Error during Production Order release
Hi Experts,
When I am releasing one production order follwoing messege appearing.
Error during availability check for order xxxxx (see log)
co02>goto> logs--> release
Date 22000504 lies after the end of the valid factory calendar (please correct).
I have checked routing, pv, bom etc. availability check indicator 02 is alreadly maintained in mm03. Earlier we have confirmed several order of this material in the past, now suddenly this error is appearing.
Kindly help me to solve this problem.
Regards
GR
Hi,
Chk for following :
01. Timings in Routings/Factory calender
02. Chk for all components in order . It may be possible that one of component is having some MRP elelment dated beyond factory calender
03. Also chk all receipt /issue elements with dates .
Regards,
Milind.
Similar Messages
-
Error during production order released
The profile selected for the capacity availability is not suitable error comes during po released.
Pls tell me how to resolve itDear
Maintain the Capacity Overall profile SAPSFCG011 in Production Scheduling profile in OPKP and the same prod. schduling profile to be assigned in Material master work scheduling view. Please check and revert.
Regards
Ganesh.M -
Error during Production Order Confirmation
I get a real wierd error during production Order confirmation. The error message is
"Additional items are not allowed
Message no. ZOAL010"
Can anyone throw some light on this?
Regards
Rajit is not std SAP message.
you can check the user exit for confirmation.
check in transaction code CMOD/SMOD for CONF* -
Unique serial number during production order release for FG materials
Hi,
Actually our client is asking for serial number generation for each FG material during its production order release.
So that with this serial number he can track it in shop floor plus after dispatching to customer.
Here the scenario is Make To Order, this serial number will also be considered by SD during dispatch.
For serial number creation, I referred documents from SAP best practices(help.sap.com).
After this, now I am able to create serial number for specific material automatically.
Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - - - according to production order releasing sequence.
Plz inform if any settings are to be made.
Thank you in advance.Hi Arman,
I Had got solution for how to track which FG is linked to which SFG sr no, just go through the below link it also gives how to use COIB transaction.
COIB transaction usage, how to track which FG is linked to which SFG sr no
But still I had not got solution for
how to assign common serial number for all FG codes automatically
Ex:- Sr No- 1 -> FG1,
2 -> FG1,
3 -> FG2,
4 -> FG1
- - - - according to production order releasing sequence.
Whether is it automatic serial number assignment is possible or not.
Plz inform if any settings are to be made.
Thank you in advance. -
Serial number during production order release
Hi,
Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - according to production order releasing sequence.
Plz inform if any settings are to be made.
Thanks,
regards,
B C GudageriThanks Glenn Larson,
This is the first time for me for creating serial number for FG materials.
Actually our client is asking for serial number generation for each FG material during its production order release.
So that with this serial number he can track it in shop floor plus after dispatching to customer.
Here the scenario is Make To Order. So this serial number will also be considered by SD during dispatch.
For serial number creation, I referred documents from SAP best practices(help.sap.com).
After this, now I am able to create serial number for specific material types automatically.
But here the condition is client wants serial number should not be specific to material codes but should be common throughout the plant for all FG codes.
Ex:- Sr No- 1 for FG1,
2 for FG2,
3 for FG2,
4 for FG3
- according to production order releasing sequence.
Me dont know about Presort and IMB serial numbers.
Please tell me the appropriate approach I can make or any of links which I can refer.
Regards,
B C Gudageri -
Error during Production Order creation
Hi All,
Our's is MTO scenario. We have maintiain Account Assigment Category as 'M' in Requirement Type. During creation on production order with ref to sales order system gives error "Account assignment cannot be carried out because of different origin no."
If I create the production order with ref to quotation system does not gives any error. But my requirement is to create the prod order with ref to sales order.
Please guide
RegardsdHi Bala,
In SPRO goto>Sales and Distribution> Basic Functions-->
Availability Check and Transfer of Requirements
-->
Transfer of Requirements
-->
Define Requirements Classes
Define Requirements Types
--> Determination Of Requirement Types Using Transaction
Determination Of Requirement Types Using Transaction
In the standard system, requirements types are determined according to a specific search strategy beginning with the material strategy group.
Strategy for Determining the Requirements Type
1. First, an attempt is made to find a requirements type using the strategy group in the material master.
2. If the strategy group has not been maintained, the system will determine it using the MRP group.
3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
Note
You can select an alternative search strategy in the 'Source' field, for example a transaction-related procedure for determining requirements type (source = 1 or 2).
Example
There are business transactions, such as consignment stock processing, in which the material with its planning characteristics is not important, rather the transaction itself. An issue from the customer's consignment stock should not trigger an availability check against planning at the plant as layed down by the planning strategy but rather against special stock.
Actions
1. Assign the item categories and MRP type to the requirements types.
2. Select an alternative search strategy in the 'Source' field if necessary.
By assigning the 1 or 2 to the Source you can have the requirements in MD04 refered to order instead of the initial source document which is usually quotation. If we don't assign this then the system by default refers to the initail document created i.e. Inquiry or Quotation whichever is the first document.
