EREC: Requirements for E-Recruiting Project

Hello Experts,
I'm working in a client who has several requirements for an E-Recruiting Project, since I'm not an expert in this module, I would like to share these requirements willing to get inputs from you for I begin my job on the right track:
1 - How can I feed automatically position postings to targeted job boards (CareerBuilder, Monster, etc.) and popular social media sites such as LinkedIn, Twitter and Facebook?
2 - Is there a mobile friendly application which allows position searches and applications?
3 - Can we have an option for Agency Access through the Career Site, which means Approved Recruitment Agencies are able to submit candidates online?
4 - How can we capture mobility (willingness to relocate / travel) at the time of position application?
5 - I do not know if it is a SAP question, but is it possible we have a method for search engine optimization for our open positions in order to have them rank well in external search engines, such as Google.
I think the answers of these questions will be useful for all.
Thanks in advance!
Sivani

Hi,
the candidates are in the e-recruiting system, have the good role, but the name and email is only visible in the list after having changed the BP data in the backend system. It's rare. The result list gives fe. 5 records, but you cannot see the name of the candidate in the result screen. When you open the record, and you ask for the data preview, all data is shown. It's only in the result list that the data is not shown. But, after you have changed somethin in the bp-data in the backend, then the data is shown in the result list. Therefor, I'm looking for a report which 'reloads' the data to be shown in the result list.
Kind regards,
Ruth

Similar Messages

  • Technical requirements for E-recruitment tool implementations

    Hello,
    We are using 4.7 version.
    We bought ECC 6.0 just a test server without portal facility for practice. Now we require the portal access. Can anybody says that how we can get that from SAP, Our main purpose is to use E-recrutiment in Portal since we already have ECC 6.0. Now we would like to buy EP tool also, however we need to give complete technical requirements for E-recruitment tool implementations for approval.
    your information is highly appreciated.
    Regards,
    Nydia.

    Hi,
    For SAP Netweaver Products which includes Enterprise Portal, Business Intelligence and Process Integration you have to buy seperate license.
    If you plan to use only E-Recruit then in ECC 6.0 you can install Enterprise Portal as Add-on Component, Generally Portal takes more system resources. If you plan to use only E-Recruit then performance will be fine.
    Hope it helps
    Regards
    KT

  • EREC: Request for E-Recruiting threads - use prefix EREC

    Dear Community,
    in order to make it easier to identify threads related to E-Recruiting queries kindly use the prefix EREC in your subject line.
    e.g. "EREC: Request for E-Recruiting threads - use prefix EREC"
    Many thank!
    Cheers
    Horst

    Dear Community,
    in order to make it easier to identify threads related to E-Recruiting queries kindly use the prefix EREC in your subject line.
    e.g. "EREC: Request for E-Recruiting threads - use prefix EREC"
    Many thank!
    Cheers
    Horst

  • LabView Programmer required for free small project

    I am looking for a Labview developer who can spend a few hours for free developing a small Labview project.
    Please email [email protected] if you are avaible ASAP
    Many Thanks
    Dave

    Why not learn LabVIEW and do it yourself.
    The help within the LabVIEW forum is free and you get to learn a language as an added benefit.

  • Technical requirements for SAP E-rectruiment

    Hello,
    We are using 4.7 version.
    We bought ECC 6.0 just a test server without portal facility  for practice. Now we require the portal access. Can anybody says that how we can get that from SAP, Our main purpose is to use E-recrutiment in Portal since we already have ECC 6.0. Now we would like to buy EP tool also, however we  need to give complete  technical requirements for E-recruitment tool implementations for approval.
    your information is highly appreciated.
    Regards,
    Nydia.

    Hi Velu -
    E-Sourcing technical consultants will require SQL skills if you are developing custom reports. The E-Sourcing query and reporting tools utilize "annotated" SQL statements the result in a SQL query being executed against the relational database. It is also useful for the report developer to have skills specific to the DBMS being used (for example, Oracle skills) - often times, using DBMS specific SQL constructs can provide improved reporting.
    E-Sourcing has a feature called "scripting" that allows custom business logic to be included in the application and executed at various "call-out" points. The scripting feature provided by E-Sourcing uses a technology called BeanShell (see www.beanshell.org for more details on this technology). Beanshell development really requires strong programming skills using Java, although some components of BeanShell may be more like JavaScript. Regardless, I recommend Java expertise for writing E-Sourcing scripts. Knowledge of HTML is not required.
    The E-Sourcing workflow capabilities also utilize BeanShell, so if you plan to implement any workflows, you will also require such technical skills.
    Many other features of E-Sourcing such as user interface customization can be done with less technical individuals. Programming is not required.
    Hope this is helpful.
    Regards,
    Rob

