Error when activating change request management

Hello,
When I activate the flag: "activate change request management" in the tab Change requests in transaction SOLAR_PROJECT_ADMIN, the following error message appears:
Warning: Problems occurred during synchronization
of the system landscape
Any idea?
The solution manager release is SAP EHP 1 for SAP Solution Manager 7.0
Thanks and best regards,
Ana

Hi Ana,
Please go through this forum.
Re: Warning: Problems occurred during synchronization of the system landscape
If this does not solve your issue, please revert back.
Rajeev

Similar Messages

  • Ssl handshake error when activating changes in admin console

    An error occurred during activation of changes, please see the log for details.
    [Deployer:149150]An IOException occurred while reading input.; nested exception is: javax.net.ssl.SSLKeyException: [Security:090477]Certificate chain received from 10.26.176.83 - 10.26.176.83 was not trusted causing SSL handshake failure.; nested exception is: javax.net.ssl.SSLKeyException: [Security:090477]Certificate chain received from 10.26.176.83 - 10.26.176.83 was not trusted causing SSL handshake failure.
    [Security:090477]Certificate chain received from 10.26.176.83 - 10.26.176.83 was not trusted causing SSL handshake failure.
    WLS 10.3 on Windows 2008: I configured one of my managed servers for SSL and I'm able to reach deployments via browser and the keystore/certificate chain I have setup. However, I'm getting the above error in Admin Console all over the place. I am unable to commit configuration changes without deleting the SSL managed server. The admin server is still HTTP via 7001. I'm not sure where to look to resolve this issue. Any ideas appreciated.

    It seems like you did not update the trust store of your AdminServer. It acts as a ssl client of your managed server and cannot verify its identity certificate.

  • "Error when activating update rule" after changing ODS key

    Hi Gurus,
    I have problem when transporting in productive system an existing ODS & the update rule linked. The message is  :  "Error when activating update rule".
    This is when i move one field from the key to a simple field of the ODS.
    Before transporting requests, i deleted data in the ODS by right-click on ODS --> Request tab --> select the request --> click on delete....
    I don't understand because i did the same in Qual environment and everything is OK : transport request & ODS loading...
    Please help.....

    Hello,
    Please try to check/perform the following steps:
    1- You must ensure for the update rule have mapping between infosources
       and ODS/CUBEs correct, this means that also these objects need
       to be of the same version in the source system of the transport as in
       target system.
    2- Please ensure all infoobjects in the cube are active.Please
       reactivate all the objects again in source system.
    3- Ensure all infoobjects are found in the communication structure.
    4- Please try to collect the update rule via BW transport connection
       with the grouping option "only necessary objects" and then transport
       those objects again.
    Could you please reactivate the infocube and its update rules again
    and then create a new transport for this infocube and transport it
    again.
    Best regards,
    Paula Csete

  • Help me configure Change request management !!!

