Error in Planning refresh

Hi,
I updated my planning dimension so I was trying to refresh database. But I throw an error at step 9 of 33.
Error->
Step 9 of 33: [Financia] Adding members to dimension Version.
com.hyperion.planning.olap.EssbaseException: 1st Pass (1060051)
then I check application log file which has following error.
[Mon May 07 14:45:21 2012]Local/Test2/Financia/admin@Native Directory/3844/Error(1023069)
Location alias WFCube already exists
Please help me to solve this issue.
Thanks in advance.

The same error has been logged elsewhere on the forums, but occurred under slightly different circumstances...
Unable to do some actions with EPMA application
Suggestions include increasing a timeout setting or checking drive space where the refresh hits.....might not be helpful in your case though.....
JB

Similar Messages

  • Database Refresh errors in Planning 9.3.1

    Hi,
    While refreshing the database in planning 9.3.1, i am getting the below errors
    com.hyperion.planning.olap.HspVerifyOutlineException: Verify Outline failed with the following errors:
    **     Error [1042006] detected in member formula for member "Education Allowance".**
    **     Error [1042006] detected in member formula for member "Telephone Allowance".**
    **     Error [1042006] detected in member formula for member "Leave_Allowance".**
    **     Error [1042006] detected in member formula for member "Overtime".**
    **     Error [1042006] detected in member formula for member "Bonus".**
    **     Error [1042006] detected in member formula for member "Turnover Adjustment".**
    **     Error [1042006] detected in member formula for member "Social Security Tax".**
    **     Error [1042006] detected in member formula for member "Medicare".**
    **     Error [1042006] detected in member formula for member "112000".**
    **     Error [1042006] detected in member formula for member "112001".**
    **     Error [1042006] detected in member formula for member "112002".**
    Regards,
    PC

    Hi John,
    Thanks for the prompt reply..
    I checked the error code *1042006* in esb_err_msgs PDF, it showing the errors as "*Network Error message: Unable To*
    *Connect To serverName. The client*
    *timed out waiting to connect to the*
    *Essbase Agent using TCP/IP. Check*
    *your network connections.*"
    But, i am getting different errors in planning. As you suggested, i checked all the member formula. Its validating fine.
    I confused here, which i have to follow John...
    Thanks,
    PC

  • Error from EAS - "refreshing security from Shared Services failed"

    Hi,
    I was using Native only security in HSS for Essbase 11.1.1.3 and EAS allowed me to Refresh security from Shared Services. (Essbase security was already externalized to HSS.)
    However, after I added "MS Active Directory", and provisioned a MSAD user to a native Planning group, EAS errors out with "refreshing security from Shared Services failed" .
    I checked Essbase security and that MSAD user is not added to Essbase.
    From Essbase Log I see:
    Essbase failed to get roles list for [ESB:Analytic Servers:servername:1] from Shared Services Server with Error [32:1062:Failed to connect to the user directory [ HSS'sMSADname].
    I then tried to remove MSAD from our H Shared Services and see if this problem goes away. However, MSAD still shows on the left panel menu in H Shared Services. How can I get rid of MSAD?
    Any suggestions?
    Edited by: user643332 on May 12, 2010 12:05 AM

    Hi,
    Are you sure you have removed it from shared services, you may have just disabled it.
    You must restart the shared services application server to apply any changes made.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Error creating planning locations from eas console

    Hi,
    I am getting the following error when trying to create new location that point to planning apps from EAS. I was able to see the servers listed under planning. But when clicking on that it displays the following error.
    "Error connecting to planning server" I looked in the EAS logs and saw the error
    " error connecting planning server 11333"
    I tested telnet connection from EAS server to planning server and it worked fine.
    I checked the HBRServer properties file location on planning server and looks good.
    Is there anything else I need to look.
    Thanks
    Srinivas

    Hi John,
    Thanks for the reply. I forgot to mention.
    I followed the steps in the document.
    Logged into every app from planning web.
    Logged into EAS -> right click Administartion and refresh users.
    Then tried. But getting the same error.
    I also checked the planning logs and it clearly mentions "Planning connected to HBR repository successfully".
    Thanks
    Srini

  • Error -2147218798 when refreshing Essbase

    Hi,I try to refresh a outline in a Planning application and I have this error message :"Cannot refresh cubes while other users are logged on" I then disconnected every user, stopped and started the application but i does not change anything...What do you think of this ?Thank youPierre

    It is probably a lock on the Planning Db rather than a user in Essbase still logged on. Run the unlockdb utility on your planning server under Planning\utils. It will unlock the planning relation database. You should be able to run the refresh then.Let me know how you get on.RegardsChris

  • Planning error : hyperion.planning.DuplicateUserException

    I am unable to log into planning app after we refreshed our test sqlserver with prod data. I get the followeing error
    hyperion.planning.DuplicateUserException: Another user with the name hypadmin already exists.
    com.hyperion.planning.HspRuntimeException: Failed to sync with user provisioning.
    any ideas ?
    I have tried updating the sid value in HSP_USERS table with the old values -- no luck.
    Please help.

