ERROR: acctg already run for date

Hi
How to solve this issue.
Please find some info on error file.Thanks.
[sngivvp03-root:/var/adm/acct/nite ]
# cat active1217
1217
Wed Dec 17 02:30:00 GMT 2014
-rw-rw-r--   1 adm adm         3720 Dec 16 14:30 /var/adm/wtmpx
-rw-rw-r--   1 adm adm            0 Dec 16 02:30 fee
-rw-r--r--   1 adm adm       225680 Dec 17 02:30 pacct
-rw-r--r--   1 adm adm       498840 Dec 17 01:00 pacct.0
-rw-r--r--   1 adm adm       300280 Dec 16 23:00 pacct.1
-rw-r--r--   1 adm adm       378280 Dec 16 05:00 pacct.10
-rw-r--r--   1 adm adm       308680 Dec 16 21:00 pacct.2
-rw-r--r--   1 adm adm       310320 Dec 16 19:00 pacct.3
-rw-r--r--   1 adm adm       305400 Dec 16 17:00 pacct.4
-rw-r--r--   1 adm adm       306120 Dec 16 15:00 pacct.5
-rw-r--r--   1 adm adm       297600 Dec 16 13:00 pacct.6
-rw-r--r--   1 adm adm       297120 Dec 16 11:00 pacct.7
-rw-r--r--   1 adm adm       298320 Dec 16 09:00 pacct.8
-rw-r--r--   1 adm adm       297680 Dec 16 07:00 pacct.9
files setups complete
wtmpx processing complete
connect acctg complete
process acctg complete for /var/adm/Spacct.0.1217
process acctg complete for /var/adm/Spacct.1.1217
process acctg complete for /var/adm/Spacct.10.1217
process acctg complete for /var/adm/Spacct.11.1217
process acctg complete for /var/adm/Spacct.2.1217
process acctg complete for /var/adm/Spacct.3.1217
process acctg complete for /var/adm/Spacct.4.1217
process acctg complete for /var/adm/Spacct.5.1217
process acctg complete for /var/adm/Spacct.6.1217
process acctg complete for /var/adm/Spacct.7.1217
process acctg complete for /var/adm/Spacct.8.1217
process acctg complete for /var/adm/Spacct.9.1217
all process actg complete for 1217
tacct merge to create daytacct complete
no fees
no disk records
updated sum/tacct
command summaries complete
system accounting completed at Wed Dec 17 02:30:03 GMT 2014
ERROR: acctg already run for Wed Dec 17 23:00:00 GMT 2014: check /var/adm/acct/n ite/lastdate
[sngivvp03-root:/var/adm/acct/nite ]
(Have provided below workaround, but still the problem exists)
ERROR: acctg already run for date: check /var/adm/acct/nite/lastdate
The date in lastdate and current date are the same.
(System accounting completed at Wed Dec 17 02:30:03 GMT 2014
ERROR: acctg already run for Wed Dec 17 23:00:00 GMT 2014 )
Remove lastdate.
Let us know the output.
Kindly advise how to rectify it.

MRP will create a requisition in your plant to procure from the plant that is mentioned in the special procurement key.
The second best solution is to maintain a calendar for this past old year 2003 in your system by using transaction SCAL.
But why would you need a requisition for a time 6 years back? Ever thought about this?
You must have a production order or sales order with a wrong delivery date or replenishment lead time in your system. Because of that the MRP run calculates an expected delivery date for the requisition item that far in the past.

Similar Messages

  • ERROR: Proxy already running...

    Friends,
    I have 2 weblogic portal domains in my Unix box.
    domainA which has AdminServerA
    domainb which has AdminServerB
    When I start domainA , it works fine.But when i start domainb, it leads the adminserverB
    failure and shows the following error.Anyone can help me to fix this?
    FATAL ERROR in native method: No transports initialized
    === Debugging ===
    This window is necessary for debugging code using WebLogic Workshop
    Creating transport
    Starting solaris/DRE/PortalSearchDRE.exe
    ERROR: Proxy already running...
    Could not bind to Weblogic server (Error attaching to Weblogic Server.).
    ProxyThread shutdown
    Starting solaris/AutoIndexer/PortalSearchAutoIndexer.exe
    Starting solaris/HTTPFetch/PortalSearchHTTPFetch.exe
    Portal search engine started.
    Portal search engine processes stopped

