ERROR in depreaction area assign to company code

HI all,
i am using ECC 6.0. i copied depreaction area from USA and tried to assign same to my company code but it is geving following error:
Inconsistency between FI company code 1234 and chart of deprec. 123C
Message no. AC481
You tried to assign chart of depreciation 123C to company code 1234. According to its Customizing definition, this company code manages parallel currencies.
The chart of depreciation does not contain a corresponding depreciation area for each of the currency types that are defined in the company code.
System Response
This assignment is not possible.
Procedure
1. Check the currency types of the company code.
2. Specify a corresponding depreciation area for each currency type.
can any one give me solution for this problem
Thanking you

Hi,
if you use multiple local currencies in FI, then you have to set up so called "parallel depreciation areas" to at least depreciation area 01 (more precise to each realtime posting depreciation area). And I would recommend to set up as well parallel depreciation areas to all other posting depreciation areas (periodic or direct posting and/or posting depreciation only).
You can find detailed information in the SAP Help Portal under [Parallel Currencies in General Ledger Accounting |http://help.sap.com/erp2005_ehp_03/helpdata/EN/4f/71dfb9448011d189f00000e81ddfac/frameset.htm]
Regards,
Markus

Similar Messages

  • Error " material is not assigned to company code" How do I

    Hi
    Guys I am getting the error
    " material is not assigned to company code" How do I solve it?
    Thanks
    samuel

    hi samuel,
    this error is due to the fact that you must have assigned the plant to this material and that plant is not assigned to your company code. or the other case may be the organisational levels whic you have maintained in which you enter your sales org. check if that sales org is assigned to your company code.
    in short chec all the assignments related to your enterprise structure.
    Regards,
    Archit

  • Error--Control indicators not assigned to company code

    While creating PO in IDEAS following error is coming.
    "Control indicators not assigned to company code"
    Pl . suggest the remedy,
    Thanks a ton,
    Regards,
    NB

    Goto T code OKKP select your co.code on left side click on Activate components.
    in first tab " activate components" activate cost center ,  order mgmt, comm mgmt etc and save it.
    Reward if useful;
    Rgds
    GIrish Kavital

  • Assignment of company code to the Equipment.

    Hi All,
    I am new-able in sap pm please guide me.
    During creation of Equipment why we are assigning the Company Code, if plant is already assign.
    What is the need of company code.
    Thanks & Regards,
    B.K.Pathak.

    You will not assign the company code manually. Once you assign Maintenance plant, system will copy from the Enterprise structure configuration.
    To validate the usage of company code in equipment master:-
    Asset numbers will be assigned to company code. These assets are created against company code only.
    Cost centers will be assigned to equipment. Cost centers are created against company code / controlling area.
    To validate the Asset & Cost Center entries in Equipment master, company code should be available in Equipment master.

  • Error as no calculation procedure assigned to company code

    Dear Member,
    I am SAP hr Fresher, Im practising in IDES,
    When i create Personal Area iam getting
    Error as no calculation procedure assigned to company code???
    What should i do???????
    Help me out experts.......
    Thanks
    Jose

    Please execute t-code OX02 and assign your company code to the country in which it exists.
    Hope this helps,

  • One controlling area  with two company codes assigned with one CoA

    Hi,
    I   am having one controlling area  with two company codes assigned , i am using the same  gl for two company codes  as cost element , when i am positng the  miro for vendor purpose  it posted the error  , to avoid the  price difference purpose , i have given  one cost center  of  first company code in OKB9 , and  overcome the error , entries posted, when i am posting new entry for MIRO   in secod  company codes with same cost  element ,  price difference of that account should go to the other cost center  which specifically created for second company code,  in the OBK9 i have given  cost center first company code   of the same GL  account , now this is another new entry in the second company code with other cost center in the second company code  since the price difference  account should sit in the other cost center of second company code,  how to  over come  this problem, pls help me
    Thanks and regards
    Murugesan

    Hi,
    First, remove the default cost center in the cost element. Then, for the system to derive the correct cost center for each company codes, define one cost center for each compny codes in OKB9 just like this:
    Co Code   Cost Element   Cost Center
    1000          1000000              A
    2000          1000000              B
    So during MIRO, the system will derive these values you maintain in OKB9.
    Regards,