    Sounds like you have not done the migration correctly.
    I take it hypadmin is the application owner and a native user.
    If so you should store the correct native sid on your test environment.
    Have a look at a working planning app on your test environment, go into the relational tables
    look at table HSP_USERS and store the sid for id 50001
    Update the other planning app in your test environment with the correct stored sid in the same table.
    Restart planning.
    Also run the updateusers utility in the planning bin/utiliites directory.
    Its much easier if you create planning applications with the default admin account as the sid stays the same across environments.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Planning Refresh problem?

    Hi All,We have a planning refresh problem. Environment:Oracle repositories on UnixPlanning Server on Win2003Essbase on Win2000When we kicked a planning refresh, it shows that the database is refreshed and when pressed OK, it shows the following error" Object is not allowed when object is closed 3704".Thanks

    hi
    i found a solution for the Problem in another Forum
    http://businessintelligence.ittoolbox.com/groups/technical-functional/hyperion-admin-l/dynamic-calc-formulas-not-refreshed-1719379?cv=expanded
    The suggestion is
    1. change the Member from Dynamic Calc to Store
    2. Refresh (After these Step the Formulas where still out of sync)
    3. change the Member from Store to Dynamic Calc
    4. Refresh
    After these Steps the Formulas are in sync again.
    Kevin Kraft
    Edited by: Kevin Kraft on Mar 25, 2009 12:33 PM

  • "Error determining planning periods for calendar "  when running a program

    Hi,
    When i am running a program with date range say "01/05/2011" to "30/06/2011",the program is executing successfully without any error. When i am executing the same program with date range as a) "01/05/2009" to "30/06/2011" and b)"01/05/2008" to "30/06/2011" the program is failing with error as "Error determining planning periods for calendar". Can anyone suggest me what i should do to avoid the failure of the program with above date ranges also.
    Thanks in advance,

    Dear,
    Error message 61123:"Error determining planning periods for calendar &".The PPC planning calendar specified in the material master MRP 2 view for the material is  incorrectly.
    The planning calendar periods are insufficiently maintained for the planning calendar used.
    Check the period of planning calendar in MD26 and generate the correct period.You can avoid the problem in several ways:
    Maintain the planning calendar far enough in the future (at least until beyond  the end of the planning horizon).
    Also check any demand is lies beyond the validity period of planning calendar.
    Reduction of the planning horizon of MRP also can control such issue, as MRP planning horizon lies in an area in which the planning calendar is no longer maintained
    Regards,
    R.Brahmankar

  • Error in Cache Refresh(Unable to refresh cache contents)

    Hi All,
    When i am refreshing Cache from the browser using link CPACache/refresh?mode=full it says success.
    When i do from SXI_CACHE it gives an error.
       Error during last attempt to refresh cache
       Unable to refresh cache contents
    So when i run any schenario in message monitoring i get the following error-
    <i>SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="1">
      <SAP:Category>XIServer</SAP:Category>
      <SAP:Code area="XICACHE">UPDATE</SAP:Code>
      <SAP:P1 />
      <SAP:P2 />
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText>http response does not contain a valid XML root tag</SAP:AdditionalText>
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>An error occurred when refreshing the XI runtime cache</SAP:Stack>
      <SAP:Retry>N</SAP:Retry>
      </SAP:Error></i>
    I checked the INTEGRATION_DIRECTORY_HMI connection...
    here the response which im getting is..
    <i> HEADER NAME                HEADER VALUE
    response_line               HTTP/1.0 200
    server_protocol             HTTP/1.0
    status_code                 200
    status_reason
    ragma                       no-cache
    ache-control                no-cache
    ontent-type                 text/html
    ontent-length               87
    HTTP BODY
    TITLE>Error</TITLE>#<BODY>#<H1>Error</H1>#FW-1 at nebula: Unknown WWW s
    rver.</BODY>##
    Time (ms)                                 17</i>
    I believe that is not the right response.
    Everything was working fine yesterday when all of a sudden this error cropped up from no where.
    Regards,
    Rahul

    Hi,
    This is the error it shows there..
    <b>ERROR ID</b>      <i>UPDATE</i>
    <i>http response does not contain a valid XML root tag</i>
    Regards,
    Rahul

  • ORA-12008: error in snapshot refresh path

    I am getting this error even i am specifying to use other rollback segment
    ALTER ROLLBACK SEGMENT R02 SHRINK;
    SET TRANSACTION USE ROLLBACK SEGMENT R02;
    alter materialized view PAY_REV_BREAKUPWITHWOFF NOLOGGING;
    BEGIN dbms_mview.refresh('PAY_REV_BREAKUPWITHWOFF') ; END;
    ERROR at line 1:
    ORA-12008: error in snapshot refresh path
    ORA-01562: failed to extend rollback segment number 1
    ORA-01628: max # extents (505) reached for rollback segment SYS_RBS
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 617
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 674
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 654
    ORA-06512: at line 1

