Error: Factory Calendar Not In Buffer

Hi all.
I am rtrying transaction CO15 to confirm order, but it giving error RU017: Factory calendar not in buffer. Contact system administrator.
I have checked all assignment, it is correct. factory calendar correctly assigned to plant. Can anyone help me...
Thanks.

Hi Puru,
Check the release date of the production order and the date on which you are trying to confirm, see that there is a valid factory calender available for that day (Plant assignment or the factory calender assigned to the Workcenter of the operation you are trying to confirm)
Hope this helps...Reward your points if so,
Regards,
Prasobh

Similar Messages

  • Please Help Me!  Encore giving error message on Build:  "fatal error", Code: "6", note: "video buffe

    Hello,
    I have been trying to build a project (a 50gb Blu Ray disc) for the last couple of days and I keep getting an error message I have never gotten before.  The error says: "fatal error", Code: "6", note: "vide buffer underflows  Total bitrate is too high near..."
    I don't know why this is happening.  I build this entire project from the ground up once before using the exact same assets but I accidently deleted that project file so I had to put it together again.  But it was practically identical.  And it would build the project just find.  I deleted the cache folder.  I deleted the main video timelines and recreated them.  I made sure the transcode settings for bitrate were not too high.  I did everything I can think of.
    Can someone please help me?  I have no idea what to do now.  The frustrating thing is that the error message doesn't tell me what asset the problem is with or anything.  This is a rather complicated project.  I have two full length movie files (about 90 minutes each) and seven video special features.  I have five audio tracks and a couple of subtitle tracks.  I don't have any idea what asset is causing the problem!
    But I used all these same assets before and I built the project perfectly.  And it is not the subtitles because I deleted the subtitle tracks and I still got the error message.
    Is there any way of knowing what assets are causing the problem?  How can I fix this?
    I have a number of people who are waiting for the completion of this disc so I need to get this resolved pretty soon.
    Thanks.

    The error says: "fatal error", Code: "6", note: "vide buffer underflows  Total bitrate is too high near..."
    What is the rest of the error message?
    What version of Encore and what operating system?
    using the exact same assets
    What format? Already transcoded m4v/a3c 5.1 or what? Does Encore show them for Bluray as "Do Not Transcode"?
    What were the export settings, particularly bitrate?
    Is there any way of knowing what assets are causing the problem?
    Not through the error message.
    Rather than deleting elements to see what causes it, I would add elements (e.g. you got the error, deleted the subtitle tracks, and still had the error, leaving the possibilit that a cache or similar is contining the problem even if the subtitles caused it).
    So add just the menus and timelines, no extra audio, no subtitles,
    When starting a new project, make sure you are using a new name for the project.

  • Changes to Factory Calendar Not reflected in work schedule

    I have updated the exsisting factory calendar in PRD .
    Yet the changes do not seem to have taken effect. I have tried to regernerate the work schedule. However I'am not sure I have done that properly.
    Any assistance would be greatly appreciated.
    Thank you

    Hi.. you cant expect any change in the Factory calender affecting work schedules. If you want the work schedules to be updated with the holidays you need to be updating the holiday calender.
    Factory calender is mainly for Plant Schedules, Bank transfers in finance , etc

  • Factory calendar error (returncode = 3)

    Hi,
    I am trying to create planning for product group, but getting error Factory calendar error (returncode = 3)
    Message no. MA408
    I have checked the validity for factory calendor but it is found ok with valid upto 2013. and allocation of factory calendor with plant 1000. the same factory calendor with validity is observed.
    Pl help me out of this issue.
    Regards,
    Anil

    Dear,
    Please check  have you maintained different factory calendars in the customizing for SOP (Transaction MC7F for S076) and for the plant OX10.
    Please use same calendar in MC7F. and check again.
    Regards,
    R.Brahmankar

  • Maintenance Order & Factory calendar

    Hi,
       How to Link Maintenance Order & Factory calendar so that when i execute the 'Cost Evaluation' table
    S115, i will get cost for the maintenance order Activities for specified month based on factory calendar.
    Pleaes Let me know.

    PeteA,
         When i execute the maintenance Order in table S115 with input data fiscal year variant (Calendar Year 4/4/5) , Order type & Month (say 02.2009) system throws message "No table entries found for specified Key" .....
    But when i execute the same table with all input data except fiscal year variant (Calendar year 4/4/5), system gives the output of my order type.
      So i think Fiscal year variant should be maintained in Order. That procedure i want to know
    (Note: In Work center "Capacity' Tab, we can only assign the factory calendar; Not fiscal year variant(4/4/5 year)
      Pls let me know

  • Date not defined in factory calendar

    while creating the process order using the t - code COR1, i got error saying that " Date not defined in factory calendar "
    i extended the factory calendar in t - code SCAL.
    still i am facing the error.
    please help

