Error while creating Product Cost Collector

Hi SAP Gurus,
While creating Product Cost Collector I am getting the following Error:
Enter a distribution rule for Order without a validity limit
Message no. KD059
Diagnosis
The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
Procedure
Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
Can any one help where exactly i need to maintain this.
The settlement profile settings are fine.
I am getting this error only after i have changed the scenario to Reproting point back flushing

Dear Suryanarayana
Please check the corresponding settlement profile for product orders.
In most of the cases message KD059 means that no distribution rule is assigned to your production order.
This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
I hope this helps resolve the issue for you. I wish you the best in your endeavours.
Kind Regards,
Brendan

Similar Messages

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Error while creating product group

    hi,
    i am getting error while creating Product group.
    Required parameters missing when calling up module
    Message no. M3749
    Please suggest me.. how to cop this
    Regards,
    amit

    Dear Brahmankar,
    I am using product groups in SOP as well as in the normal plannning scenario.In the normal planning scenario I am giving my PIR's in MD61 for the entire group.Then I am running MRP in MD02 for my product group.System is generating all the requirements normally for the entire group .
    Please suggest me , this process is correct or it will create any problem in any module .
    Thanks & Regards
    Prabhakar

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Error while creating Production Order

    HI Experts,
    While creating a production order for a material with planning stratagy 82, I am getting an error saying "Error occured in number assignment for object" AUF_PLAN.
    Can you pls tell me what was the exact problem!!
    Regards
    Prasanna

    Prasanna,
    Just a basic doubt, when you are saying that the material is assigned with Planning strategy "82", what is the need to create a Production Order manually? I am not sure whether this has an effect at all...but lets try.
    Remove the strategy from Material Master MRP 3 view and then try creating the Production Order with Order type PP04, as you were trying earlier. This is just to see whether is this something related to Order type definations or Assembly Processing.
    You also try creating a sales order, when the planning strategy "82" is still exists is the material master to see whether production order is getting created automatically by system.
    Please let us know the feedback on the above
    Regards,
    Prasobh

  • Error while creating material cost estimate

    Hello All
    I am creating material cost estimate of FG whose components are SF & ROH-2. While creating cost estimate system gives an error message which states: :
    *No cost element segment exists for 40103110 on 01.09.2009
    Message no. CK048
    Diagnosis
    The consumption account found by automatic account determination for material STD-PRICE-SF does not exist for the date 01.09.2009 specified.
    Procedure
    Check the cost element segment's validity period
    Check cost element
    Or, if you have authorization, create a cost element which did not exist previously.
    Create primary cost element*
    Please provide your valuable inputs regarding this error message. Looking forward to your inputs & feedback.
    Regards,
    J K Tharwani

    Dear Jitendra,
    Its Seem primary cost element you mentioned is not defined for 09 period.For this go to KA06,gIve that cost element number and the Valid from  date as 01.09.2009 and valid to date as 30.09.2009, press enter it will take u inside the T.C,feed the relevant data and save.
    Now again take the costing run.This time system should not throw the error.
    Check and Revert back.
    Thanks and Regards,
    Jitendra DIlip Chauhan.

  • Update error while creating production order (TCODE CO01)

    Hello,
    We have created new plant into development server for testing. We have created production Order few days back at that time we have not faced any problem. But from last two days , when we create new production Order , system gives following error:
    ORA-00947: not enough values
    DBIF_RSQL_SQL_ERROR" "CX_SY_OPEN_SQL_DB
    SAPLCOVB" or "LCOVBF10"
    HEADER_POST"
    and
    Update was terminated
    System ID....   DEV
    Client.......   500
    User.....   HPLSU
    Transaction..   CO01
    Update key...   4B6E4F48C08D027FE1008000C0A802F3
    Generated....   08.02.2010, 10:35:48
    Completed....   08.02.2010, 10:35:49
    Error Info...   00 671: ABAP/4 processor: DBIF_RSQL_SQL_ERROR
    Our work is held up.
    Please also note that If we increase the QTY in the existing Order ( already created few days back) , System accept the same and Order is saved.
    We are looking for the solution for the above.
    Early reply will be highly appreciated.
    thanks
    harish

