Error in Class Assignment in Pool Asset Managment

Hello Team,
I am facing problem in IW21 during creation Notification type MF which is used for Pool Asset Management. if possible give me solution
After Click on Equipment below window will open
and in this window if i do next, no processing will happened. If i wish to save this notification system will give error Like Error in Class Assignment.
I checked entries in PAMS_FSET table also.
Thanks and Regards,
Sweta

Hi , Please check whether class PAM is defined for class type PAM in CL02 . If it is not defined please maintain some characters in it.
Regards,

Similar Messages

  • Pool Asset Management - Assign Driver from Planning Board to equipment demand

    How to assign a driver in sap pool asset management, using Planning board , since opening the demand through graphical board i need to assign an equipment & drive to the demand created

    hi , you can use partner function to assign driver name.

  • Pooled Asset Management

    Hi Friends,
    We have configured  PAM with the request as Notifications and other related configuraiton settings as available in SPRO.
    But when the request is created through Notification Type MF and the same is triggered in PAM03 - Planning Board Profile but the Y axis nothing is getting displayed.
    To add more the Equipments confgiured are not getting displayed in Y axis for scheduling the demand. What more settings need to added.
    Can anyone have come across a similar issue during your implementation?
    Regards,
    Selva
    Mob: 0091 9620207596

    Hi Friends,
    I configured the 'PAM' in my company, but save the note appears an error in abap, Could you please help me?
    Follows step by step the held configuration, where the dump was presented.
    Notification Types ->
    Define Notification Types:
    Copy standard M1, create MF notification – Pool resquest
    Overview of Notification Type -> Screen Areas in Notification Header:
    Screen type hdr: H100
    Scrn type object: O100
    Screen Structure for Ext View:
    10\TAB01 (screen area) 850, 065
    10\TAB23 (screen area) 850 (Pool Asset)
    Priority Type: PM
    Transaction CL01 – Create class
    Class: ClassPam
    Type Class: PAM
    Pool Asset Management
    Basic Settings for Pool Asset Management:
    New Entries
    Application: Pool Asset Management
    Reservation TXT: Test
    Class Type: PAM
    Class: Classpam
    Edit Object Processing
    New Entries
    Application: Pool Asset Management
    Actv.Entry: flag
    typ: MF
    Transaction PAM01 – Create pool test
    PAM Pool: 01
    Category: T
    Description: Pam Test
    Fac.Calendar ID: none
    Holiday cal. ID: none
    Functional Loc: Enterprise
    Test:
    Transaction IW21
    Notification type: MF
    fill the required fields (ex: Text, PAM Pool and Maintain account assignment)
    Clicking save, dump is reported.

  • Configuration-Pool Asset Management

    What is the purpose of configuring PAM class for pool asset management?How these characteristics are helpful during raising demand notificaiton for pool asset? Where I can get the building block for pool asset management?
    Regards,
    Tehsin

    Hi Friends, I am new to SAP fans, Well I am also configuring SAP Pool asset management in my org, I have configured complete scenario and its working fine, the only problem i am facing the cost calculation part for TRIP based on time and running kms when you return the vehicle back to original pool.
    In service type configuration i have configured relevant activity types with rate maintained in KP26 for fleet cost center, in PAM03 on demand notification screen , when i click the button 'settle', and ask me to select the counters for time and kms based on readings , it create a Service order in back ground which has status TECO and there are no cost is posted on my service order,
    Here i want help from all PAM experts, Am i missing some thing why my cost are not getting calculated and why my Notification status not updating as 'Settled' and why my service order status is TECO
    Any help would really be highly appreciated
    How this calculation scenario works for PAM for trip cost,
    Rajeev

  • Pool Asset Management

    Dear all,
    I am implementing SAP PAM , i have configure all the configuration as per the Configuration guide which i downloaded from the service.sap.com side
    but still when i execute the PAM03 the planning board i not showing the correct result there is no drag and drop facility coming and also there is no functionality like ( issuance , reture , etc ) options.
    If anybody know about the name of the BC sets which need tio be activated for the configuration of Demand Notification and the PAM planning board that will also be very helpful.
    We have activated the SAP Echancement package in the system ( log_EAM_PAM).
    Kindly if anyone can help i will be very thankful to him / her.
    Regards,
    Haris Khan

