Error while calculating variances for production order

Hi Gurus,
while calculating variances for production order i am getting the following error
"Cannot calculate scrap variances" ( Error message)
" no standard value estimate for material" (Warning message"
A standard cost estimate exists for the material at the date mentioned in the error in released status.
Please give solution for the error.
Thanks in advance n Regards
Arul.

Is there an <b>itemization</b>, generated for the cost estimate used to calculate the target costs?
Does the material components listed in the BOM of the cost estimate used to calculate the target costs, <b>assigned to the operations</b> in which they are used. Otherwise it is not possible to correctly report the variances and scrap when operations are confirmed.
Does the order for which the variances are calculated have a valid <b>variance key.</b> ?
Does the order have the status DLV (delivered) or TECO (technically completed). If the status was withdrawn, any variances and <b>scrap variances are canceled</b>.

Similar Messages

  • Run time error while running BDC for production order creation and confirmation:

    Dear Gurus,
    We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
    and the transaction code is coming for CO11N.
    How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
    Regards,
    Madhu.G

    Hi Madhu,
    Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
    Cause
    The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
    such as the confirmation texts.
    Resolution
    SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
    If this is not feasible, the following workaround may be uses:
    Define a confirmation profile in transaction OPK0; 
    In the detail areas, remove the area "Confirmation text"; 
    Set this profile as standard, so that it is chosen automatically by the system when a batch-job
    is started; 
    Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
    Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
    Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
    Thanks & Regards,
    Ramagiri

  • Input Quantity Variance and Input Price Variance for Production Order

    Dear All
    I am running variance program KKS2 for calculating variance of production order. for Activity variances are coming under input price variance and input quantity varinace but for material the variances is now shown separately for quantity and price rather it is shown as variances total amount. Can someone help me in know why material quanitty variance and price variance not shown separately
    Regards

    How does input variance and output varia.nce will be calculated on the settlement of production order after TECO.
    VARIANCE CALCULATION DEPENDS ON CONFIGURATION IN THE FOLLOWING AREAS,
    1) VARIANCE VARIANT -  DETERMINES WHAT VAREIANCE CATEGORIES ARE CALCULATED, E.G MATERIAL PRICE , USAGE, LABOUR RATE , USAGE VARIANCE ETC..
    2) TARGET COST VERSIONS
    3) VALUATION VARIANT FOR WIP  AND SCRAP
    Can we check in KOB3 or COOIS.
    KOB3 -  YES
    COOIS -  CHECK IN COST REPORT

  • No FI document generated while doing GR for Production Order in MTO Scenaro

    Hi All,
    In material master the strategy group is 20.No FI document generated while doing GR for Production Order in MTO Scenario. Then strategy group changed from 20 to 50 but still No FI document generated while doing GR for Production Order in MTO Scenario.
    Could u please let me know whether FI document is generated at the time of GR against production order in case of MTO scenario.
    Regards,
    Nandan.

    Hi,
    While doing GR with ref to Production order check whether price is picking up or not for the production order.
    Regards
    Ravi Shankar.

  • Error when doing GR for production order with serial number

    I'm not familiar with serial number and equipment management but I'm trying to help my user resolve this issue.
    This product is returned from customer site.
    I saw that this material is being reset in IQ02 from status in warehouse to become Available when the material is consumed in the production order via 261 movement type. So now the status is available. Then the user went to change a new serial number. Later, GR for production order is done in MB31. Errors are encountered when prompted to enter the new serial number.
    Configurations XX01 and XX02 are different
    Message no. CX126
    Configuration of serial number SN02 incompatible with document item
    Message no. IO226

    Hi..
    Can you please explain in detail, I facing same problem, while assigning unrestricted stock to sales order.
    Regards,
    Sumit Pukale

  • Error in scheduling parameters for production orders

    Hi Guys,
    Greeting for the day u2026u2026u2026.
    I am trying to create production orders creation for own order  type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
    Production scheduler      -
    xxxxx,
    Detailed scheduling -
    check box of scheduling ticked,
    Rough cut scheduling    --- scheduling id u201301, scheduling and generate capa requi,, boxes     ticked,
    Adjust scheduling  -- requi to operation  date,
    Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
    Operation segment ---setup,
    All operation in order will be reduce
    Do not reduce,
    Could any one light on this issue,
    Thanks in advance,
    Mohan