  • "Check Business Area of the company code" error while posting stock

    Hi Experts,
    While posting stock to a storage location of a plant , the system is giving me the following error message :
    "Check Business Area of the company code" .
    Would highly appreciate if I could get some info for this error message and how to resolve the same.
    Thanks & regards
    Vikas Hali

    hi
    i think division is missing in material master basic data , please enter division in basic data tab in material master then you will try ,
    then post the stock
    regards
    vijay

  • Issue in Assignment of company codes to controlling area  TKAO2 and OKKP

    Hello Gurus,
    I configured company code and controlling area in development client  and transport to Testing client.But in QA client I can see  in the Table TKA02 and respective assignment of company code to controlling area .But if I am checking in TCode OKKP and selecting Controlling area and checking the company codes assisgment there is no asssisgmnet. is this issue relating to transport as I am FICO consultant not geting solution.
    This issue pertain to only one  controlling area other controlling area with there company code assignment is correct.
    Thanks a lot
    Edited by: Manu Rathore on Apr 7, 2011 8:56 AM
    Edited by: Manu Rathore on Apr 7, 2011 8:58 AM

    Hello Balaji,
    But I transport everything through one transport request and I haven't maintain any sequence.can this issue  be due to mine non maintaining   of sequence in transport request or something else?
    if so How to solve it.
    Many Many Thanks
    Manu

  • Personnel area without assigning to Company code.

    Hi All,
    Can you let me know the scenario where it is not mandatory to assign a company code to the personnel area ?
    Also, is it possible to configure SAP HR for a personnel area in such a situation?
    Thanks & Regards, Swapnil Mishra

    Hi Swapnil,
    I think assignment of Personnel Area to Company Code is required when SAP HR-Payroll results are posted into Accounts, means it is required for integration of SAP HR and SAP FI. Also you will find a feature 'PPMOD' used during accounting posting also use BUKRS in decision tree.
    Regds.
    Suman

  • Unable to assign multiple company code to a controlling area in PPOME

    Hi Experts
    In PPOME I was trying to assign multiple company codes under 1 controlling area in account assignment. e.g. ABC is the company, its 2 company codes, ABC1 and ABC2.
    In PPOME when I am assigning the root org unit (ABC) with controlling area ABC1 and company code ABC1, it hierarchially inherits the below structure.
    Whereas when I want to change the company code for ABC2 orgunit, it doesnot give the provision to change. It hierarchially inherits the root org unit structure.
    I have tried to differentiate it by creating different costcentres for different companycodes, but that also doesnot help to fulfill the need.
    Please help me to solve the issue as early as possible.
    Warm Regards
    Anwi

    Hi Rajdeep
    The same function can be handled from PPOME also, because in case of assignment of enterprise structure components with org structure components we use IT 1008.
    However, if yours process is followed, then also I am unable to change the COMPANY CODE. Rest can be well taken care of.
    Cheers
    Anwi

  • Can we assign 2 credit control area for one company codes

    hi,
    sap gurus,
    can we assign 2 credit control areas to one company codes ?
    yes we can.
    but
    what is the impact of that
    can any one analyse.
    regards,
    balaji.t
    09990019711

    Hi,
    we can have multiple credit control areas based on req-
    eg: client wants to restrict customer based on divisoin wise.
    then we will maintain credit control area based on sales area
    there 3 division in a comp: AA -BB - CC
    thens sales areas will be:
    1000-10 -AA
    1000-10-BB
    1000-10-CC ( assuming therez one sales org-1000 & dc 10)
    now create 3 cr control areas- OB45
    Assign sales area to cr Control area - OVFL
    Assign permitted credit control areas to comp code - IMG- FA- AR&AP- Credit Management- Credit control account - Assign permitted credit control areas to comp code.
    Now you can assign this Cr CA- by sales area wise in CMR & maintain the credit limits for each Cr CA.
    So when ever your needs wants to do it by division or sales area wise you can do this.
    Thanks,
    Raja