Regards,
Karthik. -
Error during production order confirmation - costing related
Dear All,
When i am confirming a production order through CO15 following error is coming and system is not allowing to proceed further
Enter rate EUR / SAR rate type M for 01.01.1998 in the system settings
Kindly guide me how to avoid this errorDear,
Please go to OB08
Then enter the details Currency Type M
Then put the valid date from date
Then put the currency from
Then put the currency to
in last columan put the rate
as
Exc rate Valid From Ratio(From) From Dir.Quot Ratio To
M 01.01.2011 X 1 AED (Currency) = x 1 EUR (Currency)
Thanks,
MS -
Error during Production order settelment
I am getting error while settlement of production order " GL Account required valid Tax code",
waiting for your advice.
Thanks1. This should be solved by the FI consultant.
2, Check the setting of the Tax in teh Control data tab of the respectiev Gl account in FS00.
let me knw the feedback
reg
satheesh -
Error during Production Order Confirmation mfbf ( backflush)
in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume so please regards this problem
with warm regards
pritpal singhDear Pritpal,
sorry dear,today i cant check my inbox immediately. Anyway my mail id is [email protected]
have checked as per my previous post.
regards
pradeep -
Change Work Center during production order confirmation
Dear All,
I must to modeling this situation:
I created an production order. In routing I used an work center A.
After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
Thank you for your answer!
Regards,
Marianonce a Order is released, the Process order detaisl for that order is frozen.
however if you want to do it, change the order status to CRTD after reversing the Movements done.
Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
if the change is long term.
or
Just manually add the new work center and do the processing. if the change is temporary. -
Batch split during production order confirmation
Hi All,
This is the process which is followed at our customer end, they want to split the batches during confirmation,
1.Production order created
2.While going through each operation, some components are failing in the in-process inspection and they need to be quarantained for further process,(it may be rework, scrap, etc)
3.Now the question is we want to create individual batches, say for example out of 100qty which went operation number 10, 50 were found to be o.k. and the remaining 50 are having defects, we want to create two different batches for this scenario at the time of confirmation.
Is there anyway in SAP todo this , like userexit
Has anybody has gone through similar scenario's
Thanks in advance
Regards
Venkat.Dear Vanket,
In the operation you can confirm Yield, Scrap and rework quantity.
In your case in each operation you need to create a batch for each qty what you enter.
As I told you before batch can be created either production order release or during GR.
In each operation you are not going to perform GR, hence batch creation is not possible.
You have 2 options as I see.
1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
If you ask me if you need to strict process to represent your case you need to go for first case.
Please go through the above carefully and test the cycle and come back if you need any clarification. -
Costing Error in Production Order
Hi
I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
No itemization available for the corresponding material on the plant.
Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
Thanks in Advance.Hi
If you are creating first time production order for the material using standard price you have to do standard cost estimate using ck11n
In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to and execute..Here only system asks for Itemisation.. Just press enter.
After that Update standard price using ck24
mark and release your standard price for the materail..
Reward points if useful..
Regards,
MSH -
Error in production order cancellation
hi all,
i got an error message during production order confirmation cancellation.
Confirmed activity must not be smaller than 0,Message no. RU033
please suggest me what is the rigt way to solve the problem.
details:
i have two operation 20 & 40.
20 - is final confirmed
40 - is also final confirmed , i need to cancel it.
regards
nirmalDear,
When you enter operation confirmations you can also to enter negative
activity quantities that are larger than the already confirmed actual
activity of the already before entered confirmations.This problem can
only occur when you entered the services in a unit that is not equal
to the unit of the respective activity.
If you want to enter a further confirmation, the system might issue
message RU033 "Confirmed activity must not be smaller than 0 (check
entry)".
Or it could be due to program error. In that case we need to raise to SAP
Regards,
R.Brahmankar -
Batch no assigning during production order creation
Sir,
We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
Kindly help
Regards,
PSHi
For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
This is easy to handle.
Please check and come back
Regards,
srihari -
Preview and print a printout in production order release
Iu2019m using CO02 to release and save the production order. Currently u201Cbatch cardu201D printout is automatically printed in production order release. I want to change this to preview the printout before printout is send to the printer. Can someone tell me the configuration for this.
Hi
Pls refer this link
layout adjustement in production order- suitable to printout sheet
Print Preview of Production Order
layout adjustement in production order- suitable to printout sheet
Thanks
S.Murali
Maybe you are looking for
-
Hello, I have two series in a line chart the first is January through December (2006) the second is January through June (2007). The Second Series drops to zero for the missing months (July-December 2007). My X Axis is Month. Any work arounds? Thanks
-
Windows Server 2008 R2 - When svchost.exe memory-leaks Outlook does not load properly
Hi all, We have a server which runs Windows Server 2008 R2, fully updated, and acts as a Terminal Server (Citrix XenApp 6.5). In the past couple months we have had problems with svchost.exe leaking memory, growing to 2-3GB of RAM usage. Sometimes is
-
I am trying to build a search box that appears on every page, so putting on page zero would seem to be the right thing to do. Unfortunately the submit button that goes with the box only works on page zero, for every other page the application complai
-
No disrespect to Spiceworks, but Inventory is a cluttered mess. When it comes to Asset/Inventory management, I would look into something like Lansweeper. It's a far better solution. http://www.lansweeper.com/
-
Elements 9 - Crashes when entering 'Create' tab
I don't know what to do; but each time that I try to enter 'Create' on the top right hand tab, Elements crashes. I am running a well configured XP machine and I am having no problems with Lightroom nor any other applications which I use daily. As th