    Dear Haris ,
    Please refer the below link also maintain the table PAMS_VSTAI  using t-code SM30 as this will not get updated on Config.
    Pool Asset Management ABGH 04 Productive Split I3908 Picked Up
    Pool Asset Management AUFE 02 Completed Split I3910 Settled
    Pool Asset Management DISP 01 Productive Split I3902 Assigned
    Pool Asset Management GELA Completed Split I3905 Deleted by requestor
    Pool Asset Management GELD Completed Split I3903 Deleted by planner
    Pool Asset Management NDIS 01 Reqmt I3901 Need
    Pool Asset Management RESM 06 Productive Split I3907 Reserved
    Pool Asset Management RGBE 03 Completed Split I3909 Returned
    Pool Asset Management STAN 05 Completed Split I3906 Need revoked
    Pool Asset Management STOR 05 Completed Split I3904 Planned need revoked
    Pool Asset Management SY01 08 Absence Maintenance/ Repair
    Pool Asset Management SY02 07 Absence End of Leasing
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/5ad2c9e2f249abad4df1479243a001/frameset.htm also refer Note: 1272432 for PAM tips.
    Regards
    Ajaysingh

  • Pool asset management planning board (PAM03)

    Hi experts,
    PAM03 comes with default icons/labels for vehicle pooling. For example in the tool bar there is a filter for 'licence plate' or 'vehicles' for sorting. As you know the PAM can be used for variety of assets such as IT. I wanted to know if you've ever attempted to update the planning board to be used for assets other than vehicles.
    I believe in note 1272432 there is mention to this functionality using function module PAMS_GRAPH_UC_OTHERS. I'm still trying to figure out how this works so any input is appreciated.
    Thanks

    Hi PAM user, the steps necessary for PAM are described in the following places, at the sap Help portal
    http://help.sap.com/erp2005_ehp_04/helpdata/en/2b/1a73268dd74a0988c00a90171294f7/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/5ad2c9e2f249abad4df1479243a001/frameset.htm
    Make sure you activate the SAP Business Function for PAM, which is LOG_EAM_PAM (via transaction SFW5). This will also provide the right settings within config for the planning board and Pool Asset Management.
    Only thing that does not automatically gets updates, is table PAMS_VSTAI, which needs to have the following entries:
    Pool Asset Management   ABGH    04      Productive Split        I3908   Picked Up
    Pool Asset Management   AUFE     02      Completed Split I3910   Settled
    Pool Asset Management   DISP       01      Productive Split        I3902   Assigned
    Pool Asset Management   GELA              Completed Split I3905   Deleted by requestor
    Pool Asset Management   GELD              Completed Split I3903   Deleted by planner
    Pool Asset Management   NDIS      01      Reqmt   I3901   Need
    Pool Asset Management   RESM    06      Productive Split        I3907   Reserved
    Pool Asset Management   RGBE    03      Completed Split I3909   Returned
    Pool Asset Management   STAN    05      Completed Split I3906   Need revoked
    Pool Asset Management   STOR    05      Completed Split I3904   Planned need revoked
    Pool Asset Management   SY01    08      Absence         Maintenance/ Repair
    Pool Asset Management   SY02    07      Absence         End of Leasing
    I hope this helps you in setting up the solution. Feel free to provide feedback on if it worked.
    Cheers,
    Hanneke

  • Pool Asset Management- Planning Board

    Hi Guys,
    We are in the process of implementing PAM in our company.
    I have done the config based on the note ; 1272432 up to certain extent. When i go to PAM03-planning board, the following message is appearing " Illegal number of columns in chart(231, 1, 0), Sum of columns in chart is not equal".
    I could not able to find the configuration part for this.
    Also in the planning table, i could able to see the request, but i am not able to see the equipments assigned to Pool (functional location category).
    Kindly provide your valuable inputs.
    Thanks&Regards,
    Pavan

