Engineering Change management SPRO

Dear Experts,
Does any body know what is "Define output format for change number" in SPRO --> Cross Application components --> Engineering change management --> Define output format for change number.
When I try to execute I dont see it allowing me to enter / change any details there. It just gives a screen with no values.
I am trying to see if this helps to define alpha numeric format for internal change number.
Thanks
Vennela

Hi
    this functionality is to Define Input and output length of change number and for template for output of change number if required . For creating new entries in menu bar goto EDIT - > New Entries
Regards
Neelima

Similar Messages

  • Is there a relation between the Engineering Change Management and MM

    Hi SAP MM Gurus,
    Is there a relation between Engineering Change Management and Materials Management? I know we get the versions changes updated in Material Master. But do not know where is the origin for ECM. Step by step configuration is appreciable.
    Thanking in Advance.
    with regards
    Ravi Babu

    Hi ,
    I have created an application and have created end users also who will be using this application. For each of these users i have to give access to application in such a way that they will be able to see only their area a work. So how do i do this ..this needs to done based on the login user_name..my question now is how or from where will i get the current session details like user_name, current session id ,current session date and time?
    Thanks in advance,
    Bhargavi

  • PLM - Engineering Change Management - ABAP Development

    Engineering Change Management
    Program: SAPMC29C
    Transaction:CC02
    Change Master Valid From date once expired (Protected Time Period) – Not able to change by the user
    Requirement is to change the valid from date to New date from custom program even if it is expired to over right existing protected date
    Let me know if any enhancement to change the validity date by restricted user
    I required step by step ABAP development required for  this change - pls help with your experience on PLM CC02 - Vaildity date change
    Screen shot attached

    Pass the following fields on input structure IN_AENRB:-
    MANDT                          xxx                         "Client
    AENNR                          123456789ECM
    AENST                          41                            "Change no. status should be 41
    AENBE                          PLANT
    DATUV                          08/22/2014               "New valid from date
    AETXT                          ECM DESCRIPTION
    FLUSE                          X
    AEDIF                          xxxxxxxxxx               "Get from AENR table for this ecm
    VBKZ                           U

  • Engineering change management working with parameter effectivity

    In Engineering change management
    i have activated parameter effectivity &
    defined parameter profile for DATE,SERNR,Kombi1-Customer(combination of Date & Customer name- Kunnr) in IMG settings
    i am able to work with Date & SERNR But when i choose kombi1
    i am getting the following error message
    "No entries in database for object KUNDE_LO table AEEF"
    i checked with table AEEF thier is no field KUNDE_LO
    How to customize effectivity type Customer
    is there any thing i have missed ....

    Hi Srinivas,
    KUNDE_LO is a data element , what ever kombi1 is defined i think that does not have any values maintained in the system.
    or
    Check whether any user exits or BAPI's used bringing the customer specifications.
    You can also check the data element existence u might have done that .....
    Reward if useful
    Thanks,

  • Engineering change management with parameter effectivity

    In Engineering change management
    i have activated parameter effectivity &
    defined parameter profile for DATE,SERNR,Kombi1-Customer(combination of Date & Customer name- Kunnr) in IMG settings
    i am able to work with Date & SERNR But when i choose kombi1
    i am getting the following error message
    "No entries in database for object KUNDE_LO table AEEF"
    i checked with table AEEF thier is no field KUNDE_LO
    How to customize effectivity type Customer
    is there any thing i have missed ....

    Kunde_lo is a data element.
    but i am not able to locate it in my SAP

  • Engineering change management for materials in MDM

    Hi,
    we want to replace a home-made material master data system by MDM, but need some Engineering Change Management functions like
    - versions of material
    - release dates
    - different release dates in relation to different factories (i.e. client systems)
    Any idea, how this could be handled in MDM ?
    Michael Tegethoff
    KONE GmbH

    Hello Michael:
    All of that information you mention can be included on MDM as plain attributes on the Materials table.
    As for Versions, if materials are updated thru MDM Import I'd suggest  include the new version number and as import action choose "Update all mapped fields", that is, while importing the old version number will be updated.
    for different release dates you can maintain as many date attributes as Factories you have. When harmonizing data (syndicating) you can map each factory to its correspondant release date, so the other factories won't even "notice" the other dates.
    Please let me know if that helped at all.
    Greetings!
    Alejandro

  • CS14 without the use of Engineering Change Management

    Hi all,
    everybody knows if the date of validity showed in the entering screen of TCODE:  CS14, lets the comparison between BOM at different date, even if the Engineering Change Management isn't implemented for a plant?!
    TKS
    Valentina

    If you don't use ECM then the change log is not such detailed and the validity dates will be firmed for one BOM item, so it may hard to compare the BOM on certain date without the ECM.

  • Difference  Between Order Change Management & Engineering change Management

    Dear,
    What is the Difference  Between Order Change Management & Engineering change Management ?

    Hi,
    ECM will help for Master data changes management.
    OCM will help to manage changes in Transaction Data like Production Orders.
    In brief,you have to first Create Change Number(part of ECM activity).then using that Change number, Master data(like BOM, Routing etc) has to be modified.
    Then through OCM affected Transaction Data(like Production Orders) for each change number to be Processed.
    Regards
    R.Brahmankar

  • BOM Validity - Using Engineering Change Management

    Hello All,
    We are currently reviewing the ECM functionality to assistn in BOM validity maintenance. I have made the necessary changes in SPRO to activate this functionality. My initial testing utilizing the Change Master and associating it with the BOM works fine. However, the question I had was more around having to make retroactive changes. I noticed that the system using the Entered or Created date from the transaction to determine the BOM validity. Is there anyway to influence the BOM validiy to look at document dateof the transaction instead of entered date? Has anyone run into this type of issue before?
    Thanks for your help.
    Gus

