Error in PR creation in material code?

hii experts,
While creating PR i m getting error , the material length is not set ..etc??
Becas in my case i have created material master and it has given a number also for material .
The same material while using in PR creartion its not allowing me ??
How i can rectify this ??
Thanks.

Hi,
Check Manufacturer Part Number activated or not? Also check OMSL t.code for Lexicographical & Leading zeros section.
http://help.sap.com/saphelp_di471/helpdata/en/08/a1110f4d7611d2b438006094b9c9be/content.htm
http://www.sapgeek.net/2010/03/material-numbering-configuration/
As system cretaed a material number, you should not have any issue for creating PR, Just check above links:
Regards,
Biju K

Similar Messages

  • Error message while creation of material for wrong warehouse no

    dear all,
    i have assigned plant and storage location to warehouse no x,created the material for the same.our question is why the system is not showing warning or error message if we create the same material ,plant and stg location combination to a diff warehouse no Y.
    Eg:
    material    plant   stg location   warehouse no
    12345      1000   1001             111
    12345      2000   2001             111  ?????.how is this possible as i have assigned this plant and stg location combination to a different warehouse no:222
    Is there any settings available in SPRO to solve out this problem.
    Regards,
    velu

    Hi,
    System will not give any error message at the time of Creation of materials, you can create for any other Warehouse no which is not assigned to Plant , Str loc.
    But the system will throw the error while doing any transaction with respect to the Material with different combination of plant , str loc, warehouse no
    This is drawback of Standard SAP.
    rgds
    gsc

  • Cross Plant Planning- MRP activation indicator turned after the creation of Material code

    Dear Experts,
    Working on Cross plant planning, where 1001 Production plant will stock transfer material to 8 different plants.
    Right now, only 10001 plant had MRP and planning file entry ticked in customizing OMDU.
    The other 8 plants have Materials codes created and MRP views extended but no MRP activation is ticked.
    Now, to have Cross plant planning MRP set, I have done necessary configurations, Scope of Planning, Special Procurement 40, and parallel processing is configured. All master datas are set properly. Tested few scenarios in IDES, working fine.
    If my understanding is clear, than I thin I need to run MDAB, activation of planning file and MDRE, Planning file Consistency Check,  because MRP will run in background?
    Is this correct or something more needs to be done ?? Please suggest
    Please also tell what is the use of MDRE t code.
    Best regards
    Shailesh

    Hello Shailesh
    MDAB (RMMDVM20) is at plant level, you need to create different variants as per your plants
    Create a variant for the new plants and then schedule a job for these variants.
    Check customizing transaction OMDU -> set up planning file
    entry and consistency check of planning file entries.
    Best Regards,
    R.Brahmankar

  • Automatic creation of Material Master at the time raising the PO !!!

    Hello All,
    I am stuck in a scenario of our client which should be implemented (or mapped) in SAP.
    Scenario: At the time of creating the PO (in there legacy system -in house developed) they can choose the items from the existing master data or/and they can also add a new item (which is not present in the master data records at the time of creating the PO).
    Now as soon as the system realise that a new item is inserted into the PO, it will create that item record automatically in the backend (database) and the master data will be present from there on.
    The items they are dealing with are all fashion accessories and they generate order on the following basis:
    1. Demand of particular item in market.
    2. List of items provided by the vendor.
    3. Based on the requirement in there outlets.
    So for them its very difficult to fix there master data records, as it can be changed daily or monthly as per the market conditions. At the same time every time they order, its almost around 100 different items (some time 80 of them are new) in a single PO so they cannot create 80 records manually each time.
    These items are not consumable material so obviously they are maintaining the stock for them. They are also not going to use IS Retail.
    I am not at all sure how can we map this particular practice in SAP, it would be really appreciated if any one could help me on this problem.
    Please let me know if you need any other details from my side.

