Engineering BOM and production BOM-very critical help

Hello All,
I am working for a client and below is the requirement, please guide me.
1) Customer has 2 department here one is engg and other is production as usual.
2) He needs BOMs only for 2 purposes a) For R and D  b) Production.
3) He needs any changes in engineering and production to be reflected from certain specified date.
4) He says he will raise ECN for every change.
Now my questions are:
1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
2) what are methods  to copy any fresh E bom to Production bom also?
3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.
Please suggest if any better model can help.
Regards,
satish

Hello Adler,
That was good response. Here any of both situations can appear. So can you help me in knowing the procedure how to do the same in both cases
Also below are my pending queries, any one please help
1) He needs any changes in engineering and production to be reflected from certain specified date as per date he mentions
4) He says he will raise ECN for every change.
Now my questions are:
1) How to copy any changes done at later stages from engineering bom to production bom at specified date. Can ECN automatically do this?
2) what are methods to copy any fresh E bom to Production bom also?
3) Can ECN once approved automatically update changes in BOM by itself or does customer cumpolsarily need to take ECN and manually change E bom and then P bom.

Similar Messages

  • EHP5_Engg BOM and Prod bom sync

    Hello Team,
    We have upgraded our ECC 6.0 with EHP5. 
    As per the information and work i had done SAP provides the
    "Guided Structure Synchronization for transition from engineering to manufacturing (or other type) BOMs".
    whats does this mean and how it works. I am not sure whether this is the option which allows bom changes to automatic flow or flow with few clicks from engg bom to prod bom.
    Any info please share the same, because i am looking for this option desperately.
    regards,
    satish

    Hello Alok,
    Thanks a lot, it was a very great answer. I have one small doubt in this.
    1) When we change anything in Engg BOM and Production BOM using ECM process (either in same ECM or 2 different ECMS) with date or serial number effectivity. the changes will automatically reflect on that particular date or serial number?
    OR
    2) When we do any change only  in Engg BOM using ECM process with date or serial number effectivity,  the changes will automatically (or by any setting) flow to production BOM on that particular date or serial number.?
    Which of the above 2 you mean?
    regards,
    satish

  • BOM and Production Order: Multiple Inputs to Multiple Outputs

    Dear All, My client's industry required BOM and Production Order must be Multiple Inputs to Multiple Outputs. We propose to create customization program to work on it but client do not want any customizations. Any suggestions? SAP B1 8.81 PL13 Thank you very much in advance. Best Regards, Vivian

    Hi,
    Please advice your requirement with an example. There is possibility to input multiple components to produce single finished product.
    Not sure you have checked with SAP help file. If not refer SAP help file and below blog.
    http://scn.sap.com/community/business-one/blog/2014/03/01/how-to-implement-production-in-default-sap-business-one
    Thanks & Regards,
    Nagarajan

  • E BOM AND P BOM SAME BUT WHY 2____CRITICAL HELP

    Hello Team,
    From long back when i browsed through the SDN i was able to summarize the below,
    1) E bom and P bom are always seperate.
    2) Any changes in E bom will not automatically flow to P bom is required we need to do development using Z code.
    3) IF customer requires to maintain E bom and P bom both identical then there is no need to maintain 2 boms one is enough
    When i put all these infront of my client, he stated below
    In his earlier work at automotive industry, he has seen maintenance of both E and P BOMs both are identical but there is a XYZ reason and asking me to find it out. He says he knows that XYZ reason but he wants me to find it out.
    As i am new to SAP implementation i was totally confused, can any one help me on the same.
    Critical please help.
    regards,
    satish

    Thanks Vivek,
    You suggestions are 100% correct.  Thanks for guiding me to correct channel.
    I usually first try with all my the knowledge which i have got in earlier experience, then read the docs in sap portal if any doubts.Do trials in ides, sandbox, ask seniors, go through threads, even after all these when i feel i am not sure then i post thread as i feel to deliver the correct thing to customer.
    From next time i will be still more cautious, do more home work on the same.
    Apologies to the forum if i have followed some wrong path and have disturbed a lot.
    Truth is this forum has helped me a lot in resolving many key issues.
    Thanks a lot for all the help.
    Regards,
    Satish

