Error in schedulinq parallel sequences with flow production operations

We have a routing with a standard sequence with operations in wich we have set "Continuous flow prod"
and "Min. Send-Ahead Qty=1".
We have a parallel sequence as well with operations set in the same way "Continuous flow prod"
and "Min. Send-Ahead Qty=1".
When you run the transaction "MD11" to create a planned order for the item the scheduling of the operations is correct
as regard the standard sequence,the system, correctly,  schedules the operations overlapping
them according to lead time set in the operation details.
But the last operation of the parallel sequence is scheduled to finish the whole lot before the operation
following the "return operation" . The system doesn't overlap this operation. In this way the
last item of the last operation (in the parallel sequence) isn't finished at the same time
with the last item of the "return operation" (in the standard sequence) as we like it would be.
We have set "Backwards scheduling" type on customizing and we use the "Alignment key= 2 "
for standard sequence and in the parallel as well. We have also tryed to set "Alignment key= 1"
in the parallel sequence but the results are howewer not correct.
In conclusion the schedulation of  continuous flow production operations
doesn't work properly between operations belonging to parallel sequences.
Could you suggest me what to do?
Thank you.

Hi,
  I tried with 5 ops 10, 20, 30 ,40,50 ( same work center  wc1)
  Set up time 1, Process time 1min for 1 pc
  set the continuous flow prodn i at op 20 with min send ahead qty 1
  Also a parallel seq was created with 3 ops op20 ,30 , 40 .
  set up time was 2 min for all work centers( same work center wc2) and proc time
  time is 1 min for  1 pc
  In that set the  continuous flow prodn at op 20 with min send ahead qty 1
  sceduling type was forward
.Alignment key was 2 for both std seq and parallel seq .
  After scheduling found that op 20 in std seq starts at 6.14am and op 40 ends
  at 6.47 am where as in parallel seq op 20 starts at 6.11 am and op 40 ends at
  at 6.47 am which is correct.( branch op is 20 and return op is  40)
  The three minutes late start in op 20 of std seq  is due to 3 minutes extra time
  defined for three  work centers setup time.
  I also tried with alignment key 1in both std seq and parellel seq.
Kindly check that you have maintained the continous flow prodn radio button
in the same operation in both std seq and parallel seq.
Regards,
S.Nandhakumar

Similar Messages

  • Scheduling of Parallel Sequence in Routing & Production Order

    Hello Friends,
    I have gone through sap library & many other threads related to maintaining & scheduling of parallel sequence in Routing as well as Production Order.
    For the example, I have 3 operations : 0010,0020 & 0030.
    I want to maintain 0020 & 0030 as Parallel Operations ( Parallel Sequence) i.e. for both operations I have maintained same lead times so that both should start & end at same time parallely.
    First of all, I have maintained all operations in standard sequence 0 all 0010,0020 & 0030 operations and also maintained tick in Required splitting check box.
    Same way , I have maintained operations 0020 & 0030 in Parallel sequence with branching operation as 0020 & Return operation as 0030. Ref. sequence i have maintained as 0 (Std. Sequence).
    Now when I am checking in Graphic it is not showing both operation 0020 & 0030 as parallely scheduled and hence same is not reflected in Production ORder as well.
    Kindly share your valuable views reg. what may be other settings for parallel sequence which I may be missing.
    Thanks in advance.
    Regards,
    Tejas

    Hi Abhijt,
    Thanks for your reply. I went through your thread & I followed same steps as mentioned by you in your suggested threads.
    I have removed Parallel sequence fully & maintained Required Overlapping for all my 3 operations : 0010,0020 & 0030
    I have maintained workcenters as below :
    0010 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0020 B  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0030 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    I checked scheduling in routing itself same way you suggested with start date today's date & forward scheduling it gives following results :
    0010 start time 07:00:00
    0020 start time 07:13:42
    0030 start time 09:14:39
    My concern is with mainly start time of operations 0010 & 0020 since for both of these are processed on different workcenters A & B respectively then why not starting exactly on same time on 07:00:00 AM only instead another operation is starting on 07:13:42AM. I am unable to find how this difference of 13mins 42 seconds is coming.
    Kindly provide your feedback. Also let me know if you need any more details.
    Regards,
    Tejas

  • My iCal won't go online and returns the error message: The server responded with "500" to operation CalDAVAccountRefreshQueueableOperation.

    My iCal won't go online and returns the error message: "The server responded with “500” to operation CalDAVAccountRefreshQueueableOperation."

