Error in activity allocation

Hi Experts.
I am from HR area , i am executing an integrated scenario with controlling . While creating some master data , i am providing activity allocation details like company code , sender and receiver fucntional area and Fund id. I am getting an error " UNITS WITH DIFFERENT DIMENSIONS CANNOT BE CONVERTED" . Can anyone please help to resolve this problem.If you want the complete scenario description i can provide it .
Regards,
Balaji.D.N
Edited by: Balaji DN on Oct 7, 2009 8:33 AM

please check the unit of measure assigned in the activity type and unitof measure of Statistical key figure being used in the activity type.

Similar Messages

  • SOS:Booking the course with activity allocation error

    hi,everyone:
      when we  booking the course with activity allocation appear error message:
    Runtime Errors         SAPSQL_ARRAY_INSERT_DUPREC
    Except.                CX_SY_OPEN_SQL_DB
    Date and Time          2007.07.04 09:39:57
    Short text
        The ABAP/4 Open SQL array insert results in duplicate database records.
    错误分析
        An exception occurred that is explained in detail below.
        The exception, which is assigned to class 'CX_SY_OPEN_SQL_DB', was not caught
         in
        procedure "LSO_REFDOC_DBASE" "(FUNCTION)", nor was it propagated by a RAISING
         clause.
        Since the caller of the procedure could not have anticipated that the
        exception would occur, the current program is terminated.
        The reason for the exception is:
        If you use an ABAP/4 Open SQL array insert to insert a record in
        the database and that record already exists with the same key,
        this results in a termination.
        (With an ABAP/4 Open SQL single record insert in the same error
        situation, processing does not terminate, but SY-SUBRC is set to 4.)
    Missing RAISING Clause in Interface of:
        Program Name                            SAPLLSO_HRTEM00REFDOC
        Include                                 LLSO_HRTEM00REFDOCU07
        Row                                     1
        Module type                             (FUNCTION)
        Module Name                             LSO_REFDOC_DBASE
    Trigger Location of Exception:
        Program Name                            SAPLLSO_HRTEM00REFDOC
        Include                                 LLSO_HRTEM00REFDOCU07
        Row                                     55
        Module type                             (FUNCTION)
        Module Name                             LSO_REFDOC_DBASE
    Who can help resolve this problem,thanks'

    Hi Paolo,
    Thank you for answering.
    I have indicated a sender cost centre + sender activity and receiver I 've tried a cost center and also an internal order.
    I have the same data and I fill the same fields in the other client (the copy source) and it is working fine.
    I am not sure that I understood what you mean by "the activation of activty type as cost object in your controlling area". Are you reffering to checkbox "Account Assignment: Activity Type Active" in OKKP? If so, the check box is not checked on the other client either. Also, I have never used this checkbox, but always have been able to allocate activities.
    Lavinia

  • Cancellation Error during Internal Activity Allocation in Event Management

    Hi,
    we use Internel Activity Allocation in Event Management.
    The User wanted to cancel a document, so he did.
    But now the status is (red-lihted) "Error in doc. cancellation 1".
    Our systems, R/3 and HR, are located on the same server.
    How could I cancel the document now?
    Do I have to post the same negative worth in CO?
    Greetings,
    Philip Beilharz

    Hi,
    I have resolved the above error. it was due to master data maintainence.
    But now while posting i am getting an error that " Activity type XYZ can not be allocated to 2008"
    Can someone help with this?
    Regards
    TS

  • Activity allocation - error

    Hi ,
    I have booked and followed up 10 participants but when i  tried to do  carry out LSO_PV18 activity allocation 5 participatns are missing , pleae let me know the cause for this issue.
    Thanks
    Kumar

    Hi,
    Thanks for the response. We are not using Billing ,even it is not coming in lso_pv17.
    The issue seems to be very strange , can some one please let me know if we have any authorization object's used for activity allocation.
    Thanks
    Kumar

  • Direct Activity allocation posting error

    Dear All,
             In T.code - KB21N I tried to  run the direct activity allocation. While enter the details in KB21N all the details picked from 3xxxxxxxxx document as it is reference document. In screen variant "Order" & Input type "Individual ". Document item price has assigned xxx INR. But controlling area currency is EUR. So the system picks constant exchange rate which is maintained in total price.
            Can anyone tell where do we maintain total price per quantity for document item
    Thanks...

    Hi,
        We have maintained activity cost(Euro=Controlling area currency) in KP26. But the company code currency is INR. How the system picks INR value and which will be editable or not.
    Thanks...

