Error in pa40 & Work schedules

Dear all,
Kindly help me out to solve the error......
1)Thread in pa40, while hiring an applicant..
(error message showing: position is not available for the start date of the infotype record.
Diagnosis: The position is available in the position table (t528b), but not for the start date of the infotype record.
System Response: An Organisational assignment for this position is not possible for the choosen date.
Procedure: Please check the validity period of the position and the personnel action.
2) Thread in creating work schedule rules and work schedules...
(Error message showing: Entry SEC 50 does not exist in t508a).
But the entry is avalable in the table t508a.
I have tried to solve but im unable to do. kindly help me out to solve this....
Thanks & Regards
Padmasree

Hi Mr Vinod,
Tnx for ur time, what u said is correct. the position date is overlaping.
i have created organisational structure in the year of 01.01.2008 and position also in the same date, but it automatically taking 01.04.2008.
And changed position date in the table (v_528b_c), but unable change in simple maintanance. Now let me know how to solve this.
[Error message showing: check the entries in positions and in personnel actions]
Thanks
Padmasree

Similar Messages

  • How to fix an error  (related to work schedule rule) in Time evaluation ?

    Hi experts,
    I am getting an error while running time evaluation - PT60.
    Find the log
    Log:TimeEvaluation                                                                                General data                                                                       
    Schema ZM04 Time Evaluation Without Clock Times
    00753402 Christoudas Natalie
    Customizing error in work schedule rule 1 VM 01 5MTWTF Person rejected: 00753402
    How to fix it? Its urgent.
    Be assured of points for useful answers.
    Rajesh

    Hi All,
    I have checked work schedules and work sc. rules. everything looks fine. Reason being fine, same work schrdule rule, i.e. 5MTWTF is used for other employees, whose payroll area, personnel area, personnel subarea, employee group and employee subgroups are same.
    Why it is throwing error for one employee 753402.
    I am providing you more information. In table V_T569r, if u select recalculation category as time evaluation, it is mentioned as 01.01.2003. Initially, one action called "Conversion take on" has been maintained as on 01.03.2002, where employee had payroll area -99 (payroll irrelevant) and personnel subarea - DAYY.
    Then on 17.03.2008, another action ran "Conversion initial reassignment" where payroll area changed to "MT - monthly", subarea changed to DAYF. At that time PDC recalculation date in infotype 0003 was 01.03.2002 which was before recalculation date, i.e. 01.01.2003.
    Time evaluation was throwing 2 error messages. one was solved by changing PDC recaluation date to 17.03.2008. But other error related to work sc rule 1 VM 01 5MTWTF still occurs. 
    Can some body now provide some useful information?
    Thanks
    Rajesh

  • Error while generating Work Schedules

    Hello,
    I am trying to generate Work Schedules manually. I have configured all the previous steps like creating daily WS, Period WS, assigning PSA grouping, assigning Public Holidays etc. When I generate Work Schedules manually, I get the following error message -
    Error while accessing public holiday calendar on 20110101
    Diagnosis
    The function module HOLIDAY_CHECK_AND_GET_INFO has generated an error.
    Please guide.
    Thanks.

    Hi,
    First check the validity period of your Holiday calendar.  If it is until 2010, then the Validity needs to be extended beyond 2010, Write to SAP and ask them to extend the validity period for your Holiday calendar.  Once the validity is extende then generate the workschedules.  As of now generate the workschedules until 112010.
    Regards
    Sri

  • Error message while Creating Work Schedule

    Hi,
    While Hiring an Employee, and creating a work schedule, using the work schedule rule NORM, the error message "No work schedule rule for key 2 00NORM 20100501 ##"
    How do I rectify this issue?
    Regards,
    Arvind
    Please Type the Error in the search forum ............ feild you will find lot of threads related to this issue

    check your PSA grouping in V_001P_ALL

  • Error "No entry in table T551A" while creating set work schedule rule.

    Dear Team,
    I am getting following error while creating set work schedule rule.
    Error "No entry in table T551A" for key 22 BBB [ here BBBB is my period work schedule]
    The actual prob is i configured all the necessary steps but when i tried to create work schedule rule im getting this error. Also, in the same screen there is one field DWS grouping initially value in this is 00 and gread mode. But after giving ES grp, holiday calander ID etc etc when i try to save that screen that value is chainging to 22 from 00.
    My ES grop=2 and PS grop=2 . Is that value is my ES and PS grouping..?? or some other thing.
    Request you to please help me out.
    Regards
    Shab.

