Error "Cost" by creating a production order

Hi,
I' ve create a production order CO01. before I saved I get this error in log "No cost element segment exists for 89000 on 27.02.2009".
With KL01 I've create a activity type and with KP26 I've planed this activity per cost center.
What can I do
Thanks
Dede

Hi,
Run the T-Code KA03, Key in the controlling area and the given cost element.
If it doesn't exists, contact your CO guy to create that.
It will solve the problem.
Regards,
Rohit.

Similar Messages

  • Co- Product Error while creating a production order

    Hi,
    While performing the Co-Products Approtionment at the time of creation of Production order..
    we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
    kindly help me out.
    the error msg is
    Debit with cost element 9460404 cannot be settled.
    Message no. KD549
    Diagnosis
    Costs/revenues exist for cost/revenue element 9460404.  This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters).  However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
    Note:
    Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
    Procedure
    Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%.  Change the settlement profile for the sender as necessary.
    Change settlement profile
    Note:
    Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.

    Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
    I will explain the step by step process that i have done.
    I am attaching the Screen shots of the issue.
    1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
    2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
    3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
    4. When I was settling the production order the same error was getting displayed.
    I have tried various methods to resolve it.
    1. I have created a periodic settlement rule and tried to settle but it didnt work
    2. I have assigned the source structure in the settlement profile this also didnt work.

  • Error while creating a production order

    Dear PP gurus
    I am trying to create a production order of a material  through CO01 , I am getting a error   05.05.2016 date comes after end of valid factory calendar. (Please correct
    Although  for all other  material , no error is coming.
    My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
    please help me how to correct it?
    Thanks in advance
    Regards

    Dear Aadi,
    When your in operations screen
    Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
    it should show you the days for ur base qty
    then click on scheduling results then click on update material master & save
    then Go to CA96
    input plant
    then mark a tick for ur material & click on update material master icon
    then check in material master work scheduling view
    Regards
    Madhu

  • Serial number error while creating the production order

    Hello frds,
    I am getting the following error while creating the production order.
    "Item 000000 requires exactly 100 serial numbers for the asset".
    If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
    I have tried using the new serial number profile also, but it is giving same error.
    Kindly guide.
    Regards,
    Narendra Bora

    Dear Narendra
    Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
    Procd Procedure description Ser.Usage
    PPRL PP order release 02
    since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
    Regards
    Soundar

  • Preli cost compo struc of production orders to sales orders -Non valuated

    Hi experts
    We use Non valuated sales order cost/settlement and assembly order processing. So production order is created from sales order and prel cost estimate is created in the production order. Now we notice that the cost component struc in production order is not copied into sales order. Only the EK02 is copied with total cost.
    How to bring cost compo struc from production order to sales order ?
    This may be a special cost estimate with costing and Is it possible to bring cost compo struc to copa record type A or F.
    I know standard cost compo mapping in copa but I could not see the costing variant used in production order in copa master data configuration.
    regards
    KT

    If the sales order is not a cost object, you cannot cost in it, and you can therefor also not see the cost component split.
    When you sell the material, you can pull through the cost component to PA, via the material master using the COPA valuation strategy. However, only the info for the material in the sales doc line item.
    You don't link to a costing variant, you link using the above valuation strategy and the costing key. The costing variant sits inside the costing key.

  • Settlement rule auto created in Production Order with Receiver Type as OIT

    Hi,
    I am creating a production order with material number in CO01. The system is automatically putting OIT in receiver category, in settlement rule.
    And its populating the child materials there. I expect the parent material to be populated in the settlement receiver.
    In the settlement profile maintained in order type, I have maitained MAT.
    Please let me know, why system is autopopulating the role like above.
    Regards
    SR

    Hi,
    If you are going to settle the production order to Material, there is no need to enter Allocation structure in Settlement profile unless its used for variance settlement...
    Allocation structure has an option to settle to OIT with a settlement cost element or primary cost element...which is why i wanted you to check for that.
    Anyways, Follow the thread, this should help you
    Change the Settlement Rule
    Thx
    PG

  • Rework cost not capturing in production order

    Hi Experts,
    I'm not getting rework order cost in the main production order while settlement of the production order. I maintained settlement rule in the rework order as ORD (Main production order number).
    Please help me.
    Naren

    Hi
    If settlement is done properly i.e. w/o test run indicator and the rework order has values posted to it - Then KO88 or CO88 must be successful. If not, system would tell you the error #
    br, Ajay M

  • Reserve batch number at creating of production order

    Hi,
    I would like to know if there is a way to reserve batch numbers when creating a production order. And when the production order is released and create the receipt, the receipt to use that batch number reserved at the moment of the creation of the PO.
    How could I do this using the SDK?
    Best regards,
    Irina

    Hi,
    Thank you for your answer.
    But, if I "reserve" the batches in a UDF in the production order, it might be that by the time the receipt from production is added those batch numbers to be used already.
    Any other ideas?
    Thank you,
    Edited by: Rui Pereira on Dec 23, 2008 4:18 PM

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • BAPI to create a production order CO07

    Hi guys,
    Need a help....i need to create a production order with the following data...
    1.final date...2.routing group 3.components screen with all the materials needed
    there will be multiple components added..as co-products and as a main material
    BAPI_PRODORD_CREATE...can we use this to add multiple materials...and will it fulfill the tcode CO07...
    any queries or any sort of info..plz share..
    Regards,
    Ashok

    Thanks for the reply.
    In these BAPIs..or FMs...we can add one material or a component...
    I want to add a main material...as a first one..
    then a component of it....so it goes on..
    say i have a main material and 10 components needed and created in a single production order...
    any info???

