Engineering change management working with parameter effectivity

In Engineering change management
i have activated parameter effectivity &
defined parameter profile for DATE,SERNR,Kombi1-Customer(combination of Date & Customer name- Kunnr) in IMG settings
i am able to work with Date & SERNR But when i choose kombi1
i am getting the following error message
"No entries in database for object KUNDE_LO table AEEF"
i checked with table AEEF thier is no field KUNDE_LO
How to customize effectivity type Customer
is there any thing i have missed ....

Hi Srinivas,
KUNDE_LO is a data element , what ever kombi1 is defined i think that does not have any values maintained in the system.
or
Check whether any user exits or BAPI's used bringing the customer specifications.
You can also check the data element existence u might have done that .....
Reward if useful
Thanks,

Similar Messages

  • Engineering change management with parameter effectivity

    In Engineering change management
    i have activated parameter effectivity &
    defined parameter profile for DATE,SERNR,Kombi1-Customer(combination of Date & Customer name- Kunnr) in IMG settings
    i am able to work with Date & SERNR But when i choose kombi1
    i am getting the following error message
    "No entries in database for object KUNDE_LO table AEEF"
    i checked with table AEEF thier is no field KUNDE_LO
    How to customize effectivity type Customer
    is there any thing i have missed ....

    Kunde_lo is a data element.
    but i am not able to locate it in my SAP

  • Is there a relation between the Engineering Change Management and MM

    Hi SAP MM Gurus,
    Is there a relation between Engineering Change Management and Materials Management? I know we get the versions changes updated in Material Master. But do not know where is the origin for ECM. Step by step configuration is appreciable.
    Thanking in Advance.
    with regards
    Ravi Babu

    Hi ,
    I have created an application and have created end users also who will be using this application. For each of these users i have to give access to application in such a way that they will be able to see only their area a work. So how do i do this ..this needs to done based on the login user_name..my question now is how or from where will i get the current session details like user_name, current session id ,current session date and time?
    Thanks in advance,
    Bhargavi

  • PLM - Engineering Change Management - ABAP Development

    Engineering Change Management
    Program: SAPMC29C
    Transaction:CC02
    Change Master Valid From date once expired (Protected Time Period) – Not able to change by the user
    Requirement is to change the valid from date to New date from custom program even if it is expired to over right existing protected date
    Let me know if any enhancement to change the validity date by restricted user
    I required step by step ABAP development required for  this change - pls help with your experience on PLM CC02 - Vaildity date change
    Screen shot attached

    Pass the following fields on input structure IN_AENRB:-
    MANDT                          xxx                         "Client
    AENNR                          123456789ECM
    AENST                          41                            "Change no. status should be 41
    AENBE                          PLANT
    DATUV                          08/22/2014               "New valid from date
    AETXT                          ECM DESCRIPTION
    FLUSE                          X
    AEDIF                          xxxxxxxxxx               "Get from AENR table for this ecm
    VBKZ                           U

  • Referenced Vs. Managed work with Photoshop editing

    How Referenced Vs. Managed work with Photoshop editing
    1) My photos are saved on a local hard drive
    2) IF, When editing with Photoshop i like to save over the original since i never like the original to begin with.
    3) Any I make other light changes like filters I do not save over the original.
    Where do the Photoshop edit versions go.  i tried playing with just one Folder. Imported one folder as managed and one as referenced..... and can't find the edited version? Am I saving it wrong? I tried TIFF I tried Jpeg…..
    Also when i imported the folder as a managed file i still saw the original folder under "pictures" does that mean it's on my hard drive twice, once in Pictures and once in the Aperture Library? That would take up too much space.
    Thanks in advance, Orly

    DocOrly wrote:
    Got it. Thanks!
    I just wish i could figure out the Photoshop part.....
    I want to continue using it while i am learning Aperture..... But the copies desapear POOF. It only reflects if I work in Managed and Save it as "Replace".
    The option to 'Replace' sounds like you are using Photoshop Elements?
    I run the full version of Photoshop (which doesn't have a 'Replace' command), so I don't know the full extent of the saving options of PS Elements. I do know there are a few preference options for importing and saving which can change the behavior so you might check with the PS Elements help system if that is what you are running.
    Also, you might check the thread linked below for some tips:
    https://discussions.apple.com/message/20310393#20310393
    Note - with the full version of Photoshop (I use CS6); the process is as William specified where one needs to use the 'Save' command to save the file directly back to Aperture to reflect the edits. There is also an Apple provided tip here:
    http://support.apple.com/kb/HT5128
    Hope this helps.