    OK Now I can answer my own question.  The incomprehensible (inexcusably geeky) error message is actually Apple language for saying simply: "The iCloud servers are down again.  Please wait until we've fixed them."  I found this out by talking to Apple support.  It took about 12 hours for the iCloud server synching calendars to come back online.  When they did, my calendar reloaded, and everything was fine.

  • How to use parallel sequence for split the operation qty. urgent or other o

    PP guru
    My scenario is as follows.
    I ve one material suppose…xyz.
    For that material I' ve created bom, routing.
    In routing I' ve mention only one operation. 0010.
    Now I' ve the production order of 1000 kg.
    I want to use two work centers to run this production order. ( e.g.work center a and b)
    In routing I used work center a.
    In short I want split that operation.
    So what I ve to do or use parallel sequence and how???
    or else is there any other option to split the order to two or more machines/work center?
    Pls explain me in brief.
    Regards,
    Ram

    Hi,
      If you want to carry the production with two different work centers , first you need to split the operation qty.
    For this in the order type dependent parameters OPL8
    in the controlling tab page enable the indicator Cost collector
    and set the default rule as PP2.
      Create a Product cost collector with KKF6N.
       Now in the production order , select the operation and choose functions--->>> split.
       Now enter the operation split quantity and execute.
       Now in MD04 you can see two production order.
       In the second production order change the work center in the operation overview as desired and save.
      Regards,
    nandha

  • Why I get an error when running a sequence using the LabVIEW operator interface ?

    I have a simple TestStand sequence calling LabVIEW vis that is giving me an error when I run it with the .exe version of the LabVIEW operator interface and I set TestStand to run the vis using the 8.2.1 runtime engine instead of the development adapter. I made a change in the operator interface to open a vi programatically and get the value of a control, this vi is also used in the TestStand sequence I am trying to run. Could this be causing my problem ?
    Thanks

    Hello Verdulken,
    I have a few additional questions:
    Does your application function correctly when running the LabVIEW operator interface you have created as a VI in the LabVIEW development environment (i.e. does this problem only occur when the LabVIEW operator interface is run as an executable)?
    What is the error that you are receiving?
    Regarding the VI that you open programmatically, do you open it in a visible manner (i.e. use the Show front panel when called option from VI Properties)?If so, do you also close this VI after it finishes (i.e. use the Close if originally closed option from VI Properties)?
    Does the error occur on the step that calls this very same VI again later in the sequence?
    Does your application function correctly if you use the development adapter for all of your calls?
    Thank you in advance for this information,
    Matt G.
    National Instruments
    Applications Engineering

  • Alternate sequence with no "return" operation

    Hello PP experts,
    I have a routing with already a ALT sequence and no "branch" operation for the same, only my return oper is configured (this is a kind of converging routing).
    I tried to enter an ALT sequence without a "return" operation but in this case it is not authorized.
    Seams "branch" operation can be optional, but "return" is mandatory.
    Can you please confirm/advise how I could simply model a "diverging" routing sequence (going out of my main routing branch and no return on it).
    Thanks

    Thanks for your answer but this does not solve my pb.
    To me there are 2 business case which can lead to model a // or ALT sequence in addition to a main seq.
    1) As per your explanation, it is a need to increase and optimize the throughput based on lot size.
    OR
    2) In my case it is regardless of lot size and throughput, but it is to model a manufacturing process that needs to have a main sequence for production, then based upon some process triggers, to "branch out" the main sequence and terminate this process in a different way based on those triggers results.
    I already model one of my biz case where I need a main sequence on my routing, and this main seq is then joined by an ALT seq on a particular operation (my return operation). In that case usage of alternative seq with "branch oper = empty" and "return operation = 0040" is working well and fits my needs.
    Seams to do the reverse, that is to leave my "return operation = empty" is not allowed.
    Thanks,
    Franck

  • My ical is constantly giving this error message: The server responded with "400" to operation CalDAVScheduleEventQueueableOperation.   Go Offline   Revert to Server . What does it mean? It´s driving me nuts.

    I am syncing to Icloud. Iphone and Ipad works fine with this setup, but my Macbook Pro just doesn´t seem to get it. I have all latest updates. I can not detect any different response from the Mac weather I click <Go offline> or I click <Revert to server>, but the message comes up about 50 times a day(!).
    Also - I seem to have a problem answering to some invitations (I invite myself from my work calendar (win Outlook). Shouldn´t I be able to answer them ?