    Thanks, Subbu.I think, it is more than that.
    I made debug mode 'false' in start script and it works fine now
    Subbu Allamaraju <[email protected]> wrote:
    >
    Are these domains created with production mode or development mode? Try
    production mode for both the domains.
    Subbu
    Lara Man wrote:
    Friends,
    I have 2 weblogic portal domains in my Unix box.
    domainA which has AdminServerA
    domainb which has AdminServerB
    When I start domainA , it works fine.But when i start domainb, it leadsthe adminserverB
    failure and shows the following error.Anyone can help me to fix this?
    FATAL ERROR in native method: No transports initialized
    === Debugging ===
    This window is necessary for debugging code using WebLogic Workshop
    Creating transport
    Starting solaris/DRE/PortalSearchDRE.exe
    ERROR: Proxy already running...
    Could not bind to Weblogic server (Error attaching to Weblogic Server.).
    ProxyThread shutdown
    Starting solaris/AutoIndexer/PortalSearchAutoIndexer.exe
    Starting solaris/HTTPFetch/PortalSearchHTTPFetch.exe
    Portal search engine started.
    Portal search engine processes stopped

  • Transaction F.5D send message a breakdown is already running for company co

    Whe I try to run the transaction F.5D send message A breakdown is already running for company code 1600 and I can't run again for this compnay code the calculate Balance Sheet Adjustment on other  hand  I see in standar table RF180 that the process in not finished since 1 day what i have to do to finish this run created?
    Thanks!
    Edited by: Otoniel Trevino on Oct 30, 2008 12:53 AM

    Hi,
           Check the Transaction Code : SM04 if still the t.code F.5d is running terminate that, or ask BASIS consultant to terminate the run.
    Regards,
    SudhaReddy.

  • I am already paying for data so why is there a charge for tethering?

    I would really like to upgrade my Droid to a Droid 4 and use the WiFi hot spot feature. I have not done so yet because Verizon wants to charge me to use this feature of the phone. This appears to be illegal and I cannot understand and justify paying a monthly fee for something I am already paying for. I have seen a few posts on other websites trying to explain why Verizon or any other provider can charge for enabling a feature and not providing any additional service to the consumer however they are all very flawed attempts. I just want a VERY VERY VERY good reason why this is legal and justifiable. Please give me a convincing argument as to why anyone can charge twice for the same thing.
    Tethering does not increase the data capacity of the phone. Tethering allows the phone to act as a bridge (modem) between a device to the network.
    Q: Does Bandwidth increase?
    A: No, if the bandwidth to your phone is 8 Mbps, enabling tethering does not change the bandwidth therefore if a YouTube video is running on the phone and three other devices tethered to the phone they will be sharing the 8 Mbps bandwidth. This means that each device would only be able to use 2 Mbps of bandwidth under heavy usage. (You will not actually get an even split for several reasons and all combined will be less than 8 Mbps but that is due to overhead and OS limitations.)
    Q: Am I allowed to use more data now that I am paying more?
    A: No, if your data plan is for 2 GB per month, you will be charged extra for using more than 2 GB in one month. This includes the data usage of the phone and other devices while they are tethered to your phone.
    Q: Is there any reason to charge for tethering?
    A: (My opinion but I would like to be proven wrong.) The only possible justifiable reason may be for those who have unlimited data plans. Verizon and other providers must provide a level of service that customers will be pleased with. I could be wrong but it would be difficult for someone to use too much data on their phone alone. (I know there are exceptional cases but this is true for the majority.) Verizon and other providers plan the network based on an average (i.e. 1 GB per month) usage for each phone with data. It is much easier and more likely users would consume more data if a device such as a laptop is tethered to the phone therefore users with unlimited plans would cost the provider more money to increase the bandwidth of the backbone. (Limited plans will be charged more but unlimited data customers are not as there is no limit, which is a problem.)
    IMHO: The right thing for Verizon and other providers to do is to stop requesting that phones be shipped which require a provision from the provider so they can charge for the feature. There is legal precedent that it is illegal for a provider of a service to charge a customer for additional devices using their services if the provider is not providing additional service.
    In order for Verizon and other providers to address issues with network capacity and unlimited data subscribers there are a few options available. One is to provide an incentive for those users to switch from unlimited to limited data plans or provide a credit for a device upgrade, etc. An other option is to keep things as they are with phone provisioning but provide tethering to limited data users for no additional charge and to charge users with unlimited plans for tethering. (BTW: I think is the best option.)
    FYI: I do have an unlimited data plan and would be willing to switch to limited data if tethering were included and the prices were the same. Right now there is no incentive for me to switch to a different data plan especially if I need to pay for tethering in addition to limited data. I currently have an iPad with AT&T service which is an additional fee I am paying but if I drop the AT&T plan, upgrade my phone, and add tethering, I would be paying more and getting less so why should I? (The less is that my iPad would not get email updates, etc. except when I turn the WiFi hot spot on, which I understand runs down the battery so you do not want it on 24x7. Oh, another reason Verizon and others should not charge for tethering as tethering is not available 24x7)
    Please I would like some straight honest answers to why it is legal for Verizon and others to charge for tethering and why I should pay for it.

