Error in ODS activation in process chain

I am getting errors when activating request using process chains.
Error message is Message No. RSM1102.
Please suggest if any notes apply for this.
Regards,
Nitin

Hi,
This happens when data is not acceptable to ODS  definition. Data need to be corrected in PSA.
Check  for Infoobject which has caused this problem in the monitor details tabstrip. Delete request from datatarget after changing QM status to red. Correct data in PSA and update data back to datatarget from PSA.
Cheers
Raj

Similar Messages

  • Error in ODS Activation

    Hi Friends,
    I got error when the ODS activating in Process Chain.
    The Error Messages are
    1. Inconsistent aggregation behavior - activation will be terminated.
    2 Activation of M records from DataStore object 0PUR_DS03 terminated
    in the data target (ODS) the request are in Red but activated as it is showing Request For Reporting Available flag having Query symbol..means the requests are available for reporting.
    What should be the possible reason
    How should i rectify it.
    Thanks&Regards
    Anand

    hi,
    I have activated ODS manually yesterday. the chain ran today.
    But today i got the below error while data is loading into ODS.
    Error Message Below.
    Runtime Errors         RAISE_EXCEPTION
    Date and Time          07.04.2009 03:43:06
    Short text
         Exception condition "NOT_EXIST" raised.
    What happened?
         The current ABAP/4 program encountered an unexpected
         situation.
    What can you do?
         Note down which actions and inputs caused the error.
         To process the problem further, contact you SAP system
         administrator.
         Using Transaction ST22 for ABAP Dump Analysis, you can look
         at and manage termination messages, and you can also
         keep them for a long time.
    Error analysis
         A RAISE statement in the program "SAPLRSSM" raised the exception
         condition "NOT_EXIST".
         Since the exception was not intercepted by a superior
         program, processing was terminated.
         Short description of exception condition:
    For detailed documentation of the exception condition, use
    Transaction SE37 (Function Library). You can take the called
    function module from the display of active calls.
    Please sugeest to resolve the problem
    Regards
    Anand

  • Error while Activating a process chain

    Hi,
    I have just modified the existing process chain with the new info package for loading into ODS and then delta update into the Info Cube.
    when i am clicking on the option schedule and activate.
    Its giving error as :
    "InfoPackage ZPAK_49RJW545FSO2MB3NF1MIZ9NJ9 is
    generated; NOT able to be used as loading variant"
    This is a IP, which is used for delta update from ODS to cube.
    I have checked the IP, its fine like i can do the delta through this pacakge manually.
    Please help, points will be rewarded....

    Dear himanshu arora  ,
    Go and check whether the Info Package exist ,
    You can check in Rsa1 and give IP name and find it.
    If your IP is not there please create it,
    If tehre please check the all parameter associated with it.
    Also go through these
    Process Chain Errors
    /people/mona.kapur/blog/2008/01/14/process-chain-errors
    Process chain creation - step by step
    /people/juergen.noe/blog/2008/01/11/process-chain-creation--step-by-step
    Data Load errors and Process chains
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    ope the following links will give u a clear idea about process chains and clear ur doubts.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
    Business Intelligence Old Forum (Read Only Archive)
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Siggi's weblogs for data load error and how to restart process chain
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains
    Hope it helps
    Regards
    Bala

  • DSO activation in Process Chains - takes long time

    Dear All,
    We have included DSO activation in Process Chains. This process takes a long time to execute. We manually cancel the corresponding process in Process Overview and repeat it from chain. The chain runs daily and this issue also occurs on a daily basis.
    Does anyone one of you have an idea of how to deal with this performance issue?
    Regards.

    Figure out in which class does your process fall in:
    Class A- High Priority
    Class B- Medium Priority
    Class C- Least Priority
    Background processes
    Class A jobs
    The number of work processes reserved for job class A is a subset of the number of background processes.
    You should only reserve work processes for job class A if it makes sense within your system organization. Work processes reserved for class A jobs are no longer available for job classes B or C.
    Set parallel processing for a specific BW process in the (variant) maintenance of the process
    Call the function for setting the parallel processes.
    You can call the function in the process variant maintenance of a process chain or in the process maintenance. The function call varies for the different BW processes.
    For example, in the data transfer process you call the function with Goto-->  Background Manager Settings.
    The Settings for Parallel Processing dialog box appears
      Under Number of Processes, define the maximum number of work processes that should be used to process the BW process.
    If you enter 1, the BW process is processed serially.
    If you enter a number greater than 1, the BW process is processed in parallel
    In the Parallel Processing group frame, make the relevant settings for parallel processing in the background:
    Enter a job class for defining the job priority.
    The job priority defines how the jobs are distributed among the available background work processes
      In the group frame Parallel Processing, you can define whether parallel processing should take place in dialog work processes or in background work processes for the processes ODSACTIVAT, ODSSID and ODSREQUDEL for the DataStore object
    Transport:
    The entries in tables RSBATCHPARALLEL and RSBATCHSERVER are written on a transport request of the Change and Transport System.
    Edited by: ram.pch on Oct 7, 2011 9:55 PM

