Error - Settlement for Production order Co88

Hello,
Before Dec 2009 the FG material xxxxx has been goods movement post without maintained split valuation. Then Dec2009 the material xxxxx has been extended to split valuated.
While process of production order settlement against said material through CO88, we are facing one error Valuation Type not set for material xxxx.
What could be the reason that system is showing the error.
Best Regards,
Avijit

Hi,
If no valuation category has been assigned to a material (MBEW-BWTTY is
blank), and you wish to assign multiple valuation categories (split    
valuation) to this material, then the material must not have linked    
documents and the stock must be zero for both the current and previous 
periods.
The reason of this restriction is that objects that are open and              
refer to valuation data without split valuation can result in                 
inconsistencies if the valuation category is changed.                         
So If you want to subsequently change the valuation control for a material       
to split valuation, you should previously check the following:                                                                               
- No stock is available for the material                                      
- All production orders must be closed                                        
- No purchase order can still be opened                                                                               
These checkings will avoid inconsistencies or undesired side-effects.    
Consequentely you can not change a valuation category of a material    
if there are purchase order item lines (even if the purchase order is  
completed) or if a stock balance exists for that material.             
For more information concerning limitations associated with changing the
valuation category, you can see note 30656.  (Although this note is  
used primarily regarding a change to the Unit of Measurement, the      
functionality is very similar).                                        
Please also check note 155874, which outlines what must be performed   
in order to change the valuation category.                             
Best regards,
MLM

Similar Messages

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Deletion Flag setting Error message for production order

    "Unprocessed future change recs for orders prevent del. flag/completion"
    I tried to used COFC and CO1P but didn't work out?
    How to fix this issue i am trying to set deletion flags for certain production orders?
    If i even found errors in final confirmations how to fix them

    Hi Aparna,
    This is absolutely fine to set the deletion flag to archieve the Production Orders.
    For this error, which you are getting, there could be entries in COGI or CO1P..
    Whether you are using Process Control (check in OPK4)?
    If that is the case you should have got the entries in CO1P.
    Can you see any entries in COGI? even 102 movement against the order?
    Check once again and revert for further discussion..
    Regards,
    Siva

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • Variance calculation for production order with settlement receiver as SDI

    Hi...
    I have one query reference to Variance calculation for production order with settlement receiver as SDI(Sales document item).
    I am working on Varaint configuration with strategy 25(Make-to-order for configurable material) with requirement class 046.
    I have created sales order ref. to configurable material,subsequently created planned order & then converted to production order.
    In production order settlement receiver is SDI(Sales document item).
    While doing production confirmation ,variance has been created.
    Now during variance calculation KKS2, I have got error message as no suitable settlement rule found for object Order no.
    Is there any way to come out of this?Or variance calculation KKS2 is not applicable with settlement receiver as SDI(Sales document item).
    Pl. guide
    Redards
    Tushar

    Hi
    In case of non valuated material, concept of variance does not apply...
    Variance is Actual Cost - Cost of Goods receipt posted in stock.. If the later value is zero, your entire actual cost is variance... That is one way of saying it
    But, in SAP, var not calculated in case of non valuated material and that makes sense as well.. Since you are in MTO scenario, it would make sense to analyse costs vs revenues @ sale order level as each SO will be unique in itself
    Regards
    Ajay M

  • Authorization check for production order settlement

    Hi All,
    Production order settlement currently can be done by any user of any company code. there is a high risk involved in the same since unauthorized postings may happen. Hence we need to add authorization check for production order settlement. Can we maintain the same at the plant or the company code level?
    Waiting for your replies. Thanks in advance!
    Regards,
    Aman Goel

    hi
    What venki has told abt the exit, its absolutely correct.Even i have used the same exit
    •     From table CAUFV pick Material(PLNBEZ),Basic Start Date(GLTRP),Plant(WERKS) .
    •     Pass parameter Material(PLNBEZ) and Plant(Werks) in table MBEW in respective fields i.e. Material(MATNR) and Plant(WERKS).
    •     Pick the latest record for the current period(LFMON) and year(LFGJA).
    •     Pick Product Cost Estimate number(KALN1) from the record and pass it to table KEKO.
    •     Check if Production Order Basic Start Date(GLTRP)<= BIDAT, if NO post Error Message.
    This is the FS for EXit PPco0007
    Reward if useful
    Amit

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • Error in scheduling parameters for production orders

    Hi Guys,
    Greeting for the day u2026u2026u2026.
    I am trying to create production orders creation for own order  type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
    Production scheduler      -
    xxxxx,
    Detailed scheduling -
    check box of scheduling ticked,
    Rough cut scheduling    --- scheduling id u201301, scheduling and generate capa requi,, boxes     ticked,
    Adjust scheduling  -- requi to operation  date,
    Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
    Operation segment ---setup,
    All operation in order will be reduce
    Do not reduce,
    Could any one light on this issue,
    Thanks in advance,
    Mohan

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • Automatic Settlement for Prod.orders & Product Cost Collectors.