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • Sales bom and assembly bom

    i want to make sales bom which consists of all the materials to make a product(machine).this sales bom is available to sales person and he has to select the varients depends upon customer requirement(varient configuration).
    then all materials are to be manufactured and are to be available in stock.
    after this step assembly person has to assemble the components according to the assembly procedure for that he has to refer assembly bom which consists of logical grouping of components for his easiness in assembly.
    so sales bom has to be with materials only(components which are to be produced to make final product) and assembly bom is with logical grouping of these materials according to assembly procedures and total materials are same in sales bom and assembly bom
    is there any method in sap to link sales bom and assembly bom which are different for sales and assembly?this is make to order scenario
    thanking you
    srinivas

    Hi Srina,
    The difference between them is
    In the assembly bill of materials, the finished product appears in the sales order document.
    But in Sales bill of materials, the finished product and the components appear as separate items in the sales order document.
    For example the finished product can be a set of office furniture.
    you can use the assembly bill of materials to define the composition of the set. The finished product is not stored as an entire set in the warehouse. However, the individual components of the set (for example, chairs, tables, and Almirah) are items in stock. If a customer buys a set of Office furniture, draw the components from stock and deliver them to the customer as a set.
    Hope this help,
    Regards,
    MT

  • Difference between Service BOM and Manufacturing BOM

    One fundamental question
    What is the difference between Service BOM and Manufacturing BOM. Also what is the difference between Manufacturing BOM and Engineering BOM.
    Why should a business create these 3 kinds of BOM's for their operations. cant 1 kind of BOM suffice ?

    This is a business definition that your business people should be able to tell you.
    Both are BoMs - it's just a question of which parts are defined under each category.
    Usually, "Service" BOMs are created by service org personnel as and when required, eg at new item introduction or new option introduction.
    "Manufacturing" BoMs are created by Engineering personnel and are the ones used when creating an order for a machine.
    Hope that it helps.
    Cheers,
    TC

  • Function Module for creating Functional Location BOM and Equipment BOM

    Hi All,
    Is there any function module for creating and changing Functional Location BOM and Equipment BOM ???

    Hi,
    Tables for Eq., BOM: EQST, STKO, STPO.
    Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
    You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
    And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
    Hope this helps.
    Best Regards, Murugesh AS

  • Costing for sales order BOM vs Production BOM

    Hi gurus,
    can some one please explain in clear how is costing different if we use sales order bom versus if we use production bom.
    Thx

    I Feel Your are asking about Sale order costing and Std cost estimate using production BOM
    IN sale order costing- You can use any BOM ( sale BOM or production BOM), IF you carried out costing in sale order level in Va01/Va02, system will read the BOM, routing for that material  & system will take the costing lot as sale order qty and carried out cost estimate, This cost estimate value will update In condition as EK02. & system will take this Ek02 price for production GR value, PGI value and the profit is calculated based on Ek02 not based on VPRS( std cost estimate)
    Production costing:
    System will take the costing lot size in material master costing view, System will read the BOM and routing for the material in Ck11n, And you need to mark and release in Ck24, this value will update as Std cost  price in material master, this value is atken for Goods movement for that material

  • BOM and production order

    CAn somebody give me the steps for creating BOM alongwith routing  in SAP
    and also the steps involved in creating a Production order //
    Please give me all the t Codes //Iam basically a finance and costing consultant
    Iam trying to create a test scenario for testing a costing variant //
    Also trying to analyse the financial impact during creation of a Prodn order
    Thanx
    Nikhil

    Mr. Nick,
    Creation of BOM:
    1. CS01 -> BOM creation
    a. Enter Mtl No., Plant No., BOM Usage (use the value 3), If you wish to keep track of changes, then generate a change number & assign the same to the change number field & also select the date from which you want the BOM to be valid from.
    b. Once inside this transaction, add the components which you want along with the qty required.
    c. There are more settings which you can do, but for a simple BOM, these entries are sufficient.
    d. If you wish to link another BOM with this, enter the mtl nos which has the BOM, this way you can build multi-level BOM's.
    2. CA01 -> Routing creation
    a. You can create a routing specific to a material or you can have a single routing for multiple materials.
    b. If you want to have a routing per material, then enter the mtl nos, Plant, change nos if you want to keep track of changes & the valid from date.
    c. You can also have routing specific to a sales document or WBS element.
    d. If you wish to have a group routing i.e. a single routing for multiple mtl's which are going to be produced in a similar way, then just enter a name in Group field.
    e. Depending on what you select above, different screens open, i would suggest, you try creating one in the sandbox server & post back if you face any problems.
    3. CO01 -> Production order creation
    a. Once you have created the BOM & routing for the material, then enter the material for which you want to create the production order, enter the production plant & also the order type. If you are not aware of what order type, then please refer to your PP consultant.
    b. After making the initial entry & when you press enter, the system automatically reads the BOM & Routing associated with this material.
    c. Once again i suggest you create a production order in sandbox server & if you face any issues you can post back.
    Also note: You can use CS02, CA02, CO02 for modifications of BOM, Routings & Production orders respectively. CS03, CA03 & CO03 for display.
    Hope i was able to give some assistance to you.
    Regards,
    Vivek