  • Internal Activity Allocation in Training And Event Management

    Hi,
    I am facing a problem while internal activity allocation of attendees in Training and Event Management. When i try to run "Internal Activity allocation for Attendees" i get an error message as " Reference document 1005 could not be found".
    I have done all the configuration but even then i am unable to understand the reason for this error.
    Plz help
    Regards
    TS

    Hi,
    I have resolved the above error. it was due to master data maintainence.
    But now while posting i am getting an error that " Activity type XYZ can not be allocated to 2008"
    Can someone help with this?
    Regards
    TS

  • Modify posting period in KB65 - Internal Activity Allocation reposting

    Hi Gurus,
    I have lots of documents originally created in CATS.
    The user who did the CAT7 transfer made a mistake and put in posting date (01.03.2010) on the selection screen of CAT7. All items have been posted on 01.03.2010 instead of the original date of the records in CATS.
    When I try to repost these items in KB65 and modify the posting date to February, 2010 the system issues an error message (BK214) that the new posting period is earlier than original and it is not possible to modify.
    Message BK214 can't be switched off either.
    Is there any chance to bypass this? Or any other idea how to modify the posting date of these items from March to February?
    Thanks,
    Jeno

    Try KB21n......we used to change the activity allocation through this transaction.....should work in your case
    Thanks
    Assign points if useful

  • Que-''actual activity allocation is not allowed for order .''

    hi ,
    During confirmation of operation at co11n (also at co11), got one error massage i.e  "actual activity allocation is not allowed for order "
    Due to this error confirmation is not possible .
    pls help me to solve this problem.
    AMOL WAGH
    Edited by: amol  wagh on Dec 6, 2008 8:09 PM
    Edited by: amol  wagh on Dec 6, 2008 8:10 PM

    Dear,
    For allocation activity costs, we need to define activity type in KL01 by specifying the unit of measurement of the particular activity type (like machine - Hours etc.). While creating activity type, we will assign a secondary cost element (with category 43) in the activity type through which the activity cost will flow.
    After that we will plan for cost center in KP06 (cost elementwise). Then we will plan machine hours in KP26 where we will link the activity type to a particular cost center.
    Please give the feed back.
    Regards,
    R.Brahmankar

  • Actual activity allocation is not allowed for order .

    hi ,
    During confirmation of operation at co11n (also at co11), got one error massage i.e "actual activity allocation is not allowed for order "
    Due to this error confirmation is not possible .
    pls help me to solve this problem.
    AMOL WAGH

    Dear,
    What is message number? Did you assign the usersttus in BS02?
    For allocation activity costs, we need to define activity type in KL01 by specifying the unit of measurement of the particular activity type (like  machine - Hours etc.). While creating activity type, we will assign a secondary cost element (with category 43) in the activity type through which the activity cost will flow.
    After that we will plan for cost center in KP06 (cost elementwise). Then we will plan machine hours in KP26 where we will link the activity type to a particular cost center.
    When we do price calculation in KSPI, system checks the planned costs for cost center (in KP06) and also checks the machine hours planned (in KP26) and gives the cost for the particular activity type.
    Please check the above in the system
    Regards,
    R.Brahmankar

  • Plan Indirect Activity allocation

    Hi everybody,
    during the execution of Plan Indirect Activity allocation, after filling the cycle I detected the following error message:
    "You are not authorized to run cycles on CC : Z910
    Message no. 00368
    Diagnosis
    Error message of the batch input with variable text. A more precise explanation is not possible."
    Any suggestion on this, please?
    Thanks in advance,
    Barbara

    Hi Ramakrishna,
    I've thought this but the strange thing is that the error message appears only for some cycles and not for all. As a matter of fact one of the cycles that I've created has been successfully executed without any problems.
    Any idea about this strange system behaviour?
    In the meanwhile I'll check in relation to the authorization profile.
    Thanks in advance.
    Barbara

  • Problem in Indirect activity allocation ( KSCB)

    Hi!
    I am getting the error while executing kscb  like below:
    Cycle OSVIUSTES2, start date 20110301, does not include any senders.
    No valid sender entries were found.
    Message no. GA710
    I have maintained planning for sender cost centre & activity ype (KP06).
    properly given sender cost centre /activity type and receiver cost center/activity ype in cycle ( KSC7).
    sender activity type category is 3 ( manual entry, indirect),, receiver activity type category is 1 ( manual entry, manual allocation).
    can any one suggest where could be wrong.
    regs,
    ramesh