  • Assignment of Company Code to Controlling Area

    Hi All
    Please see if you can help me out.
    I am working on a Singapore project.
    I have 4 company codes say 2000,3000,4000,5000 which have been assigned to a company SGSS.
    Then I created a controlling area S001.
    I successfully assigned Company Codes to Company & Company Codes to Credit Control Area 5100.
    But when I try to assign my Company Codes to Controlling Area S001, the system throws a problem saying,u2019 Data in Company Code 2000 is not maintainedu2019.
    I have maintained all the data in Company Code 2000. But as per my knowledge we donu2019t maintain u2018currency, fiscal year variant, and chart of accountsu2019 in Company Code. All these fields are maintained in u2018Controlling Area S001u2019.
    __Data in company code 2000 is not maintained.__
    __Message no. KT294__
    __Diagnosis__
    __Assignment control requires that the currency, fiscal year variant, and chart of accounts are all maintained in the company code. At least one of these settings is not maintained in company code 2000.__
    __Procedure__
    __Complete data maintenance in company code 2000. Only then can you assign company code 2000 to controlling area SG01 possible.__
    Please see if anyone can bring some light on thisu2026..
    Thanks & Regards

    Hello,
    You need to fulfill two basic rules to assign two or more
    Company Codes under the same controlling Area:
    Operating Chart of Accounts shall be the same for all
         Company Codes.
    Fiscal Year Variant shall be same for all Company
         Codes.
           However, the fiscal year variant in the controlling area and the company codes
           can have different number of special periods. The number of posting periods
           must be the same.
    Please recheck that you have fulfilled these.
    Regards,
    Ravi

  • Assignment of multiple credit control areas to single company code

    Hi Friends,
    Is it possible to assign multiple credit control areas to single company code?  If possible please explain
    me how it is possible. Any help will be highly appreciated.
    Thanks a lot in advance.

    Dear Ramesh,
    It is not possible to assign multiple credit control areas to the single company code but you can assign single credit control area to the multiple company codes.
    Relation bet ween company code and credit control area is
    Many  to One
    But not
    One  to Many
    I hope this will help you,
    Regards,
    Murali.

  • Can We Two Different Credit Control Area to 1 company code using cross comp

    Can We Two Different Credit Control Area to 1 company code using cross company code assignment.Tried but giving error at the time of bill release.Experts Can you help?

    Hi,
    It is not possible to have more than one credit  control are for a single company code.

  • Changing plant assignment to company code

    Hi,
    Need your help urgenly!!!
    We have a plant AXXXX assigned to company code AXXXX over a year and we have number of open PO's , GR's and delivery etc for this plant and now we want to change the assignment as plant AXXXX to be assigned to company code BXXXX.
    Here i want to know the impact on MM as well as FI point of view for changing the company code assignment for the plant.
    Regards
    Mariappan V

    Despite of the fact that OX18 allows it technically to re-assign a plant to another company than before (it must be possible as anybody can make errors which may need to be corrected), I personally would not do this for a plant which was already active. At least I would ask SAP directly for advice.
    e.g. if you have stock in this plant, then the stock value will not automatically transfer from company A to company B's General ledger, just because you reassign a plant in OX18.
    A purchase order has as well the company code mentioned in the header data. And there are several error messages that may come up when changing those purchase orders after a reassignment, as this company code conflicts with the new company code.

Maybe you are looking for

  • Dual monitor setup on this mac

    I need to use a dual monitor set up on this Mac. My profiler shows this for graphics Chipset Model: ATY,RV200 Type: Display Bus: AGP Slot: SLOT-1 VRAM (Total): 32 MB Vendor: ATI (0x1002) Device ID: 0x5157 Revision ID: 0x0000 ROM Revision: 113-91701-2

  • How come FCP X requires v10.8.3?

    In the Mac Store, Final Cut Pro X says: Requirements: 10.6.8 or higher but when I try installing it on my MacBook (which has Mountain Lion) it says "requires v10.8.3 or higher" Why does it say that? That's a contradiction!

  • Forms personalyzation, passing Form field values to SRS concurrent request.

    Hi, Iam calling an SRS from forms personlization. Can any body tell me how to pass the Form field values as parameters to the Reports. (Example when they call this Concurrent request from Transactions screen, The invoice number should be defaulted in

  • Remote enabled function module to copy a variant

    Hi Kindly let me know whether there is any remote enable function module to copy a variant  and save a  variant. Thanks and Regards neeta

  • Entourage constantly says "now updating calendar"

    I'm on a new MBP with Snow Leopard 10.6 using Entourage 2008 (using Exchange), and the calendar constantly says "Now updating Calendar." Mail is fine, calendar is not.  The problem is, it is not syncing calendar items added/edited from my iPhone or f