Error during transferring PDS from ECC to APO

Hi,
When I transfer the PDS from ECC to APO, the follwing message is displayed. Can any one advise to overcome this issue.
Mode N50026289010001 001000000001 S is not assigne
Message no. CURTO1010
Diagnosis
The error described in the message 103 of message class /SAPAPO/CURTO occurred in SAP APO while generating the production data structure.
Procedure
You can find the associated message text in SAP APO in message 103 of message class /SAPAPO/CURTO.
thanks and regards
Murugesan

Hi,
I think you are transferring PDS through I-Model and I-Model is active for the required selection with SNP subcontracting parameter.
Ensure that the production version "check" status is green and with correct BOM (production) assignment.
If the I-Model is active, then you can also try sending the PDS using txn: CURTO_CREATE with SNP application.
Hope this helps
Thanks
Venkat DR

Similar Messages

  • Error during Proxy Processing from ECC system

    Hi All,
    I had created Webservice  using ABAP in ECC system with Message interface designed in XI system. This Webservice will simply displays employee address when you enter employee id and address type.During my testing of Web service in ECC system via Tcode WSADMIN, I am getting below error
    "An error has occurred. Maybe the request is not accepted by the server: "
    "Error during proxy processing"
    Request
    POST /sap/bc/srt/xip/sap/Z_ADDRESS_01?sap-client=100 HTTP/1.1
    Host: rpmsap3.rapidigm.com:8080
    Content-Type: text/xml
    Connection: close
    authorization: <value is hidden>
    Content-Length: 389
    SOAPAction: ""
    <SOAP-ENV:Envelope xmlns:SOAP-ENV="http://schemas.xmlsoap.org/soap/envelope/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xs="http://www.w3.org/2001/XMLSchema"><SOAP-ENV:Body><ns1:Request_Message xmlns:ns1='http://sap2webservice'><Employee_Id>MM01</Employee_Id><Address_Type>AM</Address_Type><Date>11/11/2006</Date></ns1:Request_Message></SOAP-ENV:Body></SOAP-ENV:Envelope>
    Response
    <SOAP-ENV:Envelope xmlns:SOAP-ENV="http://schemas.xmlsoap.org/soap/envelope/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xs="http://www.w3.org/2001/XMLSchema"><SOAP-ENV:Body><ns1:Request_Message xmlns:ns1='http://sap2webservice'><Employee_Id>MM01</Employee_Id><Address_Type>AM</Address_Type><Date>11/11/2006</Date></ns1:Request_Message></SOAP-ENV:Body></SOAP-ENV:Envelope> HTTP/1.1 500 Internal Server Error
    set-cookie: sap-usercontext=sap-client=100; path=/
    content-type: text/xml; charset=utf-8
    content-length: 270
    sap-srt_id: 20061111/154215/v1.00_final_6.40/A901A40749EEA74BB8D8AB72B56C02A7
    server: SAP Web Application Server (1.0;640)
    <soap-env:Envelope xmlns:soap-env="http://schemas.xmlsoap.org/soap/envelope/"><soap-env:Body><soap-env:Fault><faultcode>soap-env:Server</faultcode><faultstring xml:lang="en">Error during proxy processing</faultstring></soap-env:Fault></soap-env:Body></soap-env:Envelope>
    Appreciate any help on above issue
    Regards
    Manish Mundra

    Hi All,
    Please help on below issue.
    Thanks in Advance
    Regards
    Manish

  • Error during Initial Upload from ECC to CRM

    Hi All,
          I am getting an error while initial upload of BPs from ECC to CRM.
    I have BP groupings defined in  ECC. I had set the filter settings for a particular BP group(e.g. ZSIR). BP upload to CRM was successful. But, when I changed the filter setting to another BP group(ZDAC) those BPs were not copied to CRM.
    what might be the problem ?
    If anyone has any documents on initial & delta upload kindly forward it to me at [email protected]
    Any suggestions would be of great help !!!!
    Regards,
    Ashish

    Hi geetha check for the whther all the bp Data is down loaded or any thing missing after down loading to crm if that is the case due to data inconsistenmcy this ttype of error will occur, so you have to synchronize the both bp data
    manually after delta down loading.synchronization
    Reward
    Venkat

  • Issue in transfer of data from ECC to APO

    Hi All,
    I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
    How should I proceed...Please help....this is an urgent requirement
    Thanks & Regards,
    SriLalitha