    I want clarify what I am asking for as I fear that many people may be thinking what Wildman stated which is not true. I think it is presumptuous for Wildman to think that I am not sincere and that I will not award points for a correct answer. The closest one to come to a correct answer thus far is jimfitzgerald however I need to see the policy or something in writing that explains what jimfitzgerald stated.
    To help clarify what I am looking for, I will respond to some earlier posts as I think it may help.
    BTW: I think it is premature to ask that points be awarded but I will put a deadline and a default to this discussion. If I don't see a good answer to this post by next weekend, I plan to award the points to Wildman as the points seem to be of importance. I am actually hoping that a good answer is provided so that it will help anyone else who is in the same situation as myself. I think there must be a good answer as I would hope that carriers would not charge for this feature if they are really not providing an additional service. I also would hope that customers are not gullible enough to pay for something twice which on the surface this appears to be. This does seem to come up enough that the carriers should do a better job explaining what they are providing.
    From: jimfitzgerald on Feb 18, 2012 at 12:06 PM
    Quote: "Also, the tethering plan does add capacity to your plan."
    Response: Please provide a reference to the Verizon Source which states this and I will award points as this is an acceptable answer and is what I am looking for as stated in my original post. I cannot just accept a general statement like this as it will carry no wait if I get charged for going over my data limit.
    From: rcschnoor on Feb 18, 2012 at 1:21 PM
    Quote: "Question #1 ... you will be consuming TWICE as much data ..."
    Response: This is incorrect as the 4G LTE connection will not be able to provide any more data per second than the phone itself. I think you meant to state that you may consume your limit of n GB per month in a period of a week on a laptop verses 3 weeks on the phone which is correct. If you continue to consume data past your limit, you will need to pay more for it so what is your point? If you don't pay more for going over if you have the tethering plan then that makes all the difference. This would be my misunderstanding and would be an acceptable answer. If this is the case, please point me to the Verizon documentation which states this and I will award points.
    From: rcschnoor on Feb 18, 2012 at 1:21 PM
    Quote: "Question #2 ... You get an ADDITIONAL allowance for your use when you activate a mobile hot-spot."
    Response: This seems to allude to the fact that I may not understand how data usage is counted when tethering is added to your plan. Please provide a reference so I can read it and I will award points. Hopefully we are coming to answer here.
    From: rcschnoor on Feb 18, 2012 at 1:21 PM
    Quote:  "Question #3 ... but I don't think anyone would be happy with a monthly data bill of $60+ dollars."
    Response: You are correct which is why I am having an issue with this. If I upgrade and keep my current unlimited plan, I will be paying $75 per month for data and tethering. To make matters worse, currently I am not a heavy data user as much of the time I have access to WiFi. I am considering switching to a 2 GB per month plan based on my current usage but I hate to give up my current plan as I will not be able to go back. I will switch however if the tethering was not an added cost or there is in fact an additional data allocation for tethered devices. I already feel that I am overpaying for data based on my current usage. The problem with switching plans is I could see if I have tethering, I may go over one or two months per year as once in a great while I need access and do not have WiFi available.
    FYI: Here is a breakdown of my current usage.
              - Verizon Phone: (Unlimited data @ $45/month) Average Usage 0.23 GB/month
              - AT&T iPad: (2 GB/month @ $25) Average usage 0.89 GB/month
    I do have another problem with switching which is unrelated to the data plan but is related to usage but will increase my cost per month.
    From: jimfitzgerald on Feb 18, 2012 at 1:33 PM
    Quote: "Or, in summary, charging for tethering is a way to make the people who use lots of data pay for it, rather than having everyone share the cost whether they use it or not."
    Response: Sorry but my experience is just the opposite.
    I would like to thank everyone who has tried to answer this question. It looks like there may be an answer but I would like to see it explained in black and white from the Verizon site. I cannot switch plans based on posts in this forum alone. If I were to switch then get hit with additional charges one month, I cannot call customer service and say that jimfitzgerald and rcschnoor told me that there was an additional data being provided to tethered devices.
    I hope this helps and I hope this can be answered soon.