  • Engineering Change management SPRO

    Dear Experts,
    Does any body know what is "Define output format for change number" in SPRO --> Cross Application components --> Engineering change management --> Define output format for change number.
    When I try to execute I dont see it allowing me to enter / change any details there. It just gives a screen with no values.
    I am trying to see if this helps to define alpha numeric format for internal change number.
    Thanks
    Vennela

    Hi
        this functionality is to Define Input and output length of change number and for template for output of change number if required . For creating new entries in menu bar goto EDIT - > New Entries
    Regards
    Neelima

  • Why does the color red change from working with images in develop to library?  The color gets lighter and nothing shows a change on histogram but visually you can see it.

    Why does the color red change from working with images in develop to library?  The color gets lighter and nothing shows a change on histogram but visually you can see it.

    That's probably a broken display profile. The conversion from Library's Adobe RGB is different than the conversion from Develop's linear ProPhoto, so if there's a problem with the display profile it can show up this way.
    Recalibrate, or if you don't have a calibrator use sRGB. If your monitor is a wide gamut model use Adobe RGB.
    Assuming Windows, change it in Control Panel > Color Management > Devices, and relaunch Lightroom so that it can pick up the new profile at startup:

  • Premiere Pro cc 2014 do not import After Effects composition. Inside Premiere Pro CC 2014 is not possible call back After Effects, is not possible to work with After Effects. Thank you

    Premiere Pro cc 2014 do not import After Effects composition. Inside Premiere Pro CC 2014 is not possible call back After Effects, is not possible to work with After Effects. Thank you

    You haven't given us much to go on here.  What exactly are you doing and what exactly happens when you try?  Which specific version of each program are you using?  (Go to Help>About...)
    On a side note, a simple, brief thread title is all that's needed.  Something like "After Effects Issue" would be fine.  You don't need the full question there.

  • Working with after effects in photoshop?

    I want to edit some contents of the after effects of videos like clearning up skin or removing objects in photoshop from after effects  - how would this get done? both ar cs5 and both ar 64bit

    If you want to work on the frames of a movie in Photoshop, you have a few options. One is to render and export a composition from After Effects as an image sequence, and work on the frames as individual images in Photoshop. Another approach is tor ender and export the composition as a QuickTime movie and then import tha into Photoshop; this requires Photoshop Extended.
    These options are covered in a bit more detail in "Working with After Effects and Photoshop".

  • Best laptop for working with after effects

    I need a laptop for work with adobe after effects and some others. Anyway I need laptop wich will not cost more than 1400€ and which will have inside intel core i7, 4 GB of memory or more and Nividia graphic card. Somthing more pls dont say the apple is the best beacuse i dont like it very much.
    Thanks.

    4GB is a rather small amount of RAM for working with After Effects. If you can get a computer with more RAM, I recommend doing so.
    For After Effects CS5, the graphics card (GPU) doesn't matter as much as RAM and CPUs, so focus on RAM and CPUs first.
    In general, a laptop is not going to give you the same performance as a desktop computer of the same price. If you need a laptop, fine; but don't be surprised when performance isn't as good as you might like.

  • Does ThinkVantage Password Manager work with Firefox 3.6. Earlier versions it would not work.

    Last time I installed Firefox it would not load Lenovo ThinkVantage Password Manager as a plug in. Since then I have not used Firefox. I would like to again try Firefox but thought I would ask the question first. Can I use ThinkVantage Password Manager with Firefox 3.6?

    Lenovo have released a patch that will make the ThinkVantage Password Manager work with Firefox 3.6 and higher. You can download it from:
    http://www-307.ibm.com/pc/support/site.wss/document.do?lndocid=MIGR-75278
    I've just installed it and it works perfectly now.

  • Engineering change management for materials in MDM

    Hi,
    we want to replace a home-made material master data system by MDM, but need some Engineering Change Management functions like
    - versions of material
    - release dates
    - different release dates in relation to different factories (i.e. client systems)
    Any idea, how this could be handled in MDM ?
    Michael Tegethoff
    KONE GmbH

    Hello Michael:
    All of that information you mention can be included on MDM as plain attributes on the Materials table.
    As for Versions, if materials are updated thru MDM Import I'd suggest  include the new version number and as import action choose "Update all mapped fields", that is, while importing the old version number will be updated.
    for different release dates you can maintain as many date attributes as Factories you have. When harmonizing data (syndicating) you can map each factory to its correspondant release date, so the other factories won't even "notice" the other dates.
    Please let me know if that helped at all.
    Greetings!
    Alejandro

  • Work with after effects, mac mini i5 or i7 ?