  • Create a Production order for rework

    Hi,
    I would like to create a Production order for rework.
    But I don't want to do it in the master PO with trigger point.
    I would like to create a new PO for rework and asign to account to the old or master PO.
    I've tried to do it but I want to know if it's correct.
    CO07, maintained the qty, in the settlement rule maintained (category= order,settlement reciever= master PO number) released the order and by confirmation where can I maintain the qty? (as Yield or as rework qty)
    Thanks

    Hi,
    Use T code CO07- creation of PO w/o material, settelment rule as u mentioned and the quantity has to be maintained in rework.
    When u confirmed the order and settel it, it will be settel againts the main order.
    Regards
    JDB

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Cost Center field in Production Order CO01 and PO tables

    Hi SAP Consultants,
    Is there any Cost Center field in Production Order transaction CO01 ?
    What are the tables where Production order data is stored/saved ?
    Any help would be appreciated.
    Thanks in advance.

    Need to understand your purpose first. Let's not make it any more technical than it should be, talking in terms of fields and layouts.
    All the replies given before mine are referring to the operational costs - which are what are passed on "for performing each operation" of the production order. These are the costs coming to the production order from the work center where the operation is performed. At the end of several operations, the production order would have collected all these costs of different operations, and also those of the materials used in the process. There may be other (overhead, etc) costs coming on to the production order too.
    If you're looking for one "cost center" for the entire production order, what cost center is this? Is it the department to which you want to settle the production costs? This is possible, that all the costs accumulated in the production order over the course of its life are finally "settled" to a different cost object, which can be an inventory account, or a sales order, an internal order, or a cost center etc. (There are exceptions, where a production order need not be settled but lets leave this to save us some complexity).
    What exactly are you looking for? What is the business purpose you are trying to achieve? Or is it just a purely technical reason to write a report or something? Even then we need to know the purpose and objective of the report/enhancement before being able to answer your question.
    -Ram

  • Creating a production order for a semi finished product

    Hi
    I am having a multi level bom scenario over here.
    one of the bom components of the header material is a semi finished product.
    I am using the planing stratagy 40 for that material.
    in standard sap when i create a production order for  header material. the requirement gets transerd to all the components. if the components are not available then only  a requirement is placed. when i run MRP that requirement gets converted in to a planned order. which converts in to a purchase req or a production order,
    well for my semi finished product. its a Work in process item. there wont be any stock for that item in the storage location any time.
    what my requirement is. when i create a production order for my finished product it should automatically create a production order for the semi finished product.
    is this possible with some configuration settings.

    Dear Deepu,
    for ur requirement u need to maintain MRP type PD for FERT material and also for ur HALB.
    If u run  MRP  only, it will create planned order for FERT and for all its dependent requirement(for PD).
    If u create order manually for FERT material then it will not create order for HALB material, u need to create manualy for this also.
    sree

  • Create MTO production order immedately after running MRP

    HI experts,
    Does a stragtey group can be used for a material to create MTO production order/purchase order after running MRP?
    Or how we can set a material to create MTO production/purhcase order immedately after running MRP?
    Now we are using stragety group 50 for make to order material.
    After running MRP, material will create a Make-to-order plan orders. Then we converted them into purchase order or production order based on propurment type.
    Thank you for your response~
    Boris

    Dear
    Please assing Planning Stargety -82 if you want production order just after logging sales order .Here MRP will be executed in background and it will generate Production Order fro MTO item and for depedent it will generate PR/PO .Make sure that , you have kep Individaul and Collective Indicator as 1 in MRP4 view of all the compoenets which have used in BOM .
    Regards
    JH

Maybe you are looking for

  • Local Testing server and htdocs

    So I have set up apache/php with virtual servers and I'm using DW8. I may have terminology errors below. Correct me where I'm wrong please. Example site directory C:/apache/htdocs/site.com/ The web directory is: C:/apache/htdocs/site.com/htdocs howev

  • Adobe Reader X error

    Adobe Reader X error When I save as a PowerPoint file to PDF and open it with Adobe Reader, the following message pop up: "An error exists on this page. Acrobat may not display the page correctly. Please contact the person who created the PDF documen

  • HT201077 icloud

    I cannot see my photos on icloud. My contacts are there. How do you see your pictures? Photo streaming on my phone is on and everything is backed up

  • packageName question when building an Android ANE

    Hi, I'm trying to implement an external library ANE wrapper for Android. I'm always receiving "class not found" error message in LogCat. No problem accessing native code, but when I try to access to external library functions it fails. I've tried Ext

  • Slow network on mac mini

    Hi All I ma running the late 2012 mac mini on 10.8.5. Both the wifi and cat5 connected network is very slow when transfering files compared with other machines here on site. I have been trying to transfer films over to a nas box and it's taking 40 mi