Error in quantity translation in CO-PA valuation using material costing

Dear SAP Gurus,
While releasing the billing document to accounting I am getting the following error:
Error in quantity translation in CO-PA valuation using material costing
Message no. K/821
Diagnosis
In Profitability Analysis (CO-PA), the system tried to use a material cost estimate to translate the unit KG for the material KG into the base unit of measure EA for that material.
The system could not do this.
System Response
The document cannot be processed further.
Procedure
Check the quantity entered in the affected CO-PA quantity field &V4 .
If necessary, change the material master to allow the unit KG as an alternative unit for the material 970000000000000016.
Can anyone provide me with a solution to the said problem.
Regards
Nikit

Hi Piet,
That does not seem to be the solution as i cant define for all the materials how many units EA = how many kgs. Thanks for the reply anyway

Similar Messages

  • Valuation using material cost estimate

    Ciao a tutti,
    We have create a material cost
    estimate without standard structure(unit costing) not FOR ALL MATERIALS, but only for ONE
    VARIANT of generic material (retail solution) (because the other variant have the same price, and because we have to reproduced 5000 BOM in unit cost for just
    one variant with transaction KKPA LSMW)
    So, now we have to valuated the material cost estimate when the customer create the billing document and put the split of the cost estimate in co-pa
    Our prolem is : we have calculate standard cost estimate for 5000
    variant not for all variant (because our customer crete the BOM in unit
    costing with transaction KKPA and LSMW, and they refuced the idea to
    calculate 30000 cost estimate with lsmw) so when we crete a billing
    document with a variant that haven't cost estimate created the system doesn't
    valuated the cost estimate (the system works well), but how I can change the variant in the valuation and put the variant that have the cost
    estimate calculate?
    Wiht the transaction "Assign Costing Keys to Any Characteristics" I think
    is not possible.
    I must to use enhance COPA0002?
    Thank you very much
    Paolo Artini
    tel: +393299223804

    Hi All,
    I am also facing the problem for Sales Order Cost Estimate. and the Costing Status is VO(Marked without errors).
    I have done the following
    created the Costing Key (sales order cost estimate)
    assigned costing key to the material type.
    assigned to the respective value fields
    sales order cost estimate,
    Run the RA
    Settlement done.
    But in COPA, cost estimates are not being split up based on the cost component (like Material, Labour and Over head) and it is getting posted to COGS only.
    Do we need to change the costing status to FR, if yes, but how to do ?
    Regards
    Ramesh KR
    +91 9884020411

  • Valuation with material cost estimate: error with product

    Hi Experts,
    Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
    Points will be provided for good solution.
    Regards,
    Jay

    Hi Jaya
    This means that your customization is wrong then...
    In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called  for in the case of non valuated materials...
    In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
    Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
    If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
    Regards
    Ajay M

  • Valuation with material cost estimate: error with product "117122"

    Hi people,
    We have the error:
    =====================
    Valuation with material cost estimate: error with product "117122"
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
    We have the follow configuration in trans.: KE40:
    . Determine material cost estimate
       . Transf. Standard Cost Estimate
    . Costing Variant
    . Control Data for Standard Cost Estimate
       . Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
    . Addiitonal data CO-PC
        . Transfer cost estimate in controlling area currency  "activated"
    We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
    Do you know what happend?
    If we need to configure some transation, or sonly process the cost estimate?
    Thanks,
    Rosana.

    Hello Guido
    Thank you very much for your return.
    It is happenning in a Client that some people are doing the configuration.
    Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
    And now, the people activate that in this new Client and I don't know the impact about that.
    I think we have to make the configuration in OKYW.
    The other transation you told me, we don't have any information.
    Could you tell me some other idea what happend?
    Message error is just "Message no. KE350"
    Abou claculate the cost:
    It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
    Could you tell us is there is some thing more to do?
    Thanks,
    Rosana.

  • Valuation with material cost estimate: error with product " 200038 "

    Hi,
    I am getting an error:
    Valuation with material cost estimate: error with product " 200038 "  (Message KE350).
    Kindly assist on the same?

    If this material is mto material go to t.code KE40 and maintain define access to standard cost estimate define cost key with
    "Transfer sales orde cost estimatex".
    If it is mts material define costing key with Transfer std cost estimate  and in costing data
    costing variant : ppc1
    costing verstion: 1
    period  indicator:  Release std cost estimate matching with goods issue or material costing matching posting date.
    This will resolve ur problem.