    HI, there are 8 steps you need to do below:
    1. Group Personnel Subareas for the Daily Work Schedule
    2. Group Personnel Subareas for the Work Schedule
    3. Define Break Schedules
    4. Define Daily Work Schedules
    5. Define Period Work Schedules
    6. Define Employee Subgroup Groupings
    7. Define Groupings for the Public Holiday Calendar
    8. Set Work Schedule Rules and Work Schedules
    All of them belong to TIME MANAGEMENT. I think you miss some steps above.
    Please check it again.
    Regards!
    Minh

  • Error during approval of customized Work Schedule Substitution Request

    Hi Gurus,
    Good day!
    Just wanted to check your inputs on an error encountered during execution of a customized application done for the MSS approval of a work schedule substitution request
      Application error occurred during request processing.
      Details:   com.sap.tc.webdynpro.services.sal.core.DispatcherException: Wrong WebDynpro-URL: no application name specified
    Exception id: [E41F13C50EFA007600000227000011180004AAD57AFD5474]
    In simple terms, what does this error mean and what are the items that we need to check?
    Regards,

    The error means the dispatcher can't find the WebDynpro application.
    1. Make sure the Business package which contains the application is installed properly (most likely not).
    2. Make sure the PCD-Path / Folder which contains the iView has end user permissions.
    3. Also check whether the System ID the iView corresponds with has end user permissions.
    Also, please always post the entire error log, most of the time the errors are nested and analyzing an error with only the thrown error (which isn't the root cause) is like pulling teeth :-S
    regards, Lukas

  • The Question about mess "Customizing Error in Work Schedule Rule ..."

    Dear all,
    I run the Start-Payroll  and I getting an error " Customizing Error In WSR for that Personal Number"
    I configuration all of Time Management with start date is 01.01.2000 and when I run Payroll on Payroll period is 01/2000 with start date is 01.01.2000 to 31.01.2000 for Employees hiring on 01.01.2000 then I have an error " Customizing error in work schedule rule .. .. ... ..".
    But I can run the payroll period on 02/2000 with start date is 01.02.2000 to 29.02.2000 for Employees hiring on 01.02.2000.  form 02/2000 it is okies.
    Please help me  solve about my problem
    Thank for your answers
    Regds
    Huyen Nguyen

    Customizing Error in Work Schedule Rule
    where are u getting this error
    if it  is PY  log
    Check GENPS this error will come under this Function
    it is the combination of
    ur Holiday calendar
    Employee Sub Group
    Personal Sub area Grouping
    and ur Daily work Schedule Rule
    Check the Start dats an end dates fo all the above Settings along with their Groupings in table V_T508A

  • Customizing error in Work Schedule Rule

    Dear Consultant,
    One of the employee left on 25th of a month. His termination process was run from 26th. Thereafter his Time sheet was uploaded upto 25th. The system accepts his attendance upto 24th but for 25th it gives error as "Customizing Error in Work Schedule Rule XXXXX". When his Personal work schedule was checked it shows expected working hours as 8. Then why it does not accept the attendance through time sheet?
    Nothing can be wrong with WS Rule as it is still working fine for all others. Also when the time sheet is uploaded first & then the employee is terminated, it works fine. then why time sheet gives error only for the last day?
    Regards
    Bindumadhav

    Hi
    Pls check the action infotype 0000 for him
    normally the if person is going to releive on say 25th ,then we have to give the leaving action date as 26 th as per SAP
    Scenario.
    consider his doj is 01.05.2006
    if u done the leaving action on 26th by mentioning the date 25.09.2009
    sap close him by 24th
    and the record stored as below
    01.05.2006  to 24.09.2009
    delete the action and perform w.e.f 26 th  then it will take as below
    01.05.2006 to 25.09.2009
    then u can upload time events
    hope it will solve
    with regards
    partha
    keep sharing and learning

  • Customizing Error in Work Schedule

    Hello Experts,
    I am getting the following error when running time evaluation, "Customizing error in work schedule rule 4 w1 52 REG1/2UP", 2 personnel numbers are being rejected.  These two employees work during the summer.  We reorg them to put them on leave, Inactive,  so no acurals occur during the time they are not on the payroll.  When these employees return, we reorg them back to Active. This time when we brought them back to active, we get the above error during time eval.  I do not have  a work schedule rule 4 w1 52 REG 1/2UP in table T508a.  I do have work schedule rules 1 and 2 with w1 52 REG 1/2UP. These two emmployees  have work schedule rule 1 w1 52 REG 1/2UP.  I have changed the payroll status for retro calculation and I've checked that the employees do have IT0007.  Does anyone know where to look to see how the system is coming up with work scheudule rule 4 and how to resolve this issue?  Any suggestions are appreciated and points will be awarded to a solution provider.  Thanks.

