Error while doing MR11 as enter Profitability segmet as Cost object
Hi All,
While doing MR11, we noticed a error message (ZC - 001) as "Enter Profitability segment as Cost object for Revenue and COGS posting".
The specified Material account is created as Cost element (CE Category 11) and in OKB9 configuration this cost element is choosed (ticked) with the option "profitability segment". Also there is no substitution rule to derive profitability segment in OBBH substitutions.
However there is a validation (GGB0), where the above specified Material account is included in the range of accounts in the Prerequisite, and Check as "Profitability segment is > (greater than) 0000000001 and with the message maintained as "Enter Profitability segment as Cost object for Revenue and COGS posting".
Can any please help why this error has come at the earliest.
Thanks & Regards
Karun
Hi Eli,
Thank you very much for reply.
I hope the note 184987 is not applicable in our case as the Field status of specified Material account does not have required entry for Profitability segment.
Can you please let me know if we have entry in OKB9 and existance of entry in Validation creates the problem and throws the above error message?
With regard to other note 134484 which you have specified on "error in Account assignment check in MM transactions" says "A detailed default account assignment (for example profitability segment) was defined in Transaction OKB9. However, the profitability segment is not set up correctly for goods movements: the characteristics material, plant, business area are missing. A later check of the profitability segments against material, plant and business area then generates an error message since the profitability segment is inconsistent".
Is there any way to confirm whether this situation is leading to our error before implementing this note.
Thanks & Regards
Karun
Similar Messages
-
Error while doing MR11 reversal
Hi,
Have an issue in MR11 reversal,
The details as follows,
1. PO quantity 1 EA
2.IR done fiirst for 0.250 EA
3.GR done for 1 EA
4.User did MR11 to clear GR/IR learing value
5.after MR11,user cancelled IR & GR
6 Now he is trying to do MR11 reversal and system gave error message as shown below,
Performance Assistant:
Purchase order history already inconsistent --> Quantity 0.750- EA Value 49.95 CAD
Message no. CKMLGRIR025
Diagnosis:
The purchase order history contains differences between the goods receipts and invoice receipts/Account maintenance for the order item in fields Difference Quantity (= 0.750- EA) and Difference value (= 49.95 CAD).
The purchase order history for this item is inconsistent.
is ther any way to solve this issue.
rgrds...Hello Jurgen,
Thanks for your suggestion.
FYI.I got reply from SAP,the correct way is the Account Maintenace should be reversed first, thenfollowed by GR and lastly the IR posting.But user has done GR IR reversal before MR11SHOW.
We have to implement report ZM_CHECK_EKBE_AREWR from note 372246 for this issue.
Thanks once again.
rgrds... -
I am getting error while doing MFBF for semifinisg good
Hi,
i am getting error while doing MFBF for semifinisg good
Existing standard cost estimate cannot be used
Message no. RM175
Diagnosis
This error appears under the following circumstances:
The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
Procedure
The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
Use product costing to create the standard cost estimate.I had already check REM profile repetitive mfg profile final backflush w. activities.
this particular material is semifinish material attached in BOM of finish material.
backflush of finish good is possible but now new requirement is to do production booking for the semifinish material.
i had assign production version , done routing and maintain REM profile,
created material cost with quantity structure ck11n then run the costing in ck40n.
still getting the error what else is to done to able to book this thru MFBF. -
Error while doing GR for scheduling aggrement
Dear Experts,
We are facing error while doing GR for scheduling aggrement.
we have done the following steps.
1) Scheduling aggreement in ME31L
2) Released in ME35L
3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
When we are trying to do GR in MIGO system is giving the following message.
Document 5500000152 does not contain any selectable items
can I know what I have missed in the above steps.
Please guide me to resolve this.
Regards,
PrasadHi,
Please check Please check if Gr is already done against this document. Also please check whether you have attached SA in the source list with line items.
T-code:ME01
Enter Mat.code & Plant.
In the next screen pl.do the following:
Valid from - commencement date of the SA
Valid to - End date of the SA
Vendor - Vendor on whom the SA is released
POrg - Your purchase organisation
PPL - Leave it blank(This is only for interplant)
OUn - Ordering unit
Agreement - SA number
Item - 1
I hope this will resolve your issue. Thanking you -
Error While doing ABT1N transaction
Hi,
I am facing the below error while doing ABT1N in Asset Accounting.Please help me in fixing this Issue.
Error Message -No depreciation area for receiving the revenue
Message no.AAPO149
Diagnosis
You tried to post a retirement on asset 1000 100007-0.You entered transaction type 300,in which the retirement with revenue indicator is not set
You tried to transfer asset 1000 100007-0.According to transfer variant 0001,none of the areas on the asset uses a transaction type for retirement with revenue
In both of these cases, you are not allowed to enter revenue or make specifications for the determination of revenue.