    Dear all,
    Please help me how to carryout the Automatic settlement of Production orders &
    Product Cost collectors on every month last working day mid night.
    Please tell me how to schedule this as an automatic scheduled job.
    This program is not been allowed to schedule as a job.
    Waiting for your inputs.
    Please help me.
    Regards
    Mangalraj.S

    Hi
    Create a Variant with the order types need to be setteled at the period and schedule the same in background processing.
    Regards
    Venkat

  • Error while calculating variances for production order

    Hi Gurus,
    while calculating variances for production order i am getting the following error
    "Cannot calculate scrap variances" ( Error message)
    " no standard value estimate for material" (Warning message"
    A standard cost estimate exists for the material at the date mentioned in the error in released status.
    Please give solution for the error.
    Thanks in advance n Regards
    Arul.

    Is there an <b>itemization</b>, generated for the cost estimate used to calculate the target costs?
    Does the material components listed in the BOM of the cost estimate used to calculate the target costs, <b>assigned to the operations</b> in which they are used. Otherwise it is not possible to correctly report the variances and scrap when operations are confirmed.
    Does the order for which the variances are calculated have a valid <b>variance key.</b> ?
    Does the order have the status DLV (delivered) or TECO (technically completed). If the status was withdrawn, any variances and <b>scrap variances are canceled</b>.

  • Error when doing GR for production order with serial number

    I'm not familiar with serial number and equipment management but I'm trying to help my user resolve this issue.
    This product is returned from customer site.
    I saw that this material is being reset in IQ02 from status in warehouse to become Available when the material is consumed in the production order via 261 movement type. So now the status is available. Then the user went to change a new serial number. Later, GR for production order is done in MB31. Errors are encountered when prompted to enter the new serial number.
    Configurations XX01 and XX02 are different
    Message no. CX126
    Configuration of serial number SN02 incompatible with document item
    Message no. IO226

    Hi..
    Can you please explain in detail, I facing same problem, while assigning unrestricted stock to sales order.
    Regards,
    Sumit Pukale

  • GR  for  Production order not possible with  settlement receiver as IO

    Hi
    I   have  created a  production order  and  the settlement rule is  to  an internal order.  But  it  does not  allow me to do  goods receipt.    Pl  tell me  what to do.
    Thanks
    kamala

    Hi,
    SAP recommands production order settlment to be beow object and additional CO Object COPA.
    Settlement Receivers Depending on the Scenario
    1.Make-to-stock production >>The make-to-stock inventory (receiver = material) >> COPA
    2.Sales-order-related production with a valuated sales order stock>>The valuated sales order stock (receiver = material)>>COPA
    3. Sales-order-related production with a nonvaluated sales order stock>>The sales order item (receiver = sales order)>>COPA
    The scenario you are trying is doesn't fit into standard SAP framework for production order so please try said scenario with CO production order. Again CO production orders mostly recommondable without PP so figure out impact on cross modules.
    Regards,Ashok.

  • User exit for production order settlement

    Hi Experts,
    Can anybody tell me if there is any user exit which will make GR and settlement of Production Orders at the same time i. e. as soon as production order is confirmed ( movement type 101 happens) the same production order will be settlelled immediately.............
    Thanks on advance for your answer.
    Regards,
    Bijay

    Hi,
    for production order you have exits PPCO0001 - PPCO0023. In transaction SMOD you can see the documentation for all this exits. Actually I think exit PPCO0007 could be a possiblity for you. This exit is called by saving the order.
    But maybe it would be better for you to use a special status profile? A user status is set if settlement status is set.
    Also BADI WORKORDER_UPDATE could be interessting for you.
    Regards,
    Sabine

Maybe you are looking for

  • Https and web clipping portlet

    Hi, I have little problem with portal, I can't add web clipping portlet from my web app, which using https. Has anyone any experience with adding web clipping portlet over ssl? Is it possible? (version 10g, 10.1.2.0.0) Thanks Jan Kralik

  • I just installed Yosemite on to my MacBook Pro

    I just installed Yosemite on to my MacBook Pro and I have noticed that my computer has slowed down, I now start working and all of a sudden, the cursor turns into the little round colored circle and the system "stalls" for a bit. My favorite bookmark

  • Display Image from URL

    Hi Experts, I am new to BSP. I have a requirement like I need to display an image which is stored in a url. The URL will be changed depending on the document no. Please suggest how can I display the image on BSP dynamically based on the document no?

  • Print out Forte Arrays

    Greetings All: I'd like to know if anyone has had any experience printing out Forte Arrays[screen tables] from the Forte Window it exists in. Example: A Forte window exists that contains Forte Arrays. I want an option to either select from the pulldo

  • PPC G4 update for OS 10.4.11

    Update installed just fine, but since then any application I'm in reverts to finder. All my icons on the desktop momentarily disappear and then return with my hard drive icon in a new place each time. Really irritating while trying to type and all th