    I have ran into this many times at work.  Generally for us, this happens when an employee is moved into a new personnel area on infotype 1, where they require a different work schedule rule.  However, infotype 7 was not updated for that same validity period and they have the incorrect work schedule.
    Example:
    Pers Area HYDZ
    requires work schedule ZIND
    Pers Area PSCC
    requires work schedule ZDTA
    The employee is in pers area PSCC until 12/31/9999 (with ZDTA on infotype 7).  They transfer the employee into HYDZ effective 6/1/2008.  However, infotype 7 was not updated and still has ZDTA.  As a result, the customizing work schedule error appears during time evaluation.  We have to create the infotype 7 record effective 6/1/2008 with the ZIND work schedule rule.
    John.

  • Customizing error in work schedule rule 2 D2 40 RRTHOLR2

    Hello Experts,
    While simulating payroll , I am getting this error.
    Customizing error in work schedule rule 2 D2 40 RRTHOLR2
    esgrouping - 2
    Holiday Calender - D2
    Personnel Sub area grouping - 40
    WSR - RRTHOLR2
    my dws are starting with 1.4.2004
    my pws are starting with 1.4.2004
    my calender is between 2004-2015
    and created Work schedule for 2004-2015
    still getting the same error
    Will you please help me out to solve this ?
    Thanks And regards
    Jaydeep Jadhav

    Hi All,
    I too faced the same type of error. Below are the steps for the solution.
    1. The error comes due to retro run with incorrect workschedule rule in IT0007.
    2. You can check table  V_T508A or V_001P_ALL to view the complete groupings of your personnel area/subarea,workschedule rule, Holiday cal,
    3. Copy the existing record of IT0007>give the retro effective period as start date and enter the end date>select the populated workschedule rule from the drop down option-->save the record.
    4. Run the psyroll in simulation mode and check the status.
    Hope it may help you..
    Best Regards
    Satya

  • Customising error in work schedule rule

    Hi All,
    While running the TM schema TM04, i am getting "customising error in work schedule rule".
    I could successfully generate work schedule with the same work schedule rule for the period 01-2006 to 01-2008.
    I have configured all the nodes under work schedule. I have maintained payroll control record with retro accounting date as 01-2006 and the payroll date as 02-2006(i.e i released the payroll for run, so period got incremented).
    In 0003, i have given TM status as 9.
    I want to know if i missed anything in configuration. Can you please help me in this regard.
    Thanks,
    Ravi

    Hi Ravi,
    You can also maintain the feature TIMMO.. the return value of this feature is Country Grouping..
    You need to select the relevant country grouping and give the same as return value and activate the feature.
    Regards
    <u><i><b>Sam</b></i></u>
    <i><b>Reward the points if my answer helps you out</b></i>

  • Period work schedule error

    Hi Experts,
    While uploading data in PA30 for infotype 2006, for few employees i am getting error as " Generate period work schedule G2DH for 2/M3/01 in 01/2011" ....can you please tell me why this error is coming and is there any setting required for this ??
    Thanks.

    Hi,
    Yes there are some public holiday like you said 1st of January, so please tell me how to assign it ??
    ...and one more thing, in some months i found that there are 21 days of 8 hours of working and 5 days of 4 hours of working and 5 sundays(weekly off) so there should be 188.00 hours but for that month working hours it is showing are 198.50, i just want to know how to increase these working hours beyond 188.00 to 198.50 and why it showing 198.50 hours of working??
    Thank you.