    Hi,
    you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
    Determine Forecast of Replenishment Lead Time
    Use
    In this field, you specify how the extended safety stock planning determines
    the forecast of the replenishment
    lead time (RLT). The following values are available:
    Supply Chain
    The system determines the RLT forecast using the supply chain structure by
    adding the corresponding production, transportation, goods receipt, and goods
    issue times. If there are alternative procurement options, the system always
    takes the
    longest
    option into account.
    Master Data
    The system determines the RLT forecast from the location product master
    data.
    Master Data/ Supply Chain
    First, the system determines the RLT forecast from the location product
    master data. If no RLT forecast can be determined, the system determines the
    forecast using the supply chain structure (as described under
    Supply
    Chain
    Dependencies
    You can retrieve the replenishment lead time forecast yourself by using the
    GET_LEADTIME
    method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
    Replenishment Lead Time in Calendar Days
    Number of calendar days needed to obtain the product, including its
    components, through in-house
    production or external
    procurement.
    Use
    The replenishment lead time (RLT) is used in the enhanced methods of safety
    stock planning in Supply Network Planning (SNP). The goal of safety
    stock planning is to comply with the specified service level, in order
    to be prepared for unforeseen demand that may arise during the replenishment
    lead time. The longer the RLT, the higher the planned safety stock level.
    Dependencies
    The field is taken into account by the system only if you have specified
    master data or master data/supply chain in the RLT: Determine
    Forecast field of the safety stock planning profile used.
    Hope this helps.
    The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
    May be if you maintain the setting in the profile, you may get the value in RELDT.
    Thanks.

  • Handling Network failure during data transfer from ECC to PI

    Hi,
    We have created a custom program in ECC to push invoice header information to PI using the proxy call.
    We're able to successfully now push these data to PI without any issues.
    However, there is a comment from client like if there is an unexpected error such as system or network failure during transferring data from ECC to PI, then how is it being handled from ECC side?
    I'm left with no answers. I know the messages will be stucked in SMQ2 or SMQ1 but we need to find out how can resend those data to PI in case of such failures. Documents in ECC are either posted or parked or payment totally based on real time process and based on each ECC event such as parked or posted or reveresed, we are sending one message to PI respectively. But how can we resend these invoices incase of an unexpected error?
    If we go with an ad hoc process, how do we implement this process for each document which is being created or rejected.
    Thanks,
    Shamim

    Hi,
    The queue will automatically restart if the problem was connection issue. In case of system failure you need to check and start them manually.
    check http://help.sap.com/saphelp_nw04/helpdata/en/f3/df5f3cb0decb09e10000000a114084/content.htm
    To check for any problems you can use CCMS monitoring.
    check http://help.sap.com/saphelp_470/helpdata/en/52/12f73b7803b009e10000000a114084/content.htm
    Hope this will help you.
    Regards
    Vinit

  • Trnasfered plant from Ecc to APO, but location not found

    Transfered plant from Ecc to APO, but the location is not available in APO Master data

    HI
    1.Check the Integration models which you created for the plant
    2.go  to CFM5 TICK THE PLant on the left side and give the plant in the right side box under plant textbox and Execute
    Now u will get a screen on the left side double click on plant and then u will find your plant.
    Select the plant and click on the icon of check
    now if u find any Integration model and the plant is active then do Intial Transfer for the Integaration model.
    otherrwise add the plant in the integration model and do Delta transfer for plants integration model
    Sunil

  • How to delete Master Data transferred from ECC to APO via CIF

    Hi, all
    I'm connecting SCM 5.1 with ECC 6.0 via CIF.
    When activating Integration Model in ECC, the following error occurred;
       "Location 0001 of type 1001 (BSG 592BUSGP) already exists in APO"
    This is because Location 0001 was already transferred from different ECC client via CIF, and not cleared.
    I'm now trying to initialise master data transferred from ECC to APO via CIF, but in vain.
    I suppose I have to first delete all master data CIFed from ECC in APO, or have to execute initialisation of APO master data with ECC data in ECC.
    Please tell me how to do this.
    For details, please read the followings;
    I connected APO client with ECC client 590.
    I transferred Plant and Material Master from ECC to APO via CIF.
    After that, I wanted to change ECC client from 590 to the other.
    I created the other client (592) by client-copying from 590 with SAP_ALL copy profile.
    I deactivated Integration Model in ECC 590, and activated the same in ECC 592.
    Here, I faced the problem.
    The initial data transfer failed due to the duplicate of data.
    Now I'm wondering how I can initialise master data in APO and transfer initial data from ECC.
    Due to testing purposes, I have to change ECC clients from one to the other this time, but I cannot initialise master data in APO and cannot tansfer initial data from different ECC client.
    thanks in advance,
    Hozy

