ERROR in COST RUN (MSG NO K0 105)

While running cost run CK11N or CK40N. I am getting Error msg. Group 2950 doest not Exit (K0105).
But Cost Element Group 2950 is available.
Regards,
Velmurugan.S

Can you cross check the Cost Element assign to your Credit Keys?
Did you define it by Origin Group? Does that correspond to the one (if any) on your Material Master?
Cheers.

Similar Messages

  • Error while costing run .

    Hello All,
    While running costing run ( plant level)  in background mode, the job is getting cancelled with some error message  "Required Parameters missing for MARA_SINGLE_READ".
    And its not allowing the costing run. Please suggest any steps to overcome this.
    Regards
    Mahesh

    Hi,
    we are having the same problem when performing the costing run just for one process order.
    Any hint?
    Thanks in advance and regards,
    Ramó

  • How to ignore the material with error in costing run ck40n

    Hi
    Pls, advice how to ignore parent material form costing run if the components of that material have errors. I need to run the costing run excluding erroneous parent item. Is any configuration on this..
    Pls help..
    K

    Hi Kesharika Goona... 
    If you want to exclude any material from Costing Run, there are two ways...
    1. Go to Material Master, Costing1 view, take the check box "Do Not Cost". If you opt for this check box, the system will not consider this material for costing.
    2. Where you run the standard cost estimate in CK40N, once you save you costing run with the parameters like Costing Variant etc, When you select the "Parameters" agains the Flow step of "Selection", you will be asked to give the inputs like Material Number, Plant etc.
    There, against the Material Number, on the extrem right side, you will see a arrow, press that arrow, and there you can see a tab "Exclude Single Values". There you have to give the material number which you want to exclude from the costing run press "Execute" icon on the botoom-left corner of that pop-up window..
    If you still face problem, pls revert back
    Srikanth Munnaluri

  • Error during costing run(CK40n)

    Dears
    During costing run (ck40n),we got following errors,
    1)Consumption account cannot be determined
    2)Costing items for material R150 in plant EZP1 without cost element
    3)Cost component split costed with value of Zero.
    Can anyone tell what rectification has to be done ?
    Regards
    Akshay

    1)Consumption account cannot be determined - Please see that consumption GL account for the raw material valuation class is assigned in OBYC..
    If you doub le click on the message it gives the combination of
    transaction/Controlling area/Valuation class/account modifier... for which you need to assign a consumotion account in transaction OBYC.
    2)Costing items for material R150 in plant EZP1 without cost element - Please doubkle click on give the description of the message...this may be due to one of the primery cost element is not created as GL a/c or visaversa.
    3)Cost component split costed with value of Zero.--if you solve the above this message will disapper.
    pl come back

  • Error while Costing Run   ---  Its very Urgent.

    Hi Peers
    When i ran the Standard cost for a material which is an external procured part, the system is showing an error message "Cost component split costed with value of zero" I checked the Moving Price for the material its not zero. Plz let me know what could be the problem. Its very urgent. Plz help.
    Regards
    Rajaram

    Hello,
    There can be so many reasons for this issue, system is not able to find any of the given option given in valuation variant which is linked to costing variant OKKN. Check the options given in valuation variant, it  must be pick from material master planning price1 or planning price 2 or info record price or pick the existing standard price. When system fails in any of these strategies its pops up the message you described.
    Maintain  price in material master fields or create info record for this material
    thanks
    Megha

  • Error in costing run ck40n

    Hi , can u help me to find solution for error in ck40n
    error is account xxxxxx require assignment to a co object , i want to knw from where this account g/l is picking.

