Error while doing Goods receipt for process order. Error code: "BS027"
I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
Error : ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
Error code: BS027.
Thanks to all in advance.
Hello,
This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
Please look into SAP Note 62367 and 64370
Hope the information is helpful
regards
Similar Messages
-
Error while doing Goods Receipt for Production Order
We have created following test data in our Development System:
Production Order:1000016
We have processed the abv. production order thru create, release & confirm stages.However, on doing Goods Receipt of the Order thru MB31, system is giving following error:
Msg.No.NA M7001:Check Table TFBEFU_CR entry 10 does not exist.
Can u pl help me in analysing the same.
With Rgds.,
Rakesh Kumar
09324847499Hi,
Maintain the OPK9 (Valuation Variant for the Order Costing).
It will go thorugh..
Otherwise revert for further discussion..
Regards,
Siva -
Error while doing Good Issue for Production Order using BAPI
Hi All,
I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
*Action in Transaction (GM_CODE)
*GM Code for Goods Issue for Production Order is 03
gs_gmcode-gm_code = '03'.
*Header Data
*Posting date
gs_header-pstng_date = sy-datum.
*Document date
gs_header-doc_date = sy-datum.
*Item Data
*Material
gs_item-material = zptp_s_rf_migo_261-matnr1.
*Movement Type
gs_item-move_type = '261'.
*Movement Indicator
gs_item-mvt_ind = 'F'.
*Stock Type
gs_item-stck_type = 'F'.
*Plant
gs_item-plant = gv_plant.
*Storage Location
gs_item-stge_loc = gv_str_loc.
*Quantity
gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
*Unit
gs_item-entry_uom = gv_uom.
*ISO code for unit of measurement
gs_item-entry_uom_iso = gv_uom.
*Order Number
CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
EXPORTING
input = zptp_s_rf_migo_261-aufnr
IMPORTING
output = gs_item-orderid.
*Reservation Number
gs_item-reserv_no = gv_resv_num.
*Reservation Item
gs_item-res_item = gv_resv_itm.
*Reservation Type
gs_item-res_type = gv_resv_type.
APPEND gs_item TO gt_item.
Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = gs_header
goodsmvt_code = gs_gmcode
IMPORTING
goodsmvt_headret = gs_headret
TABLES
goodsmvt_item = gt_item
goodsmvt_serialnumber = gt_serial
return = gt_return.
Thanks in Advance.hi,
did you look at message ?
System says, there are differences between the interface data and the order data. It can be anything. I think you should check
data in the interface .
this is the long explanation of your message :
Diagnosis
When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
The system checks this for the material and the order item.
System response
Due to this difference, the system cannot post the goods receipt.
Procedure
Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
<< Moderator message - Point begging removed >>
Edited by: Rob Burbank on Feb 6, 2012 11:24 AM -
Reverse Goods Receipt for Process Order
Dear All,
Please tell me how to reverse the Goods Receipt for Process Order for which already QM is cleared for that Particular Lot.
But Confirmation is still yet Pending.
I tried MIGO - Cancel - Material Document. But it is showing a message "Process Order already processed".
Regards
bussHi,
Use t code MB31
Movement type 102
Stock type = Unristricted use.
Reverse by entering above information then you have to manually cancel the inspection lot.
Regards,
Vishal -
Bins problem while creating goods receipt for production order.
Hi All,
I am facing a problem with selection of bins while creating goods receipt for production order in transaction MB31 and MBBE.
The order of filling bins is with respect to storage Unit not by document no, Please suggest something.
The scene is like that.
The bins are not filled in the proper sequence, the system checks for the empty bins and filled those later on.
like this,.
Typ StorageBin SC SS Stock Avail.st BUn GR Date DocumentNo Storage Unit Time
SLoc Batch Re IA PutawayS Pick qty Cert. No.