    Dear friends,
    I am Going to Configure Change request Management, so just to ensure that the configuration is not erronous, i would need Expert advise..
    Just want to know Clear few things before i proceed..
    I am also refering SPRO and related notes
    Scenario :
    I have two SYSTEMS SAP ECC 6.0 with System id R03 and Soluiton manager with SYSTEM id SOL,
    R03 has 3 clients, 300 600 700..
    In R03 300 is the development client, 600 is quality client, 700 is the production client.
    SOL has 2 clients, 100, 200
    With 200 as the production client.
    Q.1) <b>Do i have to configure CHARM in both the client (100 and 200 of SOLMAN).</b>
    Q.2) Initially I had tried to set CHARM in client 100 of solman, but later on realized that it has to be set up in client 200.
    When i logon to client 200 and  Execute IMG activity Spro-> sap soltion manger->basic settings-> sap solution manager system->activate integration with change request management.
    Then by default it take the previous client ( client 100) as the change request management client.
    ( as we know there are three steps in the above activity ), the other activity are executed properly, only prblem being that the default client is always set to 100, which should not be the case).
    I do get the prompt saying ( "The change request clent is set to clent 100, do u want to change to client 200, on clicking yes, still it is always set the same client 100 as charm client ")
    <b>Plz let me know what do i do to set the change request client to 200??</b>
    Q.3) Regarding TMS, we have local domain controller in solman and local domain in R3.
    We are planing to establish domain links between the two systems( ie both the domain controllers) ??
    Is this the right strategy ??
    <b>Any other method that u can recommend  ??</b>
    Q.4)One of the IMG activity says, Generate Destinations to client 000 of all the domain controllers..
    Whenever i do this these, destinations are created with errors, i am not able to create trusted RFC destinations without errors.
    When i logon to satellite domain controler and excecute sm59 there are 2 destinations created Trusted and BACK.
    These destinations works well,
    but when i logon to Solman, got to sm59 , when i test the TMW and TRUSTED rfc destinations  i test these destinations using Remote Logon i get error,
    " no authorization to logon as trusted system"
    I went thru one note which recomended Kernel upgrades to solve the problem,
    I r3 my kernel relaese is 700 with patch level 56, the note recomends to apply patch 80, did u have these problems??
    <b>what is your kernel patch levels in sateliite and solman systems.</b>
    Q.5) TO be able to raise tickets from R3 to solman we create RFC destinations.
    We also create RFC destinations to client 000 of all the sateliite system,
    <b>dont u think these RFC destinations might interfere with each other??</b>
    Q.6) Is there anyone who has successfully configured CHARM. Can you plz share the  configuration documents with me..
    Please note :
    <b>All the contributors would be handesomely rewarded with points .</b>

    Hi,
    Check this
    Note 128447 - Trusted/Trusting Systems
    For your Q4.
    Q3.)
    Establishing Domain link - That's the right way. Go ahead.
    These are the steps.
    <b>1.Define Transport Routes for System Landscape</b>
    assign exactly one development system to a production system, and that these two systems are connected by exactly one unique transport track. If a development system and a production system are connected by more than one transport track, this may lead to inconsistencies within the transport distribution. This type of transport configuration cannot be supported by Change Request Management, and may cause inconsistencies within the tools involved.
    <b>2. Activate Extended Transport Control</b>
    The CTC parameter should be '1'
    <b>3.Configure Transport Strategy</b>
    Deactivate the QA Approval.
    <b>4. Activate Trusted Services.</b>
    5.Activate Domain Links.
    You have to activate domain link between systems.
    6. Generate RFC Destinations to Client 000
    Hope this helps.
    feel free to revert back.
    --Ragu

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Error when importing the request

    Hi All,
    I have collected few queries in to one request and imported the request in to quality client and iam getting below mentioned error
      Execution of programs after import (XPRA)
      Transport request   : NBDK900366
      System              : NBP
      tp path             : tp
      Version and release: 372.04.08 700
      Post-import methods for change/transport request: NBDK900366
      Post-import method RS_AFTER_IMPORT started for ELEM L, date and time: 20100406151003
      Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Activation Mode)
      Error when activating element 4HBCVLNBZJBOCJ2A2NP4Y0XEM
      Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Delete Mode)
      Errors occurred during post-handling RS_AFTER_IMPORT for ELEM L
      The errors affect the following components:
         BW-WHM (Warehouse Management)
      Post-import methods of change/transport request NBDK900366 completed
           Start of subsequent processing ... 20100406151003
           End of subsequent processing... 20100406151018
      Execute reports for change/transport request: NBDK900366
      Reports for change/transport request NBDK900366 have been executed
           Start of................ 20100406151018
           End of.................. 20100406151018
      Execution of programs after import (XPRA)
      End date and time : 20100406151018
      Ended with return code:  ===> 8 <===
    Kindly let me know how to correct the error.
    Regards

