Epititive manufacturing-External operation

Can any body tell the sequence of steps that are to be done in external operation for repititive
manufacturing? is there any option to create a pur req like we do it in the creation of prod order?
If so, in activity backflush how to handle this external operation?

Dear Srinivas,
As far I know in REM - sub-contracting can be done through reporting point's,
If you are going for normal backflush it does not help you,
For your reference , please check these links,
Re: Subcontracting in REM
Regards
Mangalraj.S

Similar Messages

  • Schedule lines for an external operation in a production order

    Hi All,
    I have an external operation defined in a production order and a scheduling agreement is assigned to it in the Routing operation details.  Now, i want to generate schedule lines when a production order created but the system always generating a purchase requisition.  Do we need something to be configured in the background?  Please help!
    The idea is to have the goods receipt done against the same agreement always.
    Regards,
    Sravan

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • External Operation Job Log

    Hello all,
    I can't seem to find additional information on this. I have written an exteranl operation in c# and I can run it from the portal without any issue. I know that standard error is supposed to be captured in the job log, however I can't seem to figure out how to write to standard error from a c# console application. Console.error doesn't seem to cut it.
    I am using ALUI 6.0 sp1, but I dont' think this has changed much over the years. Has anybody written a c# external operation and been able to write to the job log?
    Thanks,
    Berney

    You could just make it write to stdout and then redirect stdout to stderr like this: "dir 1>&2". I put that in a bat file in the scripts directory and then made the bat an external operation. It wrote to the job logs like this:
    Mar 3, 2009 11:40:55 AM- Starting to run operations (1 total) for job 'stdout dir test ext op Job'. Will stop on errors.
    Mar 3, 2009 11:40:55 AM- *** Job Operation #1 of 1: ExternalOperation [Run as owner 'Administrator']
    Mar 3, 2009 11:40:55 AM- Java Version: 1.5.0_12 from BEA Systems, Inc.
    Mar 3, 2009 11:40:55 AM- OS x86 Windows 2003 5.2 as SYSTEM
    Mar 3, 2009 11:40:55 AM- External Operation Agent for stdout dir test External Operation is starting...
    Mar 3, 2009 11:40:55 AM- Original Script is: "test.bat"
    Mar 3, 2009 11:40:55 AM- Scripts home is: E:\bea\alui\ptportal\10.3.0\scripts
    Mar 3, 2009 11:40:55 AM- Appending E:\bea\alui\ptportal\10.3.0\scripts to test.bat.
    Mar 3, 2009 11:40:55 AM- Full Path to script is: E:\bea\alui\ptportal\10.3.0\scripts\test.bat.
    Mar 3, 2009 11:40:55 AM- Operation has timeout of 0 ms.
    Mar 3, 2009 11:40:55 AM- stdout>
    Mar 3, 2009 11:40:55 AM- stdout>E:\bea\alui\ptportal\10.3.0\scripts>dir 1>&2
    Mar 3, 2009 11:40:55 AM- stderr> Volume in drive E is New Volume
    Mar 3, 2009 11:40:55 AM- stderr> Volume Serial Number is 4CFC-EB07
    Mar 3, 2009 11:40:55 AM- stderr>
    Mar 3, 2009 11:40:55 AM- stderr> Directory of E:\bea\alui\ptportal\10.3.0\scripts
    Mar 3, 2009 11:40:55 AM- stderr>
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM <DIR> .
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM <DIR> ..
    Mar 3, 2009 11:40:55 AM- stderr>12/18/2008 07:59 AM 5,049 AnalyticsRunJobs.bat
    Mar 3, 2009 11:40:55 AM- stderr>10/08/2008 01:35 PM 2,034 BulkSubscriber.bat
    Mar 3, 2009 11:40:55 AM- stderr>10/08/2008 01:35 PM 3,577 SavedSearchMailer.bat
    Mar 3, 2009 11:40:55 AM- Total Memory = 33554432 bytes, Free Memory = 9573312 bytes, Used Memory = 23981120 bytes.
    Mar 3, 2009 11:40:55 AM- stderr>03/03/2009 11:37 AM 8 test.bat
    Mar 3, 2009 11:40:55 AM- stderr> 4 File(s) 10,668 bytes
    Mar 3, 2009 11:40:55 AM- stderr> 2 Dir(s) 17,469,964,288 bytes free
    Mar 3, 2009 11:40:55 AM- *** Job Operation #1 completed: Process completed successfully; Command line: ""test.bat"".(282609)
    Mar 3, 2009 11:40:55 AM- Done with job operations.
    I don't think much has changed with this in the portal 6.x world, but it looks like stderr is definitely captured in wci 10.3. If there's a problem with an older version, start a support ticket to investigate a possible bug.