VN1 106A088 0 0 CS 01/25/2010 4739297 1005721391 10:00:59
100 0001020069 60 0
VN1 107B076 0 0 CS 01/25/2010 4739298 1005721392 10:01:01
100 0001020069 60 0
VN1 108B076 0 0 CS 01/25/2010 4739299 1005721393 10:01:04
100 0001020069 60 0
VN1 109A077 0 0 CS 01/25/2010 4739300 1005721394 10:01:06
100 0001020069 60 0
VN1 110B079 0 0 CS 01/25/2010 4739301 1005721395 10:01:08
100 0001020069 60 0
VN1 106B088 0 0 CS 01/25/2010 4739302 1005721403 10:01:11
100 0001020069 60 0
VN1 123B158 0 0 CS 01/25/2010 4739303 1005721389 10:01:13
100 0001020069 60 0
VN1 124A160 0 0 CS 01/25/2010 4739304 1005721390 10:01:15
100 0001020069 60 0
VN1 118A133 0 0 CS 01/25/2010 4739305 1005721396 10:01:17
100 0001020069 60 0
VN1 119A128 0 0 CS 01/25/2010 4739306 1005721397 10:01:20
100 0001020069 60 0
VN1 120B162 0 0 CS 01/25/2010 4739307 1005721398 10:01:22
100 0001020069 60 0
VN1 121B159 0 0 CS 01/25/2010 4739308 1005721399 10:01:24
100 0001020069 60 0
VN1 122B159 0 0 CS 01/25/2010 4739309 1005721400 10:01:26
100 0001020069 60 0
VN1 123B159 0 0 CS 01/25/2010 4739310 1005721401 10:01:29
100 0001020069 60 0
VN1 124B160 0 0 CS 01/25/2010 4739311 1005721402 10:01:31
100 0001020069 60 0
Thnks you,
Anmol.
Edited by: anmol112 on Jan 25, 2010 10:34 PMno replay, clossing threat.
-
Problem in picking base value from PO while doing goods receipt for multiple POs
Hi,
Our user is trying to post goods receipt for two purchase orders which have same vendor. After the materials of two POs are allocated in the item detail screen and checked the item ok, system throwing error as "Please check the base value of the item is zero" ( also excise tab does not appear for last three line items). This error does not occur when we are trying to do the goods receipt separately for each POs. Only when we do goods receipt for both the POs together, we are facing this error.
Please let us know what could be the reason. Is there an issue with standard CIN? Any notes to be applied? Please help!Refer these notes for the issue.
1528009 - MAA: incorrect distribution of goods receipt
quantities
and
1677707 - Determining the valuation type for stock transport orders
at the time of GI
For Excise tab not appearing, you have to check J1ID for "Material-ChapterId combination" and "Cenvat Determination".
Regards
Binoy -
Error while doing goods receipt
Dear All,
against Po when i am doing Goods receipts (migo) i am getting this error, " G/L Account 379998 does not exisr in co COde" and for this
i went to FS00 and tried to create GL account for co code, for this i am getting error as" corporate group account 310100 not defined on group of chart account INT"
Please Help
Regards
http://saphelp.hpage.com/
http://saphelpone.blogspot.comGo to OB13, select the Chart of Account and execute. There you can see a field "Group Chart of Accts" under the tab "Consolidation". Check with your FI people and find out whether this is the root cause of your error as I am not sure on this.
thanks
G. Lakshmipathi -
Goods receipt for process order during confirmaiton
Hi
Gurs ,
I have created I could not able to GR for the process order automatically while i am doing confirmation .
I have mainted all the setting in the master data like back flush indicater in the material master and back fluch indicater for the
in work center .
