Hi PM experts,
How can I make below warning message (W) to an error message (E)?
Message no: CO820 (Error during availability check for order)
Regards,
Nizam
PM Consultant

Hi,
you can cantrol not to release maint orders in case if parts are missing by OIOI transaction, here under Material Availability  against Release material you maintain option 3 No release if parts are missing. This way you can achieve this. If there are other components which has stock on Maint order then delete the un-available material from maint order then it will allow you to release the order.
Hope availability check rule is maintained on material master.
Hope it helps.
Regards,
N.Nagaraju

Similar Messages

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • Reg: Error in availability check in production order

    Dear all,
    I am facing a problem during availability check. After creation of production order, when i am clicking 'Materials' it is showing a error message as 'Incorrect check'. When i click log, the error msg is "Order type xxxx, plant xxxx: Checking rule missing (see long text)".
    But in OPJK i checked it. Availabilty check is '2', checking rule is 01, Release material is '1'
    Please help me in this case.

    Hi krishnachandra,
    I think that you still don't assign any checking rule for your Order type.
    FIrst, please check what production order type is. (On production order header: CO03)
    Second, go to OPJK to create new entry and assign appropriate checking rule to that Order type.
    Then go to your production order and check Material to see the result.
    In case you just maintain one entry only with availability check 2 (check availability during order release). You have to release you production order to check material availability check.
    Hope it helpful for you.
    Edited by: dennydang on Jan 11, 2012 4:43 PM

  • Error during creation of transfer orders for material

    Hi,
            We are doing a transfer of stock from one storage with WM to a storage without WM.
    But system does not finish the process automatically displaing the following error message:
    "Error during creation of transfer orders for material document 49000XXXX"
    System cannot find source storage bin
    Thanks in advance for the help
    Regard
    Enzo

    your picking strategy does not find the bin where the material is.
    So you need to check what value you have entered for picking in WM view of material master.
    then you have to check where your material is (storage type and bin)
    then you need to check customizing to where what storage types are included in the picking strategy that is tight to the material master entry.

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • In DP50 Error during material determination for service order

    Hi,
    While doing Resources-Related Billing request,the following error is displaying..
    Kindly Help
    Error during material determination for service order
    Message no. AD01156
    Diagnosis
    An error occured during material determination for a dynamic item.
    System Response
    The system cannot perform the function.
    Procedure
    Check in the profile being used whether its characteristic allows the assignment of a material to each dynamic item.
    501384
    Message no. AD01156
    Diagnosis
    An error occured during material determination for a dynamic item.
    System Response
    The system cannot perform the function.
    Procedure
    Check in the profile being used whether its characteristic allows the assignment of a material to each dynamic item.
    Thanks,
    Mohit

    Hi mohit,
    You need to check DIP profile setting if profile is attached to your order type or not please check this
    Thanks and regards
    Sachin Kadam

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • Can not Update icloud for win7 Sheep error during transformation. check that the indicated transmitter propagating path is valid. tryet in appel updater and tryet downloading from apple but the same

    Can not Update icloud for win7 Gets
    Sheep error during transformation. check that the indicated transmitter propagating path is valid.
    tryet in appel updater and tryet downloading from apple but the same

    Hi,
    Found a note explaining the significance of these errors.
    It says:
    "NZE-28862: SSL connection failed
    Cause: This error occurred because the peer closed the connection.
    Action: Enable Oracle Net tracing on both sides and examine the trace output. Contact Oracle Customer support with the trace output."
    For further details you may refer the Note: 244527.1 - Explanation of "SSL call to NZ function nzos_Handshake failed" error codes
    Thanks & Regards,
    Sindhiya V.

  • Error during creation of transfer orders for mateRIA

    hi gurus,
    I am getting an error while moving material from sl0c2 to sloc1 which is connected to wh by mvmt 321. the document is getting posted and the stock is coming to sloc1,but the error is
    "Error during creation of transfer orders for mateRIAL.how to correct the error.
    regards
    murugan

    Hi,
    The material is maintained at the Warehouse level, hence warehouse transactions have to be completed, by creating a transfer order and the confirmation of the same will create a transfer posting from SL1 to SL2 in the system. This is trigerred automatically depending on the sytem configuration.
    Regards,
    raghu

  • Bapi or Function Module to do the availability check for Planned Orders

    Hi all,
    I need a Bapi or a Function Module to do the availability check for a Planned Orders. Anyone knows how?
    I will use it in an Exit.
    Thanks in advance
    Points will be given

    I think I found it.
    If anyone is searching for it too, we will use these one:
    CO_ZA_AVAIL_CHK_ORDER_MULTI

  • Restrict Availability check for Line item in sales order

    Hi Folks,
         My requirement is some what different than the usual,I want to stop availability check for a particular line item,while creating sales order on a particular condition (example when quantity is changed for that line item),please suggest if there is any way to do so.
    Thanks for your valuable support.