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Transfer Order not created while performing GR for Production order

    Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
    Let me give you a brief background.
    This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
    Supply area is created for WM location.
    Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
    1) Now when the Kanban is set empty a production order is automatically created.
    2) Once the production order is confirmed the material automatically shows up in the bin.
    A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
    3) *PROBLEM* - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
    Following are the settings which I have already checked:
    1) In IMG, WM movement type 103 has auto TO indicator set.
    2) IM-WM interface for 102 movement type and 103 movement type is maintained.
    The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
    I would really appreciate if anyone can help me in this.
    Thanks

    Hi Mike,
    I do not know this function in SAP, so these are just my ideas:
    1.
    System does not create a TR or a TO. the material automatically shows up in the Bin.
    I think it's a normal SAP behaviour. If you do GR against a PO the quant(s) will appear in interim storage bin w/o TO. The TO is to move the quants from one bin to another, but in this case the quant comes from 'nothing' and arrives at the bin.
    If you make confirmation and consume the components refering to a PrdOrd, the components will disappear w/o TO from storage type 100 + dynamic bin, because there's no TO that could move them from dynamic bin to 'nothing'.
    So, these 'movements' are to change the WM stock level and TOs are not designed for this.
    2.
    There's difference between auto creation of TO and immediate TO creation. Please check what SAP help says in case of TOs for outbound deliveries:
    http://help.sap.com/saphelp_47x200/helpdata/en/c6/f8406c4afa11d182b90000e829fbfe/frameset.htm
    3.
    Now when the Kanban is set empty a production order is automatically created.
    So, if you remove the stock from the Kanban it triggers the creation of a PrdOrd. This is very logical in a Kanban system because it is a pull system. but your problem is not this, it's clear.
    If you just created an automatic TO and would remove the stock from Kanban-bin, a new PrdOrd would be generated, and so on. As many times you remove the stock a new PrdOrd is created and this might be the reason why no TO is crated automatically. In this case this would be a push system and not kanban system.
    I do not know this process but if we concentrate only on the pull system, maybe this Kanaban is to store the FG until an event (e.g. shipment) should trigger the stock removal from this bin. (just my assumption)
    Please try to mark the TR creation for the movement type w/o auto / immediate TO and tell us the result (whether you get the TR if you confirm the PrdOrd).
    Regards,
    Csaba

  • Error While Updating Issue For Production

    Hi,
            When i am trying to update an UDF in issue for production i am getting the following error message.
      Item is Not a Component to the Referenced work order[Goods Issue - Object Type] Message 3560 -5

    Dear Manikandan K,
    Regarding the message we can tell you that the error message           
    "Item is not a component of the referenced Work Order" usually appears 
    because there is a case sensitive problem between the item code given  
    in the BOM and the item code given in the item master data.            
    Please check if the item codes of the BOM are exactly the same as the  
    codes given in the item master data. There should not be any differences
    between spelling of the codes (for example item code in the item master
    data is with capital letters X00014447 while the item code in the BOM  
    is with normal letters x00014447).                                                                               
    In case you find item with this issue please correct its item code     
    in the BOM manually so it will be exactly identical with the code given
    in the item master data.                                               
    Regards,
    Marcella Rivi
    SAP Business One Forums Team

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

  • Error while Goods receipt for rework order.

