Error in saving project plan in project server 2007

I am  getting following error when I try to make a change and saved the  project plan. It has happened several times since yesterday. Not sure if the file is corrupted.
 Is it possible to make a copy of the file and mark the current file as inactive?
The File cannot be opened.
Check that the File name and path are correct.
Check that the File format is recognized by Project.
Project Files saved in a version earlier than Microsoft Project 98
can't be opened.
If your File is From an earlier version, open it in that version, click
Save as (File menu), and save in MPX Format Open the MPX File. When
you use this method, project data is imported, but Formatting is lost.
Has any one has same issue? any suggestions please reply.
Thanks-

Hi Micahel,
Thanks for the posting!
what would be solution inorder to make it working.i was looking at some posts which i listed below for some it had worked....i did not try it but just guessing it would work
1. Launch Project Professional 2007 and connect to Project Server.
2.  In the new blank project (Project1), click Insert - Project.
3.  Select the troublesome project.
4.  DESELECT the "Link to project" checkbox and then click the Insert
button.
5.  When prompted to save the changes to the troublesome project, click the
No button
Or in another case it may  be
Saving as a template with re-open is a smart work around, typically when a network connection gets dropped.  In these cases
we have copy/pasted to a new file, or, saved as XML and then reopened.
I appreciate any kind of help on it.
Thanks
Tummala

Similar Messages

  • Error Message when opening Project Plan on Project Professional from PWA 2013 using either Google Chrome or Firefox

    Dears,,
    One of our clients uses Google Chrome
    as their standard navigator to open PWA 2013 that we have deployed for them.
    Every thing went fine until we tried to open a project plan using Project Professional 2013 from PWA using the Edit in Project Professional option, we had the below error:
    "Project Web App was unable to find the specified Project.
    the project was not found on Project Web App. some possible reasons include:
    The Project has not yet been saved successfully to the server.
    The Project has been deleted on the server.
    you don’t have adequate permissions to open this project.
    if the project is available in the local cache, you can click the globe in the status bar and select "Work offline", and then open the project, if the problem continues, contact
    your administrator."
    Please note that IE is working fine with this scenario,
    the belwo screenshot shows the error that appears to the users.
    Ibrahim Al-Masri Technology Manager at MethodCorp

    Hi All,
    As Gary and Guillaume suggested, have you tried to install IE tab extension for chrome?
    See the link below:
    http://www.ietab.net/
    and also im with what Dale has posted
    (why don't you just tell the PM to use Internet Explorer instead of Google Chrome? 
    I suspect that this problem reveals that PWA does not work perfectly in browsers other than the Internet
    Explorer,
    so I would simply mandate that all PMs and TMs need to use Internet Explorer for Project Server. 
    Just a thought.  Hope this helps.)
    from my side , i have tested it and it works perfect. 
    Karim El Zarka, MCTS Sharepoint 2010 , MCITP SharePoint Administrator 2010 Whenever you see a reply and if you think is helpful, click "Vote As Helpful"! And whenever you see a reply being an answer to the question of the thread, click "Mark
    As Answer

  • Cant import project plan to project server

    Hi
    Getting below error when i try to upload the project plan from my desktop to project server in 2010
    I had a glimpse on related Project server forums and project server error codes it says 
    LookupTableItemInvalidLookupTable = 11073
    An item in the lookup table is not valid.
    Can you please help me to resolve the issue
    Regards
    Santosh

    Their is not tool which can perform this for you.
    You have to do it manually,you can do shorting for all the custom field then match the values of look up table if you have any document for custom field and look up configuration.
    kirtesh

  • MS Project Professional 2010 - Unable to open Project Plan from the Server.