  • Error in ODS activation due to # character

    For last two days I have been getting the error in the process chain. The process chain stops at ODS activation because the data contains '#'. I have gone SAP Note 173241, which says that # value is allowed in data. Is there any way to remove # from the data. Thanks in advance

    It could be hexadecimal char in the load it would display as '#' but actually it would be some hexa char.
    Either you can track it based on the log and edit in PSA and see if you can correct it in R3 as well.
    We do have some of those come in our various desc fields, just modified a simple FM to strip our the not allowable char that are not in RSKC.
    let me know if u need the FM i'm using to strip out hexa
    Mayil

  • Error in First step of Process Chain

    Hi everybody,
    i have created a process chain with a start process (direct scheduling) to InfoPackage to load into InfoCube-so delete indexes and generate indexes were automatically inserted becoz of default chain option.
    i have checked the chain-- the message was chain is ok but when i activated the chain it gave a error message job-delete index cannot be scheduled return code-8. In addition to this, i checked the status of indexes and DB statastics at cube level and it's showing green light. Further to that, when i checked sytem log, it is displaying
    "> illegal values in step one....the Job_submit was not defined
    properly..???"
    Any inputs to this topic highly appriciated.
    Thanks and Regards,
    ~Sapins

    Make sure you have the following steps in order in your process chain.
    1.Start Process Variant.
    2.Delete Indexes step.
    3.Load data.
    4.Create Indexes.
    5.Roll up (if required)
    6.Compression(if required)
    7.Completion job.
    8.PSA deletion(if required)
    I process chain should allways start with a start Process variant step.
    Thanks,
    Uma Srinivasa Rao

  • DSO cannot be activated when process chain is launched from BPC

    Hello,
    we are facing the following issue in our project: we have created a process chain that loads transactional data into a DSO and then a BW cube. From there we will be launching the data into BPC.
    The process chain that we have built is working and loading OK when this chain is launched from the RSPC trx. However, when launched via the datapakage "Execute Process Chain in BW" data are loading OK from the source system up to the DSO, but the activation does not take place.
    The error that we are getting on the BPC data package is:"An exception with the type CX_SY_DYN_CALL_PARAM_MISSING occurred, but was neither handled locally, nor declared in a RAISING clause
    Call of the method IF_RSPC_GET_PARALLELIZATION is SINCHRONOUS of the class CL_RSPC_CHAIN failed; the obligatory parameter I_VARIANT has not been filled."
    Has anyone faced this issue before? could you please help on this topic? I have tried several options and all of them are pointing to the parameter I_VARIANT.
    Thanks in advance.
    Kind regards,
    Begonia

    Hi Reddy,
    I've deleted deltas load from DOS, then I launched and activated a repair full load from ECC, it worked well.
    After that I went for delta load so the load was OK but the activation failed.
    The message 'Type of data update' was: Repeat of the last delta and the Nº of Transferred and Added was zero.
    ¿Do you think I could solve the problem if I do a repair full load from ECC then I delete the Delta init and create a new Delta init?
    Any another idea?
    In conclusion I'm not yet solved the problem so advices are welcome.
    Regards,
    Jorge

  • Error while Transporting changes in Process chain

    Hi All,
    I have added a Hierarchy InfoPackage in Process chain and added this InfoObject in Save hierarchy and Attribute change Run Process types.
    My transport Request is showing only three entries each for
    save hierarchy , attribute change run and one for Process Chain.
    Now when I transport this changes to Process chain to Acceptance its showing Error message in Acceptance as
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    Process variant LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 does not exist in version A       
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    InfoPackage   no longer exists in object version A in table RSLDPIO                      
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    Variant 'ZPAK_4AY55YMC1H454OQWJUBNJCYE9' of process type 'LOADING' not found in A version
      Errors occurred during post-handling RS_AFTER_IMPORT for RSPC L  
    The errors affect the following components:                      
       BW-WHM (Warehouse Management)    
    My question is , Why the Transport request is not transporting  the InfoPackage.
    Is there any solution for this?????
    Thanks in Advance
    Best Regards
    Pratap Sone

    Hi Pratap,
           The infopackage has not yet been assigned to a package in all probabilty. Change the package and then transport the IP and then transpost the process chain request.
    Regards.
    Edited by: Ansel D'Souza on Sep 8, 2008 7:31 AM

  • Error encountered while running a process chain

    Hi,
    Was wondering what's the cause of this error:
    <b>Invalid call sequence to interfaces when recording changes.</b>
    We keep on getting this error message when we try to activate and schedule our process chain.
    Please help. Thanks!