    Dear all,
    I have created one Rework order through TC CO07.
    While doing Goods Receipt it gives Error Msg as following.
    "No valid order items exist for order 200000203"
    Message no. C6008
    Regards
    Atul

    Dear,
    There is only confirmation CO11N for the rework order. And good reciept MB31 for main order.
    There is no GR for rework order. Once you confirm rework order,you need to do the GR for the balance qty of  main order or parent order.
    And you need to priliminary settlement of rework order first in CO8B, hence the cost will be moved to parent order, then you settle parent order in KO88.
    Hope clear to you.
    Regards,
    R.brahmankar

  • Error While doing settlement for Sale Order in MTO scenario

    Hi,
    In MTO Scenario - when i try to settle Sales Order i am getting the below error. Even i have maintained the settlement cost element for PSG in allocation structure A1.
    Kindly help me
    Define a settlement cost element for receiver type PSG
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type PSG.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Kishore

    Hi
    Please check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
    Go to Allocation structure configuration (OKO6) and check your allocation structure A1.
    check settlement cost elements is it by cost element or you have assigned separate cost element for settlement.
    if you wants to settle with same cost element select By cost element.
    if you wants to settle with different cost element create a cost element and assign settlement cost element.
    http://help.sap.com/saphelp_di46c2/helpdata/EN/9d/1f4b6e5733d1118b3f0060b03ca329/frameset.htm
    hope this helps you.
    Regards

  • Shipping point error while creating delivery for subcontracting order

    Hi,
    I am trying to send Materials Provided to a Subcontractor via an SD Delivery using std SAP functionality using IDES preconfigured system.
    In transaction ME2O, while creating delivery, i am facing following error:
    Essential transfer parameters are missing in record:  000002
    The dignosis gives following details.
    Diagnosis
    Information necessary for this delivery is missing.
    Please help to sort out the problem.
    Regards
    SAmeer

    Hi Sameer
    please check OSS notes 102104 for detail help about this error.
    regards
    Srinivas

  • Error while calculating SPS for NW 7.3 Enterprise Portal

    Hello,
    I have a Solution Manager 7.01 SPS 28 (ST     400     0028     SAPKITL438     SAP Solution Manager Tool)
    I want to download via MOPZ the newest SPS for NW 7.3 with Enterprise Portal.
    I configured the SLD on the NW 7.3 side successfully.
    The NW 7.3 transmitted the data to the SMSY.
    I can create the system also successfully in the "Product Systems" and "Technical Systems"
    and also created successfully the "Logical Components" and can assign to a "Solution"
    When I try to calculate the SPS automatically for the NW 7.3 Enterprise Portal, the following
    error Messages appears.
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Process Integration not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 PDF Export not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Advanced Adapter Engine Extnd not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Demo Applications not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 BPM not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 NWDS Update Site JEE not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Composition Platform not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Guided Procedures not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Enterprise Services Repository not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Composite App. Framework not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 AS Java Extensions not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 PI Adapter Engine (Java EE) not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 EP Core - Application Portal not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Composition Voice not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Central Process Scheduling not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Mobile not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 BI Java not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Business Intelligence not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 PI Partner Connectivity Kit not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Development Infrastructure not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Adobe Document Services not assigned!  Display Help
    System P73: Installed Product Instance SAP NETWEAVER 7.3 Application Server ABAP not assigned!  Display Help
    Can anybody please help me ?
    Best regards
    Alex

    Hello Alexander,
      I was having a similar problem, but only with the abap-related NW 7.3 components.
      Please check the following note: Note 1595918 - JSPM: Validation fails due to mismatch at software features
       Do a backup of your BC_SL_SWFEATURE, delete those components you don't have, according to the usage types you have installed.
       In the portal, go to NWA -> Configuration -> Infrastructure -> SLD Data Supplier Configuration and click "Send and Collect Data".
      Verify that the data is refreshed in your SLD.
      In the SMSY,  unassign the system from all the logical systems, delete the system, delete the technical java component and run the Setup System Landscape to create the system from your SLD.
      After the system is generated, assign it to your Logical Component and try again.
       Or, instead of deleting / creating the system, maybe you can just refresh it using the steps from the note Note 1468559 - SMSY: Single system update from SLD
      Regards

  • Error while doing migo for STO order

    hi,
    we have done migo wrt the outbound delivery number and due to wrong invoice values they have cancelled the GR and again they are going to do the GR but system is not allowing to post the document since there is an entry in rg23d table with the specified invoice number.how to cancel the rg23d entry.
    please help
    regards
    msp

    Hi,
    Cancel the Excise Invoice which is captured at the time of GR and post it.
    And do the GR with new excise invoice.