    I am having this problem too...and also I (most of the time) can't invite anyone on my google apps domain to a meeting. WEIRD! HELP!!! I just switched to Mac from PC...this was supposed to be EASY!
    I get all kinds of error  messages...
    1) The request for “Test Appointment” in “[email protected]” in account “yyyy.com Google” failed.  The server responded with “400” to operation CalDAVScheduleEventQueueableOperation. *My google calendar *IS* updated despite the error, but the appointment is greyed out on my calendar.
    2)  The URL https://calendar.google.com/calendar/dav/[email protected]/user///calendar.google.com/calendar/dav/[email protected]/user/ encountered HTTP error 404. Make sure the URL is correct. The URL *IS* correct.
    Also, when I try to invite people to appointments, iCal adds random attendees and frequently will not add an attendee if they are in my domain. HELP.

  • ORA-12801 error signalled in parallel query with ORA-00018 max # session

    Hello,
    I've just run dbca to create a new database. On completion I received the following:
    ORA-12801 error was signalled in parallel query server
    ORA-00018 maximum number of sessions exceeded
    ORA-06512 at sys_utl_recomp line 760
    ORA-06512 as sys_utl_recomp line 773
    ORA-06512 as sys_utl_recomp line 1
    The processes are set at 100, sessions is set at 115?
    Can you tell how to address this error and resolve the problem? I'm thinking that I should rerun sys_utl_recomp

    Hi,
    You didn't mention oracle version as well OS.
    might be you hit a bug.
    check the below link for reference
    https://metalink2.oracle.com/metalink/plsql/f?p=130:14:8051847734518941130::::p14_database_id,p14_docid,p14_show_header,p14_show_help,p14_black_frame,p14_font:NOT,21564.1,1,1,1,helvetica
    Regards,
    Taj

  • Parallel Sequencing of Production between different resources

    Hi all,
    I want to consider the way to produce a product in parallel with other resources if available and cost efficient. ( Parallel sequencing of the production between resources)
    I have setup groups for products. Also resources (machines)
    every machine can do the same job (in different times)
    According to setup optimization it may be useful to produce all in one resource but if I need to catch the requirement date, I have to parallelize the work.
    Is there any way in SCM like (parallel sequencing in R/3) that takes us to a more feasible solution?

    Hi Mehmet,
    In R/3, in the operation of routing, we can give "split" number .  It can split one operation into several splits during scheduling or capacity leveling so that total execution time will be reduced accordingly.
    But when you transfer such operation with split number, the activity duration will be automatically calculated by using machine time divided by split number.
    However in PPDS, there is split function. I'm not sure if it is what you want.
    http://help.sap.com/saphelp_scm50/helpdata/en/3d/7e653a0c52425fe10000000a114084/frameset.htm
    Hope it can help.
    Watson

  • Deletion of Serial numbers/ Parallel sequences from production order

    HI ,
    I am trying to delete the Serial numbers from the production order programatically using the FM SERNR_DEL_FROM_PP. I dont get any error , but the serial number is not getting deleted from production order. If anyone have used this FM for deletion Please let me know what extra has to be done.
    Similarly i have a requirement or deletion of parallel sequence from the production order. Any FM to do the same?
    Code screenshot below
    CALL FUNCTION 'SERNR_DEL_FROM_PP'
           EXPORTING
                material              = i_matnr
                j_vorgang             = 'PMP2'
                ppaufnr               = i_paufnr
                ppposnr               = i_itemno
           IMPORTING
                anzsn                 = l_num_serno
                ZEILEN_ID             =
               SERIAL_COMMIT         =
           TABLES
                sernos                = gt_sernos
           EXCEPTIONS
                serialnumber_errors   = 1
                serialnumber_warnings = 2
                OTHERS                = 3.
      DATA ls_afpod_po TYPE afpod.
      MOVE-CORRESPONDING gs_afpod_po TO ls_afpod_po.
    *.....Update Number of serial numbers in parent order
      ls_afpod_po-anzsn = l_num_serno.
      update afpo
      set anzsn = l_num_serno
      where aufnr = i_paufnr and
            posnr = i_itemno.
      commit work AND WAIT.

    Hello,
    the function module SERNR_DEL_FROM_PP calls the function module SERNR_DEL_FROM_DOCUMENT within. There, the changes are only written into the memory.
    See also the code below:
    CALL FUNCTION 'STATUS_BUFFER_EXPORT_TO_MEMORY'             "P99K058111
            EXPORTING                                             "P99K058111
                 I_MEMORY_ID = MEMID_STATUS.                      "P99K058111
    The variable memid_status has the value 'SN_STATS'.
    So if you want to update the data, you have to call the following function module:
    CALL FUNCTION 'SERIAL_LISTE_POST_PP'
      EXPORTING
        MEMORY_ID_STATUS       = 'SN_STATS'
    Regards Simon

  • The deleted operation affects the confirmed yield of the parallel sequence

    there is a production order.
    the control key of the last operation is PP03,and it's confirmation is : Milestone confirmation.
    and the production order has a parallel sequence,a external processing operation.
    but i marked the external processing operation deleted.
    then i confirm the last operation,and it's sysstatus is CNF
    but the parallel sequence operation is not CNF.
    WHY?