  • Error in KE27 - run for trading goods

    Dear gurus!
    i have a error when i run KE27.
    Current, my customer don't have production activity. In SAP system, we activated Material Ledger. in period, i wanna run Periodic valuation (KE27) for all trading goods. (Note that we don't have finished good because not have production, customer just sell trading goods)
    I configured some steps follow:
    1. Define and Assign Valuation Strategy (in this step, i wonder that which valuation strategy is user for valuation for trading goods)
    - valuation trategy : 001
    - sequence     material costing       quantity field
           10                        x                            VV099
    - assignment of valuation strategy
    point of valuation                   record type              valuation strategy
        02                                              F                               001
    2. Define Access to Actual Costing/Material Ledger
       Costing key -  01
      0 legal valuation
      1. only trasfer total  cost
       periodic a/c line item
    3. Assign Costing Keys to Material Types
    point of valuation           record type    Material type        Valid to         costing key 1
            02                                   F                 HAWA              31.12.9999       01
    Then, after run period closing in Material ledger, i run KE27 to periodic valuation , but system get error:
    " Message no. KE435 - Costing key 01 does not exist
    In Profitability Analysis, the system tried to valuate by reading a product cost estimate. The Customizing settings in CO-PA call for valuation using costing key 01.
    This costing key is not defined "
    explicitly, i maintained costing key and assigned this to trading goods - material type.
    Please, help to fix it!
    any idea is appreciated.

    Activating ML is necessary because in my customer's company sell goods at planed price then revaluate value of inventories and COGS at actual price in the end of each of period. So we decide to use standard price control for trading goods and active Material ledger.
    end of period, we run period procedure of ML for trading goods, we expect allocation different amount, revaluate inventories and consumption. Run revaluation step of costing run in ML, we revaluate all   ending inventories and consumption transaction except billing transaction. So, we think that we need to run Ke27 to revaluate all line item document in COPA from billing.
    so anybody to help me revaluate consumption amount from billing at actual price in end of period?
    thanks in advance!

  • Error during MRP run for a Material : Calendar date

    Hello All,
    I am trying to run MRP for a material and it is not creating Purchase Requisition. It is giving an error that says  " 08/10/2003 date lies before start of factory calendar. (Please correct)"
    The MRP is set up in such a way that we have a special procurement key pointing to another plant. So we are expecting it to create a Purchase Requistion on that plant but it is not doing so.
    I am not expecting a change of dates in the calendar.
    Please let me know what the issue would be and where can I correct it.
    Thanks
    Regards
    SAP Fans...

    MRP will create a requisition in your plant to procure from the plant that is mentioned in the special procurement key.
    The second best solution is to maintain a calendar for this past old year 2003 in your system by using transaction SCAL.
    But why would you need a requisition for a time 6 years back? Ever thought about this?
    You must have a production order or sales order with a wrong delivery date or replenishment lead time in your system. Because of that the MRP run calculates an expected delivery date for the requisition item that far in the past.