  • Time collision error on work schedule that spans 2 days

    I have the following work schedule set up
    Sunday 19:30 - 06:30 11hrs
    Monday 19:30 - 06:30 11hrs
    Tuesday 19:30 - 06:30 11hrs
    Wednesday 23:30 - 06:30 7 hrs
    Thurs-Sat - off
    I enter hours only via CAT2, no start/end times.  I get the following error when trying to transfer my time to HR "Insert cannot be made due to collision".  I make the following attendance time entries for a day, for example on 3/30/2014
    3 hours
    2 hours
    1 hour
    1 hour
    4 hours
    The time transfer (via CAT6) results in the following PA2002 records
    3/30/2014, 3 hrs, start time 19:30:00 end time 22:30:00
    3/30/2014, 2 hrs, start time 22:30:00 end time 00:30:00
    3/30/2014, 1 hr, start time 00:30:00 - 01:30:00
    The remaining 1 hour and 4 hour entry causes the time collision.  What is strange to me is the transfer always posts the first record that begins past midnight (in my test case a PA2002 record is created with start time of 00:30:00) but the remaining time entries generate a time collision.  I would expect the remaining 2 time entries to be as follows:
    3/30/2014, 1 hr, start time 01:30:00 end time 02:30:00
    3/30/2014, 4 hrs, start time 02:30:00 end time 06:30:00
    Does anyone know why I am getting these time collisions errors?

    Hi
       How r u...... Hope doing well ......... check the date in 0003 infotype if so change ........ hope it helps u
    regards
    rajeshk

  • Work schedule rule F4 help disabled in Infotype 0007 through PA40

    Hello Folks,
    When i try to select any value from the F4 help of work schedule rule field from Infotype 0007 through PA40 , it is not allowing me to select the value.. It is disabled. How can i select the values from F4 help.
    But when i do the same thing through PA30 it is allowing to select the value from F4 Help.
    Regards,
    Nishanth Kumar

    Check the Operation for that actions infogroup in V_T588D
    whether u are useing INS or COP
    and check whether u have acitbated SCHZK in PE03

  • Updation Error in "Group Personnel Subareas for the Work Schedule "

    Hello everyone,
    While trying to assign a PS grouping  code to my Personnel Area here, I am facing a problem.
    I can't see them in the table mentioned above .
    Already checked the previous steps in Enterprise structure i.e creation PA and PSA, they are displayed properly in respective tables but I can't find them here in grouping for work schedule.
    Could any one of you be kind enough to throw some light on possible errors and their solutions.
    Thanks & Regards,
    Vibhu

    Hi,
    Just now I am able to sort out this problem, Actually we need to carry out "Maintain User Parameter" activity under 'Personnel Administration'
    IMG Steps are as follows :
    SPRO => Personnel Management => Personnel Administration => Basic Settings => Maintain User Parameters
    Following screen will come up
    here select the country you like to work on (in my case it is India)
    Select Continue
    A pop up will come stating "Parameters created for India"
    Select Continue
    User profile screen will come up
    Save it
    Now go to time management section of IMG
    Go to "Personnel subarea grouping"
    Personnel areas belonging to your country grouping will be displayed on screen.
    Thanks,
    Vibhu

Maybe you are looking for

  • Clarification for reloading purchased apps on iPod

    I think I know the answer but I wanted to double-check before proceeding: I recently did a fresh re-format and re-install on both of my Macs (10.6 on the Intel MBP and 10.5.8 on the G5 iMac), moved my music collection that was on the iMac to a networ

  • Dead 3G on IPAD

    Anyone else have a problem with this? My 3g was going goofy, then one day it asked me to restore the ipad, after i no sign of the 3g anywhere, and i mean anywhere it changed the the UDID and Serial number on its own, So basically i have a 64G with wi

  • Top N used queries and Bottom N used queris

    Hi All.... Iam the new user for SDN, I heard that lot of professional are here, can any give me complete solution, I have 30queries, I want to know the Top()used queries and Bottom()used queires in BW system. Thanks in Advance,

  • Problem recreate OWA Exchange 2007 (no solution found in these forums before posting)

    Hello,     I am trying to recreate the owa virtual directory, from a powershell (Windows 2008 SP2 + Exchange 2007 SP3)     A error occurs within powershell after writing this: "remove-owavirtualdirectory "owa <default web site>" "     This is the err

  • Blank out the reply to field before sending mail through FM SO_OBJECT_SEND

    Hi all, I need to blank out the reply to field before the mail is send to the recipient. Is their any parameter in FM SO_OBJECT_SEND which can make it blank. Is their any other way. Thanks