    Hi,
      As you have two different systems one in house developed and another SAP, and the PO creation part starts from Legasy system which creats the PO in SAP, you can do some development as per below
    1:  While Passing the details from legasy to SAP, use two columns in legasy one will contain the Material Code of ECC (for laready exist material ) and another for deescription of material.
    2: In case material is new for which there is no material master in ECC pass only description from legasy systems.
    3:While getting triggred from Legasy to ECC to create the PO, first check whehter all the material code exists or not in ECC.
    4:If some material are not created (only description present) for those material first create the Material Code using BAPI 'BAPI_MATERIAL_SAVEDATA'.
    5: Aftre creation of Material code create the PO using BAPI ' BAPI_PO_CREATE1'.
    6:For the new created material , trnasfre the master record from ECC to Legasy systemso that next time user can see that material in your legasy system.
    Regards,
    Zafar

  • Transaction code for Creation of Material

    Hi Code Guru's,
    can any one please tell me the Transaction code for creation of material.
    regards,
    Syed Khutubuddin.
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:45 PM

    Hi syed,
    Goto T.code MM01 then create Material name,
                       MM02  is change Material name,
                       MM03 is display Material name.
    <REMOVED BY MODERATOR>
    Cheers,
    S.Suresh.
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:46 PM

  • Throw error during PO creation if a material is not extended to storage loc

    Hi,
    Users require for SAP to throw an error during PO creation if a material is not extended to the storage location that is entered on the PO.
    Presently it neither gives warning or error message.
    Please advise.
    Regards,
    Pratap

    SAP does not validate that, if you want it, then you have to do such check in a user exit.
    SAP can be customized to create the material master storage location segment itself when posting the goods receipt, so it is not necessary to check this in the PO.
    Further this design  speeds up the process, you can already order before others have finished the material master maintenance.

  • NCM code error for po creation, how to solve it ?

    Hi experts
    Now we create one type of PO, it will request to input NCM code on PO item tab.
    It give the error message which request to input NCM code. actually, we don't use this code now.
    This code we maintain in Material master export/ import as control code before.
    How could we disable this NCM code check?  We  no need this input anymore now.
    error message:
    Enter a valid NCM code
    Message no. 8B329
    Diagnosis
    The NCM code you have chosen, , using grouping key , is not available in the country .
    Procedure
    Enter a different code or choose a different grouping key.
    Thanks
    ALice

    Hi
    Thanks a lot for your help.
    Now since our IPI rate will be 0 , Does that mean our Brazil PO which is still foreced to input ncm by standard SAP, right?  even though we dont' need NCM to get IPI rate now.  Since we don't want to input the NCM code in material master for all parts maintenance, specially for new parts.
    So if this NCM is mandantory to input in PO, Do you mean if we could maintain its NCM code in
    J1BTAX ? Or Which Tcode we could maintain the IPI value for NCM code as 0?  Then it could automatically come up in PO item, right ?
    Thanks a lot
    Alice
    Edited by: alice zhang on Feb 3, 2009 2:30 AM
    Edited by: alice zhang on Feb 3, 2009 2:33 AM

  • Error in the material code

    Hi,
    I am using an IDES system share of our company. Whenever i am assigning a material in the goods receipt or in Orders. The material is automatically change and take a predefine text say "RADIO" and followed by the material code.
    I feel someone has done some mistake and its affecting all the material code. And surprisingly only the external material code RADIO is possible to do any transaction . If I put a material code say 10002 system automatically converted into RADIO0000000001002 to make the 18 character and giving an error that material code not exist in the MARA table.
    What could be the reason please help.
    DP

    Closing the thread
    Edited by: DP  SINGH on Jul 22, 2010 7:10 PM
    Edited by: DP  SINGH on Jul 22, 2010 7:14 PM

  • Re: Error relating to material code when raising PR

    Dear all,
    I came acrossed the error "Material not subject to inventory management in plant XXXX" when trying to raise a PR by entering the material code. Checking the material created, the material is active and has been properly maintained by Purchasing department. How come I am getting this error when raising a PR with the material code?
    Pls assist. Appreciated.
    Thank you in advance.

    Hi,
    in the MM03 , click the blue 'i" button, there you can see the material type..
    Then go to OMS2 & Select the mat type and at the left hand side you can see the qty & value update..
    Put tick for value update for your plant for this mat type..
    Thx
    Raju

  • Default material code during material master creation

    Dear All,
               While I am trying to create any material in MM01 screen , system automatically takes a material code .So I have to remove that code from there then put my desired material code and then proceed .
                I want to know why system takes that perticular  code during material code creation .I want to remove it permanently .
                Please suggest what I have to do ?
    Regards
    Abhijit Das

    Dear Abhijit,
    Material Number range & Internal or external number range setting is done in SPRO under
    Logistic General>material master>basic setting>material type>Define number range for a perticular material type.
    Now if u want to have your own desired code go on above path,Select your material type & tick for external number range & give range of external number( interval).
    This will solve your problem,
    Vivek

  • Load Material Code Error!