    Dear Folks,
    Since morning we have been facing an issue with MS Project Professional 2010. When we try to open project plan, it takes time and then show nothing on the screen, project gets checked out to you as well but nothing comes on MS Project Professional Screen.
    Strange thing, when busy mouse cursor gets released MS Project Professional show "Disconnected from the Server" message with white icon instead of globe one at the bottom of MS Project Professional and disappear after few seconds.
    We are able to open small plans but the plans having 4000 lines is not able to open, Project Professional show busy status when we give it a try.
    Everything seems fine to me .. Project Server connection .. queue jobs .. no issues.
    What could be the possible problem and how to resolve this issue?
    Many thanks in advance.
    Best Regards

    Hi Mohsin,
    Is it happening for all users or just some of them? Is it happening for all projects? Have you tried on a different machine?
    First I'd suggest to try accessing the project plan through PWA to identify wheither it is a network issue or an application issue.
    Then check the Project Pro account to ensure that the connection settings to Project Server are correct. You could also try to remove the Project Server account in Project Pro and create it again.
    Finally, ensure that the PWA URL is added to IE trusted sites.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • How to change actual effort in project plan when Projected Actual option is enable in Project Server 2010

    Hi,
    We have enable "Protect User Updates" option from PWA->Task Setting and Display->Only allow task updates via Task and Timesheets, to protect actual efforts in project plan that PM changes manually, however in some cases we need to allow actual
    effort changes in open projects so it there any way or workaround so that Administrator or PM can make changes in actual even though "Protect User Updates" option is enable. Please Help!!
    Thanks,
    Rahul

    Hi Rahul,
    Indeed when this option is activated, there is no way to directly update actual work in the project plan.
    The workaround is to temporary deactivate this option, more preferly not during office working hours to avoid unexpected project updates.
    A better workaround would be to ask the resource to recall, correct and submit again the timesheet, so the PM can approve an updated actual work. Finally the PM can use delegation to rscall and correct the timesheet for the resource.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • BPC Project plan template, project questionaries template

    Hello,
    I would like to know if there are templates of questionaries for a project in BPC?, Also if there are Project plan templates for BPC? I need all the information you could send me in order to estimate times and complexity of a BPC Project. Information will be rewarded.
    Thanks

    Dear Teachers,
    I am also need BPC Project plan template, anyone have it?
    for Mr. Alexander : Did you finish your BPC project? I need your guidance and the template is the most important.
    Thanks you very much for you all.
    Thanks and Best Regard
    Sendy
    SAP Consultant

  • ERROR IN SAVING MARKETING PLAN

    HI forum
    when i saving the marketing plan in 5.0 getting the error like can't get RFC for SEM. anybody suggest how to solve this.

    Hi Madhu,
    If this error comes u have not definef the terget systen for ur mktg. Go to IMGCustomer Relationship ManagementMarketingMarketing Planning and Campaign ManagementSystem Landscape--Define Target Systems (ERP, BI, SEM, CPRO)
    Hope it helps. Reward the points if it helps
    Thanx
    Chinmaya

  • Is Oracle Project Management has all features which Microsoft Project Plan?

    Hello Experts,
    Customer wanted to start using Oracle Project Management suit completly along with little Microsoft project plan. as of now most of the projects are using microsoft project plan for project management and Oracle Project suit is for Costing and Billing.
    But in order to start this initiative, we need to explain the difference which Oracle Project Management can not able to do but Microsoft project plan can. Based on this management will take the decesion.
    As per my understanding, Orace Project Management can perform all the tasks except scheduling. As it supports scheduling from third party software like Microsoft project plan / primavera etc.
    Rest I think Oracle Project management suit is equally matured to perform all the project management task which Mircosoft project management can perform.
    So experts , can you please confirm my understanding and provide me some light on this topic.
    Thanks :-)

    Hi,
    First of all, I would like to know what are the various things you are performing with a Microsoft project plan apart from scheduling the resources to a specific project .
    Through Oracle Project Management, you can control the visibility of a resource,assign it to a particular project and control the tracking of the time in various assignments.If that is what you are trying to achieve through Oracle Project Management icnluding the other features it has, you can surely go for it.
    Let me know if you have any doubts on it.
    Regards,
    Tanvi

  • Why MS Project Checks Out Project after Choosing Read-Only

    All,
    Below is an quote from one of our MS Project users:
    "When users try to do a Read Only of a project plan, MS Project is checking the file out to them.   When I go in to edit the plan, I can't because the file is checked out.  I inform the user who it is checked out to, but they
    are unable to check the file back in because they never checked it out to begin with."
    When the above happens, the admin will have to force the check-in.  Is the above by design or is it a bug?  We are using Project Server 2010.
    Thanks

