I get a real wierd error during production Order confirmation.  The error message is
"Additional items are not allowed
Message no. ZOAL010"
Can anyone throw some light on this?
Regards
Raj

it is not std SAP message.
you can check the user exit for confirmation.
check in transaction code CMOD/SMOD for CONF*

Similar Messages

  • Error during Production Order Confirmation mfbf ( backflush)

    in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume  so please regards this problem
    with warm regards
    pritpal singh

    Dear Pritpal,
    sorry dear,today i cant check  my inbox immediately. Anyway my mail id is [email protected]
    have checked as per my previous post.
    regards
    pradeep

  • Error during production order confirmation - costing related

    Dear All,
    When i am confirming a production order through CO15 following error is coming and system is not allowing to proceed further
    Enter rate EUR / SAR rate type M for 01.01.1998 in the system settings
    Kindly guide me how to avoid this error

    Dear,
    Please go to OB08
    Then enter the details Currency Type M
    Then put the valid date from date
    Then put the currency from
    Then put the currency to
    in last columan put the rate
    as
    Exc rate   Valid From              Ratio(From)            From                                Dir.Quot                   Ratio               To
    M              01.01.2011    X        1                           AED (Currency)      =                         x             1                    EUR (Currency)
    Thanks,
    MS

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Serial nos entry during production order confirmation in CO15 - User Exits

    Hi all,
    Is there any user exit existing for a serial nos screen pop-up during production order confirmation.
    Regards,
    Sravan Kumar V

    Hi,
    For serial numbers at the time of goods receipt, u have to activate sr. no. mgt for that particular finished product. This can be done by assigning sr. no. profile in the material master record of that material in work scheduling view. once this is done , system will automatically prompt for sr. nos at the time of goods receipt. I am not aware about any user exit.
    Thanks & Regards,
    Vijay Patil

  • Equipment as PRT's during Production Order Confirmation

    Hi Gurus,
    During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
    The operation is showing CNF status as well the Order.
    How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
    Regards
    Nilesh

    I use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
    Thank you so much for your response.
    Regards
    Nilesh

  • Recording shift during Production order confirmation

    Hi All,
    Is there a way I can record the shift during production order confirmations using CO15, CO11 or CO11N? I do not see the shift field in the confirmation screen.
    Thanks & Regards
    Subbu SP

    Dear,
    If you don't want to use the standard functionality of SAP or you are on lower version then you can go ahead with  enhancement.
    CONFPP07   Single Screen Entry: Inclusion of User-Defined Subscreens  by using this you can define shift in confirmation.
    For more details refer this link,
    Re: Shift usage in confimation.
    << Moderator message - Point begging removed
    Points unassigned >>
    Regards,
    R.Brahmankar
    Edited by: Rob Burbank on Oct 20, 2010 4:28 PM

  • Error during Production Order release

    Hi Experts,
    When I am releasing one production order follwoing messege appearing.
    Error during availability check for order xxxxx (see log)
    co02>goto> logs--> release
    Date 22000504 lies after the end of the valid factory calendar (please correct).
    I have checked routing, pv, bom etc. availability check indicator 02 is alreadly maintained in mm03. Earlier we have confirmed several order of this material in the past, now suddenly this error is appearing.
    Kindly help me to solve this problem.
    Regards
    GR

    Hi,
    Chk for following :
    01. Timings in Routings/Factory calender
    02. Chk for all components in order . It may be possible that one of component is having some MRP elelment dated beyond factory calender
    03. Also chk all receipt /issue elements with dates .
    Regards,
    Milind.

  • Batch split  during  production order confirmation

    Hi All,
    This is the process which  is followed  at our  customer  end, they want  to  split the batches  during  confirmation,
    1.Production order created
    2.While  going through each operation, some components are failing in the in-process inspection and  they need to be quarantained  for  further  process,(it may be rework, scrap, etc)
    3.Now  the  question is  we  want  to create  individual  batches, say  for  example out  of  100qty  which went  operation number 10,   50  were found  to be o.k.  and  the  remaining  50 are  having  defects, we want  to  create  two  different  batches  for this  scenario at  the  time  of  confirmation.
    Is there anyway  in SAP todo  this , like userexit
    Has anybody  has  gone through  similar  scenario's
    Thanks in advance
    Regards
    Venkat.

    Dear Vanket,
    In the operation you can confirm Yield, Scrap and rework quantity.
    In your case in each operation you need to create a batch for each qty what you enter.
    As I told you before batch can be created either production order release or during GR.
    In each operation you are not going to perform GR, hence batch creation is not possible.
    You have 2 options as I see.
    1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
    You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
    If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
    2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
    You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
    If you ask me if you need to strict process to represent your case you need to go for first case.
    Please go through the above carefully and test the cycle and come back if you need any clarification.

