Error in cost calculation

Hi,
when i am going to release an order then system status CSER becomes active.The message comes as error occurred during budget check see cost protocol with message no. IW079 and thus save is being rejected by the system.The system is proposing diagnosis as you want to save data but when saving inconsistencies would result in the database since certain data is missing.Pls. help what is missing?

Hi,
Go to IW32, open the order, Click the Calculator button in the top to calculate the cost.
If any message comes, give the detailed message with message number & diagonosis.
And go to menu go to, click logs => Cost Determination. Check for the error message. Give that message as well if thats different message.
Regards,
Maheswaran.

Similar Messages

  • Error in cost calculation for production order

    Dear All,
    I got error of cost calculation while release of Production Order due to price of some material is not mantain .
    What will happen if I release , save the Order with error & do Good Issue ???
    Ishwar

    Dear Ishwar,
    Check the log's created for costing and rectify the same.
    I feel its better to rectify the cost related errors and then release the production order and proceed to Good's Issue.
    Check whether there is a MAP for all the Raw-materials and an origin group in costing 1 view.
    The Finished product must be having a standard cost estimate that's valid for the current period.
    Revert back in case of any more help needed.
    Regards
    Mangalraj.S

  • Check to restrict release if there is error in cost calculation

    Dear all,
    I want to have check that production order cannot be released if error is there in cost calculation(CSER)?
    How this can be possible?
    Is there any direct way possible? Please reply me in detail.
    Thanks,
    Vijay Modasiya
    PP Cons.

    Vijay,
    Create a new user status profile and assign this to the order type which you are going to use.
    The defination should be such that user status should get activated if "CSER" is activated on that order, and this should not allow "REL" status.
    In general try with "BS02" and "BS22", I am not sure whether CSER and REL can be interlinked.
    Hope this helps....Reward your points,
    Regards,
    Prasobh

  • COFC - Actual cost calculation error

    Hi Friends,
    I am a PP consultant and i have a issue with cost calculation at the time of confirmation.
    There are production orders that were confirmed in year 2010 and year 2011. For year 2010 costing documents were created but not no costing docuemnts for confirmations in year 2011.
    I checked tcode COFC and found error log as : A master record for 1111/ABCD exists only in 2010.(where 1111 is cost center and ABCD is activity type.)
    I have checked the validaty of both cost center and activity type & both are valid.
    can anyone please suggest what has to be maintained for year 2011 from controlling side.
    Thanks In Advance.
    Rohit

    Hi Rohit,
    The similar error i have faced  just couple of hours back.
    I have checked up the plan prices in KP26 for the activity type and could see that they were not maintained for 2011.
    I have maintained the same for the current year and the error got resolved.
    Pls see that you are choosing the correct cost centre and activity type combination alongwith the costing version for 2011.
    Regards
    Sachin

  • Errors arose during actual cost calculation

    Errors arose during actual cost calculation
    No prices could be determinedfor object activitytype company code xxxx , cost center XXXX, activity type XXXX
    Pls let me know immediately friends deperate,
    regards,
    sri

    Hi
    when you gone to the transaction code Kp26 Activity typ price/ planning after give the input press period screen or F6 function key and check what price was maintained for your period 12.
    And even you do one thing go to the transaction code KS02 or 03. Give the cost center and press enter . Then from the meny bar select Environment -> whereused list->.
    And let me confirm how you run the cost estimate for the material
    bye

  • Error arose during actula Cost Calculation

    SAP PP Experts,
                             I have a Problem in <u><b>CO11N</b></u>, While Click <b><u>Goods  Movements</b></u> the follwing Dialog Box was Appeared.
                             <i><b><b>Error arose during actual Cost Calculation</b></b></i>
                             Can You help me how to Reclaim It?