  • Error while creating external operation in Routing

    Hi Freinds,
    I am creating an external operation in a routing and I enter the purchasing info record which is created for the material.
    But when I try to enter this info record in the external operation then I get the Error: "Enter info record without Material"
    Already info record is created for this material then what could be the problem. This is stopping the routing creation .Please help.
    Regards
    Shailesh Nadkarni

    >
    shailesh nadkarni wrote:
    > Hi Prasobh,
    >
    > Thnks for the quick response but can you throw somelight between the difference in Inforecord with Material and Inforecord without Material. Thnks....
    Shailesh,
    If the material is procured by means of subcontracting process, then we need to assign in the material master MRP2 view with special procurement key 30, create the BOM for the material, which would contain the components which would be Issued to the vendor. In this case you would be performing all the transaction with referance to the Output material number, so an Inforecord of SubContract category needs to be created with referance to the Output material, where you Issue the components and you can recieve your material.
    In case of operation subcontract the PR or Purchase order would be with account assignment to the production order and not with referance to any material, so there wont be any referance to any material number (Product), you can Issue components for processing, but when recieving it is again not with referance to any material but operation delivery.
    Hope i was able to explain, what you wanted.
    Regards,
    Prasobh

  • Auto-Reaction Method - External Operating System Command

    Hello ,
    I am trying to run a script (test.cmd) on a monitored java system out of solution manager via ccms auto-reaction method, but without success.
    I have created a RFC Connection to the java system in transaction sm59, defined an external operation command in transaction sm69 (/usr/sap/test.cmd) and an auto-reaction method using that command. But when I test the command in transaction sm49 with the RFC connection as target destination, the command is executed on the local CEN system (SolutionManager system) instead of the monitored java system. I have no clue where's the problem???
    Thanks for any help (points, points, points)
    Mirko

    Hi Anand,
    can you please send me that doc too pleae.
    [email protected]
    I really appreciate your help.
    Thanks,

  • External operation in routing

    Hi
    In routing if I maintain controlkey with external operation, I have to enter the info record details.
    (I have to create info record without ref to material, the pur req/Pur ord created will be account assigned).
    When ever I create an order the system will generate pur req for external opeation with ref to info record and it wil be always send to the vendor which i have maintained in info record.
    My requirement is, I have 5 vendors who can do the same processing with different cost and lead time. I need to select the vendors.
    Please let me know how to achieve this.
    I cant go for Quota arrangement,since material number is not involved.
    I dont want to create different routing with different info record details.
    Regards
    S.Senthil

    Hi ,
    In Your Scenario what i feel is you can create one routing in which u can mainatin vendor info record which is commonly used.Create a production order,but before releasing  it,u can change purchase info record by making the customised setting as below.
    Go to OPL8,for particular order type and plant combination,maintain order type dependent parameters in which in planning tab -purchase requistion -try to put 2 or 1 and test (1-never it will not create,2 -purchase requistions will be created after release,3-Immidiately when order is created)
    Hope it will solve ur problem
    Edited by: Girish  Adaviswamy on Mar 20, 2009 7:18 AM

  • External operation storage location

    Hi,
       I am generating a purchase requisiton for an external operation from a production order. This purchase req is a std purchase req and account assignment is F (production order). The line item does not have a storage location due to which the ME59N fails. Does anyone know how I can get the strorage location for this external operation purchase req to populate and how I can get the ME59N to work for purchase reqs of these kinds ?
    Thanks

    Hello
    I'd like to suggest you to read carefully the following note:
    503497 - Subcontracting and MRP areas
    The following information provided on this note confirms that the storage location is not necessary for subcontracting, therefore, this field is empty:
    The most important point to understand the system behavior is the fact that the withdrawal of the (subcontracting) component is generally carried out during the goods receipt for an SC procurement proposalfrom the subcontractor stock that is managed at plant level from an inventory management point of view and that has no reference to a storage location at all.
    This causes that subcontractor requirements can never enter a storage location MRP area, since you can later not post the withdrawal from this MRP area.
    Thus SC-requirements always enter the SC segment of the plant MRP area or the SC-MRP area.
    The SC MRP area in turn is supplied by stock transfer reservations from the plant MRP area or via third-party order processing through procurement proposals with goods receipt directly to the subcontractor. A supply through the materials planning from a storage location MRP area is not possible.
    For the above reason, SC-requirements do also not carry any storage location, since the storage location does not have any control function at all for SC-requirements:
    You cannot and you should not determine a storage location MRP area (see above), and the subcontractor MRP area is determined via the vendor of the procurement proposal, thus it is independent of the storage location.
    See also Note 376050 on this topic that makes a modification available which prevents the deletion of the storage location in the subcontractor requirements, so that you can use, for example, customer-specific reports to analyze the storage location.
    You may consider the modification from note 376050, which prevents the deletion of the storage location from the subcontracting requirements, however, this is generally only relevant for displaying the storage location and this is not used for processing the item.
    BR
    Caetano

  • External Operations: which API?