    Hi!
    I am explaining my scenario here:
    I have done cost centre planning in KP06 for production cost centre and production activity type for example cost centre 1 & cost centre 2  and activity type 1 with some cost elements.
    I have executed LTP and passed the Planned activity quantity to KP26.
    Now I have some costs like energy , which I want to distribute to production cost costre using indirect activity allocation. So I have defined IAA cycle ( as you suggested using rule  3. quantity calculated inversely and sender cost centre is costcentre3 and activitytype2 ( category 2 indirect entry,indirect allocation) and receiver as cost centre 1 & 2 and activity type1 . sender values 1000 and receiving tracing factors cost centrea 85% & cost centre2 15%.
    I have maintained cost centre planning for sender i.e cost centre3 & activity type2 in KP06.
    Executed the IAA cycle (KSCB) with out errors.
    Now exeucted KSPI, then system is picking the costs maintained for cost center 1 & 2 , it is not picking the costs which were mainttained for cost centre 3 & activity type 2.
    my assumption is, once IAA is executed, system has to transfer the costs to production cost centres and then arrive activity prices.
    Please suggest me where I went wrong?
    regs,
    ramesh

  • LSO_CO Interface: Activity allocation for instructors

    Good morning SAP people,
    Ladies and gentlemen,, can you please assist me with an error that i am encountering when trying to execute the activity allocation for instructor functionality on LSO.
    I have made sure that i satisfied all the pre-requisites and price planning, loaded actual prices on both the HR and finance Boxes.
    Cost item maintained for Instructor
    Receiving and sending  cost centres maintained in the same controlling area.
    Activity type is maintained, planning is created for the sender cost centre.
    The Error is as follows:
    E KI 154 Enter Activity type only in conjuction with a cost centre
    Can somebody help me please...

    Can you please check what is maintained in T77S0 (SM30 transaction) :
    SEMIN     COSTC     (LSOCOSTC)
    SEMIN     SCOST
    The system first looks for the cost center via the evaluation path. If it finds no cost center, it uses the cost center stored in the Sender cost center.
    The switches which are used to maintain the above settings in view
    T77S0 are:
    SEMIN     COSTC     Cost center of business event cost object
    SEMIN     SCOST     Sender cost center for internal act. allocation
    Regards
    Chetan

  • KB21N -Is there a way to prevent activity allocation between Company Codes?

    Hi people,
    How can we prevent user from posting to another Company Code through KB21N (Direct Activity Allocation)?
    Note that everything is under one Controlling Area.
    thank you
    Maut

    yes, create a CO Validation (OKC7) with the following rules:
    Prerequiesite:
    COBL_SENDER-BUKRS <> COBL_RECEIVER-BUKRS
    Check:
    COBL_SENDER-BUKRS = COBL_RECEIVER-BUKRS
    also you need to create a proper message in case of Error, like:
    "no cross company postings in CO allowed"
    hope this helps - I just defined this and tested - it works....
    regards
    Bjoern
    Edited by: Bjoern Hansen on Apr 9, 2010 10:46 AM

  • "internal activity allocation from training (HR) to CO

    need to have an understanding of how this process is managed.
    thank you

    Hi,
    I have resolved the above error. it was due to master data maintainence.
    But now while posting i am getting an error that " Activity type XYZ can not be allocated to 2008"
    Can someone help with this?
    Regards
    TS

  • Direct Activity Allocation-KB21N

    Hi,
    While i am doing the  Direct Activity Allocation in KB21N,,From one cost center to another cost center...It is giving error like"CREATE MASTER DATA FOR 1101/1"
    FOR UR INFORMATION :1101 IS COST CENTER
                                         1-IS ACTIVITY TYPE
    Give me the solution plzzz
    REGARDS
    Sap Guru

    Hi,
    Check whether you have created Cost center and activity type.
    Aravind

Maybe you are looking for

  • Link to SAP R/3 Logon from Portal IView

    Hi, How is the Link to SAP R/3 Logon from Portal IView? Thanks Raissa

  • ColdFusion contact form by email - please help

    Hello, I tried to create a contact form, using email to send, and I have some issues and questions: 1. I like to have a message "Your form has been sent", but it shows the blank after user submited the form. 2. If user enter her email address, this f

  • Practical maximum size limit of imported XSD files

    Can anybody tell me if there is a kind of upper limit on the size of XSD files that can be imported into XI and used without problems? I have seen a comment before that states XI will 'choke' on large XSD files, and that enumerations were recommended

  • Satellite P10 keeps freezing up

    Hi I need some help, my Satellite P10 series keeps constantly crashing over recent weeks. I have run a defrag, and error checked the laptop. I've also deleted a lot of files to free up space, and im not sure what to do. The majority of the times it c

  • HT4859 how do i find backup of icloud on computer?

    my iphone doesnt work anymore and is unfixable. i want to find the icloud backup on internet to what was backed up. how do i do that?