDB           to listen to a remote queue in a different domain (also using wls 7.0).           I tried adding the <provider-url> element in the weblogi

  • F-53 status in SRM

    Dear SRM GURUS, we are following a classic scenarios on SRM version 4.0 where in we create a shopping cart in SRM and a purchase Req is created in backend and based on that we create a Purchase Order and do a Goods receipts and Invoice Booking in MIR

  • I see inconsistent ImageNew() failures for CMYK Jpeg Images  (CF10)

    Weird problem. I have a set of test cases that pass just fine loading a known CMYK jpeg via ImageNew().  Later, with no restart of the app server, these same test cases fail.  Again, after a while, the test case passes again.  I've dug into the Java