Proceedure
Check the transfer variant and check your entry
please do the needful
Thanks
SupriyaHello,
You will have a check box for the same.
Double click on transaction type, you will see the check box for revenue.
Otherwise, tomorrow I will get back to you once I am in front of the system.
Regards,
Ravi
Edited by: Ravi Sankar Venna on May 5, 2009 7:53 PM -
Error while doing F-90 Asset Acquisation
Hi,
I am getting the below error while doing F-90 Asset Acquisation scenario. Please help me to fix this issue.
Tax code V1 country IN does not exist in procedure TAXINN
Message no. FF713
Diagnosis
You entered a tax code which is not defined for the country of the company code to be posted to in the tax calculation procedure.
System Response
Procedure
Check and, if necessary, correct the entry.
Procedure for System Administration
If it is not an input error, check and possibly change the system settings.
To do this, choose Maintain entries (F5).
Check whether the company code is assigned to the correct country and whether the correct tax calculation procedure has been entered for the company code country.
Create a new tax code if necessary.
Caution:
Since it is possible that the tables in question are being updated at a different time on another computer, it can take a certain amount of time for the tax code to be on all local machines in client server architectures after saving the new code.
Thanks
KBHi,
you need to maintain Tax Code A0 & V0 in t.code OBCL t.code.
and also ensure to check whether you have created tax code V1 or not in FTXP t.code. If not, create V1 tax code and assign GL on that in the right Transaction event keys in OB40.
Try.... if not working let me know....
Regards,
MOhan. -
Error while doing GR against STO in IS Retail
Hi.
I am getting an Error while doing the GR against STO.
The error is "Enter goods receipts for vendor only. Message no. M7107". I am not able to understand the reason for the GR checking the vendor where it should consider the supplying site as vendor as the GR is being done against a delivery.
I have checked the Inforecord and the source list which is correctly maintained
(i doubt whether they are to be considered).
Kindly suggest...
Regards,
Vinod Kapote.Hi Vinod Kapote,
Check following IMG Settings in your system;
(a) Schema for Stock transports
(b) Shipping data for Site
Hope you have carried out following activities;
(1) Purchase order with document type UB
(2) Outbound delivery using VL10B
(3) Post Goods Issue using VL02N
(4) Goods Receipt using MIGO
Bye,
Muralidhara -
Error while doing Sales contract
Hello ,
I am facing an error while doing sales contract . The error is as follows:
Message no. FI311: No commitment item entered in item 00010
Kindly provide the solution to solve this issue
ThanksNote 1267998 - FI311 - Common issues related to this error message
Note 418471 - V1331 (Item & does not exist) / Funds Management
Regards,
Ravi -
Acccount determination error while doing SES
Hi,
I am getting a error while doing SES i.e.
147 Account determination for entry ICOA FR1 not possible.
Can anybody please guide me how to resolve this.
Thanks in advance.
Regards,
AshishHi,
Use t.code:OBYC, enter chaart of account
Click FR1
In next screen enter Val. Gro. Code, Acct Gro. Code, Valuation class and G/L accounts for Dr & Cr and save.
Note: before that u have save the Rules
How to save Ruls:
OBYC-> enter chart of account-> Click FR1->Click Rules
Select the check box of Debit/Credit in accounts , General modification, Valuation Modification, Valuation class Account are determine based on TAB and save.
Regards, -
Error while doing ABGL Asset Credit Memo
Hi Friends,
I am getting the below error while doing Asset Credit Memo in ABGL. Please help me in fix this issue.
Balance for transaction type group 10 negative for the area 01
Note:In Asset Explorer Fiscal year start Asset value is 98,425.45 and Change is 4768.19. So total Asset value as of now is 1,03,193.64.
Now we are trying to do ABGL with 12,790.23 value (Transaction type is 105). System is giving the above highlighted error.
If we give the amount 4768.19 in ABGL transaction, system is not giving any error. If we give more that that system is giving error.
Why system is giving error even the asset has balance of 1,03,193.64? Please help me on this..
Thanks
SunilHi,
If the asset has been capitalized during earlier years, use ABGF to post credit memo. ABGL is meant for assets capitalized during the year.
Best Regards,
Madhu -
Error while doing "Visulaize Plan"
Hi,
Before i did Visualize plan many times without any problem.Now I am getting error while doing so.
I was able to run "Explain Plan" successfully.
I am on HANA revision 60.
I saved above error log and the log information is given below:
I can identify invalid XML tag <TablesInvolved><![CDATA[raj/AN_VIZ]]></TablesInvolved> but how to fix this issue?