    Hi all..
    I have a console application that uses the Server API and I'd like to run it as an external operation. However, as I look into it, it appears that the job must run on the automation server... will the server API still work? I'm guessing not... seems to just hang when attempting a Reconnect().
    OK, so maybe I can use the PRC... but what value do I use for the first argument in GetTokenContext()? the URI endpoint... ????
    What's the best reference for writing external operations? Can't seem to find anything via plumtree.com searching... :(Jesse

    Your post partially answered my question. I am looking into using the PRC Collab Java API (to add calendar tasks programmatically) and want to know if that could be called as an external operation. It would probably be possible if the latest version edk.jar with the Collaboration API was on the Automation Portal Server. We have Automation Portal 5.0.4 installed and it comes with ans older version of the EDK.jar.
    Any comments and recommendations on on the best method way to accomplish what I am trying to do?
    Thanks.
    Vanita------- HP SupportTeamLux wrote on 8/18/04 4:20 AM -------
    Hi Jesse,
    I'm also doing a console application that uses the PRC and is called as an external operation.
    For the URI endpoint, I specify a URL in the application.config file. It contains the URL to the Plumtree Web Services, usually like http://portalserver/ptapi/QueryInterfaceAPI.asmx. Forthe second parameter, the login token, I use what the external operation passes me as parameter (). Works nicely...
    HTH, Fred

  • External Operating system Commands -GPG

    Hi Experts,
    Im quite new in SAP and we have a task to encrypt a file generated from SAP for upload to bank. We use  the external operating system commands to call the gpg commands for file encryption. But we encounter an error when we execute the command
    below is the error we encounter
    gpg: [Recptient's ID]: skip : public key not found
    gpg: [Filename] : encryption failed : public key not found
    but when I run the command on OS level it execute properly without any problem.
    hope you guys could me an idea on how to fix the issue i encounter
    Thanks in advance!!

    Louie,
    What is the command that you used? which OS?
    Thank you
    Regards

  • PP Internal and External  Operation

    Hi,
           I am marked one of my operation( say 40 th operation) in routing as 'Internal and External operation'. This operation is done both internally as well as externally.How I instruct system 60 Pc is processed externally and 40 Pc is processed internally incase of 100 PC of order qty.? More over how to confirm both of them???
    Edited by: Velmurugan S on Apr 29, 2008 7:44 AM

    Hi,
    I am not sure but it seems both the types are possible in this case. If you apply a control key with this setting, you may be able to either process it internally or create a PR against it.
    Note that its OR and not AND. So you may be able to process in one of the way and not both.
    For better understanding please check it in testing and tell us the results.
    Sumeet

  • External Operations in Standard Cost

    Hi All,
    Currently when we run standard cost rollup,we are not adding any external operations costs to product and once production process is complete,it is settling as a variances.how can i include external operations cost in cost component?
    every production order external operations  costs is different and we have one primary cost element to post external operations cost.
    any help is appreciated.
    Thanks,
    Rau

    Don't solve my problem ecause this is my question.
    I want that this field "Planned Delivery Time" is compiled by Default value. Is it possible.
    In my opinion I hope that in Work Center for externa Operation, for example, there is a parameter that allows me to have a default value into the Field. Or in Master data of material.
    My user want that they create a routing and insert the work center about external operation, the system put authomatically the value into the "Planned Delivery Time".
    It's a request, but I don't find a standard solution.
    David

  • External Operation Processing

    Dear all,
    I'm using a external control key, I have an external service I want to perfom. How come I don't have a place inside the routing to indicate the service that I want like PM task lists? Also how is the purchasing department supposed to understand and the production people how would they know which cost element (GL Account) to throw in, it's too technical for them since each service is related to a certain cost element.
    Do you have a workaround solution for this?