    Hi PAM user, the steps necessary for PAM are described in the following places, at the sap Help portal
    http://help.sap.com/erp2005_ehp_04/helpdata/en/2b/1a73268dd74a0988c00a90171294f7/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/5ad2c9e2f249abad4df1479243a001/frameset.htm
    Make sure you activate the SAP Business Function for PAM, which is LOG_EAM_PAM (via transaction SFW5). This will also provide the right settings within config for the planning board and Pool Asset Management.
    Only thing that does not automatically gets updates, is table PAMS_VSTAI, which needs to have the following entries:
    Pool Asset Management   ABGH    04      Productive Split        I3908   Picked Up
    Pool Asset Management   AUFE     02      Completed Split I3910   Settled
    Pool Asset Management   DISP       01      Productive Split        I3902   Assigned
    Pool Asset Management   GELA              Completed Split I3905   Deleted by requestor
    Pool Asset Management   GELD              Completed Split I3903   Deleted by planner
    Pool Asset Management   NDIS      01      Reqmt   I3901   Need
    Pool Asset Management   RESM    06      Productive Split        I3907   Reserved
    Pool Asset Management   RGBE    03      Completed Split I3909   Returned
    Pool Asset Management   STAN    05      Completed Split I3906   Need revoked
    Pool Asset Management   STOR    05      Completed Split I3904   Planned need revoked
    Pool Asset Management   SY01    08      Absence         Maintenance/ Repair
    Pool Asset Management   SY02    07      Absence         End of Leasing
    I hope this helps you in setting up the solution. Feel free to provide feedback on if it worked.
    Cheers,
    Hanneke

  • Pool Asset Management - e-mailing

    Hi
    In the help document, it says : "When the planner assigns a demand to an available pool asset, the asset is reserved and the employee automatically receives an e-mail confirming the reservation." I think I am missing something. The demanding user is not receiving any messages from the system although his user id is set in the partner list a s a user and as a requester also.
    Is there any functions or any settings that I should do in order to send messages?
    Thanks in advance

    hi , you can use partner function to assign driver name.

  • Pool Car management - (Pool Asset Mangement)

    Hi
    We have implemented Enhancement Package 3 in order to make use of the functionality available under Pool Asset Management.
    Various additional customising options become available, but there are no default settings. In the SAP documentation it says "A BC set is available for these settings and is imported automatically". I understand the basic concept of a BC set and would obviously prefer to use this than to go and make all the customising settings myself. I have however not worked with BC sets before and so I am not sure (1) where to obtain the available BC set for the various customising tables and (2) how to go about importing them.
    I would appreciate any assistance anyone could provide.
    regards, Lara

    Dear Lara,
    Please see the following link, it may help you to some extend.
    [http://help.sap.com/erp2005_ehp_04/helpdata/EN/6f/3c3f88fbef11d2958c00a0c930dcc1/frameset.htm]
    Sundar

  • Pooled connections management

    Hi,
    I am using the api which can found in oracle.jdbc.pool.* (OracleDataSource,OracleConnectionPooledDataSource) and connection caching.
    From the documentation, I understands that we can create a number (say conn1, conn2, conn3 - each getConnection request was done sequentially) of pooled connections for one physical connections. When the program that uses conn1 releases conn1, does conn2 will be automatically be able to presume its operation as though it was put into an execution queue.
    Regards.