    If it is CU Dec 2011, I guess you do not have SP2 installed, which you should do asap.
    That being said, I suspect this is due to a wrong manipulation since it would be an obvious and unacceptable bug. Can you detail step by step the process to reproduce this unexpected behavior?
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Saving Project plans error

    Hi I wonder if anyone can help with a problem we are having with saving plans in MS Project 2013. This is only happening on one project engineers system since he got MS Project 2013 installed.
    It seems when he makes significant changes, like adding new tasks or cutting and pasting tasks in the plan appears to save normally then when it is reopened on his or another laptop/desktop the new tasks which have been inserted
    have duplicated by 10 or more on each task. Then when he tries to change it all back it wont save its almost like the system thinks these changes are done on an older version.
    The error message is 'The file cannot be opened. - check the file name and path are correct - check the file format is recognised by Project. Project files saved in an earlier than MS Project 2000 cannot be opened.'
    But when the PE creates a new plan and adds in all the tasks the system recognises that this is version 2013 and there are no problems unless he tries to add new tasks to his plan after the initial plan has been created. Its very
    strange. We have had MS Project 2013 re installed and its made no difference. This never happened until he moved from 2010 to 2013.
    I hope i have explained myself well and hopefully someone has come across this before.
    Thanks

    Hi Kath,
    Is it MS Project standalone or connected to Project Server?
    I've seen this happened due to copy-paste which can corrupt the project plan. Does it also happen on a blank new file with no copy-paste?
    You could try to repair the project file in case it is corrupted, with the
    XML export or/and
    save for sharing method.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • WCM Error while saving Project

    Hi,
    I am getting following error while saving new created project in cProject.
    Saving is not possible because the WFM Core data could not be adjusted
    Message no. PRP086
    Diagnosis
    When checking the project role or project role staffing, differences to the related WFM Core data were found. The project cannot be saved because the data cannot be adjusted. Possible causes for this include:
    The WFM Core is not installed locally. When working with the application, the WFM Core service is suddenly no longer available.
    The WFM Core configuration has been changed in Customizing.
    The WFM Core is only activated after projects have been created. During the automatic adjustment of data, it is determined that resources unknown in the WFM Core are assigned to existing project role staffing.
    When working with the application, an existing resource already assigned in the WFM Core is deleted.
    System Response
    The project cannot be saved.
    Procedure
    Contact the system administrator if the required resource is not known in the WFM Core. The project can be saved as soon as the resource is created.
    Let me know how to resolve this issue??
    Thanks in advance,
    Atul.

    hi Atul,
    Are you using WFD server for your resource planning in cProjects???
    If yes, you have to do settings in customizing for the same in Workforce deployment server under Resource Management in cProjects.
    If not, then do following settings to remove the error you are getting:
    1) SPRO -> Collaboration Projects -> Resource management-> Business Partner-> Set Up Integration of HR,
    Maintain following setting:
    Group     Sem. abbr     Value abbr     Description
    HRALX     HRAC     X     Activate HR Integration
    2) SPRO -> Collaboration Projects ->  Resource management Qualification Management->  Activate Qualification Search and Matchup Using WFM Core
    In this, deactivate the use of WFD Core for the qualification match up and the search by deleting the X under Value abbr. in the activity Activate Qualification Match up and Search Using WFM Core.
    Hope this will be helpful to you.
    Regards,
    Niraj Sikligar

  • Project Server 2010 Timesheets not Updating Project Plans

    We have several project plans that are not getting updates from approved timesheets.
    Troubleshooting steps I've taken:
    1) Verified the timesheet/task submissions by the resources
    2) Verified they have been approved
    3) Verified they have been accepted by the Status Manager and processed
    4) All project plans have been published (I even used ProjTool ON the App server to do a full publish of all plans as a second step of publishing)
    5) Verified OLAP was built successfully overnight (and every night)
    6) Tasks have both remaining work and NO actual work in the Resource Usage view
    7) Had a user recall and resubmit his timesheet using "Send Timesheet" to see if the task updates would come through - they did not (I am Status Manager and the timesheet shows Approved), and even published the plan and rebuilt the OLAP again,
    just in case.
    8) Verified that no tasks are marked for closure under Close Tasks for Update in Server Settings.
    9) Verified Timesheet shows Actual Work on the Tasks via Pivot Table; compared Timesheet_User_View with MSP_Portfolio_View pivot table for project which shows 0 hours. Timesheet_User_View shows 33 hours.
    All tasks have Remaining Work, are within the date range of the timesheet and are open for submitting time. Timesheets are still out of sync with project plans for many users and there is no apparent reason. I'm out of ideas!