    Hi,
    As you have collected more than one queries in a single request,first identify the query which is giving problem.For this you can go to se11 and diasplay table RSRREPDIR,go to output list of the table and under ID field give the hexa decimal Id that you got in the error log.The table will display the query associated with this.
    In the target system check whether your query changes are reflecting or not.
    Make sure that you have collected all the necessary elements ,that is variables ,resricted KFs etc.You can check this via RSA1 Transport connections.
    Thanks
    Sreeja

  • Change Request Management users and their profiles

    Hello!
    I would like know which users are useful for the usage of change request management functionality within SAP Solution Manager and which profiles should they have?
    Users: Requester, Service Desk Empl., Change manager, Change advisory board(?), Developer, Tester, IT Operator, Administrator(?)
    Profiles: SAP_SOCM_REQUESTER, SAP_CM_DEVELOPER_COMP, SAP_CM_CHANGE_MANAGER_COMP, SAP_CM_TESTER_COMP, SAP_CM_PRODUCTIONMANAGER_COMP, SAP_CM_ADMINISTRATOR_COMP,
    SAP_CM_OPERATOR_COMP
    The problem I have:
    I get the errors (s. bellow), when I try to set correction in Development with development profile.
    <b>- you are not authorized to perform the activity selected last
    - No maintenance cycle is open for the current system</b>
    The solution for this problem is to log in with user who has "SAP_ALL" to recheck
    the correction.
    Thank you very much!
    regards
    Thom

    Dear Thom,
    Please verify the note : 881553, this problem occur when the user not have SAP_CM_ADMINISTRATOR_COMP profile..
    Best regards..
    Claudenir Bispo

  • Error when activating update rule after transporting to QA

    Hi,
    When we transport Info cubes and update rules along with Process chains. There are the following errors in Transport request(XXXXXXXX).
    1. Error when activating update rule 22HSFD3ZMALU46LS0R8PRF2MW
    IC=ZSDPCXY2 IS=2LIS_11_VAITM error when checking the update rules
    2. Error when activating update rule 7NT4WIDPDCN2ERFDRXIGH95PM
    IC=ZSDPCXY2 IS=2LIS_12_VCHDR error when checking the update rules
    and etc.
    Then we activated and saved all the erroneous update rules in another tranport request(YYYYYYYY) and again we transported alongwith the previous transport request(XXXXXXXX).
    The last request(YYYYYYYY)was successfully tranported and still there are same errors in TR(XXXXXXXX).
    Quick answers will be highly appreciated.
    Regards,
    Vijay

    Hi Vijay,
    Next time you would have transport only (YYYYYYYY). Transport Request (XXXXXXX) was not required to be moved.
    Normally Update Rule gets deactivated in QA when any changes to the CUbe/ODS are moved.
    Thus either you can transport transport request for only active update rule to QA or activate your UR directly in QA system in case you have authorization to do that.
    Regards,
    Rohini

  • Error while creating change request via solman support desk message

    I have configured CHARM and my change req. is working for urgent correction, I have tested the entire workflow.
    however when i try to create a new change req. via support desk message --> create a change request open
    I get following error
    An action was terminated due to an exceptional situation.
    Message no. SOCM_ACTION_LOG 090
    Diagnosis
    An exception has been triggered in PPF action processing.
    System Response
    Action processing has been terminated. The status of the transaction is still incorrect.
    Procedure
    You cannot execute the action until the cause of the error has been removed.
    The error messages will be kept until the transaction is next checked for subsequent analysis.
    Procedure for System Administration
    If necessary, analyze other messages in the application log for the incorrect transaction. To analyze the termination, you can activate the breakpoints in the checkpoint group socm_exception.
    Additional Information:
    Exception CX_SOCM_PRECONDITION_VIOLATED occurred (program:
    CL_HF_HELPER==================CP, include:
    CL_HF_HELPER==================CM00A, line: 29).
    pls help