    Hi
    we need to maintain the username of the person who has triggered this process through XI .
    I BAPI we cannot instruct the BAPI to maintain a specific username.
    that is why i am using this FM because this will allow us to maintain the change history with the username we want
    Regards
    Nikhil

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Variant configuration u2013 availability check for Configurable material

    Hi Guys,
      We are doing the variant configuration scenario for one of our client. We are using planning strategy as 25 (sales order with variant configuration).
      When we configure the Configurable material at sales order level, we wanted to check the availability check of Configurable for the combination of selected characteristics.
    How we can configure it in the system.
    Regards,
    Shailendra

    Hi,
    availability check will work as per the checking group you had defined in system.
    additionaly you need to put tick in configuration profile for availability check.
    checking for material varient is optional, if your bussiness has materail varients you can activate type matching and while configuring the sales order if the values of charactersticks matches system will suggest you the the appropiate varient and you can replace your configurable material in sales order with it.
    hope it will help you.
    If you need some more information please explain what exactly your are expecting from system during availability check.
    Regards
    Ritesh
    Edited by: R S D on May 28, 2009 7:29 AM

  • Error in Availability Check

    I am getting the error  in Sales Order - "No control Information maintained for Checking Group (ZP) and Checking rule A"
    Actually my checking group is 01 not A. I Have configured Transfer of Requiremenst and Avaialability Check.

    Hi Gurus,
                 Availabilty Check Configuration ( More Informative )
    Types of Availability Check in Sales and Distribution
    ProcessingThere are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.  It is specified in MMR in MRP3 screen, availability check tab.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which kinds of stocks and inward - outward movement(receipts and issues) of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features. it is assigned to requirement class.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for theavailability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document._ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field 
    Configuring entries of the Availability CheckIMGàSDàBasic fncsàAvailability check and TORàAvailability checkàAvailability check with ATP logic or against planningàDefine checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery
    Regards,
    Sarosh

  • Availability check for STO?

    Hi,
    While doing Stock transfers order (PO) plant to plant with in the company code, there is no controlling on availability check, though stocks are not available in the supplying plant, while making delivery thro VL10B,  delivery is creating with '0' Qty. This system want to stop the delivery when quantities are not available in the supplying plant.
    The following steps are configured for availability check for STO
    Schedule line Like NN activated for availability, Assigned schedule lines to item category like NLN and determined rule for STO document type, plant, Delivery type and checking rule in MM.
    how to control the delivery,  when stock are not available in supplying plant? (Means, when stock are not available in the supplying plant, delivery creation should stop through VL10B)
    Is there any more configuration is required, pl guide.
    Rao
    Edited by: R Rao on Aug 22, 2008 1:42 PM
    Edited by: R Rao on Aug 29, 2008 6:03 PM

    Alexandro,
    During delivery creation, the system performs an availability check (ATP).  You can assign the Delivery notice type for a stock transfer order delivery notice at OMGN.  The ATP for DN will be the standard ATP rules for SD delivery notices (checking rule B).You can determine which elements are used for availability checking in OVZ9. 
    To meet your goals, I suggest you use:
    Check w/o replenishment lead time ticked
    Include deliveries ticked.
    Optionally, according to your company's policies
    Include safety stock ticked
    Include quality inspection stock ticked
    Everything else unticked.
    Regards,
    DB49

Maybe you are looking for

  • Error while building SUP based iphone client application

    Hi, I am getting the following error while building the application for iphone simulator. I tried by changing search path settings and added libraries to Link binary search path.I really stuck here. Any body please help me how to solve it. Undefined

  • Drag and Drop from outside ADF

    Here's what I want to do. My ADF app is going to be hosted inside an IFrame of another app. I'd like to be able to drag items from the other app into my ADF app and drop them on a specific target item. But now, as soon as I drag the pointer over the

  • ORA-01555 error ?

    I found one ora-01555 error in alert log at 14:37PM.But when i run the following query select ssolderrcnt from v$undostat where to_char(begin_time,'hh:mi:ss')='14:00:00' and to_char(end_time,'hh:mi:ss')='15:00:00' no rows selected is getting It has t

  • How can I tell which pictures have both raw and jpeg?

    if I import with jpeg as master, how can I tell which photos also have a raw version?

  • How to buy Acrobat 9

    Hi, I'm not shure, but I think I can buy an older version of Acrobat X (which prices over 300€). If I've understood, the price of Acrobat 9 is over 25€, downloadable after the payament. It is right? If I buy this version, I will have the serial numbe