Error in CO54 Control recipe.

Dear Experts,
I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
This is very critical as my client plant is nearly down as far as SAP is concerned.
Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
Regards,
Rajesh.

Dear,
The error given is as follows.
2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
3.Message is not sent to and destination.
This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
Regards,
Rajesh Prasad.

Similar Messages

  • Error when sending control recipe to external destination

    Hi,
    When Iam trying to send control recipe to external destination through CO53, Iam getting the status of the control recipe as 'Sent'. But when I check the tRFC log, I get the status, "connection closed (no data) ".
    By selecting the line in the log and executing the LUW I get the message, target system/gate way not active.
    In the external system I get the message " Illigal activity"
    I checked the RFC connection in SM59 and connection is ok.
    The RFC is working from SE37 and the control recipe can be processed without any issues through SE37. The problem is when I try to send from CO53.
    Request your expert advice to solve at the earliest.
    Thanks in advance
    Prathib

    Hi Prathib, Have you got the solution to this problem

  • Error While generating Control Reciepe

    Hi,
    I am mapping MTS scenario for PI industry and i stuck up with an error while creating Control recipe system gives following erroe msg, No values assigned to char. 0010 PPPI_INSTRUCTION in process instruction 9999 phase 0020. Msg number is  CB210.
    Please Help me in this regards,
    Regards,
    Vishal

    Hi,
    Check the PI instructuction category and charactersitics assigned to Phase 20.
    If the value assignment is automatic check the function modules manually whether it is working fine.If the value assignment is manual then enter the required value. for the characteristics PPPI_instruction. Also check whether that is a required value.
    If it is si remove the reuired value tick and check.
    thanks  and regards
    muru
    Edited by: MURUGESAN THANGATHURAI on Sep 17, 2009 3:46 PM

  • Error Message - Control Recipe

    Sir,
    While generating control recipe I am getting following error message.
    "Value cannot be assigned autom. to char. 0015 PPPI_UNIT_OF_MEASURE in proc.instr. 0000 phase 0110"
    Please let me know how to resolve this error.
    Regards,
    Prashant Salvi

    hi,
    Go to Phase 0020 and then Process Instruction 0010.I think somewhere in this process Instrucition you have used PPPI_UNIT_OF _MEASURE as a output characteristic which has created this problem.Change it to input characterstic and then try to create the control recipe.
    Regards,
    Muthamil

  • XStep- creation of two control recipes

    Hi,
    I am using the Ecc 6.0 Enp 3.0
    I have created a Xtsep structure with parameters and checked. so errors found.
    XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
    The second control recipe has the all details which are captured from XStep.
    Why First control recipe getting created.. am I doing something wroing in setup..
    Thanks,
    JK

    Why don't you just create a custom view object? There's even an example or 2 in the docs:
    http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
    Edit: you are aware that you can create a View Object based on more than one table?
    John

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Control recipe generation from process order

    Hi,
    Iam using XSteps to generate control recipes for external destination ie destination type 02. But I find no control on the number of control recipes that can be generated.Whenever I click on the generate control recipe botton,  a new control recipe is getting generated,
    I need to have a control on this similiar to the case of destination type 04. ie system will not generate a control recipe if already a control recipe is there for a destination.
    Can anybody know how to bring this control?
    Thnaks in advance
    Regards
    Prathib

    Hi
    If you want to restrict quality inspection based on production order type, Its possible. Use exit QAAT0001. Take help from ABAPer, dont forget to set E_NO_INSPECTION based on the order type field there. VERY IMPORTANT: Put  E_TQ32 = I_TQ32 in the program, otherwise you will get error "Post stock in QM only"
    SDG

  • Regarding control recipe destination

    Dear all,
    What is control recipe destination is it the end user or otherwise similarly for a person in shopfloor how does he view Pi sheet and how he will enter details of various parameters in it and how he will close the PI sheet.
    What will happen in CO53 and what do we do in CO54 , please give in detail
    regards
    venkat

    Hi Venkat,
    Control recipe destination is  the process control system or the line operator to whom the process instructions are transferred to be carried out. When processing the order, you can generate one control recipe with the process instructions for all phases, for each control recipe of a process order.
    You then assign the control recipe destination to the phases of the master recipe, by maintaining the process control data in the process instruction overview. This section describes the assignment of a control recipe destination to a phase.
    Please find detailed documentation on the SAP Help URL as below:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/05/603bc6462311d182b50000e829fbfe/frameset.htm
    Please check and confirm.
    Regards
    Datta

  • Control Recipie Status in a process order

    Dear PP Gurus
    How can i clear Control Recipie Status in a process order, without that TECHO is not allowing....can u pls suggest..??
    Regards
    Ragesh

    Ragesh,
    It looks like you are trying to TECO the order without processing the control recipe. If my memory goes it is the status "CRCR" which would prevent this.
    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    Hope this would resolve the problem....Reward full points and close the thread,
    Regards,
    Prasobh