  • What are the Things required for BI 7.0 Implementation project

    Hi Friends,
                      Can any one suggest me
    1.What are the Things required for BI 7.0 Implementation project?
    2.System Configurations & Hardware Components?
    3. Any additional steps...
    plz suggest me.
    Regards

    Hi lakshmi,
    http://csc-studentweb.lrc.edu/swp/Berg/articles/PM_2006_upgrade_NW2004s_Bjarne_Berg_v12.ppt#426,3,Why Upgrade u2013 end of supportu2026
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d163a7-0301-0010-d9b0-98f692ea3c60
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881
    https://wiki.sdn.sap.com/wiki/x/JYk
    Check the following links.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
    check the following
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    business content
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20extraction%203.0x
    https://websmp203.sap-ag.de/co
    http://help.sap.com/saphelp_nw04/helpdata/en/37/5fb13cd0500255e10000000a114084/frameset.htm

  • Which tasks required for a Developer in a SAP project with SAP XI?

    Dear all,
    I'm a ABAPer (Developer too), i will join into a SAP development and maintenance project that use the SAP XI. In order to prepare for this project, now i should determine and  study the "Specific Skills/Tasks required" for a ABAPer (Developer too) in development and maintenance project with SAP XI technology platform. I see in our forum with thread:
    Roles for XI Programmer
    that: A developer will take care of "Mapping Task" with "ABAP Mapping" or "JAVA Mapping".
    If any person who participated in a project as same as my project (a SAP development and maintenance project with SAP XI platform), please help me to answer my question:
    My question:
    "Which other tasks required for a Developer in a SAP development and maintenance project with SAP XI platform (exclude Mapping Task)?"
    Thanks a lot to all in advance (points will be rewarded for every valuable answers),
    Vinh Vo

    Hi,
    You can check out the standard XI training content as well
    Check the following links:
    http://help.sap.com/saphelp_nw04/helpdata/en/84/e8763c997fda50e10000000a11405a/frameset.htm
    TBIT40:
    https://websmp109.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT40
    TBIT41:
    https://websmp201.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT41&LANGUAGE=
    TBIT42:
    https://websmp206.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT42&LANGUAGE=
    TBIT43:
    http://www50.sap.com/useducation/curriculum/course.asp?cid=60161651
    TBIT44:
    https://websmp102.sap-ag.de/~form/ehandler?_APP=00200682500000001337&_EVENT=DISPLAY&COURSE=TBIT44
    Reward points if helpful...
    PrasHanT

  • Audit Log is required for Project server

    Hi,
    Audit Log is required for EPM / Project Server 2010 
    Following are the requirements.
    Project Name, Resource Name and Date of Following Events.
    1. Project checked Out By, Date (This is highly important)
    2. Project Checked In By, Date
    3. Project Published By, Date
    4. Project Saved By, Date

    Hi Hachishti,
    Please refer to a recent similar thread with excellent answer from Paul.
    http://social.technet.microsoft.com/Forums/projectserver/en-US/435fbb7a-1c82-419c-b83e-e89419dc66aa/project-server-2010-view-plan-save-history?forum=projectserver2010general
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Hi all, Please suggest a case where there is a requirement for new SOAP sender adapter module. I wanted to develop a module but in my current project i am unable to find any such requirement.

    Hi all, Please suggest a case where there is a requirement for new SOAP sender adapter module. I wanted to develop a module but in my current project i am unable to find any such requirement. So please give me inputs for the same..
    Thank you,
    Vinay Kumar A

    You can try converting a synchrnous soap call to asynchronous using a custom module
    Here your module will send a response back to the sender system and make an asynchronous call forward

  • Which chassis port will be required for project of robotic arm(interfacing)

    hello..
    actually few hardware attachments ports are present at my uni labVIEW setup, that are:
    ni pxi-1050, ni pxi-8196, ni scxi-1102b, ni scxi-1112, ni scxi-1162, ni scxi-1124
    but i dont know which one is required for interfacing robotic arm project.
    plz help...........