I have maintained the setting in the control key and order and PSP as well but still it is not doing 101 automatically at the time of confiramtion.Hi,
i just don't know why you raised new thread as already ur previous thread is not closed
Now just let us know whether system is throwing any error
or what exactly happing in cofirmation screen
Go to OPK4, here
under goods movement there is option all components just tick it
then in second tab Gen individual entry tick Goods movement & termination for incorrect goods movement
Coming to GR
what is storage location ur giving
just check in MMSC, whether this storage location is activated for the header material ( GR )
Added
Plz Go through all possible options
[Auto GR is not happening.;
Regards
kumar
Edited by: kumar kumar on Nov 10, 2009 2:25 PM -
Unable to upload serial number from desktop while doing goods receipt MB01
Hi,
We have upgraded our system from 4.7EE to ECC6.0. While doing goods receipt for purchase order (MB01) in ECC 6 for serial number profile material, I can't find the option for uploading serial number from desktop where as the same option was there in 4.7.
Please help me .....
Thanks
Nrusingha DashHi Experts.,
Thanks for all of you for responding my questions.
I found my question resloved.
Actually, in previous version, the standard program has been modified by taking access key. When the upgradation happened, it got overwrited to the previous one. So, in recent version it is not appearing. -
Error during Goods Receipt for Production Order
Hi All,
When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27. I have checked in Business Add-in using SE19 but there are no implementation present. I know that in Logistic Verification MIRO there is a transaction OMRM to set messages. I would like to ask is there anything similar for MIGO.
Or is there any other place in Configuration which allows me to add these Customize message.
Thanks.
Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AMHello Jiaul,
Sorry I may have mislead you. The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27". These two dates are the Start Date and FInish Date for the Production Order in CO03,
The Basic Start Date for the current Production Order is 2010.08.25
The Basic Finish Date for the current Production Order is 2010.08.27
I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order. Do you know where I can find the configuration for this message?
Thanks -
Goods receipt for purch. order" is not allowed (NWA EXCANETHDR 0030)
Hi Gurus,
Message no. BS007
While doing MIGO with PO, Iam receving the following error msg as
"Goods receipt for purch. order" is not allowed (NWA EXCANETHDR 0030)".
Diagnosis
The current status of object 'NWA EXCANETHDR 0030' prohibits business transaction 'Goods receipt for purch. order'.
Procedure
To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'NWA EXCANETHDR 0030' to allow the transaction 'Goods receipt for purch. order'.
This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
Pls help me in this
Thanks in advance,
VasanthHi,
I guess it the goods receipt is against a PO having an asset or used an Internal order .In the Internal order control data Goods receipt allowed indicator has not been set. Please see the order in KO03 and check the allowed transactions. If GR (RMWE) is not there than ask your CO team for the needfull change after which take up GR.
Dhruba -
Error while doing outbound delivery against Purchase Order
hello
i m getting error while doing Outbound delivery for purchase order as follows
EKPO-SOBKZ=E; EKPO-UMSOK=_; EKPO-KZBWS<>_ EKPO-KZVBR<>E (Note 305582) not supported (check your entry)
Message no. M7146, i m not getting wht will be the reason,
Regards
NISHJPlease go through the note - 305582. It is clearly given the direction.
Symptom
You try to post a goods movement for a stock transport order from the unrestricted-use stock into the sales order stock or project stock.
During the goods issue, the system displays error message M7146 with a text along the lines of "EKPO-SOBKZ=E; EKPO-KZVBR<>E; ... not supported".
Cause and prerequisites
In the goods issue for the stock transport order, the system may have to create a stock in transit which is deconstructed during the goods receipt. If the withdrawal takes place from the special stock, it is clear which is the receiving stock.
However, if the withdrawal is carried out from the unrestricted-use stock ("Collective requirements", controlled by the dependent requirements indicator MARC-SBDKZ in the material master of the issuing plant), this results in the design problem that the control tables of the goods movement do not have any key field for the receiving stock. Therefore, the control for the receiving stock is controlled via the consumption indicator in the account assignment category of the purchase order. The consumption indicator therefore requires a specific default setting (you may have assumed you could change the design of these control tables, however this is not possible).