    Dear,
    did you delete the operatrion after release or before the release?

  • The server responded with "400" to operation CalDAVCalendarSplitDualTypeCalendarQueueableOperation.

    I had similar problem to error message.  I saw a response to try the following:
    ERROR MESSAGE:
    The server responded with
    “400”
    to operation CalDAVCalendarSplitDualTypeCalendarQueueableOperation.
    I tried a suggestion to go to SAFARI >PREFERENCES>PRIVACY and then click "Remove All Website Data".  Then rebooted my MacPro.
    Result:  It seems to have stopped the pop up error message.  It had been popping up every 10 minutes or so.  But I have now gone 4 hours with no repeat incidence.
    Hope this might help some of you.

    In the Internet Accounts preference pane, delete the BT Internet calendar account. If you don't use the account, that's all you need to do. If you do use it, recreate the account with the same settings.

  • Production Order not printing with Parallel Sequence ?

    Hi All,
    User is unable to print Prod. Orders when Parallel Sequence is used, but Orders using Standard Sequence are printing fine.
    Print is done in Update Task, so User is able to release the Order and when he saves the Order, the Order should get printed.
    Currently this is not happening. There is no spool generated.
    Can anyone please tell me the printer configuration required for this. Or any other configuration which we are missing.
    Thanks,
    Bhuvan

    Dear Bhuvan,
    I'm not sure if this is the issue,at a high level,check if the control key assigned to the operations in the
    parallel sequence supports for Printing in General(check box set).
    Regards
    Mangalraj.S

  • When i run a sequence with ivi step types in simulation mode i get the error code number BFFA0015 - Types do not match.

    When i run the sequence with ivi step types in simulation mode i get the error Types do not mathc. The step that generates this error is an IviScope step type and is configured as a measurement. Th weird thing is that in real mode is working perfectly. I have three measure steps and i get the error in all of them. The exact error message is:
    UUT Result: Error, Error executing substep 'Post'. An exception occurred calling 'RunStep' in 'ISubstep' of 'TestStand Ivi Step Types 1.0 Type Library' An error occurred while executing the step. Component Works IVI Control Error: The IVI Read operation failed on channel '1' for logical name 'SampleScope'. Details: (1
    ) Types do not match. [IVI Error Code: BFFA0015] Source: TSIviStepTypes [Error Code: -30721, User-defined error code.]
    Can someone tell me how to fix this problem?. It seems to me that the simulation generates a diferent type of measurement of that generated in real mode.

    Update:
    The simulation driver appears to be raising the error. By switching to specific driver simulation the error does not occur. This may be a problem in either the class simulation driver or the specific driver.
    Scott Richardson
    National Instruments

  • ERROR: You're trying to run the product with the legacy launcher oracle.ide.boot.Launcher

    Hi,
    I have problem while upgrading SQL developer 4.0.0.12 to 4.0.0.13 on my windows 64 bit machine. 4.0.0.12 version is working good, where as 4.0.0.13 is showing below error while starting it.
    I did try sqldveloper.exe and its not working, So I started running sqldeveloper.bat to get more information, also added AddJavaLibFile & SetMainClass to sqldevloper.conf but no luck. Could you please help in this regard.
    Error Message
    C:\Dev Software\sqldeveloper-2\sqldeveloper\bin>java -Xmx640M -Xms128M -Xverify:none -Doracle.ide.util.AddinPolicyUtils.OVERRIDE_FLAG=true -Dsun.java2d.ddoffscreen=false -Dwindows.
    shell.font.languages= -XX:MaxPermSize=128M -Dide.AssertTracingDisabled=true -Doracle.ide.util.AddinPolicyUtils.OVERRIDE_FLAG=true -Djava.util.logging.config.file=logging.conf -Dsql
    dev.debug=false -Dide.conf=”./sqldeveloper.conf” -Dide.startingcwd=”.” -classpath ../../ide/lib/ide-boot.jar oracle.ide.boot.Launcher
    ERROR: You’re trying to run the product with the legacy launcher oracle.ide.boot.Launcher . Check your .conf file and be sure to include:
    AddJavaLibFile ../../ide/lib/fcpboot.jar
    SetMainClass oracle.ide.osgi.boot.OracleIdeLauncher

    Use C:\Dev Software\sqldeveloper\sqldeveloper.exe instead.

Maybe you are looking for