    Hi,
          In COFC you will find the error message. Read error and correct it

  • Shipment Cost Calculation

    Dear All,
    I know that tariffzone plays a role in determining the price for the freight/Service Agent condition in case of outbound shipment cost calculation
    I have the following query in Shipment Pricing.
    Can anyone please explain whats the role of the 2 postal code columns in the tariff zone assignment?
    Also how & where I have to maintain the data for determining the tariff zone which I have assigned to the above combination.
    Please help.
    Regards,

    HI Dave,
    Thanks for the response.
    Please note that I have maintained postal codes in my Shipping point also in my customer master.
    For the combination of TP Point, Service agent, Shipping type & Country I have made the following assignment.
    I have given my shipping point Postal code in both the Postal code columns of Tarff zone assignment (say Tariff) & my customer master Postal code in both the Postal code columns of Tariff zone assignment (say Tariff1).
    Now I have maintained the condition records in TK11 for the combination of Depart. Tariff zone/Destn.Tariff zone/Service Agent i.e. Tariff/Tariff1/Service Agent
    But my condition record value is not getting determined & when I simulate my shipment cost I am getting the following error message.
    Shipment costs not yet calculated
    Shipment costs item 000001 w/ ref. to doc. $0001 item 0001
       Message no. VY104
    Goods types directory could not be determined
        Message no. VW803
    Please help to reolve this issue.
    Regards,

  • Rework Production Order not able to confirm and no cost calculation

    Hi Guys,
    During rework production order confirmation system giving error message as below:
    [Item category 01001 not allowed in accounting transaction 0000/0001
    Message no. GLT2001
    Diagnosis
    The online document splitting is active in your system. Here, each document is assigned to a accounting transaction variant and each document row to an item category. You determine for each business transaction variant which item categories can or must be posted here.
    The following error occurred for the document you entered:
    Item category 01001 in accounting transaction 0000, variant 0001 is no allowed.
    System Response
    The document cannot be posted.
    Procedure
    Check the document entered, the derivation of the business transaction variant, the derivation of the item category, and the assignment of the item categories to the business transaction variant.
    Procedure for System Administration]
    This error relating to New G/L split functionality such as the document type and G/L accounts document type. Doc type is using as same as normal production order and normal production order confirmations and other activities are posted successfully. Iu2019m in a puzzle, regards to this behavior of rework order?
    Back ground for rework order:
    Rework order was created through trigger points.
    Rework order doesn't have any material, it has to pick and settle to original production order; the same was defined at re-work order settlement.
    Rework order not doing any cost calculations at production order level itu2019s giving a message as below:
    Object was not costed
    Message no. CK060
    Diagnosis
    The system could not find any entries that are relevant to costing.
    System Response
    The system did not cost the object.
    Procedure
    Check whether the following objects should be flagged as relevant to costing:
    - Items in the BOM
    - Display BOM
    - Operations in the routing
    - Control key in the routing
    1.  Look at the message log.
    2.  Check whether a quantity was specified in the confirmation.
    Will some one throw some light to come out from this situation and what I missed out and what need to be maintained exactly Plz.
    Thanks in advanceu2026Vyas

    Hi Mangalraj,
    Have check the BOM & Routing for Parent production order costing check box is for both. Coming to rework order doesn't have any material, though it has pulled the some material cost from parent production order. The same can see at production order costs>analysis, but where as costs>itemization not able to see and mesage issued like: object was not costed.
    as early mentioned, confirmation level same error.
    Hope this may give some idea on this case, thanks for your time on this.
    Looking forward some light.
    Thanks...Vyas

  • Costing view for BOM cost calculation

    Hi,
      I want to do the setting for BOM cost calculation like when we execute the CK11  system shows all the componenet of that BOM along with the total price  in present devlopment system for one compnay code when i execute CK11 for a materialwhich is having BOM it is not displaying the BOM component, also not showing any price so what setting required for this, that after costing RUN  system should calculate the MAP of finish material as per total value of BOM component  and that value should be update as the MAP of Finish material.
    regards,
    zafar

    Hi,
    In CK24 i am getting the below error,
    Legal Valuation: Currency type 10 is not assigned in the material ledger
    Message no. CK495
    I have checked the setting in 8KEM,  OMX2,OMX3, ck13N ref. to thread
    Price Update CK24
    all settings are OK but still I ma getting the error. message as given above.
    regards,
    zafar

  • Bom Component qty & WIP Quantity differ at Trget cost calculation

    Dear gurus,
    i am facing the problem with WIP at target cost calculation in REM.
    My issue is
    BOM Component qantity is 9.524 TO  and price is 2000 then total cost is  9.521*2000=19048.
    but in WIP Report kkas in WIP explation it takes input qty 9.52 T0 and price 2000 then total price is 19040.
    Difference is 19048 - 19040 =8
    and also when i am issuing actual qty i.e 9.524 in BOM then my price is 19048.00 ant at time of variance calculaton then quantaty variance as   9.52.0-9.524.0=-0.04  then 0.004*2000 =-8 
    Please suggest solution for this.
    Any OSSS NOTE Required
    any Quires please revert back
    REGARDS
    Avinash.pegarlawar