    Hi Yunus,
    Your probably have changed the transaction type SLFN to a the customer namespace Z or Y. If this is the case you MUST also "Define Mapping Rules for Copy Control".
    Goto SPRO -> SAP Solution Manager -> Scenario-Specific Settings -> Change Management -> Change Request Management -> Extended Configuration -> Change Transaction -> Change Transaction Types -> Copy Control for Change Request Management ->  Define Mapping Rules for Copy Control.
    Once at this point in the IMG make a copy of SLFN -> ZLFN. This will resolve your problem.
    Kind regards,
    Latief

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • How big effort it is to setup Change Request Management?

    We are interested in implementing Change Request Management into our Solution manager 7.0.
    What size of an effort in mandays it actually is and what kind of professional roles are required to set it up? Some background information for your responses:
    implementation project is already there in Solman (SOLAR01/02) and is already live
    satellite system connections within SMSY are already active
    no central CTS/CTS+ is currently in use
    when having CHARM it is assumed that also CTS+ should be used
    So, I guess we are in a typical situation where implementation project has ended and live and support organisation and tools are being setup. There we need CHARM and CTS+.
    I have read lots of SDN threads and blogs, but did not get a clear picture how big effort setting up CHARM is. Please note, I not looking for config guides now, just your experiences. Even if am not interested in config guides, could you at least describe the main steps that are necessary in setting up CHARM?
    br Kim

    Hi
    Adding more to it
    Use the following link,
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Regular correction
    https://websmp202.sap-ag.de/~sapidb/011000358700000086572008E.sim
    Later login to solman enter tcode SPRO and goto scenario specific Change Request management node and start configuring by
    going through the IMG Help and as per requirement.
    Create a maintenance project and Activate Charms
    https://websmp202.sap-ag.de/~sapidb/011000358700005479242006E.sim
    Regards
    Uday

  • Solution Manager 3.2 SP 8- Change Request Management Configuration Problem

    Hi friends,
    We are in process of implementing SOLMAN 3.2 SP8 in our landscape.I am facing  problem in configuring change request management.
    When the developer is working on an urgent correction document we are facing a problem.The steps we are following are here under provided.
    Step 1 :
    Selected Action "In development" - > it created the transport request in the dev system.
    Step 2:
    Action "Log into System" -> made correction attached to the transport request manually and released the task.
    Step 3:
    Action "Release transport requests" -> The transport request in the development was released.
    Step 4:
    Went for action "Pass to correction" -> I am facing exceptions which conveys
    Status was reset by system
    A condition is not satisfied because of an exceptional situation
    Not all transport requests yet released
    And we would be thankful if you provide the authorization required for the different roles in the change request management.I have followed the help file of SOLMAN 3.2 and create the users as under
    User - Role
    SOCM_RQSTR - ZSAP_SOCM_REQUESTER
    (Derrived from SAP_SOCM_REQUESTER)
    SOCM_DVLPR - ZSAP_SOCM_DEVELOPER
    (Derrived from SAP_SOCM_DEVELOPER)
    SOCM_CHNGNGR - ZSAP_SOCM_CHANGE_MANAGER
    (Derrived from SAP_SOCM_CHANGE_MANAGER)
    SOCM_CHNGNGR - ZSAP_SOCM_IT_OPERATOR
    (Derrived from SAP_SOCM_IT_OPERATOR)
    Even then I am facing problems while developer creating transport requests and while logging into development system.
    I tried adding S_RFC,S_RFCACL auth objects to their roles but did not help.
    Pl. suggest.
    Thanks & Regards
    Mrutyunjay
    Message was edited by: Mrutyunjay Rao Dora