  • Bom And Routing Import interface errors Help needed

    Hi All,
    I am using bom and Routing Interface to load the Bom and Routing Header.papulating the BOM_INVENTORY_COMPS_INTERFACE,BOM_OP_SEQUENCES_INTERFACE,and BOM_OP_RESOURCES_INTERFACE tables BOM header and Components are created sucessfully but routing is failed with process flag 3.the errorr i am getting is You cannot update or delete operation sequences when there is no routing for the assembly item &ASSEBLY_ITEM_NAME. (ASSEMBLY_ITEM_NAME=TESTITEMBOM) (ORGANIZATION_CODE) and
    This record received an error status since a severe error occurred in the operation sequence 10 while performing user unique index conversions."
    please let me know any api is avilable to load ROUTING Components
    Thanks in advance

    Hi,
    Try following
    step 1. Insert routing header (bom_op_routings_interface) : Run Interface
    step 2. Insert routing lines (bom_op_sequences_interface) with correct reference to routing_sequence_id: Run Interface
    step 3. Insert all resource lines (bom_op_resources_interface) with correct reference to operation_sequence_id, routing_sequence_id , Run Interface.
    Thanks,
    Hrishi

  • Functional location BOM and Equipment BOM

    Hi,
    I would like to know which tables store information of Functional location BOM  (TCODE 1B11) and Equipment BOM (TCODE IB01). Is there a possibility that once we create these BOM's we can create alternative BOM as in case of Material BOM (TCODE CS01).
    Regards,
    Vishal

    Hi,
    Tables for Eq., BOM: EQST, STKO, STPO.
    Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
    You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
    And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
    Hope this helps.
    Best Regards, Murugesh AS

  • Group BOM and Plant BOM

    Hi All,
    We have a business scenario where there is Group BOM without plant and a Plant BOM with same usage (2).
    We hava requirement below
    If we make any changes in Group BOM with a change number, Plant BOM is also updated. But if we make any changes to Plant BOM with change number, Group BOM should not be updated.
    Any ideas how we can map this requirement?
    Both BOM have same usage - engineering -> 2
    Regards,
    Aby Thomas

    Any changes in Group BOM with a change number, Plant BOM is also updated when they are referenced to each other (CS07).
    In this case both share the same BOM number and changes are always reflected both ways.
    In my opinion a solution would be :- 
    1) Dereference the BOM's (CS09) , this will remove the plant bom from system.
    2) Create the plant BOM (as a copy of group bom)
    3) And then build enhancements in CS02 to copy online the changes in group BOM to plant BOM.

  • Fixed BOM and Flexible BOM

    Hello,
    Is there such thing as fixed and flexible BOM? If there is, what is the difference between the two and how could I set them up.
    Thanks!

    Hi,
    There is no such concept in SAP.  Its based on the business process and requirement we create BOM's and change it during transactions.  Normally BOMs are created with some components.  If you require to change this fixed ones, i.e., which is coming from the BOM master, then this can be done by configuring your item categories in VOV4. 
    Hope this helps.
    If you have further clarifications, pl. revert.
    Thanks
    Krishna.

  • Mass Download documents related to BOM and/or BOM items

    Hi All,
    Is anyone aware of a mass download functionality of all the documents realted to a BOM - i.e all documents items of a BOM and documents attached to BOM items(part numbers).
    Thanks
    Raj

    Hi Mangesh,
    Yes, that is exactly it. The requirement is for mass downloading all the original drawings linked to all the components of a BOM to a local drive or to an ftp site.
    One possible way , i thought of, could be to use a program DMS_RELOCATE_CONTENT which as I understand relocates all the originals realated to a list of DIRs to another location. Of course, this means that we need compile a list of components related to a BOM using CS12 or similar program and get a list of parts that has drawing attached to it. Subsequently, use this list to compile DMS_RELOCATE_CONTENT. Not sure, if this is a correct way or if there is any other simple way of achieving this.
    Thanks
    Raj