    Hi,
    In status manager's approval center, history, status updates, can you check the status of the approval? Do you have any errors in the ULs log for the approval or publish jobs?
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Error Message while Approving Tasks in Project Server 2010

    Hi All,
    While performing Tasks approvals in MS Project 2010 I am getting below error message:
    An Error Occured while processing one or more items. This was caused by one of the following:
    A timesheet job is failed and blocking coorelation in the queue.
    The approval item no longer exists or has already been approved
    The host server is unreachable.
    Following are the details of the error message found in Event Viewer:
    Standard Information:PSI Entry Point:
    Project User: <domain>\<windowsuserid>
    Correlation Id: 417dce51-740f-46f0-8f1e-182b4e0c635c
    PWA Site URL: http://<servername>/<projectserver>/
    SSP Name: spsusfiprojwebappservice
    PSError: GeneralQueueCorrelationBlocked (26005)
    Operation could not completed since the Queue Correlated Job Group is blocked. Correlated Job Group ID is: 2ae5d5f9-b554-4a44-93f0-f815d36976cd. The job ID of the affected job is: 82dce1fb-be71-4c4a-8d16-4516ea8c887d. The job type of the affected job is:
    TimesheetReview. You can recover from the situation by unblocking or cancelling the blocked job. To do that, go to PWA, navigate to 'Server Settings -> Manage Queue Jobs', go to 'Filter Type' section, choose 'By ID', enter the 'Job Group ID' mentioned in
    this error and click the 'Refresh Status' button at the bottom of the page. In the resulting set of jobs, click on the 'Error' column link to see more details about why the job has failed and blocked the Correlated Job Group. For more troubleshooting you can
    look at the trace log also. Once you have corrected the cause of the error, select the affected job and click on the 'Retry Jobs' or 'Cancel Jobs' button at the bottom of the page.
    In Server Settings>Manage Queues>Erro Details following information is listed
    General
    Timesheet:
    TimesheetIncorrectMode (3204). Details: id='3204' name='TimesheetIncorrectMode' uid='e53139e1-66cb-4b4a-a948-cbeda21340b8' mode='1'.
    Queue:
    GeneralQueueJobFailed (26000) - TimesheetSubmit.SubmitTimesheetMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='4c09d375-cad0-4b61-be16-49abbdc149e4' JobUID='b3737c2a-11f4-4799-9fd7-1d018e4c73d1' ComputerName='JSIDBWPRJA02' GroupType='TimesheetSubmit'
    MessageType='SubmitTimesheetMessage' MessageId='1' Stage=''. For more details, check the ULS logs on machine JSIDBWPRJA02 for entries with JobUID b3737c2a-11f4-4799-9fd7-1d018e4c73d1.
    Background:
    We are gearing up to upgrade our Project Server from 2003 to 2010; as part of this process we have installed MS Project Server 2010 on our dev environment. We created Test Project plans and assigned ourselves (we admins) to these plans and all of us have
    admin privileges.

    Hi, Can you give a bit more detail on how your generating the task approval. Are you going into myTasks and doing self assignment to your test project plans or are you generating these approvals via outlook or are you updating a timesheet and sending status?
    If you're using your timesheet have you created all your timesheet periods within server settings, time and task management...Donald R. Landry