  • Error in Change Run for 0cust_sales

    Hello Experts
    In master data load process chain for 0cust_sales it fails at change run step.
    with ABAP error short text "Exception condition "TREX_ACCESS_ERROR" raised."
    and error analysis
    " A RAISE statement in the program "CL_RSDDTREX_TABLSERVICE=======CP" raised the
      exception
    condition "TREX_ACCESS_ERROR".
    Since the exception was not intercepted by a superior
    program, processing was terminated.
    Short description of exception condition:
    For detailed documentation of the exception condition, use
    Transaction SE37 (Function Library). You can take the called
    function module from the display of active calls."
    Please help me understand and resolv issue here
    Thanks in advance.
    Regards
    Sudeep

    Hi,
    This seems to be related to BIA.
    Please check the below thread & link.
    [Attribute Change run was terminated;
    [http://help.sap.com/saphelp_nw2004s/helpdata/en/6b/cda64246c6c96ae10000000a155106/content.htm]
    Regards
    Vishal

  • #ERROR message in report for date format conversion

    Dear Collegues,
    Why is it that I get #ERROR message (instead of date value) in my report when I use the formula
    =ToDate(UserResponse("Enter End Date:");"dd.MM.yyyy")   ??
    When I only write UserResponse("Enter End Date:") I get the appropriate date, f.ex 5/12/2009. This is american standard for 5th of may, I need to see it like 12/05/2009.
    If I try to just enter the date object behind the prompt ([Settlement Date]) i get message #MULTIVALUE even though I have promptet for 1 special date...
    Is there another formula I can use to get the right format? I can't adjust the format using properties, it doesn't make any difference, the settings I put in there.
    Regards Silje

    Thank you for the very quick answer! Using FormatDate() I get an error message while validating the formula:
    The expression or sub-expression at position 12 in the FormatDate function uses an invalid data type. (WIS 10037)
    I tried making a variable inside BO called [End Date] = userResponse("Enter End Date:") but I get the same error message then. Creating a variable you can only choose between Dimension, Measure and Detail, not Date. Is that some of the reason?
    Finally I tried FormatDate([Settlement Date]; "dd.MM.yyyy"). Validating the formula I get the message that the formula is correct, but in the report the field containes message #MULTIVALUE...
    SILJE

  • Getting an error while using BAPI for data upload using FB50

    Hi,
    Can someone please help with the error below :
    To Upload Data Using FB50 , am using 'BAPI_ACC_DOCUMENT_POST' FM
    and passing values as
    obj_type = REACI
    obj_KEY = '$'
    obj_sys = t000-logsys
    getting errors errors in return as
    'Error in document: REACI $ R3_AFRICA
    G/L account 2511510 is not defined in chart of accounts CSGP(though the account exists in the COA)
    Control indicators for controlling area EU01 do not exist'.(we have not input any indicators)
    Thanks

    Control indicators for controlling area (t-code OKKP ) is a primary configuration before the company is set to production. Here we maintain which sub areas of controlling are activated. Have a look at those settings.
    Check the validity of the accounts/cost element in the KA03 to ensure the cost element is valid on the date of transaction.
    What is the error message number?

  • Error during repeat run for depreciation via tcode AFAB

    hi,
    I have removed year-end closing for assets to year 1999 via tcode OAAQ . However, once i want to run repeat depreciation via tcode AFAB, I received error messages as follows:-
    1. Field Cost Ctr is a required field for G/L account 4300000
    2. Account 'Expense account for ordinary depreciation' could not be found.
    Appreciate your advise to solve the errors.
    Thanks a lot!
    Hi,
    Appreciate anyone to help me on this issue.
    Edited by: MOHD. FAIZAL OMAR on May 15, 2008 4:38 AM

    Hi,
    The ERP Financials forum would be more appropriate for this topic.
    SAP ERP Financials
    -Paul

  • Error in Depreciation run for 7 th period

    Hi Guruu2019s
    When we run depreciation run  year 2008 for period 7 has failed with the following error :
    Account 'Accumulated dep. account unpl. deprec.' could not be found.
    however it has posted to few assets and not posted to few assets, when I checked in the log for posting run there is a message saying that u201Cthere are error in the posting run.after correcting, restart the run.
    u201C2documetns were createdu201D
    If I go to previous log for posting there is no error message and it says with green signals that 3 documents were created. From 1 to 6 periods, in every log says that 3 document were cresated
    Only this particular run says 2 documents were created.
    Any advise?
    Thanks in advance
    Regards
    Sunitha,