    Hi,
    i think you have maintained GL account as cost element, then it should be assigned to one CO object like cost center, internal order . GOTO OKB9 and assign cost object for that particular cost element xxxxx.
    Check and revert back.
    Regards,
    satyajit

  • Error after Costing Run

    Unable to release FR Materials for January 1st 2009
    one of the error "Price changes for material 2000000054  is not possible"
    What can be the reasons for this error, there are 1800 materials included in costing except 20 all of them relased those not released are having the error as mentioned above.
    Edited by: SDeepakKr on Jan 5, 2010 12:22 PM

    Hi,
    I guess that you have the ML active. The price change or release of a cost estimate should always be the  
    first transaction in a new period, when ML is active.                
    This behaviour is correctly issued if the period status of the       
    material is 30, 40, 50, 60 or 70. This status does not allow price       
    changes to take place. You can view this status in the table CKMLPP for the material.
    One possible reason is that the previous period was closed before releasing the new
    standard price, in this case the system changes the status of the new period to 30.
    In this case,  although you have not posted goods movement for the material, you have   
    already performed post closing for the previous period and in this case, it 
    is not possible to change the price for this period any more.
    Please take a look at the attached notes related to this subject 190707, 555176 and  574930. 
    I hope helps.
    Best regards,
    MLM

  • Cost Run should not be getting executed on Material with Price Control V

    Raw & Packing materials are with price control V in MM as company wants to keep them on moving average cost. Somehow finance users executed cost run on one such material and cost run was executed and the difference was posted in price difference. As far as I know, system shouldn't be allowing cost run on materials other than those having S as price control.
    Question is: How to ensure system sends error if cost run is attempted to be executed on materials with Price Control V?

    Hi
    If you are executing cost run using CK40N, it releases the cost for all the materials i.e. both for the header and the components
    the components may be usually valuated at V. So, the std price update for these will be only for information purposes and it wont revaluate your inventory for sure... This cant post to price difference.... Price diff upon std cost release will apply only to those materials which have price control S
    However, if you dont want to release the cost for V items, you can specify them in the exclusion list... In Ck40N selection parameters you specify your plant/material, etc...  While specifying the materials to be costed in the multiple selection screen, , you can also specify the ones not to be. Then std cost wont be released in those cases
    Regards
    Ajay M

  • Ho do we make msg. CK666 become warning msg when we do costing run?

    Dear Experts,
    The sys. activate transfer price for preserve use.
    When we do costing run for profit center valuation, the following error msg ocurred.
    CK666 Material 227BO0001/plant 1030: Transfer price could not be found.
    Diagnosis
    When switching profit center 0000008000->0000005000 (from the material component to the costing object), a transfer price could not be determined for transfer price variant 0 in respect of material 227BO0001 in plant 1030.
    System Response
    If you carry out costing for a profit center valuation, material 227BO0001 goes into the cost estimate without a value.
    If you create a cost estimate for group valuation, profit from material 227BO0001 is not transferred into the cost component split.
    Procedure
    Check the settings for transfer price variant 0.
    In OKEQ, the variant for TP is blank.
    Ho do we make msg. CK666 become warning msg when we do costing run? and let costing result can be release, or there's another way?
    Thanks in advance.

    There is alternative solution.
    Try using TCode SE91.
    Enter the class - CK and Enter the message number 666.
    Select that line message line.
    Go to Utilities, Click on "Where-Used-list" or press "CtrlShiftF3" from keyboard.
    Select programs and deselect all others.
    Identify your program and double click against that under short description.
    There you can change the letter from "E" to "W" as your requirement.
    NOTE: take assistance of ABAPer of this, Do enquire about the implication of the same in sandbox before doing anything on any other client.
    Thanks & Regards
    JP

  • No Error Log generated in 'Costing' step in Costing Run (CK40N)

    In the Costing Run, when the 'Costing' step is run (after 'Material selection'  and 'BOM Explosion' steps), it gives a hard stop when it encounters the 1st error, instead of completing the 'Costing ' step and giving an Error Log with material information and nature of errors. This makes it very cumbersome to resolve all the errors.
    In the Costing Variant setting in config, the u2018Save Error Log' indicator has been checked.
    Please let me know if I am missing something.
    Venkat

    Hi Vimal,
    Your proposal does not resolve the issue. I found OSS Note 375901, which addresses this issue - see below
    :In Customizing for the costing variant (Transaction OKKN) in the tab "Misc.", you chose "Messages online" for the Error Management option.
    Solution
    Change the error management for the costing variant to
    "Log and Save Messages..."
    Many thanks for your inputs.
    Venkat

