Error in Inspection plan check

Hi Gurus,
I have maintained inspection plan. When I check it found below error.
Char. 0020: sampling procedure SMP02 cannot be used
Message no. QP215
Diagnosis
The sampling procedure cannot be used. This may be due to one of the following reasons:
The sampling procedure:
is locked
does not fit the characteristic type
does not fit the inspection point indicator in the plan header
Procedure
Select another sampling procedure.
In sampling procedure,Sample type is 100 Fixed sample & Valuation mode is 700 Mean value within tolerence range,Control chart type is 901 Shewart chart for x-bar/n=1/Sample
Where do I wrong.

One last reply
1.If your char is quantitative type then select the valuation mode as one of the "variable " type
2.If your char is qualitative type then select the valuation mode as one of the "attribute" type
means say for 700:Valuation of mean value within tolerance limits
Valuation of a quantitative inspection characteristic according to the mean value in relation to the tolerance limits.But if you try to use this sampling procedure to a  qualitative type mic then it will not work

Similar Messages

  • Routing Entry error during Inspection Plan creation in BAPI

    Hi,
    A Material has an task list created manually thorgh QP01. Am trying to created another through BAPI  BAPI_INSPECTIONPLAN_CREATE , changed the group counter to 2, but left the Task list blank. The change number field is also BLANK. Other data are populated for structures.
    While executing the BAPI   I get the error  "For further processing, the routing entry is missing", the Operation number is passed correctly. Which routing entry is it referring to ?
    Help with some pointers.
    Rgds,
    stck

    Hi,
    I could execute the BAPI BAPI_INSPECTIONPLAN_CREATE for a Material with already existing Task list.
    But i had to pass the Change Number, Set the Change Rule to 1 (With Change Number) and Change Value = 0.
    But the new created Task group counter does not allow any more changes beacause of the Change rule = 1.
    Can we not create a task for existing Material without the change number?
    Even if we create with change number how can we allow it for changes?
    What has to be the value combination for Change Rule and Change Type for allowing the change to task?
    Appreciate your inputs.
    Regds,
    stck

  • Inspection plan 2985 has been deleted error

    Hi,
    We ahve created a new material and gr made for that materail as it is coming frist time we have created a inspection plan with QP01, but when i done  QA02, chnage inspection lot to calculate the sample quantity system is giving error that   Inspection plan 2985 has been deleted , and we are not getting the sample quantity and also the material is not coming in QE51 to update .
    regards,
    zafar

    Hi Zafar,
    Make sure you have assigned the material to a valid inspection plan in transaction QP02, once the material is assigned to the plan then go to QA02 under the inspection spefication tab click the task list / spec button, this will then automatically assign the inspection plan to the inspection lot. If you have assigned the material to multiple plans for the same usage it will give you a pop up selection of which plan to choose. Once the plan is assigned you will be able to see the inspection lot in transaction QE51N.
    Regards,
    Roderick

  • Error while uploading Inspection plan

    Dear Friends,
    I am creating inspection plans using BDC. The MIChas 2 versions. When i am using version 1, the inspection plan is created. Whereas when i am using MIC version 2 i am getting error "error occured while checking type group".Kindly let me know how do i resolve this.
    Regards
    Vivek

    Hi,
    Thanks for the reply. when i am trying to create a inspection plan in other plant, we have 4-5 sampling procesures to select from. But for this perticular plant where we are having problem, its showing only one. How do i get more options?How do i extend a sampling procedure to a new plant.
    Vivek
    Edited by: vivek mankad on Feb 23, 2010 7:57 AM

  • Errors while creating Inspection plan using BAPI_INSPECTIONPLAN_CREATE

    Hi All,
    I am writing an upload tool for inspection plans. In this program I use bapi: BAPI_INSPECTIONPLAN_CREATE.
    I made an extraction of a excisting inspection plan with SXDA_TOOLS which uses the same bapi and filled the bapi structures with the similar data. Now I am getting strange messeges in the return structure as below.
    1. Material is not maintained for plant NNNN. But the material is mainained for that plant.
    2. Consistency check not successful when creating operation
    3. Inspection characteristic cannot be uniquely assigned to one operation
    Let me know your suggestions
    Thanks,
    Sabu

    Hi All,
    Have any one used this BAPI, BAPI_INSPECTIONPLAN_CREATE to create Inspection Plan ?
    Can you help me on above errors?
    Thanks in advance,
    Sabu

  • Inspection plan creation error....