  • Error while saving BPM Project to MDS: BPM-70801 : Metadata operation failed

    Dear All,
    I am working on BPM 11g.
    I installed the following products for BPM 11g
    OS: Windows 7 SP1 Professional Edition all with 32 bit
    Installed s/w:
        JDeveloper 11.1.1.6.0 Generic Version
        OracleXE 11.2 Win32
        ofm soa generic 11.1.1.6.0
        wls 10.3.5
        RCU 11.1.1.6 for schemas dev_soainfra, dev_sdpm and dev_mds  - Utility run successfully.
    Overall Installation is successful wth no issues.
    Configuration of Weblogic server for domain is ok with admin server, soa_server1 and bam_server1 with test connections is ok.
    I am using browser as Internet Explorer 9
    In Jdeveloper 11.1.1.6.0 after creating application, project and process
    From BPM MDS Navigator I configured the connection for Database 11g XE as well using
    Override Application Server user/password
    For SOA MDS I included the dev_mds user with MDS partition as obpm
    tested connections all ok (weblogic and soa_server1 up and running)
    In Jdeveloper I am able to export the BPM successfully.
    In the BPM Project Navigator when I use the Project --> SalesQuote.jpr --> right clicking with
    option as  Save to BPM MDS the following error is occured as
    "Error while saving BPM Project to MDS: BPM-70801 : Metadata operation failed".
    If the error is resolved than I can see the project in BPM composer.
    My queries on this error are
    1) Has soa_server anything to do with this error
    2) Is dev_mds schema to be reviewed
    what can be the possibility to resolve the BPM-70801 error.
    Please provide the solution ASAP or send me the reply to my  [email protected]
    Regards
    Ajaz Ahmed

    Hello Ajaz,
    BPM-70801 is a very generic error that can have multiple causes. Please provide the error log from servers log file. From what I understand, you are using a separate soa_server1, so watch out /your_domain/servers/soa_server1/logs/soa_server1.log
    Regards
    km

  • Error running Execution plan for 'Project Analytics in PeopleSoft 9.0 '

    Hi ,
    I am running execution plan for Projects Peoplesoft 9.0 (BI Apps version 7.9.6)
    The issue is the file type data source went thru the database (data warehouse)
    the tasks that were completed SUCCESS were from the File source only from (SrcFiles).
    error as below.
    ANOMALY INFO::: Error while executing : INFORMATICA TASK:SDE_PSFT_90_Adaptor:SDE_PSFT_ExchangeRateDimension_Full:(Source : FULL Target : FULL)
    MESSAGE:::
    Irrecoverable Error
    Error while contacting Informatica server for getting workflow status for SDE_PSFT_ExchangeRateDimension_Full
    Error Code = 36331:Unknown reason for error code 36331
    Pmcmd output :
    one more info,if this helps
    values defined in the Parameters of the execution plan.
    1     DATASOURCE     ,DBConnection_OLAP     is 'DataWarehouse'
    1 DATASOURCE     ,DBConnection_OLTP     is 'PSFT_9_0_FINSCM'
    1     DATASOURCE     ,FlatFileConnection     is 'PSFT_9_0_FlatFile'
    The 'Relational Connection' In Informatica Repository Manager is currently pointing to only 'PSFT_9_0_FINSCM'
    & 'DataWarehouse'
    Please let me know what is wrong?
    Regards,
    JK

    Hi ,
    I created the PSFT connection in 'Applicaiton connection' of Repository manager.
    Also the Informatica server's tnsnames.ora should have entry for the source( PSFT database) and that of the datawarehouse.
    thanks,
    JK

Maybe you are looking for

  • IMessage in IOS 8

    I don't understand why I can't find posts about IOS 8 iMessage problems.  I have had a great deal of difficulty with iMessage since I downloaded IOS 8.  I have an iPhone 5S and a  iPad mini.  I have been having problems on both.  I also have an iPad

  • Taglibraries in JSP

    Hi, Please help me out! I've installed Jdk1.4, Tomcat4.0 and jsk2.0 in my system. I want to use taglibraries in my application. I have to import the following packages in my tag handler import javax.servlet.jsp.*; import javax.servlet.jsp.tagext.*; d

  • A3 library has increased size after upgrade

    Hi , After I did an upgrade to A3 my library has really increased the size from 80gb to 320gb, can someone please help me on this? is there something I have done wrong? Thanks in advance.

  • DOT on 875p

    recently i bought this board with the default 1.6 bios and DOT stickers on it(box and mobo). I've read some post in here that someone access the dot menu in the bios but seldom bec. it cannot be seen by default. To all the guys that have 875p mobo i

  • OS ( won't start up in Tiger 10.4.7

    Hi I upgraded to Tiger 10.4.7 and installed OS 9 3 times and it keeps on hanging on the Happy Face screen of OS 9. what can I do to fix this!!! Somebody help