    Hi all,
    Thank you very much indeed for lots of your replies.
    Thanks to all of your advices, I'm getting to understand what to do.
    Well, I'll say I have to create one more client for testing with other ECC clients or I have to rebuild the client by client-copying from 001 and implementing all transportation requests, for marking del flags to each master data and running del programme sound like tough work, and sound like odd ..
    Then, I've got next issue here.
    In SCM-APO, I use BI objects, and , if I have to create several clients for testing, I have to set up clients where you can use both BI objects and CIFed master data.
    I suppose I have to change 'BWMANDT' in RSADMINA and make RSA1 accessable in other SCM clients and implement tests.
    Also, I have to register BI System for newly created SCM clients in RSA1-SourceSystem.
    Well, if you have any experiences on this kind of use, and if you have any advice on it, please give me any tips.
    Particulary, I'd appreciate very much if you give me advice on which way you have chosen; creating several clients or rebuilding the one client in SCM-APO when you use both BI objects, CIFed master data and Demand Planning.
    Thanks in advance.
    Hozy

  • Vendor product relation not transfered from ECC to APO

    Hi,
    I am new to APO.
    We are transferring the info records(me13n)  details from ECC to APO by CIF .
    But in APO system , when I check the product for the location(/sapapo/mat1)  it says the product is not created for vendor.
    but this details are present in info records in ECC.
    Hence currently, we are manually creating the products for vendor.
    Is there any BADI where all vendor-product link can be transferred

    Hi Rachel,
    You can use BAdI: /SAPAPO/CIF_ENHANCE_TPSRC (method CHANGE).
    Take a look at SAP Note:
    1873917 - CIF Purchasing Info Record - Product does not exist at
    Vendor location
    I never used that BAdI, but we made something similar. We made an enhancement some time ago to extend the Product at the Vendor Location. This was done for subcontracting at the time the PPM was transferred. I am not sure if this is your case, because you just mentioned that you needed for a vendor. If it applies, please check here:
    483358
    - Subcontracting: creating product masters automatically
    Kind Regards,
    Mariano

  • Error while transferring materials from R/3 to APO

    I am getting an error while transferring materials from R/3 to APO , the error is on the SCM side and its "NOEXEC"  , the inbound queue has been blocked . what might be the problem

    Hi Raj,
    I think that you have RFC problems, you need to check this with your basis team, i give you a thread that talks about the same problem.
    Regards.
    Marí

  • How to transfer Sales BOM from ECC to APO DP

    Hi,
    Demand planning require Sales BOM from ECC. Sales BOM in ECC will not have Routing & Work center, then how a PPM with Sales BOM can be transferred.  If i have to create a dummy routing & WC for those sales BOM it will be tidious job to create all the master data. Is there any way to transfer the BOM alone from ECC to APO.
    Please throw some light on it.
    Thanks & Regards
    Shan

    Hi Somnath / Ritesh,
    Are you sure about ciffing Sales BOM(usage 5)to APO as PDS ? Did you test it or your comments are based on SAP documentation?
    I tried to CIF Sales BOM as SNP PDS, it is creating PDS with only parent item.Child items are missing.I have not used any production version here.
    If i use production BOM(usage 1), it is creating PDS with both parent and child items.I have not used any production version here also.
    SAP says BOMs can be ciffed to APO as PDS. No productions versions are required. but it has not mentioned about BOM's usage. May be , Is it by default production BOM?
    One more question, Is it possible to create production version with BOM usage 5? It has no meaning right..
    I think system does not allow you to create production version with BOM usage 5.
    I also tried with BOM usage 2. In this case also it behaves like sales BOM.
    looks like only production BOM can be ciffed with proper BOM structure in APO.
    if required i can send you the link to share screen shots.
    Pls comment..
    regards,
    Umamahesh

  • Transfer of PIR from ECC to APO - Time stamp

    Hi Friends,
    We are transferring Planned Independent requirements from ECC to APO through CIF.
    In APO Product view Forecast requirements Date is sync fine with ECC date however the time is setting default to 03:00:00 am.
    we want the time to be set to 06:00:00 am by default.
    How we can we archive this?
    Regards,
    Krish

    Dear Tiago,
    I changed Product view Time zone settings, and issue resolved.
    Thanks for your valuable reply. Awarded you the points.
    Regards,
    Krish

  • Transfer product division from ECC to APO

    Hi Experts,
    To transfer product division field from ECC to APO, I have made changes in FM EXIT_SAPLCMAT_001 to add entry in table OT_CIF_MATKEYCUS. And it is populating record correctly.I have added a field for product division in table /SAPAPO/MATKEY.but product division field value is not transfered to APO side. Is there any change I need to do at APO side ??