    We run into this problem every time we Activate/Schedule a Process Chain; doesn't really <i>affect</i> anything. The chain still runs as scheduled once you "OK" through the error messages.
    Seems to be some rogue message that comes up in  more Authorization-sensitive environments (Read: PRD)
    I have researched this to fruitless extents: no Notes exist, etc.
    Sorry I can't be of more help other than to say "<i>I feel your pain</i>"  :-D

  • Error during ODS activation- request deletion

    Hello Gurus,
    We had a problem during ODS activation, could you please help?
    We are on BW 3.1
    Activation of an ODS failed with the message, "Fiscal year variant MC is not maintained for calendar year 2009u201D, u201CError getting SID for ODS object ZODS_O02u201D and u201CError when assigning SID: Action VAL_SID_CONVERT table 0FISCPER."
    The expected data for 2009 didn't arrive, so the activation step in the proces chain has failed.
    What I've done is, just deleted the request from the ODS.
    But while this job was running, there was a short dump, and the same job was shown as cancalled under SM37. Though the request was successfully deleted from the ODS, it is showing as cancelled in SM37.
    I've given below the log details of the job.
    Job started
    Step 001 started (program RSDELPART1, variant &0000000003334, user ID ABCD)
    Delete running: ODS object ZODS_O02, from 310,818 to 310,818
    Delete is scheduled; Selection conditions were substituted
    Request REQU_4AZBURUGR09EXTAS8A9IRZUI4 successfully deleted from ODS object ZODS_O02
    ABAP/4 processor: MESSAGE_TYPE_X
    Job cancelled.
    Could you please clarify the reason for the short dump and for the job getting cancelled?
    thanks in advance,
    Raj

    Hi,
    As an help i suggest you can first check the corresponding message for the "Message type X" in transaction se91.
    Follow the below procedure for the same :
    1.Execute ST22 > Double click on any entries
    2.Go to Source Code Extract
    3.Locate u201C>>>>u201D and you will see Message
    i.e Message X041 (XX) in this example.
    - XX is the message class
    - 041 is the message class no. in the example above.
    4.Now open SE91.Enter the details we found from Source
    Code extract in ST22.Click Display
    5.Find the corresponding message.
    May be the message could much more elaborate your problem so it could be handeled properly.
    Thax & Regards
    Vaibhave Sharma

  • Error in PSA after running process chain

    Hello All,
    I have ran a process chain, which came back with an error.  I have checked the PSA and there is one line which has an error.  How can I resolve it and reload the data into the cube succesfully?  Is there away to delete the data from the PSA and reload it? 
    Thanks,
    Nick.

    Dear Nick,
    I will add the step by step procedure to edit PSA data and update into target (request based).
    Identifying incorrect records.
    System wont show all the incorrect records at the first time itself. You need to search the PSA table manually to find all the incorrect records.
    1. First see RSMO > Details > Expand upate rules / processing tabs and you will find some of the error records.
    2. Then you can go to PSA and filter using the status of records. Filter all the red requests. This may also wont show the entire incorrect records.
    3. Then you can go to PSA and filter using the incorrect records based on the particular field.
    4. If this also doesnt work out go to PSA and sort (not filter) the records based on the particular field with incorrect values and it will show all the records. Note down the record numbers and then edit them one by one.
    If you want to confirm find the PSA table and search manually."
    Also Run the report RS_ERRORLOG_EXAMPLE,By this report you can display all incorrected records of the data & you can also find whether the error occured in PSA or in TRANSFER RULES.
    Steps to resolve this
    1. Force the request to red in RSMO > Status tab.
    2. Delete the request from target.
    3. Come to RSMO > top right you can see PSA maintenace button > click and go to PSA .
    4.Edit the record
    5. Save PSA data.
    6. Got to RSA15 > Search by request name > Right click > update the request from PSA to target.
    Refer how to Modify PSA Data
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40890eda-1b99-2a10-2d8b-a18b9108fc38
    Hope it helps you,Revert me back if you have any queries
    Assign points if helpful
    Regards
    Bala

  • Activating Numerous Process Chains

    Hi,
    Does anyone know how I can activate numerous process chains in BI 7.0, do I have to go into a particular variant for each chain and manually mantain each of the variants to activate or can I do many at a time?  If so how?
    Thanks
    DV