  • Costing Run Error: No Valid Source of Supply

    Hi Experts,
       I am new to Costing,
        While executing Costing Run for a matrial ABC in plant XXX with a Costing Run 111, I get an error No valid source of supply could be found
    but when I run the Costing Run for Same material for sam plant with different Costing Run It gets executed properly.
    I have read the thread related to it where it is giving reference to note 713111, 499699 and 422926 but there is no check for Source List in Material master.
    Regards,
    Rajdeep Rane.
    Edited by: Rajdeep Rane on Jul 24, 2008 1:30 PM

    Rajdeep
    Use OKKN as Jigar says.  
    Select the costing variant that you are using and then click on "valuation variant"
    Look at the tab for subcontract - this will show what the costing variant is useing to creat cost estimates with.
    Your options for subcontracting are:
    2  Effective Price from Quotation Without Fixed Costs
    3  Net Quotation Price
    4  Gross Quotation Price
    5  Effective Price from Quotation
    6  Effective Price from Purchase Order Without Fixed Costs
    7  Net Purchase Order Price
    8  Gross Purchase Order Price
    9  Effective Price from Purchase Order
    If your material has a Special Procuremnet key 30 - then one of these strategies has to be used.

  • Costing Run Error

    Hi All,
    I am currently trying to roll cost for materials but have an error that i can not seem to resolve, i hope someone can assist me and help me understand.
    While rolling the cost for a specific material the MFG Overhead cost is not being calculated correctly, i have looked at the routings for this material and do see where the error might stem from, but i do not think it can be corrected from there.
    The error is that in the routing the cost for MFG Overhead is calculated by adding Labour (1H) and Setup (0.017) and MFG Overhead = 1.017.  The lot size of this material is 300 but when roll up the cost with CK11N per unit the Set up value is 0.003 but the MFG Overhead does not calculate in the same fashion it remains as 1.017 (it should be 1.017/300 = 0.0033 ) This is causing a massive discrepancy in costing.  Now one solution is that the amount can be corrected externally and then update the routing and run the costing, but there will be an issue if the lot size is increased in the future (instead of 300 the lot size is increased to 400, now the routing will have to be change to 1.017/400 = 0.0025).  How can i correct the logic within SAP?  I have tried configuring the costing sheet, but i am not not sure where to change it.  In my costing run i am using costing variant PPC1.
    I have tried being as detailed as possible, and i hope it is coherent.
    I would really appreciate you help and points will be awarded.
    Thanks in advance

    Hi Althea,
    Thank you for your response.
    In the routing we have removed the MFG Overhead and now are using the Costing Sheet to calculate the Overhead.  I think i have updated everything, eg costing sheet, costing sheet components, percentage overhead rates, costing variants.  But now the requirement has changed again!!!! Just when you think you have crawled your way out of a ditch, someone pulls you back in. 
    In the legacy system they were able to calculate overhead in relation to cost centers ( Setup, Labor and Overhead for 403, Setup, Labor and Overhead for 403B and for 407 etc), but in the costing sheet you can only enter one cost center, is it possible to enter multiple cost centers and where would i do that?
    Now i had a cost element for Overhead, but in the cost element category was incorrectly selected as 43 (Internal activity allocation) instead of 41 (Overhead rates) now when i am trying to use select that Cost Element in the Costing Sheet under the credit area it will not allow me to save it.  I have created a new cost element but i am not certain what the impact might be
    Please help!!!
    Thanks in advance

  • Error during release of costing run

    Dear All ,
              While I am trying to release a costing run in CK24 for a material the system is giving error "Use Price Change in Material Ledger for material " , message No : M8 313.
              Can anybody tell how to overcome this situation .