    Hi
    Rounding differences between target and actual values and quantities are not unlikely to occur and cannot always be avoided but can be minimized.
    Small prices and price unit of 1 are likely to cause more of these rounding differences..
    The actual credit is simply calculated as price * quantity. The target credit however is calculated during the variance calculation
    and based on the sum of all items in the itemization/cost components of the cost estimate and therefore more accurate.
    To avoid this I suggest to store the material price with a larger price unit, i.e. 1000
    Std cost release stores price upto 2 decimals and target cost calculation goes upto 3 decimals...
    Please check also the note 1265918 for more information to this topic.
    Regards
    Ajay M

  • Item Interface error - "The Cost of Sales Account specified is not a valid"

    A week back we migrated from 11.5.10 to 12.1.3
    Since then, many items are failing in Item Interface with the error "The Cost of Sales Account specified is not a valid account or has expired in organization ITEM MASTER INV."
    Item Master being the 'Inventory master organization'. I checked the cost of sales account & sales account. and they are Valid also their corresponding segments are valid in their respective value sets.
    Log message for 'Item Import'
    Import Items
    Argument 1 (ORG_ID) = 167
    Argument 2 (ALL_ORG) = 1
    Argument 3 (VAL_ITEM_FLAG) = 1
    Argument 4 (PRO_ITEM_FLAG) = 1
    Argument 5 (DEL_REC_FLAG) = 1
    Argument 6 (PROCESS_SET) = 77
    Argument 7 (MODE) = 2
    Argument 8 (Gather Stats) = 1
    TRANSACTION ID : 42878726
    ORGANIZATION ID : 174
    TABLE NAME : MTL_SYSTEM_ITEMS_INTERFACE
    COLUMN NAME : COST_OF_SALES_ACCOUNT
    MESSAGE NAME : INV_IOI_ERR
    ERROR MESSAGE : The Cost of Sales Account specified is not a valid account or has expired in organization ITEM MASTER INV.
    TRANSACTION ID : 42878726
    ORGANIZATION ID : 174
    TABLE NAME : MTL_SYSTEM_ITEMS_INTERFACE
    COLUMN NAME : SALES_ACCOUNT
    MESSAGE NAME : INV_IOI_ERR
    ERROR MESSAGE : The Sales Account specified is not valid or has expired for the organization ITEM MASTER INV.
    Please help.

    The Cost_of_sales_account & Sales_account as defined in the MTL_PARAMETERS are different from those in MTL_SYSTEM_ITEMS_B for the corresponding item. The values for these accounts in the interface tables are same as that in the MTL_SYSTEM_ITEMS_B table and hence not same as those defined in MTL_PARAMETERS.
    Actually we have a Custom trigger on the MTL_SYSTEM_ITEMS_B table which updates these accounts, once the item is created in the Master Organization.
    To verify this issue, I updated the accounts on the MTL_SYSTEM_ITEMS_INTERFACE table to match with that of MTL_PARAMETERS. Ran the 'Item Import', now those records are processed.
    Does this means that, the Interface is validating the cost_of_sales_account & sales_account to match with that of the 'Organization' ??.
    But we never had this issue in 11i. Is this a part of R12??

  • Error in activating Calculation view

    Hi Gurus,
    Please help me in resolving this issue below as I get an error when activating calculation view.
    Internal deployment of object failed;Repository: Encountered an error in repository runtime extension;Internal Error:Unable to create hierarchy view: CREATE COLUMN VIEW
              SQL: transaction rolled back by an internal error: identifier is too long: the identifer
              description" is too long. Maximum length is 127:
    I have checked all content related to this error but not able to find a solution.
    Please advise

    Though your calc view name could be small, the 'fully qualified' calculation view name could be bigger than 127 character.
    Fully Qualified name = <packagename.packagename.packagename.....>/<calc view name>
    For each calc view that you activate, HANA internally creates more than one column views (based on your attributes) which are found under the _SYS_BIC schema and there it will fail if the column view name is exceeding 127 characters.
    Solution: make sure the fully qualified name is not too big
    Regards,
    Sesh