  • Valuation with Material cost estimate

    Hi,
       I am getting an error: "Valuation with material cost estimate:error with product 003443434(material number)
    Does anyone know which transaction is used to correct this error?
    Thanks

    Hi,
    Go to MM02. Select the views of the materials i.e. accounting 1 & 2 , costing 1 & 2 . Look at the valuation class u have maintained for the same material in the view Accounting 1.
    Hope u will get ur problem solved..Assign points, if helpful.
    Satya

  • Split valuation in material master

    Hi all,
    I am using val category B. After I create the parent material with val cat B,  I am extending it to val type (inhouse prod and externaL proc). But in MM01 >> ORG LEVELS >> VALUATION TYPE, when I do F4, I am getting message 'NO VALUES FOUND' even after I have created it.
    Please let me know what would be the possible error ?
    Regards,
    Yogesh

    Hi
    For splitting the valuation of  material ypu have to maintain first the valuation category H  and price control V in Accounting 1 and then split valuated it with the price control S for SFG and FG
    These are SPRO setting for Split valuation
    1.SPRO> MM>VALN AND ACC ASSIGNMENT> SPLIT VALUATION> Activate Split Valuation
    2.SPRO> MM>VALN AND ACC ASSIGNMENT> SPLIT VALUATION> Configure Split Valuation
    check and revert
    Regards
    Anupam Sharma

  • FIFO Valuation with Material Ledger !

    Hi, 
    How do we accomplish FIFO Valuation using Material Ledger ?
    We have activated the Material Ledger, with Single - Level Determination; Standard Price S.  On execution of Single-Level Price Determination, we get the Periodic Unit Price -- which is the Weighted Average Price for the Receipts for the period involved.
    I came across SAP Forums, which claim that Material Ledger is the FIFO Valuation on real-time basis. However, this doesn't seem to be true. The Goods Issued are assigned the Periodic Unit Price (calculated above -- i.e the Weighted Average Price ).
    In addition, we have Configured the FIFO Balance Sheet Valuation Procedure, through the MM menu. The FIFO Value for the Material is giving weird results. Adding the total Inventory for all the Receipts till date and over-riding the period selection for Single Receipts.  For monthly receipts, the system just gives the Weighted Average Price again.
    The Business is expecting the FIFO valution for the Inventory Balance on Monthly Basis. ( We are using Material Ledger, so that we can roll-up this FIFO Valuation  of the Raw Material ito Gross up into the Finished Product
    -- Thanks

    Hi Kenny ,
    BASIC STEPS THAT CAN BE FOLLOWED FOR  ENDING INVENTORY VALUATION :
    Ending Inventory is valued  as per FIFO calculated through following steps:
         Run the price calculation (Txn: KSII) u2013 check that all      auxiliary Cost centers are zero
         Run Txn:MRF3 (summarization of documents for the      FIFO calculation.)
         Run MRF1 (calculation of FIFO)
         Check if the FIFO calc. is correct via MR35
    After ML run the ending inventory value should be equal to the value in MR35 and so balance amount not yet loaded to ending inventory through FIFO valuation is posted to consumption
    Exception: If total receipts for a period is less than ending inventory quantity .In this case the EI is valued at weighted average
    Please check wether the steps have been properly followed and the execption doesnot exists..
    Also, hope your Price Determination is "3" and price control is "S" in Material Master..
    Regards
    Sarada

  • Raw materials on MAP with split valuation used in standard cost estimate

    We have a few raw materials which are purchased from different vendors and of different brands. We have opened split valuations for these raw materials. These raw materials are later used in manufacture of different finished goods. We use MAP for raw materials and Std. for finished goods. What configuration and processing steps will be required to run standards cost estimate and what will be standard price for a finished good considering the following example:
    Material X is finished good
    Raw Material A with split valuation @ USD 5 (brand aplha)   &   USD  10 (brand beta)
    Raw Material B without split valuation @ USD 1
    It is expected that we used brand aplha 60% of the time and brand beta 40% of the time and production batch size is usually 100 Kg.
    Please reply
    Edited by: Chris SAP on Sep 29, 2011 7:56 AM

    hi chris
    Hope you have configured the material A for split valuation. while calculating standard cost estimate for the material C. through ck11n, the system will pick up the header price from material master.
    But here you are saying that you have chances of using the material A, 60% of brand alpha and 40% brand beta
    Instead of using split valuation use mixed costing concept. create the material A with separate Ids and create two boms one with alpha and the other with beta.
    create procurement alternative in CK91N and mixed ratio with Ck94 and release the mixed cost estimate
    please go through this thread also
    Re: Difference between Split Valuation and Mixed Costing
    Krishna

  • Error in Quantity/Value Determination  : VPRS (IV)

    Gurus,
    When I am creating an IV (Intercompany Invoice), I am getting an error in VPRS determination in pricing. VPRS is not getting determined and it throws up an error saying "Error in Quantity/Value determination" (Error number 217)
    Need you help on the same
    Regards
    Leo