    Hello,
    in CK24 are giving correct material code and plant
    if yes just check the pricing indicator i think it is V that is reason system generating this error and at the time of costing run also there may be some errors. By click on the error log you will get some more information
    Regards,
    sankar
    Edited by: durga sankar on Jan 29, 2009 10:11 AM

  • Error in the Transaction CK64 - Costing Run (CK 318 and CK 361)

    Hi Everybody,
    Please, when I use the transaction CK64 to costing run, i see the following message of error:
    1) First Error: CK 318
    CK 318 -  Cost estimate for material & contains errors -> Planned price
    CAUSE                                                                   
    When an assembly was valuated, the system found that the cost component   
    split of material component &V1& from plant &V2& contains errors.         
    SYSTEM_RESPONSE
    The cost component split with errors is not changed.  Instead,            
    valuation is carried out with a price from the material master.  This     
    result goes into the cost rollup.  This happens so that the costing       
    result of the finished product is still meaningful.                       
    </>Note</> The subsequent valuation is always with valuation variant     
    &V3&.  Valuations with a manual cost component split are not taken        
    into account.  This affects the following two cases:                      
    strategy '8': valuation with manual cost component split                  
    the possibility to calcualte manual cost component splits in addition     
    to the valuation strategy entered.                                        
    WHAT_TO_DO
    Analyze the cost component split with errors and solve them.     
    Where can I found the "cost component split"? Would be a information of Data master material (MM03)?
    2) Second Error: CK 361
    Value of costing item & in itemization is 0
    CAUSE
    The cost estimate for the assembly contains item &V2&, which has no 
    errors, but was costed with a value of zero.                        
    WHAT_TO_DO
    Please check item &V1& in the itemization of the assembly concerned.
    Where can i found this information of itemization??? I was looking in the data master of the material but i can't find. 
    Please, how can I solve this problems?
    The status of the costing run for this materials is "KF - Costed with errors"

    Thank you Rob. I guess our only option is to call each steps of CK40N by separate transactions. Do you know why when calling CK64 (costing) in background, the transaction in BDC will automatically change to CK40N even CK64 is hard-coded?
    Thank you very much for your advice.
    Minami

  • Costing run problems

    while running costing run, system is showing following error messages.
    1. Msg No. 240     Cost component split costed with value of zero
    2. Msg No. 168     Cost estimate for material PC-ROH3 / plant is incorrect     
    Pl. guide
    Ranjeetsinh

    Hi Maddy
    Please check the long tesxt for the error message
    60000001
    The system found errors in the cost estimate of material component 60000002 from plant 60000003.
    60000004
    The results of raw material cost estimates that have errors are not used in the product just costed. Only cost estimates that do not have errors or that were released are used in 50000001.
    All assemblies that contain material 60000005 from plant 60000006 in their structure are indicated as incorrect.
    The message sets the costing status of the 50000002 to 'costed with errors'.
    60000007
    Eliminate the error at the highest 50000003
    thats all
    Regards
    SK
    Rewrd your points

Maybe you are looking for

  • Can I use iCloud storage to upgrade my 4s to IOS 8.0.2?

    IOS 8.0.2 won't install on my iPhone 4S due to a lack of storage. My current iCloud storage amount is 4.8GB. The update requires 4.7GB of storage to update. Can I use the iCloud storage to upgrade the phone? If so how do I set that up?

  • Help with scrolling Panel loop

    Hi, I doing a flash scrolling Panel creating the buttons dynamic with xml, like the scroll panel made in gotoandlearn "scrolling thumbnail Panel" but creating each button with xml. well this works fine. but I want to do if a panel that loop if I move

  • Server 2003 to 2008 DCPromo fails - "The filename, directory name, or volume label syntax is incorrect"

    I've done the adprep32 on 2003 server standard for /forestprep, /domainprep, and /rodcprep without an error, as instructed by several docs on web.  But in final stage of dcpromo on 2008 server standard, it fails with Active Directory Domain Service c

  • Error in calling a method from Web services

    Hai Experts,                 When i try calling a method in web services from webdyn pro its not being called, i get a error SAOPFAULTCODE: 1 . wat might be the problem? The thing i am working with is tat when a employee try to create a FTR(HCM : Tra

  • Deploying  ejb in Jboss got error

    I have created the day05_signon.jar and META-INF directory and put it in default/deploy got error message day05_signon.jar status : null state fail watch day05_signon.jar am i doing anything wrong?pls advise