Using an inappropriate consumption indicator then causes for the goods issue an incorrect or no stock in transit to be created so that the goods receipt fails.
Solution
Implement the program change in accordance with the correction instructions.
Afterwards implement Note 413908 immediately if this is relevant for your release. -
Message no. BS007-Goods receipt for purchase order not allowed
Hello SAP Experts,
I have created an internal order to collect expense within the order.
When I tried to reverse an GR against the PO created with the internal order assigned, the following Error occured.
"Goods receipt for purch. order" is not allowed (ORD 145116170204)
Message no. BS007
Diagnosis
The current status of object 'ORD 145116180204' prohibits business transaction 'Goods receipt for purch. order'.
Procedure
To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'ORD 145116170204' to allow the transaction 'Goods receipt for purch. order'.
This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
The order was previous TECOed, and change it's status to Release, but still have the error.
Please give possible solutions. Thank you in advance.
Regards,
Steven LinHi Br. Ajay M,
Released the order and Status line as follow
REL AVAC BUDG GMPS
but the error changed while reverse the document
item 0001 Order is invalid.
Many thanks for your kindly reply.
regards,
Steven -
Error while Goods receipt for rework order.
Dear all,
I have created one Rework order through TC CO07.
While doing Goods Receipt it gives Error Msg as following.
"No valid order items exist for order 200000203"
Message no. C6008
Regards
AtulDear,
There is only confirmation CO11N for the rework order. And good reciept MB31 for main order.
There is no GR for rework order. Once you confirm rework order,you need to do the GR for the balance qty of main order or parent order.
And you need to priliminary settlement of rework order first in CO8B, hence the cost will be moved to parent order, then you settle parent order in KO88.
Hope clear to you.
Regards,
R.brahmankar -
User Exit for MSC2n( Batch) while doing a Good receipt for an order
Is ther any exit to update the Date1 field(MCHA-FVDT1) in MSC2n( Batch) while doing a Good receipt for an order
Thanks in advanceHi Varsha,
Try these User Exit.
BATCHCHK Function Module Exits for Check in Case of Batch Change
MBCFC010 Propose batch number on Inventory Management item scree
SAPLCHVW Batch where-used list
SAPLMHD1 Shelf life expiration date
SAPLV01D Determining the initial status of a batch
SAPLV01P Function Module Exits at Time Batches Are Updated
SAPLV01Z CFCs for internal batch number assignment
SAPLV1ZE CFCs for external batch number assignment
SAPLV1ZN CFCs for batch valuation in VB_CREATE_BATCH
Regards,
Vijay
Maybe you are looking for
-
I can get my voice memos from my iphone onto itunes on my Mac but when I sync my ipad, it doesn't sync. So I can only listen on my iphone using the voice memos app, which is very frustrating, since you cannot pause it and restart or gets interrupted
-
Crystal Reports 13 VS2010 Report does not display new data
The project is written in VS2010 connecting to an Access 2007 DB. It is running on a local network. All reports work fine from the standpoint that data is displayed on the reports HOWEVER, if a data table is updated the newley entered records do no
-
I have just bought a new computer..I have an old Iphone 3GS, i would like to now put everything that is on my Iphone, onto my new computer. The new compter does not have anything on it at the moment.... but if i do a back up i dont wanna loose anythi
-
ERROR : MSC-01015 Process finished with error(s)
Hi, every expert, When I install SAP BW3.5(NETWEAVER4.0) on linux_x86_64bit , and it appears the error when install DATABASE INSTANCE, The error is ' MSC-01015 Process finished with error(s), check log file /tmp/sapinst_instdir/NW04/SYSTEM/ABAP/ORA/U
-
ORDER BY on large VARCHAR column
The database driver I am using does not allow me to set an index on a large VARCHAR field. Anyone have any tips for speeding up an ORDER BY on this column for a very large table? There must be some standard tricks out there but I'm having some troubl