    Lakshmipathi,
    Pricing procedure is defined as you indicated. It is all standard. VPRS is getting determined for other materials for IV. Only for this specific material it is a problem.
    The error says as below
    Diagnosis
    "This condition has not been determined using condition records. The amount or value should be determined from another data source. For cost (condition category 'G') it is read using conditions from the material valuation segment, for a cash discount condition it is read using conditions from the terms of payment table.
    In this transaction an error occurs - the material valuation segment or the terms of payment table could not be read or a currency translation has failed."
    Any idea
    Regards
    Leo

  • Error in Quantity Value Determination

    Hi all,
    I am creating an invoice with respect to an intercompany PO. In the invoice, I am getting an error "Mandatory condition VPRS missing". When I check the analysis, I could see a message "Error in Quantity Value Determination"
    In the preceeding PO, when I checked the P101 Condition type, it also displays the same message "Error in Quantity Value Determination". However, when the value of P101 is manually maintained, --> PO saved --> invoice cancelled and --> Invoice recreated, no error in SD invoice is seen. Evident that problem is in MM.
    Please share your views and help me in solving this issue
    Regards,
    Rajesh

    Dear Jürgen and Praveen,
    Material master valuation price is maintained. What actually the error "Error in Quantity Value Determination" mean?
    Regards,
    Rajesh

  • Inventory Error :Transaction quantity must be =  available quantity.

    An error occurred while relieving reservations.|Transaction quantity must be less than or equal to available quantity.
    while doing material transactions in transaction open interface iam getting above error......Kindly help me as i am struck here and it is high priority issue and need to be resolved as soon as possible..

    refer -
    Pending Move Transactions FAQ [ID 1141334.1]
    WIP_MOVE_TXN_INTERFACE Common Errors In Pending Move Transactions With Possible Causes And Action Plan To Process Them [ID 457066.1]
    Outside Processing Wip Move Transaction Fails With Overcompletion Quantity [ID 427558.1]
    Pending Move Transaction Error - Allow Moves Not Enabled [ID 780732.1]
    R12 OSP Job (Also Repetitive Schedule) Do Not Support Overcompletion: Error 'Transaction quantity must be less than or equal...' [ID 563011.1]
    cheers,
    VB

  • An error occurred during translation of your HTML master page. For more information, please navigate to the master page by clicking the preview button in the Master Page Gallery or directly typing its URL

    I apply theme before singing all users into application ,now  visitor/member are not affected color text so we are reapplying themes 
    I am not able to reapplying SPColor /my site Host template "  An error occurred during translation of your HTML master page. For more information, please navigate to the master page by clicking the preview button in the Master Page Gallery
    or directly typing its URL" while applying theme i am getting error
     

    is it your public site/ community site or team site?
    what level of subscription you have?i would say try to delete the site and try to create a new.
    http://community.office365.com/en-us/forums/154/t/147705.aspx
    are you able to open the site in the sharepoint designer?
    or try to send them the private message to the support team.
    Please remember to mark your question as answered &Vote helpful,if this solves/helps your problem. ****************************************************************************************** Thanks -WS MCITP(SharePoint 2010, 2013) Blog: http://wscheema.com/blog

  • 217 Error in quantity/value determination

    Hi experts,
    In my pricing procedure the condition type VPRS is showing 0 value.
    In analysis it is showing error: 217 Error in quantity/value determination.
    Can you please tell what can be the problem? How dose VPRS work? I only know that VPRS is taken from the material master.
    Regards
    Fan

    Hi
    VPRS retrives the cost of the Material from the material master data > Accounting 1 tab to the Sales order.
    Once the cost is found, then Profit margin  (Net value - cost) is calculated.
    VPRS does not contain any Access sequence.
    With the help of its Condition category "G", it accesses the Material master > Accounting tab 1 and takes cost.
    There may be two cost specified in the Material master. They are
    - Moving Avarage Price
    - Standard Price
    Which one system will consider that depends upon the "Price control" field.
    If the value is "V' in the Price control field, the system takes the "Moving Avarage Price" and if it is "S", then system takes the "Standard Price".
    So, you must ensure these few control
    - VPRS should  NOT have any Access sequence.
    - Condition category "G" must have been assigned to VPRS.
    - VPRS must have been activated as "Statistical" condition in the Pricing Procedure and should not have any Account key.

  • Error "Available quantity in bin is zero" with FM: L_TO_CREATE_MULTIPLE

    Hi, all,    I encounter  one problem wtih BAPI:  L_TO_CREATE_MULTIPLE.
    I want to transfer 100 batches from P01 storage type to P02 storage type ,  this function module show error "Available quantity in bin is zero".  
    But the TO is created and this TO only include 30 batchs.
    Why this happen?
    Any one could help me? Tks.

    Hi Justin,
    I am facing the exact same problem.
    Can you please share the solution for this?
    Thanks in advance.
    Regards,
    Gayatri