    Hello,
    In the system you specifed you will also need a DAQ card which will control the SCXI portion, Generally SCXI hardware is used for signal conditionin, and I have not seen anyone controlling motors of a robotic arm. If you want to interface robotic arm you should look into Motion cards or RIO solutions. This link might help getting started with what hardware you might need for this project.
    Hope this helps
    NI-khil

  • Which sharepoint service applications & services are required for Project server 2013 to work fine.

    HI,
    Can any one help me,
    I am planning to install project server 2013,  what are the service applications and Services ( Manage services on server in central admin ) in sharepoint  are required for project server 2013 to work fine, so that i will run only  service
    application and services to increase server performance..i don't want to configure all service applications  when i  am configuring.
    Thanks in Advance..
    vijay kommireddi

    Hi Vijay,
    If you are installing Project Server on SharePoint farm, You need to start the service Project Application Service which would be available after you install project Server 2013.
    For Project Server Reporting you need to start Excel service and Secure Store service.
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Thanks,
    Phani

  • New  Decimal Notation Format Required  For Indian Projects

    Respected Members,
    As at the user level or tcode SU01 only three decimal notations are provided.
    But for country India the decimal notation format is totally different.
    Given decimal notation format is
    1,234,567.89
    And the Required Format For India is
    1,23,456.78
    Becoz we mention the Rupees in this format only.
    And this second format is not available in SPRO also .
    How to create the desired decimal notation and add the corresponding functionality.
    And if we use the given format (1,234,567.89) then when we converting the amount in words through Function module
    SPELL_AMOUNT ,it is not converting properly even though we have maintain the entries in View V_T015Z.
    Suppose our amount is 1,00,000 that is One lakh but it will show in the output  ONE HUNDRED THOUSAND.
    I know that there is another function Module HR_ch_ something to convert in words according to indian currency.
    But it does not solve the issue properly.
    THis DECIMAL NOTATION format for Indian Projects is a BIG MESS.
    So kindly tell me any solution or it is the drawback of SAP.
    So that we can ask SAP to append this Decimal Notation and required Functionality for the Indian Projects.
    Kindly Send Your Valuable answer and Try To Make clear picture and SAP Technical People if Reading this thread then kindly give stress on the REQUIRED DECIMAL NOTATION.
    THANKS A LOT.

    Hi Manish please you can try this code
    REPORT ZAMOUNT_CONVERSION.
    DATA : RESULT1(20).
    PARAMETERS : NUM TYPE P DECIMALS 2.
    DATA : num2 type STRING.
    DATA :  col_amt(20) type n,"15
             col_b type i,
             num_1(20) type C,"15
             Length type i.
    num_1 = num.
    write : 'default format      :',num.
    uline.
    skip.
    IF ( num >= 999999999 ).
           write num_1 using edit mask 'RR__,__,__,__,______' to col_amt.
           CONDENSE col_amt.
           length = STRLEN( col_amt ).
           if length = 16.
             REPLACE first OCCURRENCE OF ',' in col_amt with space.
             write :/'amount indian format:',col_amt.
           else.
           write :/'amount indian format:',col_amt.
           endif.
    ELSEIF NUM < 999999999 AND NUM >= 9999999.
           write num_1 using edit mask 'RR__,__,__,______' to col_amt.
           condense col_amt .
           length = STRLEN( COL_AMT ).
           if length = 13.
             REPLACE first OCCURRENCE OF ',' in col_amt with space.
             write :/'amount indian format:',col_amt.
           else.
             write :/'amount indian format:',col_amt.
          endif.
    ELSEIF NUM < 9999999  AND NUM >= 99999.
           write num_1 using edit mask 'RR__,__,______' to col_amt.
           condense col_amt .
           length = STRLEN( COL_AMT ).
           write :/'amount indian format:',col_amt.
    ELSEIF NUM < 99999.
       data : dumy(10) type c.
       dumy = num .
       CONDENSE dumy.
       length = STRLEN( dumy ).
         if length <= 6.
           write :/'amount indian format:',num.
           else.
           write num_1 using edit mask 'RR__,______' to col_amt.
           write :/'amount indian format:',col_amt.
          endif.
       ENDIF.
       uline.
    create a function module with this code .hope this will solve the issue.