    Hi,
    have you checked documentation for FM EXIT_SAPLCMAT_001? It's written there that you need to implement user exit APOCF005 in SAP APO.
    Cheers

  • Problem during hierarchy load from ECC 6.0 to BW

    Hello,
    I encountered a problem during hierarchy loads from ECC to BW:
    I get the following in BW:
    Error when updating Idocs in Source System
    Diagnosis
    Errors have been reported in Source System during IDoc update:
    Once I go into ERP and look at the IDocs I get the following message:
    Idoc Error 26:
    EDI: Syntax error in IDoc (segment cannot be identified)
    Message no. E0078
    Diagnosis
    The segment E1RSSH does not occur at the current level of the basic type (extension ).
    This error can have several reasons:
    The segment E1RSSH is assigned to a group whose header segment does not occur.
    The segment E1RSSH does not exist in the syntax description of the basic type  (extension ).
    The sequence of segments in the group in which the segment appears is incorrect.
    Previous errors ('mandatory' segment or group missing) may be due to this error.
    Procedure
    Please check the IDoc or the syntax description of the basic type  (extension ).
    Can anyone help?

    The most basic setting in a BW system is its connectivity with the R/3 system (which is a basis team activity, but BI consultant can always help).
    Issue: While creating source system, I am getting an error "Segment E1RSSH does not exist".
    Diagnosis
    Segment E1RSSH is in the syntax description, but it does not exist.
    The issue was that some of the entries in the table EDISEGMENT were missing.
    As this a standard table, it is recommended to restore the table from Backup or from another BI system. (Please ask your basis team to do it.)
    Now, the significance of the segments: We all know that we require 3 message types in total to communicate with R/3 system. RSRQST, RSSEND and RSINFO.
    Now each of the message types has some segments which help in communication.
    You can see this segment types in the t-code we30. Just enter the basic idoc type and click on display.
    This error is not a common error, but can be useful if at any stage of implementation or support, the table gets disturbed and you have issues with source system connectivity.
    Thanks
    SM

  • Problems when trying to transfer location from ECC to APO

    Hello,
    I am trying to transfer some locations from ECC to APO via CIF, but a system error appears: "Message no. SR053, data error for the location address 1000". For this reason I have not been able to transfer any location to APO. Could anybody tell what could the problem?
    Thanks in advance,
    David

    Hello Tiemin,
    Thanks for your answer. Based on your answer we changed some settings and now we are able to transfer locations from ECC to APO, but the error message is still showing, so even tough the error is not stopping the transfer now, we are not able to find what could be the problem.  Any more ideas about what we need to check?
    Thanks againg for you help.
    David.

  • How to CIF enterprise Change Management ECM, from ECC to APO

    Dear All.
    I am facing problems during CIF process for ECM (Enterprise Change Management) from ECC to APO.
    Every change into Material Master, BOM, etc, we must to create one Change Number (CC01) and link with the master data that we are changing.
    But when we are changing the BOM status to 02 - Inactive for a specific period, and then transport this information from ECC to APO using Core Interface, into APO the BOM, in this case PPDS, will be changed for the Whole Period. It means that the PPDS will be set as Inactive into APO being set to become inactive in the future on ECC.
    Thank you all.

    Somebody knows where I can found information regarding Core Interface for ECM (Enterprise Change Management).
    Thank you all.

Maybe you are looking for

  • Interfaces in ABAP

    Can any one tell me how to handle interfaces in ABAP. i would like to know what r all methodology  or technology we can use like RFC,IDOC,BAPI,ALE,BDC. Thanks in advance

  • Dts and ac3 - incompatible format

    I have been given some pre-encoded dts and ac3 (5.1) files that were encoded on a windows audio encoding system. DVDSP gives me the "incompatible format" message and cannot import them. I suspect the data itself is fine, and there is problem with the

  • Bluetooth settings

    This should be an easy one, but I can't get it to work. Is there a way to make "bluetooth enabled" the default option on my 8830?  Whenever I "enable" it in Manage Connections, it stays "enabled" for a while, but seems to have reset to "disabled" whe

  • Excel attachment using Wendynpro application gives error

    Hi All, We have implemented the WebDynpro application which uses the Excel attachment from local PC. This application can attach new Excel attachments & read the existing Excel attachments.  This functionality works fine in our Development Environmen

  • Best book for WebLogic server 8.1

    Hi all, I am sorry for posting this message here but please ignore and might kindly be kind to help me. I have a new job where i have to use weblogic 8.1 and Eclipse as IDE. I have an idea on Weblogic Server 8.1 Platform which comes as a package incl