    Hello gurus,
    I am getting error while creating inspection plan....
    'Work center ABC plant ABC does not exist for task list type Q'
    what should be the solution......?

    Double check that the plant for the inspection plan matches the plant for the work center. If you created the work center in plant ABCD but are creating the plan in a different plant, they may not match.
    This usually happens when you create a plan by using an existing plan in another plant as the template.
    FF

  • Error while creating the Inspection plan by T.C QP01

    Hello Friends,
    In QP01, When i am trying to create a inspection plan system throwing the error message "The inspection plan identifier exists already. Enter another."
    Message no. QP054
    But in QP02, When i checked  for that material, Plant, Group Number, Group counter, Usage, Status, i didn't find the entry over there.
    Actually my requirement is to create a inspection plan for a material and plant combination with speicfic Usage as 61(customer requirement and status 4) but when i am trying to create that system throwing the error message explained above.
    Thanks and Regards,
    Jitendra Chauhan.
    Edited by: jitendra chauhan on Jun 1, 2010 4:28 PM

    Hello Friends,
    Thanks for your valuable answers.
    I checked in table MAPL, for a particular material, Plant, Group Number and Group Counter, there is no entry.
    Where as in table PLKO, for a particular Group Number and Group Counter, entry is there. Actually this Inspection Plan Group Number and Group Counter is assigned to multiple materials through Material Assignment. If i delete the entry for this in table PLKO, than for all rest of the materials also entry will be deleted.
    Hence how to resolve this?
    Actually for other material number, same plant, same group number and same group counter, entry exist. So can i simply go in the inspection plan of other material,same plant,same group number,same group counter and than inside the material assignment to assign the required  material code, plant and the group counter number?
    Looking ahead for valuable inputs from the genius.
    Thanks and Regards,
    Jitendra
    Edited by: jitendra chauhan on Jun 2, 2010 8:09 AM

  • Error in LSMW in Uploading Inspection Plan in QP01

    Hi All,
    I am facing problem when executing LSMW, I am Uploading Inspection Plan in QP01 transaction using Direct Input methos. The problem is on 13th step :Error that I get is 'No profile with entry tool for task list / / / in session INSPECTION_OBJ', here INSPECTION_OBJ is the name of the session. I have given the constant value of field profile (BIPKO-PROFIDNETZ) in mapping step and also activated check box 'entry tool' under profile to remove this error. But in  that case i can pass only the header data while processing the session and control does not get into Operation and characteristic screen.
    Can anyone pls help me..
    Thanks in advance...

    You might need to redo the recording all over again, BDC has plentty of scenario for screen selection to go wrong, so can't really tell what cause your problem based on your desc.  I have been stop using BDC to uplaod material since 5 years ago, I always use Direct input in LSMW and it works much better. I recomend you try the Direct input method instead of BDC if still getting problem.

  • ERROR WHEN RUNNING B.D.C FOR ASSIGN OF INSPECTION PLAN TO MATERIALS

    HI GURUS,
    WHEN I RUN B.D.C TO ASSIGN INSPECTION PLAN TO MATERIAL
    I AM GETTING THE FOLLOWING ERROR.
    Error occurred when checking type  group .
    Message no. CP852
    Diagnosis
    Errors occurred when checking the routing.
    Procedure
    u2022     If the check occurred online, display the checking log and remove the causes for the errors.
    u2022     If you saved the routing, call it up again and check it online.  Display the checking log and remove the causes for the errors.
    +NOTE: THIS INSPECTION PLAN WE HAVE ASSIGN MULTIPLE+ M.I.Cs WHICH ARE SIMILAR E.g.
    CHARA180:SMS,
    CHARA:190:SMS;
    CHARA:200:HRM:
    CHARA:210;HRM
    WHEN WE RUN COPY MODULE B.D.C.WE ARE GETTING ABOVE ERROR.
    REGARDS
    AMIT

    Hi Atul,
    WHEN WE DELETE THE REPEATED M.I.Cs AND ONLY RUN THE B.D.C WITH 16 CHARACTERISTICS WHICH ARE NOT REPEATED. THE PROGRAM/RECORDING RUN SUCCESSFULLY.
    AS SOON ADDED THE M.I.CS WHICH REPEATED IN CHARA:170,CHARA:180;CHARA;190;CHARA;200;CHARA;210;CHARA220.
    WE ARE NOT ABLE TO SAVE THE RECORDING AND WE GET ABOVE ERROR.
    MY ABAPER IS SAYING ITS A FUNCTIONAL ERROR.
    REGARDS
    AMIT