  • Actual Cost Calculation in Process Order

    Hi All,
    I updated Standard cost of a raw material through a cost estimate and also ran cost estimate of the FIN that is using this raw material but when I am creating a Process order, it is taking the cost of this particular raw material from the previous estimate not the recent one to calculate the target cost. Can any body help me with this.
    Thanks
    MKR

    Hi Ashok,
    My Valuation variants for the Costing Variant of Cost Estimate and Production order (Actual/Plan) cost calculation are in Sync to get the prices according to the price indicator in material master. But when it calculates cost for a production order, it is picking up cost from the previous period for that particular raw material. I have updated the standard cost by running the cost estimate but still its not working.
    Any lead on this. This will be really appreciated.
    Thanks
    MKR

  • Target cost calculation in Process Order based on Variance Calculation

    Hi all,
    I have a question on Target cost calculation in Process Order. My understanding is, the Target Costs gets calculated when the confirmation and GR is made for the Process Order.
    But if the confirmation/GR is not done, whether the target costs gets calculated for only the activity types after the Variance Calculation (KKS2).
    I have two scenarios. In one, the target costs got calculated for the activity types without the confirmation/GR after the Variance calculation.
    In another scenario, the target costs are not getting calculated for the activity types without the confirmation/GR if I try to do the variance calculation in KKS2.
    SO i want to know which scenario is correct?
    Can anyone answer this question?
    Thanks and Regards,
    Brijesh

    Hi,
    In general, the target costs are calculated once you deliver the order.
    Target costs for the components and the activities are updated only once you deliver the order and the target cost for the finished product gets updated when you do the variance calculation.
    Consider your scenario number 1 - you said the target costs got calculated for activity types without confirmation / GR after variance calculation.
    Now, if the order is not having any status like PDLV, DLV or TECO it will not calculate the variances in the first place.
    Your second scenario is correct - without GR the system does not calculate any target costs. Also it will not calculate any variances because the order status is still not DLV.
    Best Regards,
    Sameer

  • Weighted avg Unit Cost calculation for COGS

    Hi friends,
    Has any body done weighted avg unit cost calculation for inventory valuation and COGS calculation. In a way we need to mirror ECC material ledger functionality based on the APO data in side the planning tool.
    Any ideas on the above!!!
    Kind Regards,
    Krish

    Hi Jerry,
    Thanks for the tip. I actually needed to clean the spreadsheet up and put bogus values in to comply with company policy. Anyhow, here is a sample of the spreadsheet
    http://dl.dropbox.com/u/7499586/junk.png
    Just imagine about 100 products and several hundred raw materials, a dozen types of labor and about 30 types of packaging. It's a monster spreadsheet.
    The "units" under each product is the number of units per batch. You can see each product has two columns. One where you put in how much of a raw material, package type, and labor type go into each batch, the next calculates the cost for each item. Then it gets summed at the top for the total unit cost for that product.
    Let me know if you have any other questions about it. Thanks so much for your help!

Maybe you are looking for

  • Regarding file name in the target system

    Hi.. I have got a file name releated problem in XI. I have configured a flow in XI system using proxy and after mapping process creates a output file in target machine as a "Test<Date-Time Satmp>.dat". Test is the file name and adding date-time stamp

  • How do you retain added indexes in Acrobat 7.0 Pro after program exit?

    Indexes of pdf docs created properly with Acrobat Catalog. In Acrobat with Advanced search option, add indexes is successful, and searches for text in indexed documents is successful. Exit Acrobat, then later re-launch Acrobat, indexes previously add

  • Technical Monitoring High Disk I/O

    We are looking at the Average Wait Time per Disk metric (Under host, windows) as it pertains to our MS SQL server. The situation is that this server has multiple "disks" - some for data, the standard c:\ drive (OS).   These disks would have different

  • OS Resident Size for JVM grows without bound

    Can anyone think of an explanation for the following: JProfiler shows my java application managing its memory properly, and the JVM reports the max heap memory as 80MB throughout the life of the application. HOWEVER, the operating system task manager

  • Adobe Error 150:30    Its a licensing issue I guess...how do I fix this?

    I just transferred CS4 onto my new mac but its telling me there is an "Error 150:30"   Its a licensing issue I guess...how do I fix this so I can use the program on my new mac? Is it even possible to fix? I don't think I have the physical software an