    Hi Guys,
    I am activating the metachains which inturn activate the process chains.  When I have numerous process chains with metachains, is there an easy way to activate the chain without having to go into the process chain/meta chain > go to first event and maintain it to activate?  Once this first event is activated the whole process chain is working actively.  This problem only occurs as I have transported a lot of process chains from Dev and have to activate them in Prod.
    Thanks
    DV

  • Error when trying to execute process chain !!

    guys,
    i am getting following error ..
    " Inconsistency in delta administration"
    where sud i look and what sud i do ?
    also, when i try to check the process chain, its showing error, and followinig is the descreption..
    "@5D@     A type "Generate Index" process has to follow process "Execute InfoPackage" var.ZPAK_D7GU4Y3X6N71IHL2KX784RWPX in the chain     @35@
    thaks
    Edited by: Hon Bon on Jul 9, 2010 6:37 PM

    well,
    there are 3 meta chain, which runs at 3 different time ( fixed , like 1st run at 8:00 am, 2nd on 6 pm and 3rd on midnite ) and all three meta chains are the same, these meta chain has this pc, which i m working on. and thats y i need to put discision , bcoz for all 3 times there are 3 diff. DTP has to execute.
    so, in my descision i am giving half an hour time interval ( 8:00 am to 9:00 am) , (6pm to 7pm ) and ( midnite to 1 am)
    so, depending upon the time , when the meta chain gets executed , from my PC the only on DTP gets executes. and other 2 gets fails. same way at 6 pm when once again meta chain gets executed  and when it comes to my PC my 2nd descision gets setisfies and execute 2nd DTP with option 2. here option 1 and 3 dont work...and so on
    also , i have mention following formula in my descision
    option 1 --> Local Time >= '14:10:00' AND Local Time <= '14:55:00'
    option 2---> Local Time >= '18:05:00' AND Local Time <= '18:20:00'
    option 3 ---> Local Time >= '20:00:00' AND Local Time <= '20:30:00'
    see, these gives you some more information..
    thanks

  • Planning Sequence: Error when runnning in a Process Chain

    When trying to run a planning sequence in a process chain (with the correct variable input variant) I receive the following error message:
    Inconsistent input parameter (parameter: <unknown>, value <unknown>
    When running this planning sequence in the modeler, it runs without errors.
    Any help greatly appreciated.
    Many thanks,
    Matt

    Hi,
    Can you pls explain your requirement..
    1)Are you trying to  trigger this proces chain in the background?
    2)Does the planning sequence which you are trying to execute in the process chain contains a planning function that is expecting some variables to be passed by the user?
    Rgds
    Shyam

  • Error when creatiing transport for process chain

    Hi Experts,
    I am trying to create a transport for a process chain, but when i click on the red truck i get the following error:  Error in Object Editing: Edit objects seperately since they belong to different original systems.
    Can you please advise me on how to resolve this issue? Thanks in advance.

    Has this process chain or some components of it (for example IPAK) been brought from some other system?
    Try collecting all the objects in RSA1/Transport connection - and see the directory entries for each subobject (txnSE03 or TADIR table). You may have to either change the source system for some objects (in SE03) or split the transport objects manually into multiple transports.

Maybe you are looking for

  • Cannot login to iCloud with Yosemite

    Hi everybody, a few weeks ago I updated my iMac to Yosemite. It all works fine except that I cannot login to iCloud with my wife's account. When she logs in into her iMac account it sometimes appears a Mac configuration screen. It seems that everythi

  • Shared drives no longer network accessible on iMac running Mountain Lion.

    Hey all, I've been searching the community on and off for weeks and have not been able to come to a solution.  I have an external hard drive connected to a 2007 iMac running Mountain Lion that has successfully been shared on my network for over two y

  • Importing 35mm and 24fps video

    I have two projects starting now, I want to make sure I'm using the best import/timeline options. One was shot on 35mm, transferred to DVCAM and then to MiniDV. I'm importing off of the MiniDV from a Panasonic DVX100B. The other was shot on the 100B

  • BHCA Calculation for UCCE 8.0.2 for 2011

    Hi everyone, I would like to calculate BHCA (UCCE 8.02) for whole 2011 year but did not find data in Logger database. Can some one help me to calculate BHCA for whole last year. Thank in advance

  • When sp_add_log_shipping_primary_database Creates Alert job - why sp_add_log_shipping_alert_job ?

    Hi,  sp_add_log_shipping_primary_database created two jobs : 1. Backup Job 2.Alert Job . Why do we require sp_add_log_shipping_alert_job ?  Many Thanks Chaithanya M Regards Chaithu.. If it is usefull,Mark this as Answer.