    Hi Krishna,
    You can use change numbers to change independent (recipe) formula in the PLM-Recipe Management.
    The object formula is assigned to the object type specification (type 60 of the change management).
    For the object type specification the use of the object management record is not supported in the SAP standard.
    Only the change documents are available.
    Best regards,
    Roland Freudenberg

  • Engineering Change Management - Effectivity Types

    Hello Forum members,
    we want to make our BOM Engineering Changes being dependent from material stocks.
    The process is the following: A BOM material shall be exchanged only after the old material's stock is depleted, e.g. a steel holder shall be replaced by a aluminum holder only after the existing stock of the steel holder is depleted. The use of a fixed date is therefore not helpful.
    We are thinking about how we could implement this dynamic Effectivity Type that is linked to the MM inventory. Has anybody ever done such thing or something comparable? Any ideas of how this could be done?
    Thanks for your suggestions!
    Marcus

    Hi Marcus,
    Actually you need to 2 separate things to get what you want:
    1) use discontinuation functionality (MRP 4 view) to use existing stock when you a follow up material, or a group of follow up materials. This means that the system will not generate new supply elements for the discontinued material, but use all the existing supply. In this stage the BOM is not changed yet.
    2) after the stock is used up, or when you get a clear picture from planning and (1) on the date when it happens, then you create an ECM with that date and change the BOM accordingly.
    Regards,
    Mario

  • Engineering Change managment

    Hi
    Please help me with this.
    I am using Change number:  CN0000005387 for IAP 2.0 (FAP9010258/1 and FAP9010259/1) package. Future date 03.07.2028
    And using Change number: CN0000005234 for ECDS4.0(FAP9010669, FAP9010759 and FAP 901 0808) with future date 28.05.2028
    My problem is I have by mistaken used change number CN0000005234 while updating IAP2.0 and with this change number I have just added one procedure to AGO configuration Profile. And this is completely a new package.
    How can I separate these packages from each other because I cannot release IAP 2.0 and I am not suppose to ECDS4.0.
    Sarika

    Hello Sarika,
    Once you have used the change number, we cannot undo, since it's master data change.  But we have 2 options
    Option1: Shift the date as required in the change number. But all the relevant objects will move, which probably you would have tried.
    Option2: For a specific change number you can have multiple effective date, I mean object specific. I have used this function longtime back. But only check required is, can we use it for a change number which has created object managment record. Which is your specific reqmt.
    Reg
    Samson

  • How to see any changes done in BOM through Engineering change management?

    Dear experts,
    My client need to verify the revision of some assemblies in BOM through ECM.
    I tried to verify it by taking some change numbers & executing it in CC03. I am getting the history date & name of person who done the changes. But can not able to see the actual changes.
    Could you please tell me how to see the changes done?
    Thanks in advance for cooperation & support.
    Regards,
    Mehul Veni

    Dear Mehul Veni,
    Assuming you have created a change number through CC01 and made changes in CS02 for a particular BOM by entering this
    change number in the input screen in CS02.
    Once after making BOM changes,save the data and check in CC03>enter the same change number>menu->environment-
    >reporting->Bill of material--->select the change number and click on expand sub-tree and you will get all the required details.
    Check and revert
    Regards
    Mangalraj.S

  • Work flow of  Engineering Change Management

    Hi,
    We have created the Transport Request , few are customization(Creation of programme mamager) and few for work flow( change in work flow).
    What is the sequence of Transport this request?

    Hi,
    this you need to check with your developer, whether any dependency is there for this transport. Based on the dependency, in a particular order you need to transport, else the transport will fail.
    regards,
    V. Suresh

  • Engineering change management.

    Hi
    I am new to ECM.
    My process is to create a change request > approval for  change request> change number --> perform the change --> Approve the change performed.
    Is this scenario possible in ECM.
    I have doubts only on the last step of the process. I want the change to be applied only after the someone approves the performed change.
    explaining  it with an example.
    I have to change a BOM component quantity .
    First I create a change request --> get approved --> change number  --> perform the BOM  change with the change number  -->  Approve the BOM component quantity change. 
    The updated quantity should be used only after the performed change is approved.

    All of above are possible; the process in SAP is of an ECR/ECO, with release key.

  • Bapi for create Engineering Change Management (ECR)

    Hi abapers,
    do you know a function module to create ECR? (Not CM!)
    Thx

    nobody knows a bapi for CC31 transaction?
    Edited by: Andrea Peruffo on Sep 9, 2008 3:13 PM

Maybe you are looking for

  • Java 2 Platform, Standard Edition   Version 1.4

    Hi All , I wanted to know if this comination will work : jre 1.4.2 - > 8.7.1 thin driver - > 8.7.1 Oracle Db ......? We are planning to run our application server environment on that JVM but don't know if the said thin driver is supported or not ....

  • How to use the Oracle AQ JMS API using Toplink

    My application is using AQ using PL/SQL. We want to convert the PL/SQL code to the JMS interface Oracle offers, the problem is that I need to use a java.sql.Connection object in order to connect to the AQ. I don't own the java.sql.Connection in Topli

  • Finding and combining multiple itunes libraries

    I believe I have set up multiple itunes libraries that are located on different drives (the internal and an external). I'd like to find them and combine them into one place. Any help would be appreciated.. macbook running OS X 10.9.4

  • Adding a Tabstrip in VA03

    Hello, I am Preety new in the Enhancement area, i have to add a tabstrip for our custom fileds both for header and item data in va03. can any one help me on the same how to do that which BADI or Exits are suppose to be used. Thanks and regards, Gunja

  • Bridge between a relational DB and an XML based DB

    Hi: Iam implementing a repository which acts as a bridge between a relational db and an xml db, has any work already been done in this area ?