    Ok Sudhir.
    Then the problem is one of the workcenter you are using in Production Order. The Intervals of available capacity are maintained in a work center capacity whose 'To date' is after the expiration date of the factory calendar. The error does not occur if the date is 12/31/9999.
    Go to workcenter - Capacity - Interval & shifts
    The 'To date' of an interval of available capacity must be maintained so that it is within the validity period of the factory calendar. The exception is the date 12/31/9999, which is allowed.
    Regards
    Abhijit Gautam

  • Error Msg_ME078 - DELIV. date outside period covered by factory calendar

    Dear experts:
    when i create PO with ME21N,
    if the delivery date is not within the year of 2010,
    there will appear an error msg "ME078 - DELIV. date outside period covered by factory calendar".
    i have checked the factory calendar with SCAL.
    i know how to modify the factory calendar to expand the time period,
    but now i still have a question,
    the system can't change the year period automatically?
    so we have to change the period after we confirm the public holiday calendar?
    thanks ~
    B/Rs
    Jamie

    hello~
    if the system can't update the calendar automatically..
    why the consultant didn't set the valid period to an  exaggeration year at that time?
    did they have any concern?
    thanks a lot~
    B/Rs,
    Jamie

  • Factory calendar error in service order

    Dear Guru's
    could any body help me in solving the below issue.i created the service notification in iw51 after that i clicked the service order tab then system gives the pop up mesage in that i mentioned order type,planning plant,business area,main work center after that i got the below error.
    Date 09.09.2011 is after the valid factory calendar period
    Message no. IW432
    Diagnosis
    You entered a date for which the factory calendar was not maintained in your factory.
    System Response
    Processing will not be continued.
    Procedure
    Enter a valid date.
    If you want to use the date rejected by the system as a valid date, you must maintain the factory calendar in your system with the help of the Customizing function:
    Proceed
    If you are not allowed to perform the function, contact your system administrator.
    from which master data system is picking the Factory calendar.
    how to solve the problem.
    Thank you in advance.
    suribabu.

    Thanks to every body.i solved the problem.

  • Error MSG '01/07/1900 date lies before start of factory calendar' in MD04

    Hi all,
    I have this error message when enter a particular material in MD04.  I know our factory calendar does not start in 1900, can anyone tell me how to clear this message?  I suspect there is a bogus data somewhere.  Can anyone help me how to fix it?
    Thanks,
    Lin-Lin

    Hi,
    For this particular material, there must be Orders which are created with this date.
    That is the reason, immediately after you input the material details an Press enter, in MD04 this  message will appaer.
    So, Check all the Orders (Better to check all the Receipts and Requiremnts as well) and Change the Date to current..
    One more information is this must be a for ecample a firmed Order like Production Order or a Firmed Planned Order etc..
    Check and revert for further discussion..
    Regards,
    Siva

  • Invalid factory calendar or error in the factory calendar

    When I am trying to post " Goods issue for consumption:" in T.code MB1A getting below error error
    Invalid factory calendar or error in the factory calendar
    I am made chages in OY05 still facing same issue. Please help me out.

    Hi
    The factory calender is not a mandatory field during configuration, but is required for IM postings to occure.
    Check and maintain factory calender:  SPRO\SAP ref IMG\Enterprise structure\Definition\Logistics general\Define, copy, check, delete plant.
    Regards

  • System does not propose the delivery date based on factory calendar

    Hi,
    I am creating a sales order for a delivery date for this sat which is (2/22/09)
    I have maintained 2 separate calendars for
    1) shipping point
    2) for the route
    The route has a transit time of 1 day and the calendar has sat and sunday as non working.
    the Shipping point has a pick/pack time of 1 day and the calendar has sat and sunday as non working
    The material is available in the warehouse
    Now when i create this sales order i enter the delivery date as 2/22/09, the system does not propose me the delivery date of monday (i.e 2/23/09) It accepts the 2/22/09 delivery date.
    In the schedule line i do see the date as 2/22/09 only.
    The delivery was created with the following dates
    Picking = 2/17/09
    Transportation Planning = 02/18/2009
    Loading =02/18/2009 
    Planned GI= 02/18/2009
    Delivery Date = 02/22/2009
    How can the system give me the delivery date of a sunday when the calendar doesnt allow sunday as working day.
    Also the route time is 1 day in transit so i am not sure why the system is proposing a 3 day transit time?
    Can any one explain the behaviour of SAP for the delivery date logic

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • Error while processing sales order as factory calendar missing.

    "factory calendar missing or error in factory calendar".iam getting this error while processing sales order even though i have assigned it to shipping point and plant and sales org.