  • Inspection Plan error

    Hi All,
    when i try to save a Inspection Plan with a Quantitative characteristic message appears "Task List Data contain errors", also i can save at this point. why is this message coming? shall i any way save the Inspection Plan?
    Regards,
    DTD

    Hello
    Please check what is the error you are getting. correct the same and then save
    you can get the log of error in QP01 > Extras (menu button) >  task List check > consistency log
    let me know what is error ur getting
    Regards
    gajesh

  • Error while creating Inspection plan

    Hi,
    While creating inspection plan in QP01, system is showing error  "Material type ZROH is not defined for task list type Q''
    Please help me to solve the error.
    Thanks
    Prasant

    Hi,
    This is due to the configuration error,
    Just use T.Code OP50
    Create an entry for task list type "Q" with material type "ZROH" and save,
    Then try creating a Quality Inspection Plan, it will work
    Regards
    Merwyn

  • ERROR WHEN CREATING INSPECTION PLAN

    HI GURUS,
    WHEN CREATE AN INSPECTION PLAN GET THE FOLLOWING ERROR
    Op. 0010, CH 0180: Char. ident. SMS used for QDI several times in task list.
    THIS BECAUSE MY CLIENT WANTS TO REPEAT THIS M.I.C TWICE.HOW CAN I SOLVE THIS
    REGARDS
    AMIT

    Hi,
    It is not a error message It is a warning message for Use the Same MIC in Multiple time, No problem just you can save the Inspection plan, It will not reflect any problem any where.
    Regards,
    S.Babusingh

  • Error occured during budget check while planning in network activity

    Dear All,
    i have created a project with 4 WBSE. i have assigned budget to one of these WBSE and released that project. than i want to do planning in next WBSE this is giving error while saving this planning as Error occured during budget check, see cost.
    i have created user status for budgeting like if we have not budgeted than WBS is not able to release. i have added availability control as Forbidden while not budgeted but this not effective.
    please suggest me some thing to remove this problem
    thanks
    Sunil

    hi,
    In WBS you can Plan and budget to group WBS , the below wbs will consume budget form top.
    Proj>WBS1(Group WBS- Plan/Budget) it is applicable for below all wbs elements say WBS2>WBS3
    When you are determining Hierarchy you should create WBS in same levels then only you can allocate Budget.
    If you wan to allocate budget for WBS2 and WBS3 separately.
    Proj
    WBS1
    WBS2                    WBS3
         WBS2A                   WBS3A
              WBS2B                    WBS3B
                   WBS2C                         WBS3C
    Proj>WBS1 (it will no more act as Group wbs element) then  you can directly plan and budget for below wbs elements WBS2 and WBS3.
    Below hierarchy will consume budget from as displayed above.
    Note: In you case as per my understanding return budget make zero, then plan and budget the same it will work.
    Thanks and regards
    Sadiq

  • Uregnt pls!! Inspection Plan -Load error

    Hi,
    I am trying to load Inspection plans using Direct input method of LSMW.
    I am getting an error saying
    <b> The control chart in the sampling method does not match the insp. char.</b>
    When I did a F1 following is message.
    where to look in this config?
         Message no. QD240
    Diagnosis
         The control chart type 525 is entered in the sampling procedure used.
         This control chart type does not match the inspection characteristic.
         Examples:
         o   It is assumed that measured values are recorded for the control
             chart.
         o   The control chart is only allowed with a fixed sample size.
         o   The control chart is only allowed with partial samples.
    Any ideas?
    regards
    Praveen
    Message was edited by:
            PRAVEEN s

    Hi,
    May be due to
    if you have inspection point defined in your task list then free inspection point indicator ON in Sampling Procedure.
    I am not 100% sure
    aRs

  • Create Inspection Plan -LSMW -Direct Input -Error with Control Indicators

    Hi,
    I am creating Inspection Plans using LSMW-DIRECT INPUT Method.
    Although MIC's control indicator parameters are correct while creating a plan it is changing the control indicator parameters.
    how can we suppress this?
    I want to use MIC's default parameters.
    Regards
    Praveen

    have Lost Previous File
    what does that mean? did they lose the source that should be used to load the data from?
    without source you cannot load data.
    Had you ever got this source file? how? by mail, then check your old mails and take it from there, ask the sender to he/she checks the SENT folder in his mail system. Maybe someone has a local copy of this fille.

Maybe you are looking for