I gone through various blogs related to Visulaization Plan but not found related to this issue.
<Plan xmlns="http://www.sap.com/ndb/planviz" ID="ID_0" Type="Estimated">
<SQL><![CDATA[SELECT KOKRS, BELNR, PERIO, SUM(MEGBTR)
FROM "_SYS_BIC"."raj/AN_VIZ"
GROUP BY KOKRS, BELNR, PERIO]]></SQL>
<CompileTime>
<Start Unit="us">1401281467643661</Start>
<End Unit="us">1401281467658329</End>
</CompileTime>
<RootRelation ID="ID_0" TypeName="PROJECT" Status="Finished">
<Name>Project</Name>
<ExecutionType>Row Search</ExecutionType>
<Summary><![CDATA[raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO, SUM(raj/AN_VIZ.MEGBTR)]]></Summary>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">2.12902e+06</Exclusive>
<Inclusive Unit="us">2.64021e+06</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Details><![CDATA[{"Projected Cols":"raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO, SUM(raj/AN_VIZ.MEGBTR)","Project column0":"NString(4, 0) __trex_field_NVarchar3__() ....... [3]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [0]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [1]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 0 ....... [2]:LOAD:<4/5 (4B)>:","Project column1":"NString(10, 0) __trex_field_NVarchar3__() ....... [8]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [5]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [6]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 1 ....... [7]:LOAD:<4/5 (4B)>:","Project column2":"NString(3, 0) __trex_field_NVarchar3__() ....... [13]:040:<5/7 (16B)>:
/1/ void* \"__rids__\" ....... [10]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [11]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 2 ....... [12]:LOAD:<4/5 (4B)>:","Project column3":"Decimal(18, 3) __typecast__() ....... [23]:076:<10/12 (16B)>:
/1/ Fixed16(18, 3) __trex_field_Fixed16__() ....... [19]:043:<6/8 (16B)>:
/1/ void* \"__rids__\" ....... [15]:NOP:<0/1 (8B)>:
/2/ int32_t(10, 0) const := 0 ....... [16]:LOAD:<3/4 (4B)>:
/3/ int32_t(10, 0) const := 3 ....... [17]:LOAD:<4/5 (4B)>:
/4/ int32_t(10, 0) const := 3 ....... [18]:LOAD:<5/6 (4B)>:
/2/ int32_t(10, 0) const := 18 ....... [21]:LOAD:<8/9 (4B)>:
/3/ int32_t(10, 0) const := 3 ....... [22]:LOAD:<9/10 (4B)>:"}]]></Details>
<Child ID="ID_8" >
</Child>
</RootRelation>
<Relation ID="ID_8" TypeName="TREX_SEARCH" Status="Finished">
<Name>Column Search</Name>
<ExecutionType>Column Search</ExecutionType>
<Summary><![CDATA[Aggregation on a single table]]></Summary>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">511194</Exclusive>
<Inclusive Unit="us">511194</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<TablesInvolved><![CDATA[raj/AN_VIZ]]></TablesInvolved>
<LogicalPlan ID="ID_11" Type="Estimated">
<RootRelation ID="ID_11" TypeName="PROJECT" Status="Finished">
<Name>Project</Name>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Child ID="ID_12" >
</Child>
</RootRelation>
<Relation ID="ID_12" TypeName="GROUP_BY" Status="Finished">
<Name>Aggregation</Name>
<Summary><![CDATA[raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO\nSUM(raj/AN_VIZ.MEGBTR)]]></Summary>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>648284</EstimatedOutputCardinality>
<Details><![CDATA[{"Grouping Cols":"raj/AN_VIZ.KOKRS, raj/AN_VIZ.BELNR, raj/AN_VIZ.PERIO","Aggregation Cols":"SUM(raj/AN_VIZ.MEGBTR)"}]]></Details>
<Child ID="ID_13" >
</Child>
</Relation>
<Relation ID="ID_13" TypeName="TABLE" Status="Finished">
<Name>Column View</Name>
<Schema><![CDATA[_SYS_BIC]]></Schema>
<ObjectName><![CDATA[raj/AN_VIZ]]></ObjectName>
<Location>hanasp7:30003</Location>
<EstimatedCost>
<Exclusive Unit="us">0</Exclusive>
<Inclusive Unit="us">0</Inclusive>
</EstimatedCost>
<EstimatedOutputCardinality>682404</EstimatedOutputCardinality>
</Relation>
</LogicalPlan>
</Relation>
</Plan>
Regards
RajHi,
To solve this you must update your studio. In lower studio versions (PlanViz) does not allow "unknown" XML tags sent by higher version servers. A fix for this issue was made so that PlanViz parser can simply skip unknown tags.