    Rafik,
    You can use external operations control key like the standard one "PP02", here in the purchasing view you can assign the GL account / Inforecord details, based on these details the external operation PR would get created.
    Regards,
    Prasobh

  • External Operation but without entire Procurement Cycle

    We have an operation in the Production Order, where a process is done by a vendor. However this is handled such that the Vendor collects materials across several production orders on a regular basis. The invoicing is also done late, perhaps monthly. Because of this, we find that modelling the operation as an External Operation is difficult since the PO would stay open and the Production Order cannot be closed until all the administration work is completed.
    We would like to capture the external costs of the operation, as a form of immediate 'Confirmation' for that operation and posting into interim costs. Later, when the physical goods have arrived and invoiced CO can reconcile those costs against these interim costs.
    Is it possible to set an Operation as External yet not have to go through entire Procurement cycle?

    Dear
          if vendor is doing first operation, Create a semi finished material with special procurement 30 subcontracting key in material master MRP2 view  and maintain BOM of components which are sending to vendor and routing with external procurement.
    Open another semi finished material for in house production and make BOM of component received from vendor i.e. subcontracting semi finished.
    Result of above given procedure, there will be two documents without interlink (purchase order and production order). then you can open production order as per material available quantity and close whenever you desire and similarly for purchase order.
    if vendor is last operation, procedure will be vise versa of above procedure.
    Thanks
    Muhammad Ashfaq
    Edited by: Muhammad Ashfaq on Jul 21, 2011 6:23 AM

  • External Operation in CO11n

    Hi Gurus,
    While confirmation external operations (Sub-Con), those should not be visible for shop floor guys. I mean those externally processed operations must be greyed or disabled for editing.
    What are the settings I need to do ?
    regards
    Ram Kumar

    I am passing through post, and replicated the scenario in my system. During test
    scenario I was not able to hide the operations by checking the
    Confirmable operations in OPK4 under Selection in tab Operation
    indiv entry using initial scrn
    My understanding of the above setting is, operations (like 0010,0020...) 
    should not be recognized in Co11n with above setting
    Recognized in terms of CO11n should not able to discern that operations  (0010,0020...) are maintained in  master data
    Note: With Control key setting ( tcode OP00:Confirmations not possible ) able to
    disable the confirmations

  • BAPI_ROUTING_CREATE for external operation

    Hi,
    I am using BAPI_ROUTING_CREATE to upload operations, and this method is working well as long as all my operations are in-house operations (PP01). But, when I want to upload external operations with control key PP02 or ZP02, I get an error "Cost element is not defined in the system" ( I am entering info-record, purchase org, cost element in addition to the fields for activity number, workcenter and so on during this upload).
    But, when I create a routing manually using CA01, and enter the same data for external operation, I am able to save the routing with the exact same cost element.
    Could you please help me with this error? Why am I not able to pass the same information using BAPI for external operations. Is there any other field I need to use?
    Thanks.

    Hi,
    Since you say the cost element exists & its possible to create via CA01. Add the below code before passing the value to your BAPI.
    CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
                EXPORTING
                  input  = itab-cost_elem
                IMPORTING
                  output = itab-cost_elem.
    Where itab is the name of my internal table & cost_elem is the field.
    Check & revert if the above resolves the issue.
    Regards,
    Vivek

Maybe you are looking for

  • How do I remove the iCloud account on a iOS

    My iPod Touch has my old iCloud account and I dont know the password or the security questions and the Terms and Conditions Screen freezes when I hit accept so I can not change any iCloud settings. Any ideas on how to fix this?

  • How can i reuse my existing socket connection

    Hi, this might sound basic, it probably is: As part of my larger project, i have to send and recieve data to multiple socket connections. The thing that happens is that everytime i send data, it seems that java is creating a new stream or something (

  • Images with straight lines are distorting (round) on PSCC on iMAC but not on MacBook or second iMAC?

    Images are distoring (rounding) on Photoshop CC on my iMAC but same NEF file on MacBook Air or our second IMac do not show distortion.    On preview, the image appears normal.    Is there a way to repair PS CC or does it need to be reloaded?   How ca

  • Problem: load SQL Server 'varbinary' data

    Source database: SQL Server 2000 OS: Windows 2003 (SP1) Oracle: 10g (R2) Datatype Mapping: SQL Server 'varbinary(1000)' to oracle 'BLOB' With the help of OMWB, I created the oracle database schema for a SQL Server DB (offline capture). I have problem

  • Applying multiple effects to a Node?

    How can I add more than one effect to a Node at the same time?  I want to add a blur and drop shadow to a Shape concurrently.  Can it be done?