  • Process instruction sheet and control recipe

    dear,
           can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works.
    if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration as well as process.
    thnx-rgds
    Amitabh

    Hi,
    In control recipe destination the destination type must be browser based.Another is Abap based generally it is using.
    So select that recipe destination, select phase & go in deatil u will find INSTR.READ1, READ2,SIGN which can used as a instruction.
    There are two types 1:process sheet 2: remote fuction call (RFC)
    Process sheet is used for giving instructions to line operator & also entering data during reaction etc per period.
    For INSTR- select it give instruction for that particular phase.
    READ1 - In which we are one column is available where we can enter 1 value by line opearator
    READ2- Here 4 columns are available u can use it as date,time,temp,total etc. as per your requirement.
    SIGN- Here u can use it as a to identify who entered the value.Systen will ask for pass word after entering ID
    After creation & releasing  process order  create contriol recipe.
    Thern go for T code- CO 53 - send control recipe(control recipe monitor)
    http://help.sap.com/saphelp_46c/helpdata/en/f3/6ee4117aed11d2a5fe0060087d1a6b/content.htm
    CO60 - Operator will enter the values
    CO54 - send process messages
    http://help.sap.com/saphelp_46c/helpdata/en/ac/6a101268ce11d2a67600104b57eaa3/content.htm
    CO55- Check the report.
    Check the above & reward if useful.
    Regards,
    Suhas

  • How to delete Control Recipe

    Hi ,
    Can Control Recipe can be deleted eventhough Incomplete.
    In our scenario sometimes control recipe is auto generate at the time of process order release.So some times due to circumstances order can not proceed further in this case that generated control recipe creates problem to make order TECO or delete.

    Dhaval,
    The standard practice is to manually trigger a Process message to the order, to have the status CRFI - Control recipe finished.
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Use Transaction CO54 to send the Message to the process order.
    Regards,
    Prasobh

  • Remove status "control recipe created"

    Hi
    I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
    How i can correct this?

    Hi,
    First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
    Control Recipe/PI sheet deletion procedure
    Thanks
    Kumar

  • No control recipe created messge in PPPI

    Dear gurus ,
    I am trying different combinations of process instruction categories. But when i creating process order for some cobinations control recipe is not creating.
    Error log is showing that "No control recipe is created"
    Please reply can i see the exact reason for the not creating the recipe.
    Thanks in advance .
    Abhi

    Hi Abhi,
    Check In master Recipe ,in the PI Tab,There must be some PI category is assigned and in that PI Category,this PI Charactiristic has been assigned.
    First goto that Phase of the Master Recipe and then goto PI tab and then find the PI category.
    Regards,
    R.Brahmankar

  • Error while creating a recipe in plm..

    Hi every one,
    System throughing below error while creating a recipe.
    "Entries in status management Customizing are incorrect"
    kindly suggest.
    have a good day..
    regards,
    kirran

    Hi Kirran,
    Please see if you have defined a status scheme and assigned it to the recipe type. Before defining a status scheme, you must complete the one time IMG activity 'Collect Object Types and Assigned Attributes' under Recipe Development > Status Management. Then in the next node you define individual statuses and a scheme with transitions. For each status, you must define 'field value' for the field RCP_USAGE which is nothing but a value from Recipe Purposes customizing.
    Hope this helps.
    Regards,
    Rajeev

Maybe you are looking for

  • IPhone 3 to 4.0.2 upgrade - lost contacts, messages, mail, calendar, notes

    I have just upgraded my iPhone 3 to to the latest 4.0.2 OS. However, in doing so I have lost all my contacts, messages, mail, calendar and notes. How do I get all my lost information back.

  • How can I wirelessly access my desktop's extrenal drive via my laptop?

    I know that the Unix underpinnings of OSX only allow me to access my home folder wirelessly but most of the files I want to share are on my 250 gig lacie external drive. There must be a way around this but I don't know what it is. I would like to be

  • Defective phone return mistake

    I recieved a new phone in the mail via verizon to replace a defective phone.  I made a mistake and thought that I had 5 days to send the defective phone back after activation.  Well after struggling with activiation and backup assistance I realize it

  • Acrobat prints are blank

    Acrobat version:  9.3.0 Pro Windows 7 Home Premium x64 I routinely receive PDF files of engineering drawings via email which I can view on-screen.  When I try and print them to an HP 9800, no matter what I try, the printer spits out blank paper... Su

  • How do i change pixel aspect ratio of an image in elements9?

    My camera only shoots in one format ratio, i would like to change images to 2:1, or 1:2. Without cropping or letterboxing. (Hence i think it is the 'pixel' aspect ratio i need to alter, not the 'picture' aspect ratio). Is this possible in elements or