Please go to version 74, if possible.
Regards,
Michael -
Error while doing EHP4 upgrade in downtime phase
HI .
Iam facing the below error while doing the EHP4 upgrade , in downtime phase.
Checks after phase MAIN_SWITCH/STARTSAP_TRANS were negative!
Last error code set: RFC call to subst_get_uvers failed with key RFC_ERROR_COMMUNICATION (open): SAP_CMINIT3 : rc=20 >
Connect to SAP gateway failed Connect_PM GWHOST=Hydhtc4526D, GWSERV=sapgw04, SYSNR=04 LOCATION CPIC (TCP/IP) on local host with Unicode ERROR partner '10.136.162.30:3304' not reached TIME Mon Jun 06 18:17:46 2011 RELEASE 720 COMPONENT NI (network interface) VERSION 40 RC -10 MODULE nixxi.cpp LINE 3286 DETAIL NiPConnect2: 10.136.162.30:3304 SYSTEM CALL connect ERRNO 10061 ERRNO TEXT WSAECONNREFUSED: Connection refused COUNTER System start failed
Please help me in resolving this error.
Sanketh.Hi,
Upgrade tool is trying to start the system but system is not coming up. Try to start system manually and see if system comes up or not. If not then check logs in work directory for why system is not coming up.
Thanks
Sunny -
Error while doing AIAB Settlement
Hi I am facing the below error while doing AIAB during AUC settlement. Please do the needful.
Data for determination of capitalization not managed in area 01
Message no. AW507
Diagnosis
You have chosen a depreciation area, which does not carry the depreciation data from table COEPBR.
Procedure
Choose a different depreciation area.
Thanks
KCHi,
This message could be helpful:
Error AW507
Please check the field T082AVIEWB-AUTHORITY. If it is not on 2 this is the reason.
In this case, you can change the value in T093-VIEW1 using the coding as per SAP note 29706 which you have already discovered. There will be no risk involved in changing this value.
regards Bernhard -
Error while doing AUC Settlement in KO88
Hi
I am getting the below error while doing KO88. I have maintained the Allocation structure for FXA and given the cost element group in the Source field & Given FXA in Receiver category and selected By cost element option aginast Receiver category FXA in Settlement Cost Element field. I am getting the below error while settling in KO88.
Define a settlement cost element for receiver type FXA
Message no. KD506
Diagnosis
In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type FXA.
Procedure
Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
Please help me
Thanks
KishorePlease check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
regards
Ranjan -
Error while doing BAM configuration in JDeveloper
Hi,
I tried to create a connection to my local BAM Server in JDev 10.1.3.2.0 and also in 10.1.3.3, but I always failed! Error messages:
"Server is not set up correctly SOA1"
I'm running on Windows 2003 and installed BAM according to the Installation Guide (version was Bam with Enterprise Link for windows 10.1.3.3.0).
I did not get any error while doing the other setups and can access the different BAM tools via the Oracle BAM Start page, but I can't create a connection in JDev. I used the following parameters:
Host Name: SOA1(system name)
Port Number: 80
User Name: Administrator
Password: <windows domain pwd>
Domain Name: DOMAINNAME
Any help would be highly appreciated.
Regards,
Shailyhi Shaily
It looks like suggesting a different forum is not needed, because you already tried that ...
Error while doing BAM connection in jdeveloper
Error while doing BAM connection in jdeveloper
Error while doing BAM connection in jdeveloper
I hope you get some answers.
success
Jan Vervecken
Maybe you are looking for
-
Let me know how to get screen size of user..
Hi. I'm going to change a container size in a screen, dynamically. I want to know that an user's screen is 1024X768 or others.. Let me know how to get screen size of user's computer. Best Regards. Kil - Nam.
-
Converting white background to transparent
I scanned in a clock face. The numerals are black and the background is white. I would like to make the background (white color) transparent. Can anyone explain how to do this? Thanks in advance, Chaz
-
Can I change the back/foreground color of a disabled JComboBox?
I need to change the color of the text or the background for a disabled JComboBox. My users would like to be able to see the data better even though they can't alter it.
-
Difference between different persistency providers?
Hi, In the JPA examples I saw the use of two different TopLink Essentials persistency providers, namely: oracle.toplink.essentials.ejb.cmp3.EntityManagerFactoryProvider oracle.toplink.essentials.PersistenceProvider Does anyone know which one should b
-
I am working with a trial version of Dreamweaver CS3. In code view, when highlighting a collapsed tag and using the Properties Panel to change the class, the entire tag expands. A comment on the same line as the closing tag is moved to the next line.