    Hi Friends,
    I configured the 'PAM' in my company, but save the note appears an error in abap, Could you please help me?
    Follows step by step the held configuration, where the dump was presented.
    Notification Types ->
    Define Notification Types:
    Copy standard M1, create MF notification – Pool resquest
    Overview of Notification Type -> Screen Areas in Notification Header:
    Screen type hdr: H100
    Scrn type object: O100
    Screen Structure for Ext View:
    10\TAB01 (screen area) 850, 065
    10\TAB23 (screen area) 850 (Pool Asset)
    Priority Type: PM
    Transaction CL01 – Create class
    Class: ClassPam
    Type Class: PAM
    Pool Asset Management
    Basic Settings for Pool Asset Management:
    New Entries
    Application: Pool Asset Management
    Reservation TXT: Test
    Class Type: PAM
    Class: Classpam
    Edit Object Processing
    New Entries
    Application: Pool Asset Management
    Actv.Entry: flag
    typ: MF
    Transaction PAM01 – Create pool test
    PAM Pool: 01
    Category: T
    Description: Pam Test
    Fac.Calendar ID: none
    Holiday cal. ID: none
    Functional Loc: Enterprise
    Test:
    Transaction IW21
    Notification type: MF
    fill the required fields (ex: Text, PAM Pool and Maintain account assignment)
    Clicking save, dump is reported.

  • Error in account assignment with Asset

    Hi Gurus,
    I am trying to create a shopping cart with a valid Asset master but getting an error-
    Transaction type does not exist
    Error in account assignment for item 1 
    I can create a PR with this Asset number in ECC successfully without any error but the same Asset number is giving the above error in shopping cart
    Regards
    Kapil

    HI
    is the problem related only with asset number? or also with other account assignment?
    than try to understand if the following table is correctly defined
    SAP Supplier Relationship Management-SRM Server-Cross-Application Basic Settings-Account Assignment-Define Account Assignment Categories
    than
    SAP Supplier Relationship Management-SRM Server-Cross-Application Basic Settings-Account Assignment-Define G/L Account for Product Category and Account Assignment Category
    regards
    andrea

  • Change fiscal year to 2006 in Asset Management : error in year-end closing

    SAP version: 4.0B
    Transaction Codes used: Year-end closing – AJAB, Fiscal year change – AJRW
    We are trying to change the fiscal year to 2006 in Asset Management.
    I tried to change the fiscal year to 2006 for the company code 0055 using transaction code AJRW. The test run has displayed an error message “Fiscal year change in co. code 0055 1 possible only after year-end closing 2004 2’.
    I have used the transaction code OAAQ to find the out the fiscal year, the closing for depreciation area is successfully performed.
    Unfortunately it is still showing ‘2003’ which should have been 2004 for company code 0055.
    I tried to close the fiscal year 2004. The test run has completed successfully. I have scheduled the ‘RAJABS00’. The program has executed successfully with no errors or warnings.
    The closing for depreciation area (Transaction – OAAQ) is still showing 2003 for company code 0055, which should have been changed to 2004.
    I am new to Asset Management. Can you please give some suggestions on how to fix the problem and change the fiscal year to 2006.
    Thank you,
    Vidya

    Hi,
    Thank you very much for your prompt reply.
    I have used transaction OAAR to check if any area is still open for previous years.
    Surprisingly! The areas are closed only till 2003.
    Can you please let me know what to do (transaction codes - programs) to close the areas for fiscal year 2004.
    I am new to Asset Management. I think you are good in Asset Management. Can you please give some suggestions on how to close the fiscal year 2004.
    Can you please let me know if I have to run any other transactions other than closing the areas before running the transaction to close the fiscal year 2004.
    Thank you very much.
    Sincerely,
    Vidya

  • Error in asset management config area

    Hi
    I got error in asset management configuration area error is ASSERTION_FAILED. How to rectify this error,  if any one knows please post the solution.

    Can you give what you are doing in config and the long error text with error number

  • Error in cancellation GR for po acc assignment category is Asset

    Hi Gurus,
            I have one GR document this document i need to cancel ,based on this IR is completed after that IR also Reversed,now i am trying to reverse the GR ,based on this GR the PO is account assignment category is "Asset",this po line item is only one line item.
    Error in the GR reversal is
    " Acquisition value negative in area 01"
    please guide me why this error is coming at the time of cancellation GR.
    appreciate your quick reply.
    Regards
    sap mm

    Hi
    Check the currency in PO....Since fico guys create asset and maintain a currency for dipreciation area 20..so u need to procure that asset from the vendor who has the same currency...since there is diff in currency system throws error during cancellation.
    Goto AS03 give the asset number,compnay code press asset values tab there u can see  the dipreciation areas on the left hand side
    clickon dipreciation 20 and check the currency on the right botton end.
    So ask ur fico guys to sort ur pblm.
    regards
    pradeep.