    Hi! I'm working with after effects and Cinema 4D, mac mini i5 is better than i7? I don't know if the video card has influence (HD Graphics 3000 de Intel vs adeon HD 6750M de AMD con 512 MB), but the CPU maybe is more important.
    Thanks!
    rompelomo

    As otehrs have said the i5 is probably all the speed you will need, but in the future the i7 may well deliver a bit if an edge. I see no reason not to go directly to 16GB, you could probably get by with 8GB but "get by" is the operative phrase. SSDs have been mentioned, but You should consider the 1.1TB Fusion drive. As a practical matter the overall performance will be VERY close to that of all SSD, but a lot more capacity at a much lower price than SSD.
    Since you are a web developer, I will share my "site development" secret with you. I had a rather ancient Mac mini I was not using. It was old and slow, but could run Mavericks and Server. I have it setup in a closet, running headless (no monitor or keyboard) and controlled from my Mac mini workstation. It is a great place to test new sites without having to go live. I do occasionally catch a problem running on my remote site server that I missed testing on my development Mac mini. Since I already had the old Mac mini my total outlay for my test site turned out to be $30 for the Server app.

  • How Transaction Manager work with Resource Manager, like Connection pool?

    hi,
    I'm using BEA Webloigc8.1 Stateless Session Bean/DAO/Oracle stored proc.
    but I'm not quite clear how Transaction Manager work with Resource Manager, like Connection pool.
    my understanding is that, in a weblogic transaction, a stateless session bean interact with several DAOs, and for each method of DAO a connection is acquired from connection pool. I've heard that the connection will not return to pool until the transaction commits.
    My question is that, does it mean that for a weblogic transaction, multiple connections might be allocated to it? and if multiple connections are allocated, then how many oracle transactions would be started? or multiple connections share the same oracle transaction?
    I didn't feel it make sense to start multiple oracle transactions, cause deadlock might be incurred in a single weblogic transaction.
    any help appreciated!

    Xin Zhuang wrote:
    hi,
    I'm using BEA Webloigc8.1 Stateless Session Bean/DAO/Oracle stored proc.
    but I'm not quite clear how Transaction Manager work with Resource Manager, like Connection pool.
    my understanding is that, in a weblogic transaction, a stateless session bean interact with several DAOs, and for each method of DAO a connection is acquired from connection pool. I've heard that the connection will not return to pool until the transaction commits.
    My question is that, does it mean that for a weblogic transaction, multiple connections might be allocated to it? and if multiple connections are allocated, then how many oracle transactions would be started? or multiple connections share the same oracle transaction?
    I didn't feel it make sense to start multiple oracle transactions, cause deadlock might be incurred in a single weblogic transaction.
    any help appreciated!Hi. If you configure your WLS DataSource to use keep a connection for
    the duration of a tx, it will do that, and in any case there can be
    no deadlock however many connections operate for a given XA transaction.
    Here is the best coding form for DAOs or any other user-written code
    for using WebLogic DataSources. This is important for two reasons:
    1 - Thread-safety is maintained as long as the connection is a
    method-level object.
    2 - It is crucial to notify WebLogic that you are done with a connection
    ASAP, by your calling close() on it. We will then put it back in the
    pool, or keep it under the covers for your next request if it's in a
    transaction etc. The pool is optimized for quick get-use-close scenarios.
    public void one_of_my_main_JDBC_Methods()
    Connection con=null; // Must be a method level object for thread-safety
    // It will be closed by the end of the method.
    try {
    con = myDataSource.getConnection(); // Get the connection in the try
    // block, directly from the WebLogic
    // datasource
    // do all the JDBC within this try block. You can pass the
    // connection to subordinate methods, but not to anywhere
    // that thinks it can use the connection later.
    rs.close(); // close any result set asap
    stmt.close(); // then close any statement asap
    // When you're done with JDBC
    con.close(); // close the connection asap
    con = null; // nullify it so the finally knows it's done
    catch (Exception e) {
    // do whatever catch stuff you want. You don't
    // need a catch block if you don't want one...
    finally {
    // It is important to close a JDBC connection ASAP when it's not needed.
    // without fail, and regardless of exit path. Do everything in your
    // finally block in it's own try-catch-ignore so everything is done.
    try { if (con != null) con.close();} catch (Exception ignore){}
    return ret;
    }

  • CS14 without the use of Engineering Change Management

    Hi all,
    everybody knows if the date of validity showed in the entering screen of TCODE:  CS14, lets the comparison between BOM at different date, even if the Engineering Change Management isn't implemented for a plant?!
    TKS
    Valentina

    If you don't use ECM then the change log is not such detailed and the validity dates will be firmed for one BOM item, so it may hard to compare the BOM on certain date without the ECM.

Maybe you are looking for