    Hi Rishi,
    You better check with your BASIS team.
    Check this link also
    Supervisor Error ADM0015
    Regards,
    Satyajit Kumar
    Edited by: Satyajit Kumar on Feb 8, 2010 7:47 AM

  • Getting error while creating shipment cost document

    Dear Guru's
    I have created STO then made delivery and then shipment. All documents are ok but when i m creating Shipment Cost document
    agains shipment getting error Enter Cost Center. Where  I should enter cost center and how can i make cost center value as a default.
    Regards,
    RM

    Hi
    On double clicking on the item level, respective item details of the material is displayed and then click SHIFT+ F6 to see the COSTCENTER in the shipement cost document.
    Configuration:
    1) In Item category configuration account assigment category is Cost Center.
    Logistics Execution>Transportation>Shipment Costs>Shipment Cost Document>Shipment Cost Types and Item Categories-->Define item categories
    2) In the Transaction code OKB9 Costcenter is assigned to the company code , in order to automate the determination of CO assignments in case of Shipment cost document creation
    Logistics Execution>Transportation>Shipment Costs>Settlement>Automatic Determination of CO Assignments
    Edited by: Bhaskar C.R on Jun 17, 2010 10:13 AM

  • Cost calculation error while creating production order

    Hi, "version 0 is not defined in controlling area xxxx for the fiscal year 2008, maintain the fiscal area dependent version parameters for the version o".the above error message appears at the time of saving my production order with co01 t-code. i have tried to rectify this by okez t-code, but it gives message that "activation of the indicator is notallowed". the same message appears while releasing the order, while doing the GI . Pls suggest.

    Hi,
    Please refer the below thread.
    https://forums.sdn.sap.com/watches!add.jspa?forumID=144&threadID=484386
    Regards,
    Senthilkumar

  • Error while creating Product Group in SOP

    HI Gurus,
    When I am trying to create the product group in SOP in MC84 , I get follwoing error.
    "Product group cannot be created (batch input error 7)  Message no. MA218"
    how to slove this?
    Thanks in advance.
    RG

    Rajiv,
    Basically if there are mismatch in the Field selection and fields visible in MC84 you would get this error.
    The workaround suggested by SAP is to create a product group using MM01 with material type PROD, latter on using the change product group transaction MC86 you can assign its members.
    Regards,
    Prasobh

  • Error while creating production order (capacity leveling)

    Hello Friends,
    For capacity Planning - Leveling, i am using overall profile  "SAPMPSG006 - MPS/MRP: Capacity availability check", in Production scheduling profile, which i have attached in the material master.
    In Availability check parameter, checking control for the combination of Plant,order type and business transaction 1, in capacity availability section also, i have maintained the overall profile "SAPMPSG006 - MPS/MRP: Capacity availability check'.
    Now i have created the production order for a particular period (start date 17.03.10 , finish date 20.03.10). In CM01, agaist the work center, i can see the load. Hence available capacity and required capacity is same for three days.
    Now again i have created one more production order for the same period (start date 17.03.10 , finish date 20.03.10), system is showing the window with the message work center with overload.On the same screen, when  i click on finite scheduling tab, than system showing the new latest start date and time the same as earlier date i.e 17.03.10.
    Here my question is , when i click on finite scheduling tab, than system should propose the date 21.03.10, as on and after this date capacity on this workcenter is available. But system is not proposing the dates, where capacity is available.
    When i checked the dispatching log, there i found two errors.
    continued..................