    It looks like that in period 7, you do the first "unplanned depreciation". That's explain why the error only happen in period 7.
    The problem happens because GL account for "unplanned depreciation" is not created.
    Try to check in t-code : AO90 => Choose your Chart of Account => Choose Account determination for asset class in which you did the unplanned depreciation => Choose Depreciation => Check all GL accounts assignment in "UNPLANNED DEPRECIATION ACCOUNT ASSIGNMENT".
    Then check in t-code :FS00 whether the GL Accounts (in "UNPLANNED DEPRECIATION ACCOUNT ASSIGNMENT) are exist or not.
    If the GL accounts are not exist then you should created the GL accounts first. Afterwards, try to running the AFAB again using "Restart".
    Good luck.

  • Error in conversion exit for DATE

    Hi 
    I am loading transaction data to Zcube  from a flat file ,for  0CALWEEK
    in excel   I am  unable to type 022007,if I load 22007 I am getting error like
    Error in conversion exit
    CONVERSION_EXIT_PERI6_INPUT
    here 2 is the 2nd week in 2007
    Plz  provide me how to format cell in excel to take 0 as starting number and the file will be saved as CSV format  or any other procedure
    Thanks
    Padmanaha

    Hi,
    Select the column in excel
    Right Click and choose format cells.
    In the pop up window, the first tab is for formatting. A list will be available, there you have to choose "Date" format.
    Within the date format, you will find number of options to set the formatting according to your specifications.
    If that does not work out, just use "Custom" format as "mmyyyy" for all the cells in that particular column.
    With Regards

  • Z77A-GD65 error 55 after running for 5 months just fine

    Hi,
    My Z77A-GD65 has been running perfectly since last May with a 3770K, G.Skill 8 GB DDR3-2133 Quad-Kit and a Antec EA-550 Platinum PSU.
    Now the PC reboots continuously with error 55 showing on the mainboard.
    Two weeks ago I installed a new GPU, Geforce 660ti. After some initial hassles, it was working just fine.
    Things I have tried:
    - Removed the GPU, No go.
    - Removed all memory but 1 stick in slots 1&2. Repeated this with a different stick. No go.
    Probably something broke, but not the 'bent pins' issues I see reported when people see a 55 error, as my system was running just fine.
    Can anybody give a hint what broke and what should be replaced?
    Thanks for the help,
    J.

    Thanks for the hints, but still no go...
    Things I did:
    - Cleared the CMOS according to the guide, actually several times, but no go.
    - I borrowed a spare 650W Be Quiet PSU from a friend, but alas, I still see the 55 error.
    Does this then point to a defective mainboard or the CPU? From the documentation I get the impression that 55 means that the CPU can not be started.
    Is this correct?
    Thanks for the help,
    J.

  • Error message in Opportunity for dates

    Hi,
    I am facing a problem in finding the reason why an error message is coming.
    We have an opportunity and there is a validation stating that Start date shoudl not be greater than closing date.    I have checked the opportunity it carries correct values.  I have Start date is lower than closing date but even then I am getting an error on opportunity stading that Closing date is less than start date.  I have checked the badi I have kept the break point in all the place where ever this message is getting fine but no were it is getting stopped.   But even then I am getting this error message.
    Please help me .
    How to remove this error.
    Thanks
    naveen

    Resolved

  • ODBC call SQLDriverConnect for data source Server name failed: [ . Notify Customer Support.

    Need help !
    While running DS job through designer we are getting below error:
    ODBC call <SQLDriverConnect> for data source <SErver name> failed: <[>. Notify Customer Support.
    Additional notes:
    1. Source and Target datastore are getting connected properly as i have imported table's definition using it.
    2. Source and target data store pointing to SQL server 2008 R2 express edition DB (64 bit).
    3. It seems like server machine has both 32bit and 64bit drivers installed on it. Please refer attached driverdetails.jpg file for more details.
    Thanks

    Hi did you referred this :
    ODBC call <SQLDriverConnect> for data source <MyComputer\SQLServer2008R2> failed: <[Microsoft][ODBC SQL Server Driver][DBNETLIB]SQL Server does not exist or access denied.>. Notify Customer Support.

Maybe you are looking for