    The reason why it's still using SYS_RBS seems to be that since you are refreshing a materialized view, it might be doing parallel DMLs. In this case the clause of specifying a particular rollback segment is ignored.
    In addition to the above, try taking the rollback segment offline by executing
    alter rollback segment SYS_RBS offline;
    and then drop it by running
    drop rollback segment SYS_RBS;
    Then create new one and see if it works.
    if the above mentioned doesn't work somehow...
    try to change the extents storage parameter by running
    alter rollback segment sys_rbs storage (MAXEXTENTS 1000);
    Can't be sure as i currently don't have access to my system
    Hope this helps
    Message was edited by:
    thrilller

  • Error in Planning services

    Hi when i am trying to accesss the forecast data of campaign related one planning profile i am getting this error.
    Error in planning services
    Error messages - count 0001:
    RFC error: Call of a method or kernel Method that has not been implemented.
    Pleas help
    Regards,
    Ravi

    Hi Ravi
    hope you have sorted out this problem, i am getting the same error, could you please guide me or share some informaton. i need this as soon as possible
    thank you
    regards
    shankar

  • Error detailed planning has been reset

    PS Gurus,
    user is trying to copy planning through CJ9BS
    Gave project definition & versions & month & year
    In setting button user selected copy detailed planning for Cost elements
    User is getting error (detailed planning has been reset) Message no. KPT3017
    Thanks
    MM

    We would appreciate if you post the solution for this.
    Regards
    Madhusekhar Gupta

  • IDOC Tables with Errors Post System Refresh

    Hi Everyone,
    Is there any Report  or other way through which one can get List of  IDOC Tables with Errors Post System Refresh.
    Thanks,
    Regards,
    - Ishan

    Hi,
    While selecting the Infopackage to run the INIT load, it is taking me to the ECC login screen. Once i enter my credentials, its showing a dump with the message:
    Short text of error message:
    No RFC authorization for user XXXXX ( RSA8 ).
    Long text of error message:
    Technical information about the message:
    Message class....... "RSAR"
    Number.............. 051
    Variable 1.......... "No RFC authorization for user XXXXX ( RSA8 )."
    Variable 2.......... " "
    Variable 3.......... " "
    Variable 4.......... " "
    Please advice.
    Regards
    sneha

  • Error in cache refresh

    Error in cache refresh
    Dear all expert
    I have created one BPM scenario after when execute that scenario then problem come in cache
    Before that scenario my Pi working fine now.
    I have delete communication channel of BPM scenario but still facing problem in cache .
    I have done following step for solving problem  
    I have delete HMI rfc and recreate it when I test that RFC connection every time it will ask password I have already set login name (PIISUSER) and password in login tab
    I have found some entry in queue I have delete it
    Please help me
    Thanks
    Amit Shivhare

    Thanks to All of you
    my problem solved
    Hare I have write down all step that I have done during solving problem
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/cs/junior/view/wlg/9857
    thanks
    Amit Shivhare

  • Error in planning services urgent plz

    Hi when i am trying to accesss the forecast data of campaign related one planning profile i am getting this error
    Error in planning services
    Error messages - count 0001:
    RFC error: Error when attempting to IMPORT object RSDRI
    plz tellme how to resolve this.points willbe rewarded
    regards
    madhuri

    Hi Madhuri,
    Please check the following in BW BPS Server:
    - Check whether the campaign related planning profile is activated from Client-000 of BW system and transport to client-800
    - After activating the planning profile in Client 000 and transporting it to Client-800. Goto transaction bps0 in BW system and select the planning profile tree. Right click on it and set the profile.
    Also check the following things in BW:
    - Maintain the master data for Business Partners in BW, if not maintained the load the master data for BP as well as products using the normal BW process:
    1.     Activate the data source in CRM system and replicate in BW system.
    2.     Assign the data source to info source and activate the transfer rules.
    3.     Create the Infopackage and load the data.
    I hope this helps
    regards
    Srikantan

Maybe you are looking for

  • Friends and Family

    Happy new years guys... Here's the deal...like most people I have all my music set-up with smart playlists so that the higher rated songs play more often and "Last Played" is not in the last 2 months. My question is this...Is there a way to lock song

  • SMARTFORM: how to create 3 copy (each copy can print more than one page)

    SMARTFORM: how to create 3 copy (each copy can print more than one page) Hello everyone. my user want to have form that print 3 copy. such as 1 copy description = master,  2 copy description = copy 1 ,3 copy description = copy 2. so i create 3 page .

  • L_TO_CREATE_SINGLE  -  new storage unit is not created by SAP

    Hello Friends, I am using a FM L_TO_CREATE_SINGLE to create transfer order. But, When I am not passing Destination SU as import parameter, it gives me following error. "Storage unit XXXXXXX is not consistent with other transfer order data" This is ha

  • Nokia lumia 520 error unable to find a bootable option

    pls help as lost all my apps and contacts it turned on fine then last week I should add so lol I installed a update however yesterday it wouldn't let me access any messages or calls just kept turning to home screen arrrrgghh xmas day lol then it just

  • Syncing with iPhoto

    My camera saves both jpg and RAW formats simultaneously, and I transfer the two (duplicates) to iPhoto (ver. 6.0.6). When I sync my iPod Touch (the one that came out last September) both formats are transferred, but I want only the jpeg on the Touch.