  • Oracle eAM Enterprise Asset Management, Work Request Create Page Error

    Dear All
    I am facing this error on Oracle eAM Enterprise Asset Management, Work Request Create Page
    oracle.apps.fnd.framework.OAException: java.lang.ArrayIndexOutOfBoundsException
         at oracle.apps.fnd.framework.OAException.wrapperException(OAException.java:912)
         at oracle.apps.fnd.framework.webui.OAPageErrorHandler.prepareException(OAPageErrorHandler.java:1169)
         at oracle.apps.fnd.framework.webui.OAPageBean.renderDocument(OAPageBean.java:3247)
         at oracle.apps.fnd.framework.webui.OAPageBean.renderDocument(OAPageBean.java:3042)
         at OA.jspService(_OA.java:228)
         at com.orionserver.http.OrionHttpJspPage.service(OrionHttpJspPage.java:59)
         at oracle.jsp.runtimev2.JspPageTable.service(JspPageTable.java:390)
         at oracle.jsp.runtimev2.JspServlet.internalService(JspServlet.java:594)
         at oracle.jsp.runtimev2.JspServlet.service(JspServlet.java:518)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
         at com.evermind.server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
         at oracle.apps.jtf.base.session.ReleaseResFilter.doFilter(ReleaseResFilter.java:26)
         at com.evermind.server.http.EvermindFilterChain.doFilter(EvermindFilterChain.java:15)
         at oracle.apps.fnd.security.AppsServletFilter.doFilter(AppsServletFilter.java:318)
         at com.evermind.server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:642)
         at com.evermind.server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:391)
         at com.evermind.server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:908)
         at com.evermind.server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:458)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:313)
         at com.evermind.server.http.AJPRequestHandler.run(AJPRequestHandler.java:199)
         at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
         at java.lang.Thread.run(Thread.java:662)
    ## Detail 0 ##
    java.lang.ArrayIndexOutOfBoundsException
    java.lang.ArrayIndexOutOfBoundsException
    ----------------------------------------------------------------------------------------------

    I am finding eAM to be pretty interesting in the asset intensive environment. My implementations in shopping mall, metal and plastic manufacturing are quite interesting. It simply depends upon how you configure the system. It is a good package in my opinion
    Regards
    Lokesh Tayal CPIM

Maybe you are looking for

  • How to edit a instrument in Logic Pro 9

    I have found a string that I want to use, but I want it to last after I release the tangent. But I can't seem to find any mixer to edit the instrument. Have tried to read the manual, but I don't know which section. And when I thought I found the sect

  • Mail freezes mac os 10.8.4

    I just got the mail program to freez. It is total stoned dead. I am in the process to move our mail server to MS 365. I got good log in to our old and existing mail domain server via iphone mail and ipad mail and web verson of the mail. But the mail

  • When Running DBMS_STATS inside a Proecure it Fails

    Hello. I need to schedule a job to compute stats. I decide to create a Procedure GATHERTABLESTATSGTS2 and schedule a job as described below : CREATE OR REPLACE PROCEDURE GATHERTABLESTATSGTS2 as BEGIN FOR i IN select distinct owner,table_name from dba

  • Need help for Conversion Function in Oracle

    Hi, Can Any One help me Please. I need a Oracle conversion script for converting from decimal to hex. and decimal to datetime. Thanks In Advance.

  • Query to find adhoc queries taking high cpu on server

    Hi, I want to find all the adhoc and other queries consuming high cpu on sql server. sys.dm_exec_cahched_plan will only have cached queries and not the currently running ones.