    Dear,
    That's great production order system is proposing the future date automatically.
    Few check,
    1) Factory calendar for holidays?
    2)Any other production order on that days?
    3)Your capacity profile and its setting?
    Basic dates
    Check whether scheduling should be performed with a time being specified. For this, check the scheduling data of the scheduling type in Customizing. OPU3
    Do the basic dates change?
    Check whether the alternative "Adjust basic dates" has been selected for the scheduling parameters.
    Check whether the basic dates are set correctly on account of the operation dates. So check operation dates also?
    Regards,
    R.Brahmankar

  • Error while creating shipment cost

    Good morning,
    I'm trying the solve an issue when we create a shipment cost.
    I get the following error when trying to transfer the cost "No purchase order item was generated for shipment cost item" / "in case of evaluated receipt setlement, please enter a taks code."
    We are working with automatic creation of PO but for one supplier it is not working. I already compared master data of other suppliers but don't see the issue.
    What can be the issue? At what transaction the Po is generated?
    Thanks for feedback

    Hi,
       The tax code is mandatory because of the ERS indicator in vendor master. You can find the ERS indicator in MK02 - Purchasing data.
       If the ERS is flagged in vendor master, you need to maintain the tax code in the PO. Since the PO is created from SCD, you can maintain the condition record for input tax condition type in VT11 along with the tax code as shown below:
       Maintain the same and test the scenario again. Revert back if its not solved.
    Regards,
    AKPT

  • No Funds Center error while creating Production Order in CO01

    Hi SAP Consultants,
    I am trying to save production order in transaction CO01 but I am getting error saying "No funds center entered/derived in item 00001"
    Diagnosis
    In company code (&2) the component Funds Management is active. This requires the entries or the derivation of a funds center.
    You can use the following elements to derive the funds center: company code / account  or CO object .
    Procedure
    Enter a funds center or ensure that the funds center can be derived from the possible assignments by:
    assigning a funds center in the commitment items- master record or maintaining the assigning of a funds center to the CO object.
    My company is a public sector company and Funds management is active.
    Any help would be appreciated.
    Thanks in advance.

    Hi,
    Kindly check for item 0001 in the Material Master which Profit Center is maintained and check if a Funds center is assigned to it. This should solve your problem.

  • Rem product cost collector

    Hai gurus,
    I have one doubt in REM product cost calculation.
    1) when I am running PCC for REM I met with following error as  - Routing does not match with selection
        ID 01.
    How to correct the error.
    Regards,
    sekar chand.

    Dear Sekar,
    1.While creating product cost collector,use Production version as the controlling level.
    2.Check RM01 is the order type and ensure your production version is without any errors.
    3.Ensure you have selected rate routing in the task list type in the production version.
    4.Check what routing selection id is assigned in MRP parameters in OPPQ and also in the scheduling
    parameters in OPU5 for the order type PE.
    5,Your routing selection id should be a one which gives the first priority to the rate routing R.
    Now check and come back with your further queries.
    Regards
    Mangalraj.S

  • Please maintain  the master data for material during product cost collector

    hi
    i get a error
    please maintain  the master data for material during product cost collector
    please guide me
    regards
    leo

    Hi Leo,
    Can you elaborate your issue, like when did you get the error exactly?
    If it is the error you got while creating Product Cost Collector, then this is not the right Forum to post.
    Please post your question in the 'ERP Manufacturing (PP)' forum
    Regards,
    Manimaran M

Maybe you are looking for

  • Schedule lines confirmation based on item category(TAN and TANN)

    Hi All, We have a problem with the schedule line confirmation in the standard sales order. Suppose if I give the item category as TAN, the schedule lines are confirmed for that line item. If I change the item category from TAN to TANN, then there is

  • Report Painter - Download Capabilities

    Greetings - Does anyone have any experience in downloading reports in bulk from Report Painter?  The scenario is that we want to create a new CO report, Plan vs. Actual by cost center in a different format then SAP standard.  We then want to be able

  • EPMA Prcess Manager not starting

    Hi John, I had gone thru the document you mentioned in the other post and increased the DimensionServerStartTime from 600 to 1200 and also to 1800 later but i am encountering the following error. Error 1053: The service did not respond to the start o

  • Extend Directory Server Client Console

    Hello there: Just a tricky question. Is there any way of extending the (Java) Graphic User Interface of the Sun One Directory Server (5.2) console? I dunno even if this part is open source or not. Thanks in advance. Best regards.

  • Can I use the USB superdrive in Bootcamp?

    So I just bought a brand new 15" MBP, and I didn't realize that Apple stopped shiping them with optical drives. I found out that I now need to get an external optical drive such as the USB Superdrive. Anyways, I need to put Windows 8 on the Mac throu