  • Requirement For Migration Project

    Dear All,
    We have a requirement to migrate a project into ATG 10.1 which was developed in ATG 9.0.
    Please provide some information ASAP.
    Regards,
    Ram

    What information do you require ASAP????
    The migration kits are available by following:
    All patches, fixpacks and migration kits have been migrated to MOS. Here are the rough steps that you or customers may use to access these:
    1.     - In MOS or ISP, go to the Patches & Updates tab
    2.     - In the Patch Search panel, click on Product or Family (Advanced)
    3.     - Start typing the Product name "Oracle ATG Web" and that should auto-filter the results to the ATG products.
    4.     - Select the appropriate patch(es) from the list
    5.     - Select the Release that you are interested in (e.g. 9.3)
    6.     - Click Search to see the list of matching patch sets
    7.     - Click on the patch you want and you should be able to view its Readme or Download it.
    The migration kits are listed with the target release, so the 10.0.1 migration kits are visible if you search for 10.0.1.
    Gareth

  • EREC - Activation EHP4 for E-recruiting - replication BP data external cand

    Hi,
    We have activated EHP4 for E-recruiting and thus we have changed from BSP to WebDynpro for the recruiters. When we do a search on candidates, we receive a list, but the data is not filled in the result screen. Only the internal candidates are shown. When I change a BP for an external candidate, the data is shown in the result list.  When we click on a candidate the data overview is shown with all the data, but in the result list the name or email is not shown. Is there a report available to fill the fields for the external candidates?
    Kind regards,
    Ruth
    Edited by: ruth cloots on Aug 30, 2011 11:26 AM

    Hi,
    the candidates are in the e-recruiting system, have the good role, but the name and email is only visible in the list after having changed the BP data in the backend system. It's rare. The result list gives fe. 5 records, but you cannot see the name of the candidate in the result screen. When you open the record, and you ask for the data preview, all data is shown. It's only in the result list that the data is not shown. But, after you have changed somethin in the bp-data in the backend, then the data is shown in the result list. Therefor, I'm looking for a report which 'reloads' the data to be shown in the result list.
    Kind regards,
    Ruth

  • How much % of coding required  ideally for an XI project?

    Hi,
    1) I would like to know,how much % of codinng part will be there for an XI project?
    2)duration for XI implementation.
    ofocurse it depends on project to project, but ideally i would like to know..
    Thanks for your reply,
    cg

    HI,
    Look for the thread Effort estimation to integrate SAP & Non-SAP systems for the overall implementation duration.
    For the code development effort,
    mostly connected to
    1. Mapping (XSLT java, XSLT ABAP)
    2. RFC development
    3. Third Party applications involving SCRIPTS (incase of FILE etc.,)
    Add at least 2 to 4 weeks to the overall time.
    One point to say at this time is that XI development doesn't only mean Java coding but ABAP too. Above thread I tried posting the overall time frame
    to know and process with ABAP as well.
    If you are looking for any specific RFC or BAPIC calls, please let us know and probably will be able to give you if I have it in my repositoty.
    Thanks,
    Srini.

Maybe you are looking for

  • Looking for help on what Hardware to use for FCS

    I am looking to set up a shared storage for use in a small editing network and I am having a hard time getting my head around what exactly I need. I have 4 edit stations that currently run externals. I am looking at a solution like FCS to centralize

  • FTP in BI Publisher

    we want to ftp'ing the report from the BI Publisher. waht is the encryption of the report to FTp and how to encrypt the ftp . anybody have more knowledge on this please let me know some knowldge about ftp in bi publisher?

  • User-Exit or BADI for creating TO using TR in WM

    Dear Experts, I am preparing Transfer Order using Transfer Request through transaction code LT04. Now when I am doing Putaway (either background or foreground), system itself evaluates and suggests destination bins as per SAP standard logic. For me t

  • How to set database default temporary tablespace in 8i?

    SQL> alter database default temporary tablespace temp3; alter database default temporary tablespace temp3 ERROR at line 1: ORA-02231: missing or invalid option to ALTER DATABASE

  • Adobe Flash Player Keeps Downloading in TextEdit Form

    I've been trying to install the newest version of adobe flash player (12) on my mac (OS X 10.6.8) through Safari (5.1.10) but every time I dowload it and click on it to install it, it opens in TextEdit so I can't do anything with it. How do I change