    Hi Malik, How are you? I'm sorry to trouble you,
                   Let me introduce, I'm Daniel, and I saw your fantastic asnwer in
    the topic "How to update Factory Calendar in SRM", and might I have the same
    problem. It's with the "factory calendar".
    In transaction va02 when I choose a Delivery Date, and I sent it to process, as
    a result in the "shipping tab" it calculated to the first item one date, and to
    the rest one date different.  I don't know What it happen?
    I debugged the program and I saw that to the first item use to calculate the
    date is the function  'APO_SCHEDULING', and to the rest item use
    'SD_SCHEDULING', and until here I come.
    How can I do to what the dates calculated are the same? or What would be the
    problem?
    I need the dates calculated are equal.
    I looked at it's using two "factory calendar" which are "J4" and "C2". Is this
    correct?
    Thanks In Advance,
    My best regards,

  • SNP Planned order not following resource bucket capacity/factory calendar

    Hi gurus,
    SCM 5.0
    I am running SNP heuristics for a product and expecting planned orders for it.  It has corresponding production data structure and multimixed resource.  The resource has an assignd factory calendar and SNP bucket capacity.  The bucket capactiy availablity dates of the resouce is consistent with the factory calendar workdays/holidays.  Using simple lot for lot strategy, I am expecting heuristics to schedule the planned orders on the dates of the demand in compliance with teh SNP bucket capacity availability of the resource.  APO does not schedule on holidays consistent with bucket capactiy.  This is true until...
    We have a public holiday in factory calendar that needs to become a workday. To remedy this, we put a special rule for the factory calendar and explicitly made that holiday into a workday.  The changes were synchronized with APO, and this is also reflected in the bucket capacity of the resourc: former holiday now has bucket capacity after the calendar change.  However, when running heuristics, it still does not create SNP planned order on that former holiday that has been changed into workday.  Even if it is a public holiday, there is already a special rule for the factory calendar and the resource bucket capacity reflects this correctly. But SNP heuristics seems not to follow this change.
    Any ideas on this? looks like a bug.

    Hi Edgar,
    Yes, when your resource reflects the addional capacity of the holiday turned working day, then it is expected to be considered for the SNP planned order.
    Instead of SNP heuristics, you may try to check interactively in SNP planning book, if manual order creation in the bucket works out.
    Since this is a mutlimix  resource , it can also be checked if in PPDS planned order can be created on the day.
    The above checking may not solve your problem , but will get to know if at least manully the bucket is being considered or not.
    regards
    Datta

  • Need solution for the following sync error: "iTunes could not sync calendars to the iPad "iPad name" because an error occurred while sending data from the iPad"

    Need solution for the following sync error: "iTunes could not sync calendars to the iPad "iPad name" because an error occurred while sending data from the iPad"

    I want to add that I deleted all the old back-ups and created a new back-up without any issues except sync problem.

  • Calendar Server installation gets error "libnmspr20.dll not found"

    Calendar Server installation gets error "libnmspr20.dll not found"
    <P>
    When installing Calendar Server 3.5 on NT near the end an error
    occurs: "libnmspr20.dll not found " and then it will exit the setup
    without completion.
    This is a bug because it is looking for the libnmspr20.dll in the
    system path but the Calendar Server installation has left it in a
    temp directory. This does not occur if the Netscape Messaging Server
    has been previously installed on the same host. A workaround is, when
    the error message displays, you DON'T press ok, but search your
    computer for the missing file (usually found in temp-directory).
    You then copy the file to a directory in your system path. Now you
    can press the OK button and the installation will fail. Re-install
    the calendar server, this time the installation won't fail.

    Installing Latest JRE on NT4 sp6a produces the same error:
    InstallShield DLL Custom Action:
    File 'C:\TEMP\RegUtils.dll' can not be found. Make sure the file is on the target system or installed already.
    I searched www.installshield.com since the error is an installer error and the installer is InstallShield. NO results found there either.
    Seems like the installer team needs to brush up on the NT4 platform.

Maybe you are looking for

  • Photoshop Elements 7 Editor crashes upon opening any image

    I have been trying for 2 days to get my Photoshop to work. I've used PSE7 for years, no issues. Suddenly yesterday, every time I try to open an image in the full editor, I get the "Photoshop has stopped working... check online for a solution or close

  • OS X Upgrade path from 10.1.5 to 10.4.9

    I have a client who recently purchased a G4 [I think it's first-generation, it's running OS X 10.1.2. Today I was downloading system updates from the 'downloads' section and cannot find a link for OS X 10.2. Is that a paid upgrade? If not, how do I g

  • Adobe Premiere Pro CC crash on startup

    Hello i have a problem when i will open Adobe Premiere Pro CC it crash and i become this error Problem signature:   Problem Event Name:         APPCRASH   Application Name:          Adobe Premiere Pro.exe   Application Version:          8.2.0.65   Ap

  • Cant sync itunes on my iphone on my mac book pro

    Trying to sync purchased songs and it will not work. I think it recoginizes my husbands iphone as well. I dont want to erase my music

  • Explain plan, slow update

    We have two schemes in our database. One general and one history. When record in general scheme is modified trigger updates record in history scheme and inserts one new row in history scheme. There are indexes on columns that are used in updates(wher