    Hi guys i have a problem y have a BI system that load data from R3 when i load material codes with only numbers it works fine...but when i load a single number with a letter it give an error...
    I donth remember where i can configure that BI accept letters on material code.
    I hope somebody could help me
    Regards

    Hi,
    It allows characterstic also
    sap deliver material 18 char
    so it should accpet may be small letters of that material number
    if when conevrsion is not happening OMSL  tcode
    maiantain the mataerila length as 18 and execute thaat
    matnr_exit_input conversion and check the same.
    check it once again it allows the char also.
    Thansk & regasrds
    sathish

  • Material Code - Report Based on Creation Date

    Hi,
    What is the Standard T.Code to know the Number of Material code created in a day?

    Hi,
    There is no standard report for materials created in a Day,
    You can make use of OIW8 transaction code you will get Material list day wise. click on material field selection list and then give the dates and execute.
    You can make use of MM50 also, take a maintenance status which you have not maintained till now and give the dates and execute you will get the list od materials created in that particular day.
    Thanks & regards,
    Kiran

  • Creation of material master

    Dear all,
    While entering of MM01, MM02, MM03 T codes, The system showing the error message - "Record Y1 01 does not exist in Table T133A" - for this what do I do, Plz suggest.
    reg
    Vishnu.Ch

    Hi Madhu,
        Thanks for your reply. But, I have one more doubt. For non stock materials, we
    will specify the cost centre and G/L account at the time of creation of Purchase order. Then, do we have to specify the valuation class at the time of creation of
    Material Master since there is no automatic account determination?
    Regards
    Yoga

  • Error while delivery creation

    hi,
      i am getting an error while delivery creation for qty 2.The error is "Only 0 EA of material xxxx available".
    The schedule line cat in this case is cp and avalibility check is carried out and confirmed qty is given on some date ahead.
    User then runs the MRP and PR is created .
    Then the user creates a PO but not with ref to the PR created from above,instead the user creates a SO assigned PO and then creates GR which is SO assigned.
    Now when the user is trying to create delivery the erroe is "Only 0 EA of material xxxx available".
    Pl tell me why am i getting this error inspite of having the qty against the SO?
    Is it because a PR is generated from the MRP run for tht order and we have no GR agaist tht PR?Where do u i check this setting

    Hi,
    In SAP there is no stock available for that material. That is the reason it is showing that message..
    Please check MMBE t.code  stock overview for that material. I  think sales order scheduleline date is showing some other date.becuase today there is no stock so u will be not able to create any delvery. So please create delivery only on confirmed schdulines date....
    Other wise do stock posting and then do availability check then try to create delivery...
    Regards
    sankar
    Edited by: sankar sankar on Jul 1, 2008 1:10 PM

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

Maybe you are looking for

  • WRT120N for gsm and pc

    Hello, i've got the following problem/question. I have W-less router WRT120N and i'm using it for WLAN connection for one laptop. My internet provider has restricted the TTL and i can't share internet between more computers. But i'm wondering if i ca

  • Power Manager locking taskbar and creating two battery icons on X201

    I am having an issue with one of my X201s and Power Manager running windows 7.  My other X201 that runs the same software and was buil7 withing a few months does not have the issue. Periodically while on the internet a second battery icon will pop up

  • Mac mini dvi

    I got a Mac mini with a Intel core duo 1.66 GHz I need a DVI to VGA connector as my monitor uses vga I'm wondering if I can us a dvi-i connector 24+5 dual link to a vga 15 converter

  • How do I get hbo go to work from ny IPhone 4S to my apple tv

    I have the HBO Go app but don't have any luck using it.  I also have an HBO subscription.

  • What's the correct way of preparing artwork for print in Illustrator?

    I want to print an illustration on 8.5in. x 11in. paper. Whenever I print, the artwork always fills the whole page and all of the artwork doesn't show. So I created a new document and these are the settings. Are they correct? Thanks in advance.