    Hi all,
    We are trying to implement the Change Request Management piece in Solution Manager 3.2. 
    We are facing the following issues which I think relate to the same reason:
    1)We have created a Maintenance Project in SOLAR_PROJECT_ADMIN and assigned it a logical component, which consists of our two system landscape (namely DEVàQAS). We have also created the IMG project in the DEV system and have distributed that IMG project to both the Solution manager system and the DEV system. Now we have to make the maintenance cycle and task list for that maintenance project, but as we select the project and click on “create project cycle” it shows the message "The project is not released. Hence cycle can not be created". It is showing the status of project as locked .How can we open or unlock the project to remove the error?
    2) Also after selecting the SMI project when we click on the button “CTS status switches” or “project specific Transport route” it responds with the error "Project landscape not configured; set the project status to "open" first ".
    3)When we click on “synchronize single project” it prompts for the login of connected system (Development System) and after login, it gives an error "Warning, problems during synchronization of the system Landscape".
    For Error resolution, we have checked the system landscape and it does not give us any errors. We have done that, both from the solution manager by going to the transaction SOLAR_PROJECT_ADMIN -->  >system landscape tab>selecting our logical component and doing a check by clicking the "Check system Landscape" button. It returns with "no Errors". We also did a check on the TMS configuration by logging directly on to the TMS domain controller system and checking the Transport routes. We have checked the RFC connections without any errors.
    Any help would be greatly appreciated.
    Thanks
    Abhi

  • Runtime Error when activating Comp Records

    When trying to activate IT 0759 records in Comp to update Basic Pay, some employees received a Runtime Error. It states, "The exception CX_HRPA_VIOLATED_POSTCONDITION was raised, but it was not caught anywhere along the call hierarchy."
    It says it was not caught in 'HR_ECM_INSERT_INFOTYPE' function.
    Has anyone else seen this problem? It didn't happen for all employees.
    Thanks!

    Hi guys,
    Another reason for locked SPO's is:
    The terrible attribute-change-run (ACR). When you try to activate  a locked SPO, you only get a message like this:
    Runtime Lock: Activity ACTIVATE_SPO, Object DATATARGET ZZZ
    Unable to lock the semantically partitioned object
    Error when activating Semantically Partitioned Object ZZZ
    NO DTP request is running, so you can take all the day trying to find the error.
    So  in my case, there was an incomplete ACR (cancelled with error - red).
    It's like a curse. It is not easy to find the relation between ACR an SPO activation process (SAP error message is not useful to identify the reason)
    Finally, keep in mind:
    Check any DTP request running or cancelled that affect your SPO model and
    Check if you have an ACR (running or cancelled). This can lock your SPO object
    regards!

  • Intergrating Change Request management with satellite systems

    Hi,
    We are using SOLMAN with SCM functionality.We have integrated it r/3 and now integrating with XI.I have created the logical componenet for the system and added to the maintenance project.But when i enable the project for change request management it gives a warning and when checked in SLG1 it shows error message as no consolidation system for XS1(Developement sys) and no export system for XP1(production sys).All the configurations to be done in the TMS are done as per the instruction in the configuration guide and R/3 is configured in the same way which is working fine.Please give your comments on this.
    Thanking you in advance,
    Avinash

    CLOSED

  • Change Request Management without Transport Management

    Hello Change Request Management Experts!
    I have understood that It is possible to take change request managment in use without transport management. So I could handle Change Request with different statuses without automatic funtions behind these statuies. We like to see how to handle changes between different roles of people and implement the functions after that.
    I suppose that I should take only Change Request (approvals) and not Change Documents (execution) from Change Request Management.
    Have any of you tried to do that? 
    Best Regards, Leena Nissilä

    Hi Andy,
    Thank you for your answer. I have tried to do that also but I where is still some configuration missing because I get error message in: No maintenance cycle is open for the current system. I have also tried to to that maintenance cycle but I thought that it needs CTS activation in some project.
    I also like to know what is minimun configuration for change management that I could use SDAD with Service Desk.
    I looking forward to you reply,
    Br Leena
    Edited by: Leena Nissilä on Sep 17, 2008 1:24 PM

Maybe you are looking for