  • Error during Production Order creation

    Hi All,
    Our's is MTO scenario. We have maintiain Account Assigment Category as 'M' in Requirement Type. During creation on production order with ref to sales order system gives error "Account assignment cannot be carried out because of different origin no."
    If I create the production order with ref to quotation system does not gives any error. But my requirement is to create the prod order with ref to sales order.
    Please guide
    Regardsd

    Hi Bala,
    In SPRO goto>Sales and Distribution> Basic Functions-->
    Availability Check and Transfer of Requirements
    -->
             Transfer of Requirements
    -->
                 Define Requirements Classes
                 Define Requirements Types
      -->      Determination Of Requirement Types Using Transaction
    Determination Of Requirement Types Using Transaction
    In the standard system, requirements types are determined according to a specific search strategy beginning with the material strategy group.
    Strategy for Determining the Requirements Type
    1. First, an attempt is made to find a requirements type using the strategy group in the material master.
    2. If the strategy group has not been maintained, the system will determine it using the MRP group.
    3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
    4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
    5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
    6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
    Note
    You can select an alternative search strategy in the 'Source' field, for example a transaction-related procedure for determining requirements type (source = 1 or 2). 
    Example
    There are business transactions, such as consignment stock processing, in which the material with its planning characteristics is not important, rather the transaction itself. An issue from the customer's consignment stock should not trigger an availability check against planning at the plant as layed down by the planning strategy but rather against special stock.
    Actions
    1. Assign the item categories and MRP type to the requirements types.
    2. Select an alternative search strategy in the 'Source' field if necessary.
    By assigning the 1 or 2 to the Source you can have the requirements in MD04 refered to order instead of the initial source document which is usually quotation. If we don't assign this then the system by default refers to the initail document created i.e. Inquiry or Quotation whichever is the first document.
    Regards,
    Karthik.

  • Error during Production order settelment

    I am getting error while settlement of production order " GL Account required valid Tax code",
    waiting for your advice.
    Thanks

    1. This should be solved by the FI consultant.
    2, Check the setting of the Tax in teh  Control data tab of the respectiev Gl account in FS00.
    let me knw the feedback
    reg
    satheesh

  • Serial Nos entry for FG during Production order confirmation in CO11N

    Hi all,
    Can anybody explain me how can we confirm the assemblies serial no wise for FG in CO11N.  this is a stringent requirement for my client.
    Withthis  they can track which assembly n upto which operation was that confirmed.
    Thank you

    Hi,
    In OIS2 define a profile and assign procedure PPAU and configure PPAU as
    usage = 03,
    EQ re = 01.
    Assign this profile to assembly as well as product, that profile u have to assign it in material master work scheduling screen.
    Now when you go for confirmation in co11n system will ask you the serial no.
    Now you do the confirmation...you can get what you described.
    This is a standard Sap functionality.First do confirmation and then do goods receipt in MB31 where you assign serial numbers.
    OR.
    An other way is go to COIB here u have to enter the the serial number and material then it will display the this serial number generated against which production order.and if ur generating number of serial number against single production order then it will dispaly all serial number.
    COIB -
    > enter material number and serial number -
    > click on list<>tree--
    >again enter the serial number and material -
    >click on explode it will display the production order and if number of serial numbers are their then it will display at the bottom
    Please check it and refer to below link
    http://help.sap.com/saphelp_470/helpdata/en/dd/f8c817b3f911d1896e0000e8284931/frameset.htm
    Hope will work for you.
    Regards,
    R.Brahmankar

  • Serial number assignment to components during production order confirmation

    Dear all,
    When confirming a production order (Tcodes CO11, CO11N, CO15) the user should have the possibility to add serial numbers for components directly in the goods movements overview.
    A modification for that is describe in the SAP Training documents SCM 310, p. 485-487.
    Do you have any details on the described modification and/or any experience with similar modifications?
    Thank you in advance.
    Best regards,
    Klaudia

    Hi friend,
    Use t-code OIEN... Thr u can see the external number range given for various groups of equiments..
    hope this will help.
    Regards,
    Ravi Thakkar
    INCAT

  • Scrap During Production order confirmation.

    When I Put scrap qty in Co11 screen or co15 Screen, Is movement type 551 gets automatically activated??What are the accounting effects and by what transcation can I see these accounting effects.

    Hi,
    Please check production order header screen Go to --> documented goods movements.
    Regards
    Ranga

  • Error during production order released

    The profile selected for the  capacity availability is not suitable error comes during po released.
    Pls tell me how to resolve it

    Dear
    Maintain the Capacity Overall profile SAPSFCG011 in Production Scheduling profile in OPKP and the same prod. schduling profile to be assigned in Material master work scheduling view. Please check and revert.
    Regards
    Ganesh.M

Maybe you are looking for

  • Pointers regarding Currency handling in BI

    Hello All, I am having difficulty in getting to grips with how currency is handled in queries. There is a vast amount of resource out there but I am just starting out on this road of discovery and am looking for a few basic questions answered and als

  • Supplier Open Iterface Import

    Hi I am using Supplier Open Interface Import to import the list of vendors. On running the concurrent request if fails with the following error. ERR REP-1419: 'beforereport': PL/SQL program aborted. Do someone know the cause. Are there any special re

  • Remote Class Mapping

    This may be just me or possibly a bug in Flex, I have a remote class and a local class and using AMFPHP the classes should map in Flex without a problem and it works... but only if I have a reference to the local class somewhere in the script block.

  • Safari 3.2.1 and Mac OS 10.4.11

    I have reached the point where Safari (current version for Tiger) on Mac's running 10.4.11 (with all current updates) is totally unusable. It simply quits responding to calls to load web sites. I cannot even quit Safari using the Safari Quit Safari m

  • Two Computers two itunes libraries... 1 Iphone

    I have two computers - 1 iphone and 2 itunes libraries... is there an easy way to make the two Itunes libraries sync, so i don't have to constanly make sure both libraries match, so it doesn't delete the stuff i want, and so podcasts etc don't downlo